Generate Schedule Lines in PR - ME51N

Hi,
Is it possible to generate schedule lines with PR thru ME51N.
Our requirement is that if we insert Delivery Date in PR line item, system ask for Schedule Line in which we insert the same as per requirement...
Please suggest..how can we do it???

Hi,
As already solution provided, 2 points I would like to mention,
Delivery date in ME51N not only meant to enter manually. Its automatically calculated and overwritten your entered date - it populates calculating valid delivery times available in info records, purchase organization data from planned delivery time, GR processing time etc.
The best solution is go ahead with Scheduling agreement. For every requirement if you are not able to go ahead with Contract/Scheduling agreement - go ahead with separate line item with assign source of supply from which planned delivery times calculated automatically or you can enter separately.

Similar Messages

  • How system will generate schedule line for PO after  MRP run.

    Dear Experts,
                                 i have updated  MPS in MD61, the period indicator was  M (monthly),  after  MRP run, system  generating schedule  lines  on daily basis for Scheduling Agreement(ME38), i want  schedule lines   on mpnthly basis, how to achive this,
    thanks in advance.
    regards
    rajakarthik

    Hi
    1. Are you maintaining any Planning time fence period for MPS- No 
    2. What is the PIR qty you maintained in MD61:
                                                                                    i.) FG01 is having BOM  child part RM01.
                              To  produce 1 nos of  FG01 , I need 1 nos of  RM01                                                                               
    ii.) i maintained  FG01 in MD61  with PIR  Qty 5000. in MD61,Planning period is M  and planning hirizon1- jan10To 31-Jan10
           ii.)  i maintained lot size:Monthly lot size for RM01.
           iii.)  there is  no stock  available for  both RM01 and FG01.                                                                               
    3. After MRP how much qty is get planned on what date-     
         i)   planned order created for FG01 in co41 with qty-5000 nos.
         ii)  in ME38, schedule  line created for RM01,  on 01-01-2010, with 5000 nos,  currently Category of Delivery Date
    field is D and delivery date is   01-01-2010, but i want Category of Delivery Date should  be M and delivery date should be 01.2010.
    thanks
    raja

  • Generate schedule lines via MRP

    Hi,
    Unable to generate schedule lines via MRP.
    Settings:
    Mat master - External proc , no spl proc
    OA - Maintained
    Source list - Maintained MRP Relevant - Indicator 2
    Quota arrangement- Exist with only 1 vendor(same as of OA) 100%
    MD03 - Planning data - Create PR (indicator-1), Create Sl(indicator 3)
    Please let me know whether there is anything else which influence SL generation.

    Hi,
    hi,
    1. Mark checkbox source list in material master.
    2. purchase info record for the vendor & material combination
    3. source list for the material - mention the scheduling agreement and mark as mrp relevant, schedule lines generated
    4. Use MD03, choosing 1 for purchase requisition, 3 for schedule lines and planning mode, prerequisites requirement exists for material. If requirement does not exists it will not create scheduling agreement line.
    I  hope you got all your answers. so kindly close this thread.
    YB

  • MRP generated schedule lines

    Hi,
    I made a scheduling agreement say "YYY" with material "A". The target quantity specified is 100. I had made all the relevent settings & MRP is generating schedule lines successfully.
    But the schedule lines generated for material "A" for the SA "YYY" are more than the target quantiy 100.
    I want to know if I can restrict MRP to generate the schedule lines upto the sppecified target quntity only. How can I do that? Are there any settings for this?
    If not then can anybody explain me what is the use of target quntity with respect to MRP?
    Regards,
    MHP

    Try to change system messages 06/067 to Error (in Material Management -> Purchasing -> Environment Data -> Define Attribute of system messages).  Rerun MRP.
    Please check and revert.
    Rgrds,

