Generic Extractor: enriching GL Data with Purchasing Data

Experts,
This is my first time with Generic Extractor.
Requirement:
We have a requirement to enrich GL data with Purchasing data via the Material Document Number.
I need to provide this upto to the datawarehouse layer wherein another team will take over.
Solution idea:
Material Document is not part of the datasource 2LIS_02_SCL.
a. Should I enhance this datasource to include material number  OR
b. Develop a concept to create a generic delat enabled extractor that pulls data from EKBE, GR and IR information.
In EKBE multiple material documents can exist per PO. The extractor returns 2 record per PO (before and after image) with the updated information.So if we have the first GR with Material document 901 and then a second GR with material doc 902 the extractor loads 3 records. New record, Before image and after image and the only one stored in BI is the after image. material doc would have value 902 if enhanced.
For the generic extractor approach the  the ability to load deltas is crucial, since the EKBE table is very big. Maybe
"CPUDT-Day On Which Accounting Document Was Entered" and "CPUTM-Time of Entry" can be leveraged as delta hook.
Any ideas???
Thanks,
Jain

No one answered

Similar Messages

  • Can generic function module extractions possible with CRM data sources.

    Hi Friends,
    can generic function module extractions possible with CRM data sources.
    90% extractions are generic function module extractions.
    How is it possible without BW adapters..
    It's very urgent ...Please.
    Thanks,
    Basava Raju

    Hi Madhu,
       Just curious ... if you already have a generic FM extractor then just go into it and find out where it is reading the data from. If its reading data from the CRM system then thre is no need for any BW adapter ... just in case you need any ABAP help ... post here ... I may be of use to you.
    Best regards,
    Kazmi

  • Why does my phone use data with cellular data turned off?

    I have problems with my iPhone 5 using data on its own. It usually happens at night, with all the apps closed and plugged in to charge (should be connected to my wifi). Recently, I started turning off my cellular data any time I'm at home out of desperation to save my data. Last night, my phone used 6MB of data with my data off, plugged in. I use My Data Manager to track, it matches up with AT&T's record of my data usage, so I'm pretty sure the app is not wrong. I have the 200MB plan, so I have to be very careful and it's incredibly frustrating to wake up and find 6MB gone when cellular data was turned off. Does anyone know what's going on?  I haven't bothered calling Apple or AT&T, I never get anywhere with either one.

    I'm not familiar with My Data Manager but from the name I would think it would tell you what app or apps have used the data and that might help narrow down the problem. If it doesn't have that information, you can go to Settings > Cellular > Use Cellular Data For and that shows usage by each app and if you click on System Services in that list it will also give details of that usage. The numbers are since you last reset the statistics (bottom of that screen). With a little time and detective work you may be able to identify the cause.
    Also, there have been many discussions on various internet forums of AT&T (and other) reporting of the time of data usage not matching the actual time of the use. The usage numbers over a number of days for example are accurate but usage reported at 2AM may actually be a summary of some types of use that happened the previous day.

  • How to compare current date with past date

    Sample code for comparing current date with past date
    i dont want to Calender.set method to compare it.
    How can i do it?

    PLEASE stay with ONE thread:
    http://forum.java.sun.com/thread.jspa?threadID=5143991&tstart=0

  • Generic Extractor using Function module with Complex Interface

    Hi,
    Has anyone created Generic extractor using Function module with Complex Interface?
    What is the difference between Complex and Simple interface in Function module?
    Pls explain.
    Thanks,
    Gopal

    Hi,
    Go through this link.....
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/d3219af2-0c01-0010-71ac-dbb4356cf4bf
    GTR

  • Billing user exit to overwrite the service rendered date with billing date

    Hello,
    My client would like to determin the rebate conditions based on billing date. However, the system only uses the service rendered date for rebate determination.
    Therefore, I am trying to overwrite the service rendered date with billing date at the time of billing creation.
    Could you please let me know what user exit I can use?
    I can't user the user exit RV60AFZC because the billing date is not determined when this user exit is running.
    Your help would be appreicated! I will give you good points! Thanks

    Hi Londa,
    Try using one of the following includes for your requirement.
    (a.) rv60afzz
    (b.) rv60afza
    (c.) rv60afzb
    (d.) rv60afzd
    (e.) BAdi SD_CIN_LV60AU02
    or if you are working with ECC 6.0 use the Enancement Spot ES_SAPLV60A available from SE80 by giving package VF and then selecting Enhancements and then expanding Enhancement Spots
    Hope these are helpful to you. Reward accordingly.
    Thanks and Regards,
    Maddineni Bharath.

