GI Raw Materials to Semifinished Reservation Number...

Hi All,
I can't post Goods Issue Raw Materials to Semifinished Assembly Reservation Number.the message said "Document 0000067397   does not contain any selectable items". I tried to confirmation semifinished order number before i post goods issue  (CO15)....but i still can't post GI.....help me please....thanks....

Hi,
Please check with Backflush indicator and Final Issue Indicator & Qty withdrawn field at component Overview of Production Order.
Once the Backflush ind is activated for Material, system will not allow to issue the Goods at MB1a,MIGO.
Since u already have tried the Order Confirmation, the good issue should have happened. Please check with "Documented Good movement" at production Order.
Check with Goods movement error at COGI.
Please try and comeback.
Pradeep

Similar Messages

  • Movement 262 against a Process Order and a RESERVATION number.

    Dear PP experts,
    Our raw materials are reels of paper. Our inventory supplies the production with a reel e.g. 1000kg and posts a 261 against this order (and against the reservation).
    By the end of the production phase any remaining raw material qties are returned to the inventory and a 262 against this order is posted (but the reservation is not updated).
    This causes the withdrawn qties shown at many pp info views to be *incorrect8. While the post goods movements lists are correct.
    A MIGO for 262 and with reference to a reservation is not possible.
    I did post finally a 262 against a reservation through COR6 and having the u201Cbackflushingu201D indicator on at the material view (process order material view). The u201CConfirmation of process order create: Goods movementu201D view had all info and MOV. TYPE 261 active and I was able to change it to 262 and saved it. All updates seems to be ok and withdrawn qties are the same with the sum of u201Cpost goods movements listu201D.
    IS THERE A WAY TO POST SUCH A MOVEMENT (262 AGAINST A RESERVATION) BUT NOT FROM COR6 (AVOIDING TO SAVE A CONFIRMATION TOO) ? Let's say to use only the screen of "Post Goods movement" of COR6 wo the 1st screen of confirmations? Or any other Tcode that might exist.
    Thanks in advance for yr suggestions.
    Kind regards,
    Elly

    Hi Elly,
    To return via reservation number is not available in SAP, however, there is a workaround.  When perform Goods Issue via Reservation (Mvt 261), there will be a material document get created.  This material document will be used as reference to perform Goods Return (Mvt 262) in which it will update the respective reservation qty.
    You may then use tcode: MBRL - Return Delivery or tcode: MIGO with A02 Return Delivery, R02 Material Document.
    1) Enter the Material Document that was used for the Goods Issue via reservation.
    2) Be careful here, select ONLY the required material(s) (by default, all materials issued via the material document is selected) and their respective qty for return.
    3) Check and Save it.
    Hope these steps help.
    Cheers!
    SweePeng

  • In house mfgd. raw materials for a production order- Cost capturing

    Hello Experts,
    The scenario is as below:
    Client wants to manufacture in house some of the raw materials for a production order of sub assembly. These raw materials are made from scrap, with some manhours spent on it. After making them in house, these are handed over to stores for kit preparation.
    The planner wants to create a stock of these materials (without making individual prod. orders since there are many of these). One option is, planner can do the cost centre issue reversal (202 movement). But the raw material cost is also getting captured in it from the material master.
    From costing point of view, the cost of raw material should not be included since it is made from scrap. Only the cost of man hours spent is to be accounted for.
    Please help as to how to map this scenario. For capturing cost of man hours spent, we can include a routing for it in the production order of the sub assembly. But how to eliminate or exclude the material cost. All inputs from your side are appreciated. Thanks in advance
    Regards,
    Chetan.

    Hi Chetan,
    Your scenario has some major issue.
    1. You cannot produce RAW material in SAP.
    2. The cost of material produced inhouse will be different than that of original RAW material.
    3. There will be some cost effect in the final finished product if you consider this inhouse produced material for product costing of finished goods.
    We have similar scenario with my client and here is what I have implemented.
    1. Create a new HALB type part number for the inhouse manufactured RAW material. This will ensure that you assign Routing and BOM to same and can capture the COST for the same.
    2. Creating new material will enure that the product costing for inhouse produced RAW material is done.
    3. You can create single Production order for the same as you only have to capture cost. This depends on your Business scenario.
    4. Once you have inhouse produced raw material, you can create alternate BOM for the FINISHED Material with this new Part number in BOM.
    5. Create Production Version for the two BOM and ask Planner to select the Version 2 if he requires new part number in Production Order. I assume that this case would genrally appear in very small numbers.
    6. Now coming to product costing for final assembly. Since we are going to reuse scrap material to create the new part number, only activity cost and component cost will be used to determine cost. This cost will be less than that of RAW material cost.
    So we always suggest our customer to consider OLD part number to determine the PRODUCT COST of final material. BUT business will have to take a call on this.
    Do let me know if u need any thing else.

