Future Price Material Master
We have 230 plants where we execute. We created all materials in one dummy plant where we execute costing for all plants and then update the price through MM02 in Accounting View Future Price and enter the valid from date. Then we go to CKMPRP - Maintain Future Prices and maintain the valuation. Then we go to release the future price from CKME - Release Planned Prices . Can any body tell me if there is any problem we can face due to this or its ok.
Have same question and waiting for expert's reply
Similar Messages
-
Opening stock price,,,Material master or MR21?
hi members,
while uploading the opening balances, from where will the prices of raw materials will be picked....Material Master or MR21
regards
sureshhi,
thanks for the reply
regards
suresh -
Deleting of future price in accouning 1 View from material master.
Hi,
During month end process of CKMLCP, we have done the marking activity. so that the system updated the future price for all materails under specified plants. this is valid from 31.03.2008. by this time the system was not released the price automatically even, the valuation area (plant) is activated with automatic release. when doing of production confirmations for the current period, the system is throwing error as "future price and standard price exists". when we deleting the future price manually through MM02 transaction the systm is allowing to do production confirmation.
Kindly suggest me any transaction code which deletes the future price in accounting 1 view of material master, which is updated because of marking done through CKMLCP.Hi,
Thanks for your reply,
We tried to delete the price through CKR1 transaction. after giving of parameters of material and plant blant screen is coming.
i think CKR1 is useful for deleting of future price updated through costing run i.e., CK40N marking.
But in this case when we scrutinise, this is updated through CKMLCP transaction.
after performing of "post closing" activity through CKMLCP,
i think SAP has provided another Tab i.e., Mark Material Prices. by this time the system will mark future price at current periodic cost. and at the same time there is a provision to give date either manual date or select the radio button of beginning of following period in parameters tab.there is no provision for giving of valid date upto.
may be this is useful to update the standared cost estimate with current actual.
I am also not sure why user have given data as 31.03.2008. usually they are not suppose to do this marking, but, by mistake they have performed.
Kindly correct me if any mistake and suggest any other way which will delete the future price in accounting 1 view of material master. -
Future Price in Material Master
Hi,
Can some one help me understand in which table the future price maintained for Hard Currency in material master is stored.
Regards
Raghu Ram ThatavarthyI got the link. Once i change the material future price in Mater master either manually or through costing run, a cost estimate number get saved with this material in table CKMLHD.
With reference to this cost estimate if i run table CKMLPR, i can see future price both for company code currency and hard currency splitted in two line items with respective currency type. -
How to view previous standard price in material master?
Dear expert,
in material master Costing tab 2, i can view the current and future cost estimate price. but i want to view the previous month standard cost estimate price in material master?
For these, is there any configuration setting needed?
Thanks for advanceHi
When you re-release a Std Cost - The Future cost would become the CURRENT cost and the Existing curent cost would become the PREVIOUS cost.... You can then see the Previous cost estimate in material master
br, Ajay M -
Dear all
the price in material master was 15.50 INR but due to client required 3 decimal place so fico consultant has changed it to 3 decimal place in spro SAP Natwear ->general setting--->currency and maintained 3 decimal places. it changes to 155.0 when this problem occcured he changed as before. it doesnt effect in material master price.
the problem is that this is not for 1 material this is for all materials.how to make it as previous
how to changed it .
please help me out.
regards
PravinHi,
Please let me know whether its a Standar Price Or Moving Average Price.
Whatever it may be you can change the Moving average Price for a Particular Plant in MR21 Trxn code.
If its a Standard Price Re enter the Price in the Future value Field and Give Valid from date. Bcoz once you enter Price in the Material Master it wont Fluctuate.
Reg,
Ashok
Please ssign points if Its helpful. -
How do view previous cost estimate price in material master
Dear,
friend i want to see the previous standard estimate price of FG and SFG in material master data.i can view current and future standard price. But not the previous price so kindly anybody suggested me, is there any configuration needed for view previous price in controlling module.
Thanks
advance.You can try table MBEWH table for Material valuation price for previous periods
Or get product cost estimate number KALNR field from KEKO and use that as an input to CKIS table. Here cost is displayed as itemization -
Future price vs. average price / material expenses in COPA
Hello,
at the moment we have some trouble with the material input in the COPA for merchandise. Normally the material input for it should be the average price from the material master.
