Future scheduled changes to material lotsize and mrp behaviour

Hi,
I have scheduled changes for a material in lot size for the next month and and also the lotsize key of periodic lot sizing procedure of weekly lot size from daily total to weekly total and also mrp type pd to p1.
  when I run mrp then for the first changed month it is giving the changed lot size and weekly total and for the other future months it is considering the old lot size value and weekly total.
  to display the new lot size what I have to do.
Thnaks and Regards
Ramana

Hi Vivek,
     If I'm correct The changes will be made active on the scheduled date i.e. on 1st of october in our case using MM13. then the new lot size will be dispalyed in material master. if this is the the case untill unless the scheduled date comes I can't expect MRP to give me new lot size propsals.
   But for materials with a long lead time foe ex 60 days I want to schedule new lot size data for the 60th day onwards and till that time old lot size data has to be taken. I want to get procurement proposals with old lot size for the coming sixty days and then with new lotsize after the 60th day onwards and I want run MRP for a period more than 6 months starting now and so that i can give procurement proposal to the vendors accordingly in future and present. Is there any way to acheive this.
Thanks and Regards
Ramana

Similar Messages

  • IDoc for  -Schedule Changing of Material- Table PCDPOS and / PCDHDR

    Hi Experts,
    i have an very big Problem. I have to find a way to transfer Change Master Data to a target system. I am not talking about ECMMAS. I need the Content of an future change in my target system.
    MATMAS only distributes the current Material Status. But not the future status, which is the on I needed. E.g. Use TA CC03 and enter a change master number and select one of the objects. Here you can see the Material Master how it looks "in future" and this is the view i need to send from my source to my target system. Has anybody an idea, how i can do this?
    Big Thanks in Advance
    Udo

    Hi Rahul,
    For that classification data fields
    there is no change log option checked in the data element level.
    or there is no associated changelog class.
    check in <b>SCDO</b> transaction for change log class.
    Regards
    vijay

  • Network Material Reservation and MRP

    How does SAP know a Material Reservation created from a project has already been processed by MRP once ?
    For example; 
    If I create a Material Reservation in a project and then run MRP on that project a Purchase Requisition will be created for the Reservation.  If I run MRP again on the same project, the system will not create another purchase requisition from the same reservation.  Somehow the system knows this reservation has already been processed.  I canu2019t find the status field that identifies this reservation as being previously processed.  It is not anywhere in the Reservation record, it must be in the MRP tables somewhere.
    Thanks,
    Dave Flick

    Hi,
    Not sure if i have fully understood your report, but here is a suggestion which could help.
    Use the stock requirements FM stated in my prev posting & in addition to that use the FM - MD_PEGGING_NODIALOG.
    Now for each procurement proposal (STO or preq etc) read which element it is pegged to using the FM stated in this posting. Read these values into a internal table.
    Now you can compare the reservations with this internal table, if it exists you can choose not to display it, while displaying only those which does not feature in the internal table.
    Hope the above helps & meets your need.
    Regards,
    Vivek

  • Stock Material Consumption and Costing Behaviour

    Dear All,
    I have created a Maintenance Order and issued a stock Material on it. So, MO is carrying a cost e:g 1000.
    After GRN process, the Plan cost should convert into Actual Cost but its not doing so. Can anyone guide me how can the Total Planned costs be changed into Actual Costs ??
    Best Regards
    BK

    Hi,
    Go to Tcode OIOF and check  Actual var. calc is assigned or not for ur order type and plant.
    regards
    sunil

  • Change Individual Material - What are the required parameters?

    All,
    I've just started using ES Workplace to test out some of the packaged SAP services.  I've been able to successfully use the "Find Material Basic Data by Elements" service to search for materials.  But now I'm having trouble with the "Change Individual Material" service and getting it to do anything.  Specifically, I can invoke the service from WS Navigator and it says that it executed successfully but the fields that I was attempting to chagne are not changed on the material. 
    So, I have two questions:
    1.) Where is the documentation for each service which defines which fields are reqruied for the service method to execute successfully?  I don't see it anywhere.
    2.) For this service in particular, what fields are required for the service to execute?  Say, for example, that I want to change the volume of a material.  Which fields need to be populated?