  • We need to manage raw materials by vendors(makers).(about Split valuation)

    Hi all.
    We just  started a project to install SAP system.
    Our client need to valuate their raw materials by vendors(makers).
    For example : raw01(3Cm*3Cm steel hot coil) is sold by VendorA, VendorB, and VendorC.
    Raw01(from VendorA,  B, and C) are same materials but the price is largely different by vendors(makers),
      just as raw01(VendorA)'s price is 1,000/EA,
           ,     raw01(VendorB)'s price is 1,500/EA
         ,and raw01(VendorC)'s price is 2,000/EA
    So our clients , expecially finance dept and purchasing dept, want to manage them seperately.
    Finally we consider about split valuation(batch valuation with valuation type).
    But Our concern is as below:
    1. System Performance : The number of GR is 1,000 / per day.
                                            It means that the batchs(1000EA) will be created everyday.
    2. In case of raw mat, we want split valution.
       All material type use Batch : Our material types are raw mat, half finished good, finished good.
                                                     They will be managed Batch number.
                                                     But we just want to manage split valution in case of raw material.
    Now we consider all cases which can be occured.
    Please give us good advice.
    Best.
    Mahnkwi.

    hi chris
    Hope you have configured the material A for split valuation. while calculating standard cost estimate for the material C. through ck11n, the system will pick up the header price from material master.
    But here you are saying that you have chances of using the material A, 60% of brand alpha and 40% brand beta
    Instead of using split valuation use mixed costing concept. create the material A with separate Ids and create two boms one with alpha and the other with beta.
    create procurement alternative in CK91N and mixed ratio with Ck94 and release the mixed cost estimate
    please go through this thread also
    Re: Difference between Split Valuation and Mixed Costing
    Krishna

  • Getting Blend materials from Raw Materials in RMWB transaction technically.

    Hi,
    I am working on a PDM report having requirement for determining all unit and case UPC that contain a chemical represented by a CAS.
    I have a requirement for getting Blends using Raw materials.I am able to find the raw materials from pure substance but not able to get a logic for getting the Blends from this raw materials.
    Is there any Function Module to find the Blends from raw materials or any logic which I can put in my program to find this.If anybody could help me in this.
    Then I have to get the Finished Goods using the Blends.
    And Finally Finished Goods comprised of Finished Goods.
    There is no time to debug the Standard RMWB transaction.
    <removed_by_moderator> .Kindly all PDM-ABAP users please help me on this issue.
    Thanking you in advance.
    Sudip
    Edited by: Juan Reyes on Aug 14, 2009 2:49 PM

    Hi Chetan,
    Your scenario has some major issue.
    1. You cannot produce RAW material in SAP.
    2. The cost of material produced inhouse will be different than that of original RAW material.
    3. There will be some cost effect in the final finished product if you consider this inhouse produced material for product costing of finished goods.
    We have similar scenario with my client and here is what I have implemented.
    1. Create a new HALB type part number for the inhouse manufactured RAW material. This will ensure that you assign Routing and BOM to same and can capture the COST for the same.
    2. Creating new material will enure that the product costing for inhouse produced RAW material is done.
    3. You can create single Production order for the same as you only have to capture cost. This depends on your Business scenario.
    4. Once you have inhouse produced raw material, you can create alternate BOM for the FINISHED Material with this new Part number in BOM.
    5. Create Production Version for the two BOM and ask Planner to select the Version 2 if he requires new part number in Production Order. I assume that this case would genrally appear in very small numbers.
    6. Now coming to product costing for final assembly. Since we are going to reuse scrap material to create the new part number, only activity cost and component cost will be used to determine cost. This cost will be less than that of RAW material cost.
    So we always suggest our customer to consider OLD part number to determine the PRODUCT COST of final material. BUT business will have to take a call on this.
    Do let me know if u need any thing else.

  • Batch determination for raw materials in process order

    I have defined a sort rule, batch search strategy and assiigned this strategy to process order type.classification for batch is also defined with charecterstic mentioned in sort rule.But when i am doing BD for raw materials in Process order , it is barnching into some other screen saying, no selection criteria and no strategy info defined. what are the necessary settings to make BD possible for all the materials having batch management.