After having analysed some missing costs for material input we have realised that in case there is a future price with a valid date < the billing date the future price is taken and not the average one, e. g.
average price: 10 u20AC
future price: 12 u20AC
valid date: 01/31/2008
billing date: 02/01/2008
results in material input of 12u20AC. In the sap help it is said that the future price is only taken into account if "it is activated for material valuation."
Can somebody tell me what changes I have to make so that the material input is taken from the average price instead of the future price (quasi setting the future price to inactive regardless of value and valid date). Otherwise we have have to change sd conditions etc. which is a lot of work.
Thanks in advance.
hansiHi
Here is the information from the pdf file.....
Cost condition - VPRS
Use
In Pricing, you may want to compare the prices with costs or even implement contribution margin
accounting.
To do this, you can use the condition type VPRS as the cost price.
The condition type VPRS goes into the valuation segment in the material master and determines
from this the standard price or average price.
Settings in Customizing
The condition type VPRS is labeled as a statistical condition in the pricing procedure.
Using the condition category G, the condition type VPRS goes into the valuation
segment of the material master and determines from here the standard or average price.
The condition category S always accesses the standard price whereas condition
category T always accesses the average price.
You can refer P 102 in this link....
http://help.sap.com/printdocu/core/Print46c/en/data/pdf/SDBFPR/SDBFPR.pdf
Hope this information is helpful.
Thanks,
Ravi -
Calculated Std cost est vs Material Master Std cost price
Hi all,
Why will a calculated std cost est not be equal to my standard price in my costing 2 view on the material master? For ex:
I calc a price for material 1 = R11.50
The price in the material master (MBEW-STPRS) is R10.80.
I can see that the difference is some activities for one of the operations in my production process, but it does not show on my material master.
Can anyone suggest a solution?
Thanks,
HeinThe planned price can be copied from CO-PC, or entered manually depending on your settings in CO. If you open the standard material cost and release it the two price of planning price and standard price will be same.
As to the price of PO that is another price, actual cost happened.
FYI.
If no marked standard cost estimate exists, you can enter a price in this field manually. This makes it possible for the system to find a price when costing an assembly via the valuation strategy, even if no standard cost estimate with status KA (correct) exists for a BOM material (such as a raw material or semifinished product).
If you subsequently create and flag a cost estimate for this material, the results of this cost estimate are adopted as the future planned price, and the manual entry overwritten. It can then no longer be changed. Therefore, you are recommended to use the Planned price 1, Planned price 2, and Planned price 3 fields to maintain the planned prices of material components and to define them in the valuation strategy. -
Moving avergae price updation in material master for project stock
Dear All,
My query is pertaining to updation of MAP( moving average price) for project specific procurement ( as project stock) for valuated project stock.
As definelty the cost of procurement gets consumed by project .but i want to know does the project stock procurement still updates the moving avergae price or not.
Ex:-Suppose MAP in material master is 10 USD ( with qty 1)and i procure the same material ( qty 1)for project with account assignment Q for 9 USD . now will the MAP in material master becomes 9.5 USD or it remains 10 usd.?
Please reply urgently
Regards
AmitHi Amit,
If your Project Stock is valuated, then, the valuation data for it is stored in a different table: QBEW.
The normal, anonymus warehouse stock (the unrestricted use stock which is not assigned to any project or to any sales order) has its valuation data stored in MBEW.
The "Accounting 1" view in the Material Master MM03 ONLY displays the data of MBEW.
In the material master you will never see the valuation data of the valuated project stock (table QBEW) or the valuated sales order stock (valuation indicator "M" - table EBEW).
The valuation data for the tables QBEW and EBEW can be seen in SE16 or in the transaction MBBS.
Also note that these valuated special stocks are managed independently of the normal stock. If, for example, you change the Moving Average Price of your normal stock in MBEW, this will not have any influence on your project stock, as the data is under a totally diferent table QBEW.
I hope this helps you,
Esther. -
PRICE IS NOT REFLECTING IN PR FROM MATERIAL MASTER
Dear Experts
The moving average price of material is for eg 80 , in PR it is showing 0.01.Then with such price we can not process PO. What should be done so the price reflects in PR.
what criteria should be checked and maintained.
Thanks & Regards.
Erfan.Hi,
Please check whether the unit of price is same in both material master as well as in the PR.
Regards,
Divya -
Moving average price in material master
Dear All,
M client is in manufacturing process(variant configuration) having make to order scenario (Non-Valuated).
We are having steel and ring business, For Steel business we are producing in house/subcontracting and For Ring we are sending Raw material/Semi-finished goods to Sub-contractor for which he is charging processing charges. Raw material/SFG(semi-finished goods) provided to subcontractor is SFG for steel business.