  • Hello, I recently bought a new Laptop and wanted to sync all my data from the old one. Accidentaly I merged my Sync Data with Device data, how can i recover it?

    hello, i recently merged my Sync data with New device Data , because the option MERGE THIS DEVIC's DATA WITH SYNC DATA was checked, how can i recover my stuff back ? from a previous state

    Sorry, SYNC don't have that option right now

  • How to Recover SD Data with SD Data Recovery Software?

    There are various kinds of SD card recovery program in the market ,data recovery software is your top choice when you encounter SD card malfunction. This excellent SD card recovery tool is focus on recover lost files beautifully including data lost from formatted or damaged SD card which could not be accessed normally, virus attack, software crash, hard disk not formatted error, etc ,it also offers various service like hard drive partition file recovery, external hard drive file recovery , memory card file recovery, USB drive file recovery, etc.
    We use SD card frequently by using card reader to achieve important files stored in it. as it is small in size ,so it is portable and very convenient. Meanwhile, SD card is also very fragile and easy to be corrupted. There are two main reasons for SD card data loss. One is hardware corruption which is unable to be recovered unless we send the SD card the professional data recovery service center , the other is software corruption like accidentally deletion of files and virus infection ,which would be recovered data recovery software .H-Data Recovery Master is great to recover android lost formatted data with easy.

    You need either an iTunes backup on your computer or an iCloud backup to restore your app data. Other data may be recoverable:
    If you had enabled iCloud sync you can recover contacts, calendar events, notes and email by syncing your new device to iCloud. You can also view it by logging in to https://icloud.com
    If you had enabled Photo Stream or Photo Sharing you can recover photos from it.
    You can sync your music from iTunes on your computer, or, if it was purchased from iTunes, you can download it again.

  • To comapre a single date with multiple dates

    Hi All,
    I am using fetch xml report in which there are two table Opportunity and activity
    One Opportunity with have multiple activity
    Opportunity has a field  called new_dateofapplication
    and Activity has a field called StartDateActivity which have multiple values
    i need to compare these dates somehow as below  but it didnt work
    =iif((Fields!new_dateofapplicationValue.Value)<=(Fields!StartDateActivityValue.Value),sum(Fields!ActivityDurationValue.Value),0)
    for e.g
    Any help much appreciated
    Thanks
    Pradnya07

    Hi Simran08,
    According to your description, you have two tables in your report. Now you want to compare the date in Opportunity table with the date in Activity table, sum all activity hours which their date are later than the start date. Right?
    In Reporting Service, if you want to compare two values in IIF() function without using Lookup/LookupSet, these two data fields need to be in same scope. Your date are from different tables. It seems you have different datasets for those tables. This may
    be the reason why you can’t make your expression working in your report. And for comparing data from different datasets, we only have Lookup/LookupSet function. However, this function is only working in conditions where the value of one field is equals to
    the value of the other field. So we can never use this function to judge if the value of one field is greater/less than the value of the other field. So in your scenario, it’s impossible to find a solution if your Activity table only has those two columns.
    Also if you get the total hours in that way (like you post in your picture), you can’t figure out how many hours in total hours are spent on each program. But I guess it supposed to have some fields in your Activity to show clients and program. If so, you
    just need to set groups in your table and get total in group footer. It will looks like below:
    If possible could you post the dataset and table structure or any other detail information about your report? That can help us tested your case in our local environment and do further analysis. Thank you.
    Reference:
    LookupSet Function (Report Builder and SSRS)
    Best Regards,
    Simon Hou
     

  • To compare date with another date in string in siebel bip report

    Hi,
    In my rtf I am comparing a Date1 with a date in string i.e. '10-NOV-14'. If Date1 is less than '10-NOV-14' I am dispalying a certain text and if not another text.
    This condition is working fine if Date1 have 2014 values but if  Date1 cointains 2015 date than the mentioned condition is falling.
    Kindly suggest any solutions.
    Regards,
    Siddhika