    Hi
    Config Setting In Batch Management
    This will help you for config setting:
    Logistics general - Batch Management
    1.1. Specify Batch Level
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Specify batch level and activate batch status management Transaction  OMCT
    1.2. Batch Number - Activate Internal Number Assignment
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Number Assignment --> Activate internal batch number assignment Transaction  OMCZ
    1.3. Batch Creation - for Goods Movements 
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Creation of new batches --> Define batch creation for goods movements Transaction
    1.4. Characteristic Value Assignment -- Update Standard Characteristics 
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Characteristic Value Assignment --> Update Standard Characteristics Transaction
    1.5. Activate Batch Classification for Goods Movements in Inventory Management 
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Characteristic Value Assignment --> Valuation for goods movements --> Activate Batch Classification for goods movements in Inventory Management Transaction  OMCV
    1.6. Batch Determination u2013 Condition Table(Cross Client)
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Condition Tables --> Define production order condition tables Transaction  OPLB
    1.7. Batch Determination u2013 Condition Table(Cross Client)
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Condition Tables --> Define SD condition Tables Transaction  V/C7
    1.8. Batch Determination u2013 Access Sequence(Cross Client)
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Access Sequences --> Define Production Order Access Sequences Transaction  OPLF
    1.9. Batch Determination u2013 Access Sequence(Cross Client)
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Access Sequences --> Define SD Access Sequences Transaction  V/C2
    1.10. Batch Determination u2013 Strategy Types
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define Production Order Strategy Types Transaction  OPLE
    1.11. Batch Determination u2013 Strategy Types
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define SD Strategy Types Transaction  V/C1
    1.12.  Batch Determination u2013 Batch Search Procedure
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define IM   Search Procedure Transaction  OMCY
    1.13.  Batch Determination u2013 Batch Search Procedure
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define Production order Search Procedure Transaction  OPLG
    1.14.  Batch Determination u2013 Batch Search Procedure
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define SD Search Procedure Transaction  V/C3
    1.15.  Batch Determination u2013 Batch Search Procedure Allocation
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Allocate IM search procedure/activate check Transaction  OMCG
    1.16. Batch Determination u2013 Batch Search Procedure Allocation
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Assign Search procedure to production order Transaction  OPL8
    1.17.  Batch Determination u2013 Batch Search Procedure Allocation(SD)
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Allocate SD Search procedure Transaction  V/C5
    1.18.  Batch Determination u2013 Activate Automatic Batch Determination(SD)
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Activate Automatic Batch Determination in SD -->For delivery item categories Transaction  V/CL
    1.19.  Batch Determination u2013 Batch Selection Class
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define Selection Classes Transaction  CL01
    1.20.  Batch Determination u2013 Sort Rule
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Batch Determination & Batch Check --> Define Sort Rules Transaction  CU70
    1.21.   Batch Determination u2013 Make Settings for Batch Where-used list
    Menu Path  Enterprise Structure> Logistics General> Batch Management --> Make Settings for Batch Where-used list Transaction  OMBB              
    regards
    Faisal

  • Can we get the raw materials for a classified Material from MSEG table?

    Hi All,
    Can we get the raw materials for a classified Material from MSEG table using Order number?
    If yes How we can find it out for Past month only? As well how we can get the std price for this raw material.
    Please help me out,
    Thanks,
    Ravi

    Field STPRS (Standard price) From Table MBEW.
    Kanagaraja L

  • How to breakdown a finished product back to its raw materials

    Hi Gurus,
    I have a scenario.
    My insuatry is a piston manufacturing industry. I make final pistons and send it to my customer. Some pistons are rejected and they come back to our plant. Now I want to use raw materials/semifinished goods that I used to make the piston. I open the piston and use those parts. How do I it in SAP means I need to break a finished good back to its raw material position.
    Thanks

    Hi Mangalraj,
    My scenario is :
    I get back a rejected piston from my customer and then I dismantle it to get back my RM/SFG.
    What I am doing is : My BOM is Piston has 4 components ( 3 RM + 1 SFG).
    I make a production order of 1 SFG which is a part of piston and in components section I give piston quantity is +ve and all three RM quamtities in negative.
    When I do GR for SFG I am only able to see that SFG in MIGO , I am unable to see the 3 RM quantities in MIGO with movement type 531.
    DOes 531 movemnet type happens automatically with 101 movement type or we need to do separate 101 and 531. As per my understanding 531 happens along with 101( also please let me know if any setting is required for the same)

