Can anybody tell me where and how can I reschedule the Schedule line dates available from a GATP check. My requirement is as follows:
For a GATP material, after the GATP check, I need to push the Goods Issue date AHEAD based on the DAY and TIME maintained in the Route Schedule id (VL51, VL52, VL53) for the Route, Transportation Group, Customer, Shipping Point and Shipping conditions.
I have presently coded my development in the Enhancement option after the FM RV_AVAILABILITY_CHECK in the include FV45VFMV_MVERF_PRUEFEN. Here I have called the FM APO_SCHEDULING to get the new set of Schedule line dates by passing the Goods Issue date that I calculate based on teh Route Schedule id.
But the problem here is that the Schedule line dates that I get here have different time intervals from the Schedule line dates that I get normally in a GATP process in a standard process. Logically I feel, these time intervals should be the same while the Enhancement is in place or not.
Please provide me inputs if anybody had faced this issue...
Thanks in advance,
Susanth Kumar

Hi
When I see the schedule line in the sales order where in the qty in the delivered qty column (second column from the confirmed qty column) is updated item wise irrrespective of the delivery done as per scheduleline date.
It means though the delivery and PGI is not done for the date 15.12.2008, but the qty in the delivery qty column is updated and the balace to to be delivered shows for the last date.
So here iam able to deliver only on the last date i.e. 25.01.2009 or at a later date for the schedule line date missing in between and not on the specific date.
Is this how SAP standard works - I was wondering why i cannot deliver any schedule line qty and date later after delivering quantities of the subsequant schedule lines.

Similar Messages

  • How to get schedule line date copied to "First date" in sales order

    Dear forum
    I am creating a sales order as normal and put in a Requested Delivery Date (KETDAT) for the order.
    This requested delivery date is then copied to the "First date" (ETDAT).
    Now, the ATP is checked for each line item in the order and a Schedule line date / material availability date is calculated for each line item.
    My question is: Is there any way to have the "First date" field of the line item in the sales order populated by the first material availability date (calculated by ATP), instead of copying the Requested  Delivery Date? Any user exit? Any config?
    It would mean that every time I rerun ATP check in the sales order line item, the "First date" field would change if the material availability date change. If there is multiple material availability (multiple schedule lines) dates per line item, then the earliest date would be copied to the "First date" field.
    Is there such functionality? Or possibility to config/program?
    /Ola

    Kannan
    OK. Unfortunately reservations cannot be created at the serial number level. So the unsupported way of doing this is updating the mtl_serial_numbers tables. I hope you would know (by some means) which serial numbers you want to allocate to a specific sales orders. If you know, update group_mark_id column in mtl_serial_numbers table with your order_line_Id, This will avoid any one from picking the serial numbers (they will not come up in the LOV or will not be auto allocated).
    But you have to make sure to take it off when you actually want to pick this order line and allocate this serial number. So just before you pick release/ confirm this order line you need to update column back to null so that you can allocate that serial number.
    Thanks
    Nagamohan

  • Dropship PO schedule line date changes and impact in SO

    Hi,
    Please suggest where senario; Drop ship PO created and Changed Schedule delivery date on Purchase order and automaticaly changes in Sales order schedule line level.
    SO- PR - PO
    Senario1;
    When Vendor not confirms requested delivery quantity on date, he confirms partially qty and later confirmes remaining quanity. When we split in Purchase order delivery schedule directly it will not update at sales order it confirms and changes initially qty only on SO schedule line level. how can i copy back to sales order schedule qty partial split done on PO.
    Senario2;
    When SO created and PR - PO generated later when we Add new line item in SO or Directly add PO line item how can i make sync between the two documents automatically.
    SO Schedule delivery date and PO schedule delivery date how can i see the link b/w to document back to back updates automatically when we change any one doc.
    Thanks in advance
    JACK

    Hi Caetano,
    thanks for your suggestion
    Yes, we use firm zone for few of the vendors. there the system don't change the schedule lines.
    Also for the stock transfer PR's there is no firm zone and the lead time is one day. in this case it changes everyday after the MRP run.
    the stock transfer PR's leads to the creation of Schedule lines from the source plant. Since this PR gets changed everyday. the alerts coming out of MD07 gets changed and we really did not know if this order is delayed or not.  In the source plant we use the firm zone to avoid moving the schedule line. But then the alerts are always not correct.
    is there any setting which helps in not moving the PR everyday without using " start in the past"
    thanks
    Nagendra Kumar

