Hi
I am finding some issues in planning. My requirement is to create planned order everyday. So in MD61 the qty is entered on daily basis say X, X1, X2 etc for one week. My planning strategy is 40, MRP type PD, Lot size TB, Individual 1. When I am running MRP I am expectimg the planned order to be generated for each day against the required qty. But the MRP run is combining the requirements of X, X1... etc and giving 1 or 2 planned order. What went wrong? I also tried with strategy 30. But in vain. So how can I generate the planned order daily basis?
Thanks & Regards

Dear,
In MD61 or MD62 and select the perticular material and then goto edit and period splitting and select Day.
Take MRP run with Planning mode = 3 Deleted and Recreated.
Also refer this useful link,
Re: Requirement
Regards,
R.Brahmankar

Similar Messages

  • Production orders in place of planned orders in MRP run

    Hi,
    Please help me with this senario,
    we receive saleorders through CRM interface then these are chnged to redistribute to different plants by changing the plants in saleorders.
    we want to run and create production orders directly for these saleorders without creating planned orders.
    I tried using strategy 82 but it makes the production order online, but we want it to be created after mrp run.
    Is there a way to create production orders instead to planned orders in MRP run.

    Hi You used Right strategy only.Use Strategy '82',  Transfer requirement from CRM and execute MRP run in Background.It will generate Production order.But i didn't understand what you mean by 'Online' 3
    Pl.  Correct me If I am wrong.
    Edited by: Velmurugan S on Mar 4, 2008 10:02 AM

  • Problem with scheduling planned orders in MRP

    There is a problem with scheduling planned orders in MRP. SFG is assigned to the BOM of FG. No inhouse production time maintained in the material master of SFG & FG. routing maintained for both . In OPU5 scheduling & capacity reuiremnts tickmarked for detailed scheduling. Scheduling level - via detaied scheduling. Scheduling type - backward. Adjust basic dates , adjust dep. req. to order start set. In MD02 , scheduling is via ' lead time scheduling'.
    My problem is the start date & time & finish date & time is same for planned orders of FG & SFG in the detailed scheduling tab of the planned orders. (Duration is same because of same capacity requirements on the same work centre. But how is the finish date same for both SFG & FG?)
    (Capacity requirements are being generated.)
    What could be the problem ?

    Dear,
    By scheduling the routing and maintain lot size dependent time in material is best practice and result of scheduling will be consistent.
    If you want SFG before FG you need to define lead time offset in BOM or need to maintain the floats before production.
    Hope clear to you.
    Regards,
    R.Brahmankar

  • Creating purchase requisitions instead of planned orders after MRP run in MDBT

    When running regenerative planning in MDBT for plant with following details ,The system has to provides planned orders for the materials .
    Processing key:NEUPL
    Create Purchase requisition :3
    Schedule lines:3
    Create MRP list:1
    Planning Mode:1
    Scheduling :1
    But sometimes it provides purchase requisitions for certain materials.The problem happens for different materials at different times.
    I checked the material master and found that procurement type is external procurement.Business need to create planned order for the materials and then want to convert it to purchase requisition.
    MRP group is assigned to the materials but no creation indicator maintained for the MRP group.
    Please tell me why this run creates purchase requisitions suddenly and in the next run it disappears?

    Hello
    Maybe someonelse is running MRP in another transaction, such as MD02, with a different parameter. Check on transaction MD05 when was the last MRP execution and the user that ran it.
    Also check if there is any active implementation of BAdI MD_MRP_PARAMETERS.
    If you don't have a cretion indicator, maybe it would be useful to set it for your MRP group, with the parameter 3, in order to make sure that planned orders will be created.
    BR
    Caetano

  • Multiple planned orders in MRP run

    Hi All
    I have a requirement where I need to create multiple planned order for the same material during MRP run. I understand that once I run MRP a planned order creates. If I run again for the same material, the quantity will be changed for the same planned order. Do we have any configuration so that system creates multiple planned orders for same material for each MRP run.