  • Serial Numbers for Raw Materials

    Hello All,
    We are not using serial numbers at the moment, but we would like to assign a serial number to each material that enters the warehouse. So not on finished goods, but on raw materials. If we for instance order 10 boxes of a material, we would like to create 10 different serial numbers for these boxes (in MIGO).
    Batch management is not the solution, since the 10 boxes would receive the same number, whereas we want a unique number per box.
    Is this possible?
    Regards, Marc
    Edited by: japie303 on May 12, 2009 1:08 PM

    Thanks for your replies.
    We already have storage unit types, one of them is "Box". So in the warehouse mgmt 2 tab, an entry has been made which looks like:
        LE quantity          Un         Sut
    1. 100                     Ea         Box
    This works nicely when goods are putaway: the system suggests that if there are 1000 materials ready for putaway, 10 boxes are delivered and thus 10 storage bins are required.
    The only thing that fails is that there will be 1000 serial numbers generated, instead of 10. Handling Unit management is no option, because that brings a lot of workload with packing and unpacking goods. Changing the base unit of measure to box is not an option, since a box is no unit of measure.
    Regards,
    marc.

  • Overhead costs on raw materials

    Our requirement is to have some percentage overhead on raw materials.  So I created a costing sheet and applied a percentage to them and did a std cost estimate. Now when GR is received it valuates against the std cost (which includes OH) and posts the difference to PPV. Client wants it to valuate against the orginal price of material (without OH)
    Ex;  ROH  Mat A $1.00 in planned price 1
           Costing sheet : 10% OH
    Standard cost of this ROH A is $1.10
    Purchase order will be at $1 so GR will post  Dr. Inv $1.10  Cr. Gr/Ir $1.00 PPV $ 0.10
    But clients want that PO price $1 to be valuated against $1 (true ROH cost) and post $0.10 to absorption account
    Dr. inv $1.10, Cr Gr/IR $1  Cr abs $0.10  
    if P.O is $1.10 then Dr. Inv $1.10 Cr. Gr/IR $1.10 Dr.PPV $0.10 Cr ABS $0.10
    I am not sure if it is even possible if not waht options do I have to have and overhead for Raw materials with out updating standard cost estimate with $1.10.
    Thanks

    Hi
    Yes, it is possible
    What you want is to Debit the inventory with 1.1 i.e. inclusive of Overhead.. But, Credit the GR/IR with 1 $ and post the 0.10 to absorption account instead of PPV... So, that PPV reflects true PPV
    You need to create an accrual key for the same..
    1. Create an accrual condition type and accrual account key in MM pricing procedure. In this way, there is a credit entry to the GL account represented by accrual account key. Hence the PPV represents the true value.
    2. For the accrual condition type, you can create a condition record such that its value is same as your overhead. You can use the user exit to automatically populate its value from KEKO and KEPH table.
    Refer this post where it was discussed a few days back
    Product Costing-Overhead inclusion in Inventory standard cost without PPV
    Regards
    Ajay M

  • How to achieve Indenting and Issuing of raw materials in Oracle 11i

    Hi
    We have an issue with indenting and issuing of raw materials between stores and shop floor.
    Business Process is:
    1) Shop Floor should send a requisition of raw material to stores department i.e., (Indenting) with authorization of Production Manager.
    2) Then based on the requisition, stores needs to issue the raw material to Shop floor with Stores Manager authorization in report format.
    Work around:
    we have created Flexi Fields (DFF) in the Batches window under context value,
    through which we can indent quantity of that item datewise required.
    But the trouble is, it is time consuming and data entry is more.
    Also we have RM Pick List report, which is not useful for us for this process.
    Can any one please give me any idea how to do this process with minimal data entry in optimal time without new customization.
    Thanks in advance for your valuable ideas
    Prem.

    Hi Gordon,
    My SBO version is 8.8 PL 10, Indian Database. I want to see the "Raw Material" G/L Account's opening balance in the Opening Balance Column of Trial Balance or similar report of SBO. The technical problem behind this is - the mentioned reports shows the the amounts in OB column if that amount is entered by the OB Transactions (in Administration -> System Initialization). But how to manage the Raw Material / Inventory G/L through this concept, as the OB amount for this is entered through Inventory Initial Quantity. We can do the entry one day before the expected starting date of the financial period, is that can be a standard practice? For. e.g. entering the opening balance for 1-1-06 on 31-12-05.