  • Schedule Line date is considering Sat and Sun

    Our facoty calendar (US) does not include any Saturday or Sunday as a workday.  However, when we enter an order for 3 day delivery, Saturday and Sunday are counted.  The schedule line date changes ONLY if the 3rd day falls on a Saturday or Sunday.  For instance, and order entered on Friday, the 18th will bring in a schedule line date of Monday, th 21st.  This is 3 days, but we don't work on Sat or Sun, so we really need to the schedule line date to be Wednesday, the 23rd.  Now if we enter the order on Thursday, the 17th, the schedule line date will still be Monday, the 21st because the 3rd day fell on a Sunday.  Is there any way NOT to count Saturday and Sunday at all as workdays?  Thank you for your help.

    What function you choice?  please show with me, my company has the same trouble, I think SAP not good in this function (Propose the delivery date)
    Thanks so much.
    Edited by: hieulm_VietNam on Feb 24, 2010 8:07 AM

  • MASS CHANGE IN SCHEDULE LINE DATE

    Hi All,
    Will u advise whether it is possible to change schedule line date in MASS
    Example. We are having make to order scenario. Sales order is prepared with 25 different line items with shipment date 10 th Feb. Out of these 25 items 10 items are ready by 20 th Jan. If we want to ship these goods on 20 th Jan. we have to change schedule line date item wise.
    Is there any way that we can make this change in a mass without changing delivery date of the sales order.
    Thanks
    Ravi

    V_V2 calls a program that can be 'customized' since it consist of 2 phases:
    1) selection phase
    2) rescheduling phase
    You can copy program SDV03V02 into a custom one and add your own selection criteria without altering the second part of it.
    I alreay made it and it works fine even when upgrading.
    regards
    Roberto Mazzali
    pls. reward if helpful

  • Schedule Lines dates for sales order

    Our goal is this:  On the line item > Schedule Line tab there is the requested delivery date.  In the details of that schedule line there are five different dates:
    Delivery Date
    Goods Issue Date
    Loading Date
    Material Aval. Date
    Transportation Plan. date
    We need to be able to put in the customers requested date that is in the future on this schedule line, but if the parts were to be recieved in earlier then the date they requested, then we would want the parts to ship out early automatically.
    For Example:  Customer Requested date is 01/31/08  and the parts are confirmed to come in on 01/31/08.  The parts end up coming in on 01/20/08, so the next time the delivery list is run, we would like the parts to ship out right away.
    Is there a way to do this?

    Thank you for the quick response.  I understand that we can use the reschedule report to manually monitor the product whether is comes in or not, but was hoping to achieve having a static date on the schedule lines of when the customer requests the parts, and then the delivery date that activates the MRP and ATP checks would be an earlier date.  So when the parts come in, it would read from the delivery date.
    Not sure if this is even possible, or if SAP standard for the schedule line dates is to how only one active date per schedule line.

  • Schedule Line Date Showing in future in Sales Order though the Stock is available in system on same date

    Hello All,
    Good Morning,
    We have received an Incident where in the Sales Order during the ATP Check we do user is getting the future schedule line date in future as enclosed in the screen shot below. User has created the Sales Order on 12052014 for 7 line items. For the Line Item 7 the Stock is available in the system on same day but still after ATP Check the date is shown in future.
    I wan to replicate the scenario in Quality to find the exact bug to fix the Issue but not able to replicate for same customer and material i am getting the current date as confirmed delivery date. please guide me if you can share some inputs so that i can go in right direct and fix the issue.
    Please respond it is critical Issue.
    Thanks,
    Farhan.

    Hello All Experts,
    Many Thanks for all the Inputs you have given.
    Finally we have replicated the Issue in Quality 2 Days Back and Indeed it was great Achievement.
    Finally We have given to Abaper to debug it find the root cause.
    Let me summarise the actual Issue.
    Issue : Sales Order Schedule Line showing future date for the Materials which are having Product Allocation even though the Stock is available and Allocation Qty also available in the PA Master Data we maintained..
    We created one Sales Order for Line Item A and B. Line Item A is having Product Allocation. When we created Sales Order for both Line Item A and B we got Schedule Line Date as 13.06.2014. Then we Schedule the Re-Scheduling Job in V_V2 and check the effect. For Line Item A the Schedule Line Date got changed to 01.07.2014 and Line Item B it was same as before.
    Would like to know is there any config setting at Schedule Line Level we have missed just want to cross check if there is any or something in Product Allocation Configuration.
    Please refer screen shots below for more details of Sales Order before and after effect in Re-Scheduling.
    Please provide your inputs on this.
    Thanks,
    Farhan.

