Generating call object from Maintenance order with Fund management

Dear All,
we have activated the funds management and assigned the fund center as Mandatory for creation of order.
But while using the order type in maintenance plan during scheduling ,system is not releasing the call stating incomplete account assingnment ,since there is no provision to specify the Fund center in maintenance plan.
Any work around
regards
thyagarajan
Edited by: thyagarajan krishnamurthy on Oct 15, 2009 8:11 PM

Hi
Thanks for your response .
In my client we have activated the customer at save event to check the Fund center and settlement receiver to be same.Hence while saving the order system will check prompt an error if it was different.
I think due to the above exit ,system is not able to release the call object.
We cannot able to cancel the exit also.
Any clue?
regards
thyagarajan

Similar Messages

  • How to generate Java objects from XML files with out  scema compilation

    Dear participants,
    My name is Raghavendra , i have a requirement of reading XML files Dynamically and parse them and create java types for manipulation . i will not be provided with sxd files (no schema compilation )coz no one knows how many types of structures are there. i want a generic solution. Please Help.
    Thanks ,
    Raghavendra Ach
    you can mail me to " [email protected]"

    georgemc wrote:
    You could also look at something like Apache Digester, which will parse your XML and populate Java objects with the data. A slightly steeper learning curve than the lower-level APIs such as JDOM, but that's outweighed by the lesser development effortdon't think that would work for the original problem, which seemed to indicate that the xml had an unknown structure.

  • Multiple doc type setting for service PR generated from Maintenance order

    Hi Gurus,
    My client has multiple company code and has different document type for PR and PO as per the company code. For generating the  service PR  from maintenance order system take the document type of PR defined in the config.
    Is it possible to define multiple document type for service PR depend on the company code/ Plant level?
    Kindly help.
    Regards
    DP

    Hi Ravi,
    I used the User Exit COZF0001 .  Since we can assign only one PR doc type in the config .
    I have assigned one PR doc type in configuration which will work for a company code and all their respective plant. So in this case user exit wont do any job for changing the doc type.
    You will defined a condition in the User exit saying that if  company code /plant which you get it from maintenance order is not same (Config )  then provide the  PR doc type which you want to create for respect plant or company code.
    I dont have coding right now with me. You need a small coding to be done to create the separate PR doc type in EBAN-BSART
    with respect to plant . Check in your configuration at what point of time you are creating the PR either in saving or release of MO. You can take the even to activate the User exit.
    Consult your ABAPer  they can do in 10 min.
    DP

  • Automatic Reservation from Maintenance Order

    Hi,
    I have a problem. Generally from Maintenance Order type PM01 under Order Category 30, when we give some materials requirement, SAP automatically generate reservation for those materials and take the GL as Consumable Item.
    But in my case, that GL has to be changed depending on what perpose we are using the material. But Manual reservation is not allowed for the order category 30 and no GL can be changed for automatic reservation.
    Can anybody suggest any way-out so that we can give our desired GL No. for the reservation for Maintenance order (say Order type PM01 under category 30 which is SAP internal).
    Thanks in advance,
    Satadal

    Thanks for your answer. Actually I found that place, it is determined from OBYC transaction with a combination of GBB (A/c Key) and VBR (A/c Modifier).
    But for same movement type261, I need manual G/L allocation at runtime. i.e. depending upon case to case, the G/Ls will be different. So, different movement type perhaps would not serve the purpose.
    Basically I need to over-write the G/L for automatic reservation created from PM in the PM01 order type with category 30 where manual reservation is not allowed.
    Can you suggest any way out so that I can actually over-write the G/L for automatic reservation- through SPRO or some kind of development...
    Thanks
    Satadal

  • Auto generated service PR from maint, order

    Dear Experts,
    As you know while processing external services using control key PM03, a service PR will be generated for the service selected from the agreement or contract & from there we will create PO.
    Here in my case while creating PO from auto generated PR it is not carrying the condition type ( Discount entered the contract).Instead of that it gives the option to enter the condition type in the drop down list.Then we can select the condition type as discount & process the order.
    where as for the same service from the same agreement,if we create the PO from the manually created PR (not the auto generated from maintenance order) it carries the condition type of agreement (discount) to PO & the discounted price will be displayed automatically.
    Why it is not happening to auto generated PR? is there any particular settings are available? is there any notes available?
    Please help me out to come out of this problem.
    Thanks & best regards,
    Praveen

    Dear,
    I am extremely sorry for this issue. there was some problem with the program & rectified the same.
    Thanks & Best regards,
    Praveen

  • Goods movement from Maintenance order

    Hi Experts
    I have the following scenario,
    I have a component ( with Material master) in the maintenance order  and i use Item category N to trigger  a Purchase requisition. The Pur Req is converted to Purchase Order and then the GR is done directly to the order .
    Now i have not used this Component  and want to make a goods movement to place it in stock. So the requirement is to move the material from Maintenance Order to the Storage location .
    How and which movement type can i use to do this ?
    Please help
    KK