  • MRP To Generate SCHEDULE LINES for Scheduling Agreement

    Hi
    I have followed the below steps but still the Schedule lines is not generated for scheduling agreement.
    1Maintain MRP views 1,2,3,4 for the material in material mste.(MM01)
    2. Maintain Purchase Info Record for the vendor plant & material combination.(ME11)
    3. Create Scheduling agreement using ME31L
    4. Maintain source list for the material & the scheduling agreement # and Line item set the MRP relevant indicator 2 (Necessary ?) ME01
    During Run MRP for the material.the below details entered///
    Processing key NETCH Net Change in Total Horizon
    Create purchase req. 1 Purchase requisitions in opening period
    Schedule lines 3 Schedule lines
    Create MRP list 1 MRP list
    Planning mode 1 Determination of Basic Dates for Planned
    Run MDBT or MD02 but still doesn't create the schedule lines......Anything else missing.
    MRP1:
    MRP Procedure: PD
    MRP Group: 0000 (External Procurement only)
    Lot Size: EX (Lot For Lot)
    MRP2:
    Procurement Type: F
    Sched Margin Key: 000
    MRP3:
    Avilablity chec: 02 (Individual requirement)
    MRP: 4
    Nil

    Raj,
    Source List a Mandatory for Scheduling Agreement, if you want to create automatic Scheduling line.
    Plz use (2) in MRP RELEVENT tab in ME01 (Source List).
    rest of the thing is ok, make sure a material master(MRP 2 VIEW) in that view you have to give a planed delivery days. it is must.
    HOPE IT WILL WORK
    Regards:
    Poision

  • To generate Schedule lines for scheduling Agreement when MRP is run.

    Hi,
    Please help advise on my following requirement:
    When I run the MRP for 'Single Item - Multi level' (MD02) for a material, I want MRP to generate delivery schedule lines for that material in Scheduling agreement.
    Please advise as to how i can go about with this.
    Regards,
    Manju

    Hi Manju,
    For this you need to set creation indoactor for planning run in SPRO.
    The path is spro-MM-CBP-Carry out overall maintenance of plant parameters-Click on maintain-give your plant-click on external procurement under planning run-here you can give your option for the schedule line creation.
    Traction code is omi8. Hope this will help you.
    Cheers
    Ravi

  • Provide - Steps To generate schedule lines from MRP

    Dear All
    Please provide me with the steps (in details) involved to create the schedule lines automatically from MRP.
    Early help would be appreciated.
    Regards
    Rahul Bhardwaj

    Hi Rahul,
    1) MM02 OR MM01- Maintain MRP data in material master- Purchasing and MRP1 view --> e.g.MRP type,lot size etc. in MRP veiw
    & JIT schedule indicator in purchasing view (other data /mfr.data)
    2) ME01 - Maintain source list for the material (Use in MRP planning to be 2 -schedule lines generation thru'MRP
    3) ME11 - Info.record is must for the material and vendor combination.
    4) ME31L - Create schedule agreement
    5) ME35L - Release schedule agreement
    6) ME9L - Message output
    7) MD61- Create Planned independent reqt.for the material
    8) MD03 - Run the MRP( single level-single item)
    ( You can check the result in MD04--- Schedule lines to be seen)
    9) ME84- Create SA release
    10) ME9L - Message output ( Scheudes to be printed & dispayed).
    Regards
    Venkat

  • Schedule lines are not getting generated through MRP

    Hello Experts,
    While running MRP, we observed that the system is creating PR instead of schedule lines, although all the necessary prerequistes to generate schedule lines through MRP are maintained. For e.g.
    1. MRP Schedule line relevant indicator '2' is maintained in the Source List.
    2. Sch. Agreement dates and Source List validity dates are same.etc...
    Further after some analysis, we observed that if we change the source list validity from date to some back date then system is creating correct schedule lines.
    Example: Material M1; Planned delivery time 7 days; GR processing time 5 days; MRP Type PD; Lot Size WB;
    SA validity dates - 07.09.2011 to 31.12.2011
    Source List validity dates - 07.09.2011 to 31.12.2011
    If MRP run on 12.09.2011 and source list dates are retain same as mentioned above, system creates the PR.
    If MRP run on 12.09.2011 and source list dates changes to 05.09.2011 to 31.12.2011, system creates the schedule lines.
    Could you please let us know, why the system behave like this?