  • Schedule line date in Sale order for backward sched.

    Dear Experts,
    In my MTO Scenario, I want to Use Backward Scheduling, so as any change in Schedule line dates in Sale order shall take effect at least in planned order Stage, i.e in output of MRP,
    But not happening so..
    I  have customized OPU5 and checked OPU3 as well,
    Please suggest...
    Regards
    Raghu

    HI Mario,
    Thanks for reply,
    I have not worked in this strategy but will try,
    What i found was, in Planned orders detailed scheduling tab, the Scheduling type appeares to be Forward, but when i convert it to Production order it shows backward scheduling.
    This duel behavior is difficult to understand.
    Regards
    Raghu

  • Required Delivery Date vs. Schedule Line Date vs. Calendar

    Hello Experts,
    The Factory Calendar shows that Monday to Friday are the only working days. Now, the user created a sales order and manually entered a date that falls on a saturday. As a result, the schedule line dates were all set on saturday. Availability check is in place and stocks are available.
    My question is: Why did the system proposed saturday as the schedule line date when the calendar shows saturday is not a working day? Am i correct to conclude that the manual entry in the required delivery date in sales order is the priority in determining schedule line date? Your inputs on this scenario would be highly appreciated.
    Best Regards,
    Gene

    Even though Sat is a holiday, the system will propose a CSL and confirm the stocks but the delivery would be created only the next working day. This is controlled by the factory calendar.
    Now, the system confirms based on the stock availability on that day, this does not mean  the delivery would be created the same day. For delivery creation the factory calendar comes into play and the lead times are calculated based on the calendar.
    Regards.

  • Change schedule line date

    Dear All,
    I have a requirement where required delivery date for one divisions material
    in sale order and STO should automatically propose todays date plus 10 days i.e.
    if any sale order or STO created today then required delivery date in STO and
    SO should show 24.10.2010.
    Accordingly we have maintained planned delivery time in material master 10 days in MRP2
    view and it is working fine but another requirement is that user can reschedule the
    delivery and he can change the schedule line date in So (RV45A-ETDAT) before or after
    10 days in VA02 but it is not allowing to change it is considering todays date + 10 days.
    In STO it is allowing for change the delivery date (MEPO1320-EEIND).
    Plz advice how I can make the field RV45A-ETDAT changeable in sale order through VA02.
    Regards,
    sps.

    Hello,
    If you want a sales order to have the requested delivery date automatically populated with today's date +10 business days, this can be maintained via the following SPRO path:
    SAP IMG --> Sales and Distribution --> Sales --> Sales Documents --> Sales Document Header --> Define Sales Document Types
    Go into the sales document type you would like to maintain.  In the section "Requested delivery date/pricing date/purchase order date", there is a field Lead Time in Days.  Put 10 in here, and the requested delivery date will automatically be set to +10 days when an order is being created.
    Planned delivery time in the material master is for when you're out of stock and the system proposes the next available delivery date.  If you have stock on hand, when the availability check runs the system will use the line level delivery date.  At order entry, when a line item created this line level delivery date is taken from the requested delivery date.
    I hope this helps you.

  • PGI date is before Schedule Line date.

    Hi
    We have a scenario which I want to understand. There was ZERO stock on 01.04.2009 in my plant. The stock received on 14.04.2009 but while doing the GR, the posting date changed to 05.04.2009. Now a sales Order created on 14.04.2009 with schedule line confirmation on 14.04.2009. When we checked the delivery and its material document generated after PGI it shows the posting date of 04.04.2009. All the dates in Delivery has been changed to 04.04.2009, however actually the delivery created on 14.04.2009.
    Now my querry is how the system allow to do the PGI on 04.04.2009 when there was no stock for the material on that date, and the schedule line is for 14.04.2009. Is this the standard behaviour?, if yes, Can we restrict it, so that PGI can not be done before the Schedule Line Date or before the actual availability of material.
    Thanks in advance
    Regards
    Amitesh

    hi AA,
    This doesnt seems to be a Std process. GR happens for current date. and you can alter Actual PGI date but the document date (delivery) shall not be prior to MAD or Transportation planning date of Order. i guess this may require an OSS.
    Reg
    Mahesh

  • Purchase Ord delivery date changes SO schedule line date?