    I can see some sample test data is also given there, please see link posted in previous post (but for ERP).
    Regarding your question about so many fields required to update certain data then please remember these services are created to be very generic so you pass lot of data which you may not want to update but only change field which you want to update and it should work.
    Same service you can use to update different attributes of Individual Material.
    One more thing, you are reading data using material service and trying to update individual material, is it correct? i thought they are two different thing.
    Regards,
    Gourav

  • How to restrict changes of material quantity in Maintenance Order

    Hi Expert,
    How can i restrict the user to change the material and quantity in the Order's components tab.(IW32) Eg, not allow changes after RELEASE.
    Can the system keep track on all the changes for material number and quantity in the Orders?
    Please Advise
    Thank You
    Best Regards

    Hi,
        Better way is grey that tab after releasing the MO .. try BADI ;-IWO1_SCREEN_MODIFY Field Content and Display Modification
    You can also explore User exit ;-PPCO0023 : Check Changes to Order Components
    FM ;- STATUS_READ
    regards
    pushpa

  • Item Category and MRP type for material is not allowed

    Hello all,
    I got a Error Message:
    <b>Transaction Z113 is not defined (Message no. V1347)</b>
    <b>Diagnosis</b>
    This combination of item category Z113 and MRP type for material is not allowed.
    <b>System response</b>
    The system does not allow further processing of this item.
    <b>Procedure</b>
    Check your entry.
    You can display the combination defined in table TVEPZ, which controls scheduling line category determination, and change it as required if you have the authorization to do so. The MRP type for the material may be changed in the material master.
    <b>The SD Configuration seems all right, I have:</b>
    Sls Doc Type (<b>VOV8</b>) – ZA9 (no delivery type assigned)
    Item Category (<b>VOV7</b>) – Z113
    Assigs Sls Doc & Item Ctgry (<b>VOV4</b>) – ZA9/ZNOR/blank/blanl/Z113
    ZNOR = Std Item-Av. chck  Del
    ZNOR defined in MM03/Sls Org 2
    Define Schedule Line (<b>VOV6</b>) = Z7 (without delivery)
    Z7 has FLAG on Prod Allocation
    Assign Schedule Line (<b>VOV5</b>) = Z113/ND/Z7
    At table: TVEPZ
    I have the entry: Z113/ND/Z7
    Guys, what would?
    Please help me out because I am stuck in this issue.
    Thanks a lot,
    Barbara

    Barbara, this may be tied to Strategy Group on the Material Master (I can't read enough into the detail)
    Item Category determination + MRP Type for your schedule line type ties to a Sched. Line category(this you know)
    New Rqmts class gets tied to a Rqmts Type
    New Rqmts Type gets assigned to rqmts class
    Strategy, assign the Rqmts Type to it
    Strategy Group, Assign the Strategy  to it
    MM02 [MRP3 view] strategy group should be the one that ties together (all the other ties
    It may be something in this area that you need to trace through ?
    Bill

  • Changes in Material Master leading to issues in MRP

    Hi,
    For a particular material a user changed a lot of material master data (MRP1 and MRP2 view) within a couple of hours.
    As a result MRP is not working as we would expect:
    - some orders have no quantity in the "Available quantity" column in MD04 and as a result do not trigger any PO (Received/Required quantity = -1, but Av qty = blank)
    - whenever a shipment is foreseen it is consumed/reserved by/for the order which requested delivery date is closest after that shipment date
    These are the changes made to the master data in November 2009:
    Planning Strategy Group: from Make-To-Stock Production to No Planning to Strategy Group for Spares & Consumables to No Planning to Strategy Group for Spares & Consumables
    MRP Group: from Client Specific MRP Group for Period Mgmt to General to External Procurement to Client Specific MRP Group for Period Mgmt to General to Client Specific MRP Group for Period Mgmt
    Availabilty Check: from Indiv. Req. to Indiv. Req w/o PO. to Indiv. Req.
    Unplanned Consumption in period: from blank to 11.2009
    Fwd Consumption Period: from 0 to 999 to 0
    Consumption Mode: from blank to Forward Consumption Only to blank
    Unchanged MRP material master data:
    Bwd Consumption Period: 0
    MRP type: MRP
    Planning Time Fence: 1
    Lot size: WB (weekly lot size)
    Procurement type: External Procurement
    Backflush: always backflush
    What should we do to have MRP work correctly again for this material?
    Changes to material master MRP? Delete all schedule lines and start from scratch in SOs?
    All help is much appreciated!
    Best regards,
    Geert
    Edited by: Geert P on Dec 10, 2009 6:08 PM
    Edited by: Geert P on Dec 14, 2009 4:04 PM