    Hi Adithya
    Planned orders may be changed by MRP until they are firmed. Therefore, what you need to do is to firm the planned orders after the MRP execution.
    You can use for example, transaction MD19 to mass firm planned orders after each MRP run.
    Otherwise, you can user BAdI MD_PLDORD_CHANGE to automatically firm the planned orders created by MRP.
    BR
    Caetano

  • Problem when creating planned order with MRP run

    Hello,
    I create a material with a fix reorder point, MRP type VB. When I run MRP with MD03 on this material I have several problems :
    - planned order is created with an opening date in the past, so I have error 'Opening date in the past' in MD04. How can I generate a planned order with opening date not in the past
    - when changing manually opening date, after running again MD03, I have error 'No BOM selected'. Material is configurable, has a text BOM, a routing and a configuration profile. What is the problem? When modifying planned order, I have message :
    Material requires configuration
    Message no. 61259
    Diagnosis
    Orders and requirements for a configurable material must have characteristic values.
    Usually, you should create a variation for configurable materials managed in inventory management which has the default variant configuration.
    System Response
    MRP: Requirements without characteristic values for a material cannot be planned in MRP.
    Procedure
    Check requirements or orders.
    Create a configuration evaluation for the material in the material master record if necessary.
    Thanks in advance.

    Hi
    I am facing the problem. Could you please tell me if you have resolved the above problem? If yes, Could you please provide me as how you resolved? Thanks in advance.
    Thanks
    Nagesh.

  • Wrong Planned Order dates - MRP Run

    Dear Experts,
    Please guide to resolve the following problem:
    I have uploaded the PIRs for 3 months. When I take the MRP run, the system is scheduling the planned orders for first 2 months only. For the 3rd month's PIR the planned order are created for the PIR dates only. 
    For example, if the PIR (for 3rd month) is maintained on 25th of the month. The planned orders for FG & SFGs are being created for 25th only. While for 2 months the Planned orders are properly scheduled.
    What could be the reason for such behavior.
    The planning horizon is 90 days.
    Regards,
    Rohit.

    Dear Rohit,
    If you are running MRP with NETPL, then the Lead time scheduling will be carried out only for the planning harizon.
    Try executing MRP you can select NETCH key.
    or
    If you want to run MRP with NETPL key, then please give In-house production time in workscheduling view as per the routing values. For example 1 day is the processing time and give the quantity for for 24 hr production. Then the sceduling will be carried out as per this values.
    And change the planning harizon for detailed scheduling in OPU5 transaction.
    Thanks and regards
    Murugesan

  • Generate Plan Order from MRP Run (MD51) by WBS Element

    Dear All,
    1. I have created sales order with assigment WBS element (VA01)
    2. Then I created Routing & BOM for Material (CA01 & CS01)
    3. Generate MRP Run (MD51)
    The problem the generated mrp run doesnt consume planned order .. i have set the planning strategy 21 or 40, but still doesnt works.. is there any other parameter that i should configure..???
    Help Me...
    MamaRara

    Hello,
    Hopefully, the following link can assist you.
    - Re: After firming planned order, new planned order is generating in MRP run
    - Basic Scheduling in MRP run
    - Re: MRP run
    - During MRP run unwanted plant and storage location include and exclude
    - MRP run does not consider the common stock
    Thanks & Regards
    JP

  • To generate planned orders throught MRP even without forecast/sales orders

    Goor morning, we should send long term plan forecast to the suppliers, but in the system we're able to see just few weeks demand (lng term horizon is not still implemented). Do you think is possible to generate some planned order as MTS policy (based on the past consumption), even without any sales order or forecast inside the system? Tks in advance

    1) create a Plan IN MD61 with inactive version select the period as you want & enter  W- week in initial screen
    2) create a plan In MS31 and assign the created in active version plan in MS32 assign the plant and activate  independent requirement
    3) Run MRP in MS01, system will create a plan order for LTP
    4) and do the evaluation for created plan order in MS38.