  • Data not updating for raw materials only in cube level

    HI all gurus,
    we have flow like ods1->ods2->cube1,cube2 and cube3.
    In ods1 we mapped ZMATERIAL WITH OMATERIAL.
    In ods2 we mapped zmaterial with zmaterial directly.
    In cube we mapped zmaterial with zmaterial only but also we added 0mat_type in update rules of cube. i.e.we mapped in update rules  0mat_type is master data attribute of zmaterial.
    But the problem is ods2 is mapped to cube1,cub2 and cube3 parllelly.
    But the data is not populating to cube2 and cube3 only for rawmaterials i.e 0mat_type is having 15 material types(finished ,semi finishe and rawmaterials) only 4 raw materials are not showing any data for these two cubes but for one cube1 it is showing data for all 15 material types. (including raw materials)
    what could be the problem.
    I checked the Attribute change run.
    I checked the data in masterdata also zmaterial and 0material.(data is available upto date).
    Please help and i will definitely assingn the points.
    It's very urgent becauz total my development work is stopped.
    Thanks & regards,
    Kumar.

    Hi,
    Check the material values in cube2 and cube 3 for records not having 0mat_type and then using that material check the material master data table to confirm whether mat_type is present for those materials or not.
    Also, if you have written any start routine in update rules for cube 2 and 3 then check that too.
    PB

  • Discrete production process after creating sales order with raw materials

    Dear all,
    I need your support on a specific solution related to discrete production process.
                                After creating a sales order where the materials are marked as raw materials (ROH), with reference to the sales order the production order is created and the store issues the material for assembly process and is sent for assembly of materials. After assembly of the materials the inventory is added to the sales order stock as same as raw material and after PGI the billing is done for raw material only.
    Please let me know the process of raw material to raw material scenario.
    Thanks
    Seshi

    Hi Seshi,
    This question seems to be related to ERP rather than to SAP ME. You'd better post it to ERP-related forum. Please use these instructions to find a proper space.
    Regards,
    Sergiy

  • MTO not considering available raw materials

    Here there are some available raw materials in unrestricted use. When any new sales order is generated for MTO finished material it is generating a new purchase requisition for the same raw material ( since that raw material is not assigned to the sales order ). But here client is asking that it should consider the available raw material only when they generate any new sales order for finished product and it should not generate any new PR

    Hi
    For raw materials in MRP- 4 view give individual/coll field as 2 which is collective requirement. It will consider. Do it only for raw material.
    Regards
    Antony

  • Collective requirement for Raw materials for the whole week during mrp ru

    hi gurus,
          I have a requirement like this. the raw materials required for on different requirement dates has to be clubbed together  per week and one single purchase requisition for that raw material for that week. I had created a availability checking group and assigned that to check rule. then attached that in material master mrp 3 view of the material master.
       If i run mrp for that product, it is not clubbing the weekly requirement instead it is clubbing only daily requirement and pr is getting generated.
      can anybody give some valuable inputs so that i can proceed further?
    regards,
    senthil

    Hi,
    Try using the Lot Size: WB.
    With this system wil club together all the requirements and propose a single receipt element.
    Regards,
    Siva

Maybe you are looking for

  • Elements 8 orgnaizer

    How do I delete does file from the list ? they are not on the Hard Disk any more. How do I make  the organizer open in all the screen. when i will bay the box version (its not out in ISRAEL yet ...) and uninstall the trill version all my TAG and Albu

  • Dynamic photo gallery script?

    Can anyone suggest a good photo gallery script? My client is a photographer and needs a user-friendly system where he can create galleries, upload images. He also needs to assign usernames/passwords to each gallery. I was going to use Coppermine, but

  • URxvt and the mouse wheel

    Hi all! I would like to know if it's possible to scroll down in man or less with the mouse will using URxvt. Thank you.

  • Recovery partition failure Dv6-7914nr

    Primary partiton had many issues, so after trying to restore to earlier time(failed) I tried to restore from Recovery partition. This is the error I get when turning on computer                              File:  \boot\BCD                          

  • PDF Export: Missing Graphics

    PDF Export: Missing Graphics<br /><br />Below is a section of code we are using to export a document as a PDF. The code will work 99% of the time, but occasionally we are getting the resulting PDF with some of the linked PDF components completely mis