    Solved internally by adjusting Strategy Group

  • Item category (Customized )ZJT1 and MRP type for material is not allowed

    Hi Guys,
                   When i try to create the order i see the error as item category and MRP type of the material is not allowed.
    I checked in Vov5 table, i could observe that Schedule line category is maintained.
    Could you please help us in resolving this..
    Thanks and regards,
    Rahul

    Hi,
    Please assign the Item Category ZJTI and MRP type (for eg: PD) assigned to the schedule line category in IMG under Sales and Distribution--> Sales ---> Schedule line -->Assign schedule line
    Hope this resolve your issue
    Regards,
    KrishnaO

  • Change a Material A from Planning at APO( XO ) to MRP (PD)

    Hi,
    if i change a material from planning at APO to R3, what is the impact that i need to prepare ?
    do i need to delete the planned order at APO for the material and set the deletion flag for the material at APO or delete the material.
    Do i need to set a C5 to delete the APO planned order at R/3?
    Regards

    Hi,
           When you change the material MRP type from X0 to PD, the integration model stops integrating the material between R/3 and APO meaning any changes done to the material or the BOM or routing or orders or any where the material is referenced is not integrated any more.
    So, just to be safe, before changing the MRP type, go to transaction WUF ( where used Function) in APO and search for all orders.
    Depending on your configuration, usually PPDS orders are set to immediate transfer to R/3 but SNP orders are set to periodic. So in both the cases, you have to delete the material using program /sapapo/rlcdelete with selection deletion in R/3 and APO or send deletion. If it is SNP order, you need to run the transaction /sapapo/C5 to push the changes/deletion.
    Then you can change the MRP type to PD from X0.
    So after you change the MRP type, create and activate your integration model again. Check in CFM2 to make sure the material is not being picked up any more by the relevant integration models.
    Then it's up to you to keep or delete the APO product master.
    The orders generated for this material are also no longer integrated.

  • Want to change the Material group in Scheduling aggrement after creation?

    Hi Gurus,
    I want to change the Material Group in scheduling aggrement. I am able to change in PO but i m not able to change in Scheduling aggrement. It is in display mode after creation.
    I have checked the SPRO setting it is in optional entry only.
    Can anyone please help me. Wr we have to check the settings..
    Ot this is Standard SAP has provided.
    Please help me..
    Thanks
    Venkatesh P

    Hi,
    Thanks for your reply.
    EKPO is standard table. That we cannot change and that do end user want to chagne the material group.. This is not for one time.
    Please help..
    Thanks
    Venkatesh P

  • PO Change according to material group and G/L Account no.

    Hi Expert,
    I have a requirement of "PO Change according to material group and G/L Account no.". I am using BAPI_PO_CHANGE.
    But it is giving error.
    "I 06 684 Releases already effected are liable to be reset
    E BA 003 Instance 4500010532 of object type PurchaseOrder could not be changed
    E ME 046 Purchase order item 00010 still contains faulty account assignments
    W ME 039 Goods receipt posted unvaluated due to multiple account assignment
    E ME 083 Enter G/L account no."
    Can any body tell me how to fill this BAPI.......
    Even i am trying to debug standard tocde of PO but it is not calling bapi BAPI_PO_CHANGE.
    Could you please help me on this.
    Regards
    Sanjay Kumar

    Hello,
    To assign material group to G/l account you have to matain valuation class for Material group
    SPRO >> Materials Managment >> Purchasing >> Material Master >> Entry aids for items with out material master.
    Assign this valaution class to G/l in OBYC.
    Regards,
    Shailesh

  • Link between Delivery schedule line counter from PO and the material docume

    Dear Gurus,
    I have one PO with single line item having delivery schedule -
    Material 1 -
    delivery schedule 01.01.2009     2000
                                                         01.03.2009    5000
    I have received quantity against this Po
    I want to know where I can find the link between Delivery schedule line counter from PO and the material document
    Best regards
    Sar