  • NO Planned order  after MRP

    Hi all
    first, I created PIR by MD61, then run MRP, but there is no planned order, why? how to deal with? in addition , in MD04 there is requirement created by PIR.
    I found in IMG, planning file entries consisten:variant has variant,  is it that no planned order  revalent to the consistent variant? if yes, how to remove the consisten variant?
    thanks in advance!
    Dan

    Set up Planning File
    Here, you must carry out a background job for creating the planning file entries.
    Choose "Set up planning file" if you want to activate MRP for a plant whose material master data already exists in the system. Thus, the materials are then included in the planning file.
    The procedure for setting up the planning file entries is as follows:
    1. Create variant for your background job.
    2. You have two options on how to proceed:
    a) Using Schedule, you can define when the background job is to be started. The background job is then automatically started on the defined date (date and time).
    By choosing Show scheduling, you can display the scheduled background jobs.
    a) By choosing Immediate start, the job is started immediately and is carried out in the background.
    Consistency Check for the Planning File
    The planning file entries are checked to make sure that they are consistent by using a background job. This program deletes planning file entries that are no longer valid or adjusts them accordingly.
    Carry out the consistency check, if you:
    Deactivcate material requirements planning
    Deactivate materials planning for material master records by using the MRP type "No planning"

  • Generation of planned order

    Dear All,
    We have production order assigned to sales order but still MRP generating account assigned planned order. The exception message for planned order is 6 - start date in the past & for production order 10 - Reschedule in. Delivery date for sales order is 31.10.2009, start date of production order is 03.06.2009 & the production is actually started. Please let me know the reason of this excess planned order.
    Regrards,
    SAP CONS

    Dear,
    If you want the system to consider the existing procurement proposals & propose a re-scheduling date for the same, then go to OPPQ specify your plant & click on rescheduling, here you can specify which firmed proposals considers during the rescheduling, so tick the fixed purchase requisition planed order, then system will not consider the same & you not will find a new procurement proposal.
    After making the settings as per your need, re-run MRP with planning mode as 3 then check the result.
    Also refer this link for details,
    Re: Roll forward period
    Regards,
    R.Brahmankar

  • Capacity Booking by Planned orders from MRP

    Hey All,
    I would like to know how Capacity is booked on the Planned orders resulting from the MRP run.
    Regards.

    Hi Danish,
    On the basis of Delivery Date or requirement date system schedules the order either it is though Backward or Forward scheduling. For this calculation system considers the Inhouse Production Time , GR Processing Time , Routing data etc.And during this calculation system will ignore the available capacity on particular date means you have to perform Capacity Leveling later.
    And on the basis of that Routing which is selected during MRP run system generates the Capacity requirement on the relevant work centers / Resources.
    Refer below link,
    [Detail Scheduling|http://digilander.libero.it/vietrim/]
    Regards,
    Dhaval

  • Delet plan order through mass processing (cohv)

    hello,
    PP experts i want the solution for deletion of plan orders in the transition cohv
    in the COHV transition  the mass processing selection do not have the function
    technically complete for plan orders.
    plase tell me how the function tech. complete can be created for the plan orders in the COHV.
    regards,
    mangesh

    Mangesh,
    As suggested by fellow forum members "MD16" is the only possible option in Standard SAP to delete planned orders in mass.
    If you need anything other than that you need to go for your own custom program to do the way you want.
    Please close the thread after rewarding points for answers which helped you.
    Regards,
    Prasobh

  • Firming planned order in rem

    hi,
    i want to firm all planned orders automatically(rem) .mrp run hapened a day before. i already given always firm  in rem profile 0002.
    but still not get firming ????

    Hi
    If you wsith to firm the planned orders through MRP run, then you have to assign MRP types with Firming types in the material master and the PTF. as you require Automatic firming, U can use P1 MRP type. so while MRP run all the planned orders available within the PTF will be firmed automatically and any new requirements within the PTF will be moved to the end of the PTF.
    Note system will automatically firm the Planned orders when  u make any changes to the same.
    Hope this helps
    BR
    SK
    Reward and close thread if useful

  • Mass update for production and planned order MRP controller

    Hi Gurus,
    It's anyway possible to mass update MRP controller for Production orders and  Planned orders. If any please provide me step by step process.
    Thanks,
    B.Deethya.

    I feel You have changed the MRP controller in Material master and want to incorporate same in production order & plan order.
    For Planned order Run MRP with delete and recreate mode, system will create a new plan order with MRP controller in Material master
    For production order, Mass change is not possible, create a simple BDC or LSMW, And change the MRP controller