    Dear,
    Welcome to SDN,
    In transaction OMDT you have to enable the indicator create schedule lines
    In MD02 MRP control Prameter here select the Delivery schedules -3- Schedule line. Processing Key as NETCH and Planning Mode - 3 delted and recreated.
    Maintain source list ME01, in that put MRP indicator as '2' i.e. schedule lines via MRP.Put your agreement no in that.
    If u run MRP properly u will get schedule lines automatically in ME38.
    Make the schedule agreement, make it source relevent in the source list make is FIX and MRP indicator as 3.
    Regards,
    R.Brahmankar

  • MRP - PRs being generated along with Schedule lines

    Hi
    Problem statement - PRs also getting generated alongwith schedule lines in MRP.
    We have 'PD' MRP type set up for externally procured material with 'F'. I had set up to generate schedule line using the sourcelist. and during the planning run MD03, I am selecting the following values
    Create PR - '2' Purchase requisitions in the open period (any value in the three generates a PR/Planned order in the open period)
    Delivery Schedules - 3 Schedule lines.
    The client requires only generation of schedule lines.  How can I get this done.
    regards
    Nagaraj

    Dear Nagaraj,
    For MRP to create the schedule lines automatically, please change to the following settings.
    1. Create Scheduling agreement for the vendor,Agreement type  LP.
    2. In ME03, Source List: Maintain MRP = 2 Record relevant to MRP. Sched. lines generated automatically.
    3. Run MRP
    Hope this helps you.
    Regards,
    Ashish

  • Why GR performed on MRP generated delivery schedule line (unconfirmed)?

    Hi Gurus,
    Need some advice from you all, I have a scenario here which MRP generated the delivery schedule lines for material A on 10.08.2011 - 124 KG.
    User review the MRP result and didnt confirm the line, but she added in manual line on 11.08.2011 - 124KG.
    On 11.08.2011, warehouse performed GR on the delivery schedule lines. It's found that GR was actually updated into the delivery schedule line generated by MRP (10.08.2011) and not the manual line confirmed by user. (11.08.2011).
    User is questioning now why the GR able to be performed on MRP generated line which had not been confirmed? Any guru can share with me the fact and good note regarding this on MRP? Thanks!
    Michelle

    Hi,
    Since we are talking here about schedule lines, these are open for GR when the delivery schedule is send to the vendor.
    In your case you had a quantity open for 10/08/2011 generated by MRP, then the user added manually another line on 11/08/2011. After this the user will have transmitted the delivery schedule which makes that both the items where marked as transmitted and thus open for GR.
    Now when the goods come in the system will post against the first open schedule line that is found until this is fulfilled and then switch to the next open line at the moment of GR. So this is why the GR was put against the MRP generated schedule line as this one was the one with the earlier date.
    Regards,
    Peter

  • Schedule Line(Delivery Schedule) generation stopped

    Dear Experts,
    We are using Scheduling Agreeements to procure materials from Vendor.We are using MRP(type PD) to generate our requirements.We have noticed that ,for a Schedule Agreement- MRP generates Delivery Schedules accordingly,but if user will try to interven the process by entering a manual schedule line with some quantity,and Fix Indicator is getting fixed,after that MRP is not able to generate Schedule Lines,henceforth.
    We had done the same things earlier,but MRP was able to generate Schedule Lines even after manual intervention by user.We have not maintained Fix indicator in Source List also and the particular material and the Agreement both have been marked as MRP relevant against that Vendor in Source List.
    If we will remove the open delivery schedules having Fix indicator fixed ,after that we run MRP,then the Schedule Lines are getting generated,but for those Schedule Lines(Manual or thorough MRP) having Fixed Indicator fixed and have GRN transaction completed,we would not be able to delete those and also MRP will not be able to generate Delivery Schedules.Please advice what is the reason behind this and share the full concept of Fixed Indicator against the same?
    Regards,
    Soumick

    It looks we encountered very similar problem,one item line in our Scheduling Agreeements can't be driven by MRP MD02/MD41,but if we add another same line item under this SA, this new line can be driven by MD02,and generated delivery schedule line.
    I don't know why. Please give me some light! Thanks!