    This example may help:
    <xsl:stylesheet xmlns:xsl="http://www.w3.org/1999/XSL/Transform"
    version="1.0">
    <xsl:param name="currentDate"/>
        <xsl:variable name="firstDate" select="concat(substring($currentDate, 1,4),substring($currentDate, 6,2),substring($currentDate, 9,2))"/>
        <xsl:template match="/">
            <xsl:apply-templates select="//item"/>
        </xsl:template>
        <xsl:template match="item">
            <xsl:variable name="secondDate" select="concat(substring(submissionDeadline, 1,4),substring(submissionDeadline, 6,2),substring(submissionDeadline, 9,2))"/>
            <xsl:choose>
            <xsl:when test="$firstDate &gt; $secondDate">
                <xsl:call-template name="late"/>
                </xsl:when>
                <xsl:when test="$firstDate &lt; $secondDate">
                    <xsl:call-template name="ontime"/>
                </xsl:when>
                <xsl:when test="$firstDate = $secondDate">
                    <xsl:call-template name="same"/>
                </xsl:when>
                <xsl:otherwise>Monkeys<br /></xsl:otherwise>
            </xsl:choose>
        </xsl:template>
        <xsl:template name="ontime">
            This is on time
        </xsl:template>
        <xsl:template name="late">
            This is late
        </xsl:template>
        <xsl:template name="same">
            This is on time
        </xsl:template>
    </xsl:stylesheet>

  • How to compare user entered date with current date

    Hi all
    my requirement is, user allowed select one date, in code i have compare this date with current day date. it should be 15days gap other wise display error message.
    I am worried about how to get current date in code. Is there any code to get current date. please reply me with code or mail me at [email protected]
    Thanx
    keerthi

    Keerthi,
    Use the method <b>getDifference()</b> of the DateHelper.java available here.<a href="http://www.koders.com/java/fid14A61FEB1B45A64E42E1DCAD7070B46AE46340BA.aspx">DateHelper</a>
    1. Create a new folder, say Util under your src folder. (com.xyz.util)
    2. Put this DateHelper.java file in that folder,(com.xyz.util) .
    3. Now, write an import statement for this java class in the required view.
    4. Use the getDifference() method of this class to the difference in days between two days.
    Or
    Simply use this code.
    // Get msec from each, and subtract.
    long diff = currDate.getTime() - selectedDate.getTime();
    int noOfDays = diff / (1000 * 60 * 60 * 24);
    where currDate is today's Date and selectedDate is the Date selected by the User.
    Bala

  • PowerPivot Dates with no Data

    I've got a classic "fact" table with Membership data linked to a "date" dimension table.  The fact table stores membership data at each month end date.  My Members Added measure works as expected, but Members Added YTD repeats
    for every date in the Dim_Date table.  I wasn't expecting that.  I only want to show the dates for which there is data.
    Members Added:  =CALCULATE(SUM(Fact_MemberWalk[MemberCount]),Fact_MemberWalk[TranType]="New Member")
    Members Added YTD: CALCULATE([Members Added],DATESYTD(Dim_Date[DateKey]))
    Picture of Problem:
    Kirk P.

    Hi Kirk,
    According to your description, this issue is more related to Power Pivot. The Power Pivot forum is a better place for Power Pivot issue, we will move it there for you.
    Regards
    Starain
    We are trying to better understand customer views on social support experience, so your participation in this interview project would be greatly appreciated if you have time. Thanks for helping make community forums a great place.
    Click
    HERE to participate the survey.

  • Compare finish date with target date

    Would like to keep track of late Projects by comparing the finish date with the target date but are unable to do so. The idea is just to filter and count the summary tasks which have a later Finish date than the target date and present that as a the number
    of late Projects. However it does not work, when trying to setup the filter Project tells that the target value can not be used for comparasion against the finish date.
    Does anyone have a workaround or maybe a better solution to keep track of late Projects. Please note that we are talking about Projects that risk to be late compared to a date promised to a customer. When we plan we always add some extra time at the
    end to have some extra when the Project is delayed at a certain department, however we want to keep track of how many late Projects we have and how late they are. Are not after seeing the status for each departments, only how we are doing in relation to what
    we have promised our customers.
    Kind regards //Anders