    Hi,
    Click the below link for more information
    http://sap-img.com/plant/in-pm-how-to-return-material-backflushed.htm
    regards,
    Venkatesan Anandan

  • Services for Object in Maintenance order can not link

    Hello,
    "Services for object" in Maintenance Order can not link to share point.
    Linking documents from the C drive or Global drive is successful but if SHAREPOINT is used, it fails
    When trying to link to a Word document on our Sharepoint... It fails... when I'm in an order... it gives me an error... (displayed on the attached Word file...) and when I'm working within a document... (CVN02) it merely links to my C:\ drive which won't work...  
    We need to link to our "master" Sharepoint (web based) documents.
    Please suggest the solution.
    Thanks
    Regards
    Anil

    Anil,
      Couldn't you add the web address as the attachment?
    Regards
    Narasimhan

  • PR Delivery Date Issue from Maintenance Order

    Hi All,
    We have a scenario -
    - Create Maintaince Order (IW31)/Assign Basic Start Date and Basic Finish Date.
    - Auto PR Generated from Maintenance Order but the delivery date in PR is Basic  Finish Date.
    My client's requirement is Auto PR will pick up the Delivery date as Basic Start Date. What settings do we need to Do for this scenario and on wht basis the delivery date is decided in PR wrt to Maintenance Order?
    Regards
    Pankaj

    Hi SAP Gurus,
    Any updates how to solve this issue?
    Regards
    Pankaj

  • GR from Maintenance Order

    Hi All, Please help in the below issue,
    there's a spare part material valuated with split valuation as follows:
    Defected avg price 10/EA
    Used      avg price 20/EA
    New       avg price 30/EA
    From PM module, one EA from defected valuation type issued and the accounting doc shows value of 10 (correct), after finishing maintenance work on this part it will receipt in the same sloc but with valuation type Used,
    the issue is when GR from order the accounting doc shows value of 20 (debit stock with 20) the current price in master data while the actual cost from maintenance order is 200 how to make the GR valuated with actual cost from maintenance order which is 200.
    Your help will be highly appreciated, Thanks in advance.

    Greetings Hossam,
    Looks like what you are trying to achieve is to implement the Refurbishment Order process.
    In the standard system, you can use the Order Type configured as a refurbishment order to settle the actual cost to your stock value.
    Say that you have the material master created with split valuation, as you mentioned.
    Defective avg price 10/EA
    Refurbed avg price 20/EA
    New       avg price 30/EA
    Say you have 1 EA of Defective material at €10 , your refurbishment Order actual cost total is €15 , your material price is Moving Average, and you have no other stock. You would then issue the Defective part to the order with mvt type 261 (Order total cost goes up to €25). Then you would receive the 1 EA Refurbed part from the refurbishment Work Order with movement type 101. (Order total cost drops to €5). You would subsequently settle the Work Order total to the stock of the Refurbed valuation, raising the moving price from €20 / EA to €25 / EA.
    Please refer to the documents on Refurbishment process, search the SCN, and feel free to ask any specific questions.
    Refurbishment Order - Customer Service (CS) - SAP Library
    Creating a Refurbishment Order - Customer Service (CS) - SAP Library

  • Plan Component from Maintenance Order

    Hi,
    When i plan a component from maintenance order I use item category N with key MATE.
    But i woul plan component for purchase requisition on project stock( account assign Q) directly from Maintenance Order. Allow I insert item category N in the field ad near insert the value 2 for project stock.
    When i release the order the system blank the field and i don't create a Purchase requisition with project stock but i purchase requisition with account assignement F
    Because the system put away the field blank?, I must done another customizing, or i must utilize another KEY?
    Thank you

    Hi,
    When you make Item cat as N it means they are non stock .
    For non stock & with F order as account assignment system creates PR.
    if you want this componenet as Project stock them there are following  ways
    1.Make PR with item cat as Q & make PR on WBS or PS System.
      System will post direct entries.
    2.Make normal stock PR then issue against WBS by order
       Settle the maintenance order to WBS element
    3.Get material as normal stock material issue with 221 mvt against WBS or PS system.
       Systme will make enties to WBS.
    Ramesh

  • Plan material from Maintenance Order

    How i can plan from Maintenance order a material with accaunt category Q(special stock) for create a RDA
    Thank you

    Hi,
    I already have plan component from maintenance order but when i insert item category N for create a Purchase requisition and insert item category 2 for stock project Q the system blank the field and Don't create a purchase requisition with account assignment Q.
    Because the system put away the field blank?
    There are any way for create purchase requisition with account category Q?
    The BAPI that you suggest me can avoid this problem?
    Thank you.