  • *MRP unable to create Delivery Schedule Lines in MM Scheduling Agreement*

    Hi Experts,
    I need your help...
    The issue is, in-spit of maintaining Source List with an u201CScheduling Agreement with item No.u201D & u201CSource List Usage in MRPu201D as 2 (Record relevant to MRP. Sched. lines generated automatically), MRP run does not generate Schedule Lines, instead PRs are created.
    Please help me to understand such behavior and fix the issue as the requirement is to generate Schedule Lines only.
    Thanks,
    Pratap

    Hello
    Please check
    1) Source List maintained properly in terms of Material # ; plant # ; proper POrg ; Schd Agr # and line item# ; proper validity date & MRP relevant indicator
    2) Please also check Quata arrangement if you are using. whether % is maintained correctly against the vendor
    3) MD03 , Delivery schedules- should be 3
    4) check your planning horizon whether it is NETCH or not
    5) check material master -MRP2 view, Procurement type is F- external procurement, schedule margin key if you are using
    if everything above is set, then I feel it should work
    Also please verify-
    lot size, safety stock and the corresponding prod volume for MRP input v/s the stock available in MMBE
    example.
    MD04, we can see the open del lines.
    if SS = 50 , prod volume is 150
    1) if MMBE shows 200 then it wont generate any schedule.
    2) if MMBE is 180 and your lotsize is 40, then after MD03, you will have a schedule line of 40 (provided if everything is set properly)
    Please ensure there are NO open delivery lines . if you find such in MD04, then please close open delivery lines
    in calculation of MRP, system considers such open delivery lines are going to receive and no additional schedule line generated even after MRP run
    thanks

  • MRP - Problem in scheduling of MRP created schedule lines

    Hi,
    I am working with single level BOM of FG and trying to generate Schedule lines for RM as per requirement coming from FG - BOM explosion during MRP run - 
    Material master setting of RM is  as below -
    MRP type - PD,
    Lot Size - Ex,
    Procurement type - F,
    Planned dlv time - 14 days
    i am getting dependent requirement as below -
    06.07.2009 - 2000 EA
    13.07.2009 - 1500 EA
    01.08.2008 - 1000 EA
    And schedule lines are generated as below -
    06.07.2009 - 2000 EA
    13.07.2009 - 1500 EA
    01.08.2008 - 1000 EA
    The date of schedule line should be after taking calculation of planned del time of the RM, which is not happening. I can't understand why?
    The planned dlv time is same in all 1) Material Master 2) Scheduling agreement and 3) Pur info record
    Please help.
    Regards,
    Amol

    Dear Amol,
    the date shown is the ultimate reciet date and not start date.
    Since you have already converted PR into schedule lines you will not be able to see the actual start date.
    If it was still a PR you can see the release date as planed delivery time days early.
    If the requirements date was say 31/05/2009 and you were taking planning run today then the recieved date would come as 05/06/2009.that is 14 days from today.
    if requirement well beyond planned delivery time then the planned delivery time will not reflect in recipt date.

  • Schedule lines on scheduling agreement by MRP

    Hello,
    we use MRP to generate delivery schedules on a purchasing scheduling agreement. The vendor of the material has a limited capacity but when the need of our customer is very big MRP generates schedule lines on one date (too many for the vendor too handle).
    Is it possible to limit the amount of a schedule line per period (for example we allow to generate 100 tons per week, if the need is 500 tons it should be splitted into 5 schedule lines over 5 weeks).
    Thank you for your help!!!!

    Hello,
    the weekly lot size generates lots per week but this answers only a part of my problem.
    example: vendor can produce 50 tons per week
    need is 200 tons
    with a weekly lot size and a maximum lot size of 50 the system proposes 4 schedule lines of 50 tons on the same week and this is not what I want. I want 1 schedule line of 50 ton on the week and the rest on the weeks in the future.