    Anders,
    Trevor and Dale have tried to steer you towards the normal tracking fields and methods already available in Project, but let me take a more direct approach to your exact question. First of all, you didn't tell us what field you are using as the "target date".
    I'll assume it is the Date1 field manually entered for each summary line.
    You could probably produce something close to the report you want with custom field formulas, filters and some manual counting but let me offer a more automated approach. The following macro will examine each summary task in your project and determine if
    the finish date is before or on the target date (Date1), or if it is after the target date. If it is after the target date, that will count as one late project/order and add it to a running count of late orders. The difference in days will also be tracked
    and added to a running total of delay. At the end, a message will appear in the exact format you describe.
    Sub LateReport()
    Dim t As Task
    Dim LateCount As Integer
    Dim LateDays As Integer
    Dim TotDelay As Integer
    For Each t In ActiveProject.Tasks
        If Not t Is Nothing Then
            If t.Summary = True Then
                If DateValue(t.Finish) > DateValue(t.Date1) Then
                    LateCount = LateCount + 1
                    LateDays = DateValue(t.Finish) - DateValue(t.Date1)
                    TotDelay = TotDelay + LateDays
                End If
            End If
        End If
    Next t
    MsgBox "Number of late orders: " & LateCount & " (" & TotDelay & " days of total delay)"
    End Sub
    Note, in my view, and I'm sure in Trevor and Dale's also, the Finish field of the summary line does not indicate completion, it simply indicates the scheduled finish date of the last task in the subtasks under that summary. I think you should use the Actual
    Finish date as the comparison value since it indicates when the project/order is complete. If you do decide, actual finish is a better choice, then substitute t.ActualFinish for t.Finish in the above macro.
    My input.
    John

  • How to compare Sale data with Previous data

    Hi Guys,
        Any one tell me how we will compare Sales data with Last year Sale data. Is there any T.Code or any kind of Report in the SAP. If available please suggest the same.
    Thanks & regards,
    Naveen Bhatia

    Hi Naveen,
    Did yo ucheck t-code SD01
    Regards
    Rohit.

  • Compare - Current Data with Perious Data.

    Experts,
    We have created default report like below
    Date - Company - Product - SCode - Amt Spent - Net Amt - Calls
    12/12/2010 C1 P1 Code1 1000 1500 15
    13/12/2010 C2 P4 Code2 1500 1200 10
    12/12/2009 C1 P3 Code3 2000 1700 25
    11/12/2010 C3 P1 Code4 3000 1600 10
    11/11/2009 C2 P2 Code5 5000 3000 30
    Grand Total 12000 9000 90
    Here we are using Column selector for Date column to change the report from Date to Week (or) Month (or) Quarter (or) Year.
    My Questions
    1. I want to compare Default Date report with Perious Date, Last month Date and Last Year Date.
    2. If I select Month from Column Selector then I want to compare Month report with Last Month, Last year Month or Perious of Last year month.
    3. If I select Year from Column Selector then I want to compare Year report with Last year, or Perious of Last year and so on.
    Please help me, how can we achive the above task.
    Thanks in Advance.
    Balaa...

    Hello,
    First you have to define the new measures for last month, last year and so on. You can refer to this link:
    http://www.rittmanmead.com/2007/04/obi-ee-time-dimensions-and-time-series-calculations/
    After that, what you can do is instead of using a "Column Selector" you should use "View Selector". You can create different views, one for month, other for Year and include them into a "View Selector".
    After that you can add it in "Compound Layout".
    Regards,
    JorgeRS.

Maybe you are looking for

  • Macbook Pro 13" Late 2011 keeps crashing

    How do I fix it? *** Panic Report *** Machine-check capabilities: 0x0000000000000c07 family: 6 model: 42 stepping: 7 microcode: 40 signature: 0x206a7 Intel(R) Core(TM) i5-2435M CPU @ 2.40GHz 7 error-reporting banks Processor 0: IA32_MCG_STATUS: 0x000

  • How to stop size of JTextField from changing when I change font to bold

    I'm working on a Sudoku solver for a CS project. I've got JTextFields for the input. I want to bold the entries of the begining puzzle, like they are in the magazines. When I set the font to bold, it changes the size of the text field. I'm using the

  • Convert String to java UTC date then to sql date

    Hi, I am trying to convert string (MM/dd/yyyy format) to UTC date time and store in the database. This is what I did: String dateAsString = "10/01/2007"; SimpleDateFormat formatter = new SimpleDateFormat("MM/dd/yyyy"); formatter.setTimeZone(TimeZone.

  • Identify sold to and related partner functions .

    How to identify sold to , bill to and pay to  from ship to data in BW ? Could you please help me with partner functions and describe me how it works in BW ? Regards

  • Document on HRMS Localization

    Is there any document which gives the Localization in Oracle HRMS for all the countries?