  • Catalog procurement from Maintenance Order

    Hi Gurus,
    My client is implementing Punchout Catalog from SAP ECC 6.0. we are not into SRM server. I made the settings in Web services ID and Description and i am able to do shopping from Vendors URl and return back to SAP ECC.
    Now 1) they want to populate the Vendor name automatically into SAP, which is not getting carried.
    2) I want to link the Punchout Catalog to Work order scenario also. For that i need to define the Order type and Catalog in the Link "Interface for Procurement Using Catalog" under the node Plant Maintenance and Customer service which i am not getting.
    Please advice me what needs to be done or what settings or any BADI needs to be activated on this issue.
    Thanks for your response in advance,
    I am not sure is this the right place to post this thread. Please advice.
    Thanks,
    Saakithyan.

    Hi,
    I already have plan component from maintenance order but when i insert item category N for create a Purchase requisition and insert item category 2 for stock project Q the system blank the field and Don't create a purchase requisition with account assignment Q.
    Because the system put away the field blank?
    There are any way for create purchase requisition with account category Q?
    The BAPI that you suggest me can avoid this problem?
    Thank you.

  • PR from Maintenance Order - Material Purchase

    Dear Experts,
    Likewise we can generate Servide PR against Maintenance Order,  also it picks service data frrom Maintenance Order....Similarly can we generate PR for Material Purchase against Order also it should pick Material from component that we have enetered in Maintenance Order ..is it possible??
    Thanks
    DM

    Hi
    Deletion of PR from Maintenance Order is not possible because the PR is created automatically
    This PR will get deleted automatically when you cancel//teco/complete the order
    Otherway around is you can always block the PRs
    Regards
    Kartik

  • Deletetion of  service PR from maintenance order

    Hi Experts ,
    Is it possible to delete service PR from maintenance order. If it is created from order due to some problem I want to delete it ,so is it possible ?
    With best regards,
    AVI DDS.

    Hi
    Deletion of PR from Maintenance Order is not possible because the PR is created automatically
    This PR will get deleted automatically when you cancel//teco/complete the order
    Otherway around is you can always block the PRs
    Regards
    Kartik

  • Problems for creating a delivery from a order with less items

    hye, I have created a delivery from a sales order and all is ok. So, If I put less quantity in severals items, the delivery is generated ok and the sales order is OPEN status.
    Now , I want to generate a delivery from sales order, but I don´t want to include in my delivery all sales order's items. For example, if I have in my sales order four items (Itm1,Itm2,Itm3,Itm4) with theirs quantity, by SDK I want to generate the Delivery with Itm2 and Itm3 only. I can't do that. I hate It,jajajajajaja.
    With the next FOR, I get do it with all Items but I don´t know to say it that when status = 0 "jump" this item.
             delivery.CardCode = Order.CardCode
             delivery.DocDueDate = Order.DocDueDate
             delivery.DocDate = Order.DocDate
             For i = 0 To Order.Lines.Count - 1
                 delivery.Lines.BaseType = 17
                 delivery.Lines.BaseEntry = Order.DocEntry
                 Status = 1
                  If Status <> 0 Then
                       delivery.Lines.BaseLine = place
                       If i <> Order.Lines.Count - 1 Then
                          delivery.Lines.Add
                          place = place + 1
                       End If
                  End If
              Next
         retval = delivery.Add
    Thanks and I hope to get a solution.

    What is "it" that you cannot do (+ hate)???
    What is "status"? LineStatus???
    What is your problem when you try to skip an item?
    PS: You should always use enums instead of hard-coded values e.g.: Use the BoAPARDocumentTypes Enumeration for delivery.Lines.BaseType

Maybe you are looking for

  • Compiled 2.6.31 no UFS rw

    I had been using a custom 2.6.30.5 with UFS rw without any issues. Now that I have compiled the 2.6.31 kernel using my old config and accepting the defaults on all new additions my drive will only mount as ro. This is the drive's fstab entry: /dev/sd

  • What can I do if I have used my 5 mg iCloud

    I received a message that I need to purchase more storage? Do I have other options?

  • Logo made in Ps is bit blurry in Microsoft Word

    Hi there, for a client I made a logo in Photoshop. For her letters she uses Word en wants to use to logo there. But if the logo is imported in Word, using insert from file from the menu the logo gets a bit blurry, sort of anti-alias kind of blur. I t

  • Dark blue bar on folder icons in Finder?

    This is probably just a trivia question, but what's the significance of the dark blue bars on some folder icons in Finder? I just copied some folders into my MySQL database and noticed that almost evey folder I copied has a dark blue bar across it.

  • PSE 10 Install Issue

    I've had several issues with all things Adobe since last fall on my Mac OS X.  I've uninstalled PSE 10 about a half dozen times, and reinstalled it.  I just attempted to do it again, as many actions I had saved weren't running properly.  I've done th