  • SCHEDULING AGREEMENT AND SCHEDULING LINE CREATION

    Hello Guys,
    I trying creating a scheduling agreement(SA) for vendor & material combination.
    I have created a Scheduling agreement in ME31L then maintained in ME38.
    In ME38 i have also mentioned the delivery date. when i am checking EKKO for Purchasing document , its created with the delivery date specified.
    My question is how to create a schedule line ? Do we need to maintain a source list of that material, plant and vendor.
    If we have the source list maintained, then what is the next step after SA is created and maintained.
    Do we need to do MIGO? because i tested by creating one SA in ME31L and maintained in ME38. I mentioned the delivery date as today and when i checked EKKO table the Purchasing document is created.
    Do i need to create a Purchase Order?
    If no then do i need to do MIGO? If i need to do MIGO, for what reference do i need to do MIGO???
    My client never maintained a Scheduling agreement, they want the scheduled lines to be created and sent to vendor and we need to receive  the goods on specified delivery date.
    Help will be appreciated.
    Thanks.

    Hi,
    You need to make a distinction between the scheduling agreement (ME31L/ME32L) and the delivery schedule creation (ME38/ME84)
    With ME31L you create the scheduling agreement. In the scheduling agreement which is created for a vendor you maintain the parts that you will order at this vendor, the target quantity that you will order over a certain period and the price.
    In ME38 you use the scheduling agreement number that is created with ME31L to create schedule lines (manually). These schedule lines consist of a date and an quantity. This is the data that needs to be transmitted to the vendor and against which the vendor is shipping the ordered materials.
    Once the vendor ships the materials you post the goods receipt in Migo against the scheduling agreement number.
    That is the basic working of the scheduling agreement and the delivery schedule.
    Now some remarks.
    You need to set-up the required output conditions for transmitting the data to the vendor either via print, fax, email or EDI.
    You can do this manually in each scheduling agreement and each release but typically you maintain the output condition records.
    For scheduling agreement contract (ME31L) you use transaction MN07.
    For the delivery schedule (ME38/ME84) you use transaction MN10.
    In order for you to be able to post the goods receipt the delivery schedule needs to have been transmitted otherwise you will get a message that not requirement are found when trying to post goods receipt.
    Also the goods receipt can only be posted if the requirements are valid on the day that you are performing MIGO. This means if you would post GR today then the open requirements in the scheduling agreement need to be for today or already from previous dates. The system will not allow you to post GR for quantities that are only due tomorrow (if this is required a user exit needs to be set-up).
    If you want schedule lines created via MRP then you need to set-up a source list using ME01. You have to make sure that the MRP key is set to 2 in orer for the system to generate schedule lines and you also have to make sure that you have the correct MRP parameters set-up.
    You can use ME84 to transmit the delivery schedule lines generated by MRP if no changes are required. With the ME84 you can transmit multiple releases at once, however this transaction can not be used to make manual changes to the MRP proposal.
    The scheduling agreement offers lot's more possibilities but the above should get you going with the basics.
    Hope this will help you on your way.

Maybe you are looking for

  • SSO to Web application – Cookies blocked in IE

    Hi Experts I need to create SSO to a webpage (that contains a standard html login form) into a NetWeaver 2004 Portal I have used the App Integrator iView and it all seems to work fine except cookies are block in the user’s Internet Explorer and there

  • WLS8.1sp2 - PKCS#11 Provider for WebCertificates error

    I'm trying to startup a WLS Server, which has his web certificates stored in a HW Devices. Der CryptoProvider read via PKCS#11 the certificates out of the HW Module. Unfortunatly the possibile operation via PKCS#11 are not the same as via a PKCS#12 (

  • Apps crashing after ios5 update.

    I had upgraded iPad 2 to iOS 5.after this many of the third party apps crashes suddenly. To name some of them include , accuweather, toi. I did deleted all the apps & freshly installed them after iOS5 upgrade. Is this bug in iOS5. Is there any fix?

  • How to parse xml clientside in a PDF

    I need to polulate a drop down and then a listbox with data from a hidden field. The data is different every time i load the form so i have to use Livecycle forms to put the xml in a hidden field. Doesn anyone have an example that parses xml client s

  • Delay generation

    Hi folks, We can generate delays in C++ or C by Sleep(...) functions whose parameter is the delay duration in milli second. What's the equivalent of this function in Java. For i.e. if I wanna generate a 2-mSec delay what method I am supposed to invok