We are doing movement type 912 E for sending goods for subcontracting (sales order is attached) and while doing G/R through MIGO processing charges are debited and credit goes to gr/ir account,Upto this point I am ok with costing as visible from sales order analysis(KKAC).
Now In our scenario if out of 6000 rings (as defined in sales order)customer is rejecting 1000 rings we have to detach that sales order through movement type 411 E and bring to our own stock or by movement type 412 E attach to another sales order .Also We are using 413 E movement type for transferring unsold goods to another sales order.
In 411 E and 412 E movement types system takes moving average price (maintained originally ) and by using movement type 413 E no value is transferred only quantity is transferred (because of non-valuated scenario).
Now if system picks original price maintained say at re.1 my costing for detached and attached sales order are incorrect .
Example
Material master(A) accounting view
Map 1
Stock 100 total value 100
Sales order 1(10 tonnes)A (finished product)
Cost 1000
Revenue 800(5 tonnes)
sales order 2
cost b/f 5
Revenue 800(5 tonnes)
Now if 5 tonnes are detached from sales order it picks price from
Master i.e Re.1 so Rs.5 is taken to own stock through mtype 411 E
Or it takes Rs.5 to another sales order 2 as cost of 5 tonnes .
Now my sales order 1 will show loss of Rs.195(995-800) and sales order2 shows profit of Rs.795.
I want to know whether system is behaving correctly or some customization is to be done.
Thanks and Regards
Vijay
Edited by: VIJAY MATLANI on Oct 13, 2008 5:28 AM
Edited by: VIJAY MATLANI on Oct 13, 2008 5:30 AMHey
Check have you made any purchasing documents, with reference to material.
And anybody played MR21 for the particular material?
Thanks
Raman -
Inter company PO is not pulling the valuation price from Material Master
Hi Experts,
We have a scenario, Inter-company PO with pricing procedure which pulls Material Price from Material Master (Std Price), similar to intra company PO
Even after maintaining the std price in the supplying plant , system is not pulling the Valuation price from Material master only for a particular Material
I checked the Plant level attributes ( for ex: Plant Mat status, client level status and everything looks fine )
Could you guys please mention what would be the issue ?
Thanks in advance
IllayarajaHi,
Is there a routine which pulls the value? then you need debug with ABAP help for that routine where its failing to pull
Thanks
Diwakar -
Change price in material master
Dear Experts,
May I know how we can change std. price that maintained in material master. I believe t/code MR21 use to change price for MOP (moving average price) but I'm not sure for std. price.
*Please assist me how we can use MR21 & what are the important element need to take care during price change by using MR21. And please help me to understand the t/code as well.
Thank you.
rgds,
nanthaHI,
MR21 is for valuation price change. Go to t code and enter the material number and new price and save.
Check the accounting impact in accounting documents.
Regards
Ram -
Mass Change Standard Price in Accounting view of material master
Hi anybody,
I am maintaining more than 5000 records material master . Each time change material prices using MR21, but I don't want go MR21. need to develope one abap program for change material standard prices using BAPI or normal ABAP Program. how do I develope?
please give me sample program for that.
Thanks
S.MuthuHello Mani
I have already checked all the open items.....
No sale order. No entry in table MSEG.
Only one PO without GR.....So that should not make any difference.
Br
Avinash
Maybe you are looking for
-
Hard drive failure on Pavilion dv6-6000 laptop (LT069AV)
I posted this as a reply on another thread (xxx). Thought I might get a quicker response starting a new question. Persistent BSODs and disk errors culminated in a "disk not found" error yesterday on my dv6-6000 laptop PC. Windows 7 Home, Intel i5
-
I'm having problems installing Itines on my new computer with Windows 8. I always get problem with install. the error code is 2503. How do I correct this?
-
i have an iphone 3gs and i can't load facebook because it says i need os 4.3 or higher but i have 4.2.1
-
Low speed connection, but still have input history.
Hi there, We have done some tests in our business to see the performance difference between "low speed connection" being enabled and disabled for a system, both from a network perspective, and from a performance perspective on Citrix servers. We have
-
Synchronize Windows XP/Outlook 2003 with Dot-Mac?
I'm very curious whether anyone has come across an application I can load on Windows XP that will enable me to synchronize Outlook with my Dot-Mac account. This would be an ideal application from Apple to support converts from Windows to Mac but also