    There is no link from the MAterial document line item (Table Mseg) to the PO Schedule Line (EKET).
    If this is for Evaluating an on time delivery or GR, you may consider the following approach.
    PO details Po Date  QTY
    Sch1   01Jun2009   200   
    SCH2  08Jun2009   100
    GR Details
    GR1   01Jun2009   180
    GR2   07Jun2009   110
    GR3  09Jun2009      10
    Calculate a *** total qty for the PO Line.
    PO details Po Date  CUMUL QTY
    Sch1   01Jun2009   200   
    SCH2  08Jun2009   300
    Calculate a *** total qty for the ontime GR.
    PO details Po Date  CUMUL PO QTY  CUMUL GR on time
    Sch1   01Jun2009   200                180
    SCH2  08Jun2009   300                 290 (180+110)  the 3rd GR was too late
    Evaluate the PO SChedule Lines as follows:
    Po SCL qty + CUMUL GR QTY - CUMUL PO QTY = ADJ GR ON Time Qty
    SCH1 01Jun2009
    200 + 180 - 200 = 180 on time for 01Jun2009 date ( 90% fill rate)
    SCH2 08Jun2009
    100 + 290 - 300 = 90 on time for 08Jun2009 date (90 % fill rate) the first 20 of the GR on 07Jun2009 went to fill the late, early date.
    Best of luck !
    SCH2 100 +290 - 300 = 90 on time for 07Jun2009 date

  • How to change material type and industrial sector of the exsisting material

    Hi,
    There is an issue where user wants to change material type and industrial sector of the exsisting material .Is  it posible to do so??
    IF not ,how can we delete that material from material master so that another material with same number and required material type and industrial sector  can be created.
    Points will be definitely rewarded.
    Thanks
    Rohit

    Hi Rohit,
    You can change the material type in MMAM trxn code if the material dosenot conatain any open purchase requisitions, open reservations & open purchase orders. Also material stock should be zero.
    Remember the new material type should have same attributes same as old material type.
    OLD Material New Material
    1) Standard Price 1) Standard Price
    2) Manufacture part 2) Manufacture part
    profile actvated profile actvated
    3) Quantity & Value 3) Quantity & Value
    Updation in all areas Updation in all areas
    4) should have same GL 4) Should have same GL acs
    acs
    It is not possible to change Industry sector once created.
    If you want to delete the Material, you can flag it in MM06 trxn code.
    Reg,
    Ashok
    Dont forget to Assign points if useful.

  • Schedule changes and validity dates for prices in product catalog(SRM-MDM)

    Hello!
    I'm working on a project that is going to use SRM-MDM and the question is if it is possible to schedule changes(for example to add new prices that have a validity period, can you make the changes now that are going to be valid from 1st of februari?Or can I add products today that are only going to be available to buy from a particular date?).
    The other question is if it is possible to have a validity period for prices and when the date is valid,then the product is shown in the catalog.In the same way that when the date is not valid, the product is not shown in the catalog.Can this be made automactically?Can a logic be build to choose which products are going to be shown in the catalog?
    Do you have any suggestions for those issues?
    Thanks in advance!

    Dear Poster,
    As no response has been provided to the thread in some time I must assume the issue is resolved, if the question is still valid please create a new thread rephrasing the query and providing as much data as possible to promote response from the community.
    Best Regards,
    SDN SRM Moderation Team

Maybe you are looking for

  • Editable Form: Reader Extensions

    I created an editable form with a digital signature field using Adobe Acrobat Pro X on a Mac and posted that form online. I enabled Reader Extensions. A user trying to fill out the form is consistently having problems where she can save the filled in

  • Iphoto not working with upgrade and updated after Yosemite update

    We updated to Yosemite last night and this morning I found I can not open my iPhoto.  We had a very old version that cost to update so I decided to wait, well when I saw there was a free update I did that, then it said To open your library with this

  • Is OEM database control configured for the DBs?

    Hi I have multiple oracle (10gR2) databases running on a linux (5.8) server. How can I check that for which of the databases has the OEM Database Control been configured and on what port is it listening? Best regards

  • Adding vertical lines at x= ?

    Hello everyone. I am using labview 8.6 and i have a small problem: I need to add two vertical lines at x = ? x1 and x2 will be controlled by numeric control. So i can be able to move the lines left and right ( both of them). The problem is i already

  • Sun Cluster failovers - Does anyone have a definitive list of steps

    Sun Cluster failovers - Does anyone have a definitive list of steps or sequence of events that happen when one performs an scwitch -z -g