    Hi,
    I am purchasing a drop ship item as per sales order. The account assignment in the purchase order is the Sales order. 
    Why in some cases the schedule line date in the sales order changes when I change the delivery date in the purchase order? whereas in other cases it does not.
    Please help me out with this question.
    Sincerely.
    Puja

    Puja,
    The SO schedule line date should not change when you change the purchase order delivery date.
    However, if you change the PO del date, AND a user performs re-ATP against the sales order, OR if you are running backorder processing (rescheduling) of sales docs, then the SD item/schedule date may change to match the changed availability situation caused by the change of the delivery date of the PO.
    Look in the sales order in VA03, then Environment>changes.  Look to see if anyone or anything has 'touched' the SO item that is home to the schedule lines that were affected.
    Regards,
    DB49

  • Schedule line data

    Hi gurus,
    How can we see the changes in schedule line data. i.e. all changes in delivery date in open sales orders.
    Thanks in advance.

    Hi,
    goto environment in Va02/Va03 and click on Changes.
    There enter your schedule line instead of item. You can see all the changes for the schedule line.
    Hope it helps.

  • Delivery before the schedule line date in scheduling agreement.

    Hi All,
    I have a situation where in I am using JIT delivery schedule for processing the delivery requirement from customer. In this, lets say, I have a schedule as 08/05/2009 for material A to deliver 1000 qty and the material is made available to me after production as of 07/05/2009 and I want to despatch the material on 7th only and not on 8th. The system does not allow me to do this.It allows me to make a delivery only on 08/05/2009.
    Is there any alternative to this and is this SAP standard behaviour.

    I think you can change the schedule line date in scheduling agreement itself and do the delivery.
    regards,
    Sudhir

  • Delivery Schedule line date customer receiving day dependant

    Hello Experts,
    We are working with transfers between plants with STO UB. Tha availability check is activated at storage location level and it works correctly. Now, some plants have a special day for receiving goods. Say, Plant A receives on monday, plant B receives on tuesday, Plant C receives on wednesday.,...
    We want to influence the delivery schedule line based on the goods receiving day of the requesting plant?
    ex : if the system determines delivery schedule line date on 31/01 but the receiving day of the plant is monday, so the system have to update this date to the next receiving day (04/02 = monday)
    Thanks for your help.
    Regards.
    A.

    Hello Experts,
    We are working with transfers between plants with STO UB. Tha availability check is activated at storage location level and it works correctly. Now, some plants have a special day for receiving goods. Say, Plant A receives on monday, plant B receives on tuesday, Plant C receives on wednesday.,...
    We want to influence the delivery schedule line based on the goods receiving day of the requesting plant?
    ex : if the system determines delivery schedule line date on 31/01 but the receiving day of the plant is monday, so the system have to update this date to the next receiving day (04/02 = monday)
    Thanks for your help.
    Regards.
    A.

Maybe you are looking for

  • How do I get my 3rd party instruments to show up in my Logic Pro instrument library?

    I have purchased and downloaded orchestra instrument libraries from Albion. How do I get them to show up in my instrument library so they can be used?

  • Form triggering through Output type

    Hi All, There is a issue which i am facing , I have create a output type ZFIN and attached a custome program xyz with this outputtype. when the output is triggered throught transaction VL32n the custom program should be trigger but ther is an error r

  • Photoshop CS4 Printing

    Every since I updated to CS4, I am having problems printing to my color printer. It now prints a small thumbnail from Photoshop. This problem didn't exist with CS3. Adobe said the printer memory needs to upgraded to 2mb. Since it only has a max of 1g

  • Plz send me material for version change for 4.5 to ecc6.0

    hi experts, currently i am working in upgradiation project from 4.5 to ecc6.0, i am new for this one plz send me some material for version change, and give me suggestions what r the main changes from upgradiation from 4.5 to ecc6.0 regards madhu

  • Integration kit

    Hi, just wondering to know how long it takes to install SAP Integration kit SP2 after installing  SAP Integration kit 3.1. Thanks, Rag