GLPLADM Planning profile for new gl - default parameters

i have copied the existing SAPFAGL profile and the layouts belonging to them and created a new profile with the same layouts. i am trying to set default parameters in order to get file description for each of the planning layout. i am able to do in our sandbox but not in the development client. the difference between two clients are sandbox is an upgraded version to 6.0 and the development client is a new box loaded with ECC 6.0. kindly help me on this.i would need to have the file description in order to do a excel planning upload. my excel planning upload works fine for the cost center profile and the layouts. i am having issue with the new g/l planning where the planning is done at the profit center and g/l Account

no errors no issues.. usually when we click on the default parameters it takes us to the screen showing the layout and then we key in data and the excel sheet gets loaded . we key in data or we can save the file description , it is automatically generated and the file description generated by the system gets populated in the file description field of the planning layout in the planning profile. in my case, when i click the default parameters, it doesnt go any further, and no warning or erro messages are issued. the same default parameters take me to the layout screen when i click the default parameters from the Cost center planning profile. i am not able to resolve this, asked many people but of no use. hope you understand my issue.

Similar Messages

  • Planning Profile for Project System

    Dear All,
    In planning Profile (T Code OPSB) for Project System we can find  RElem.f.billing plan ..field, in this field which cost element we have to assign wheather it is sales revenue or secondary cost element cat.31 or else..plz adives me..
    Thanks and regards

    Mr. Sridhar,
    Thanks for ur reply, here my querry is, i have types of sales revenues like domestic, export, industrial etc.. there is only option is there to maintain revenue cost element, so which revenue cost element i have to maintain in planning profile.
    Regards
    Ramesh

  • Profile for new lens

    I use LR 3.5.  I just bought Canon's new EF40mm f1:2.8 lens.  Is there a LR profile for this lens?  If so, how do I obtain and install it?

    The LPD used to be on Labs but is no longer searchable, there, but if you search www.adobe.com it’ll come right up:
    http://www.adobe.com/cfusion/search/index.cfm?term=lensprofiledownloader&loc=en_us&siteSec tion=home
    Add the keyword Mac to your search if you need that version, otherwise he Windows version is what shows up closer to the top of the search results.  Be sure to get the newest one, 1.0.1 release the beginning of October.

  • Lens correction profile for new Sigma 12-24 mark II

    Hi
    Sigma 12-24mm f4.5-f5.6 II has been out for a while. But i can not find a lens correction for it in lightroom. Does anyone know if there is such a profile ??

    Adobe does not announce release dates for new profiles. However, you can except that the next minor release upgrade after the release of the lens will bring the profile to LR.

  • Selected color profile for new images from "clipboard" is wrong in CS6

    I have given up trying to find the answer to this myself.
    Steps to reproduce:
    1. Take a screenshot of something in your web browser (macintosh CMD+SHIFT+4) to the clipboard.
    2. Select File > New from the menu. Clipboard should be the selected Preset.
    3. Notice how in CS6 the color profile under "Advanced" is "Display" and NOT "sRGB" — in CS5 it is sRGB.
    4. Paste from the clipboard into your new document and get the color profile mis-match warning if you are in CS6.
    It is either not picking the color space of the clipboard properly like it will in CS5, or I am missing something somewhere.
    Nothing I do in an attempt to fix this is working. I have sRGB set as my default profile in color settings, and nothing I do changes this setting for the "Clipboard" preset.
    I am getting sick of forgetting to manually select "sRGB" every time, opening up a new document sized to my clipboard and then getting the color profle mismatch warning when I paste in the clipboard contents!
    I take so many screenshots as I develop websites this is a CONSTANT problem as I am constantly creating new documents from the clipboard to check alignments, zoom in to get color samples, and many other reasons.
    Message was edited by: DrunkCyclist

    That helps a little. It explains why "Display" is selected when I create a new from the clipboard in PS.
    The ColorSync profile from a screenshot opened in the Preview App shows up as "Color LCD" in the inspector.
    So, I assume what is happening in PS is that the new document is being created in the working color space and my clipboard contents don't match that and therefore causes the warning?
    I could see getting a warning if I create a new document from the clipboard in PS and it embeds the "Display" profile within it, and then I try and paste something which has an sRGB (or other) embedded profile, but I was assuming the new document from the clipboard contents would have the same color profile as the clipboard contents.
    I just don't get why I get a warning when I create the new document and the very first thing I try and do is paste the clipboard contents into said document.
    However, when I select "sRGB" from the dropdown list instead of "Display" in the PS dialogue box it does not give me the mismatch warning.
    Although the warning does say my source and destination document are both using the "Display" profile but my working space is sRGB.
    The more I think about it, I may have just checked the "Don't show again" box in CS5 if I ever had the same issues and therefore never dealt with that again!
    I am going to go read as much as I can about the color profiles in PS. I used to deal with this a lot as a print designer but not so much anymore working in UI design. I only really look into these issues when I get weird color shifts on saved files and things of that nature.
    Thanks for taking the time to explain some things!

  • Profile for new user

    I'm creating a new user from the transaction SU01.
    Which profile do I have to choose for being able to access to all transactions?

    in profiles tab give
    SAP_ALL
    SAP_NEW
    i think this will helps to u

  • Where are the lens profiles for newer Nikon DSLR products?

    There is hardly anything for D800 and newer lenses like 24-120 f/4, 70-200 f/4, 28-300 f/3.5-5.6, etc. Also, I have Lens Profile Downloader 1.0 installed and it works, but I cannot update to 1.0.1. It refules to install:

    24-120 f/4, 70-200 f/4, 28-300 f/3.5-5.6, etc. Also, I have Lens Profile Downloader 1.0 installed and it works, but I cannot update to 1.0.1. It refules to install:
    There is a Adobe supplied profile in the standard install for the 28-300 (NIKON D3X (Nikon AF-S NIKKOR 28-300mm f3.5-5.6 ED VR) - RAW) and for the 24-120 (NIKON D3X (Nikon AF-S NIKKOR 24-120mm f4G ED VR) - RAW). Those profiles will work fine for those lenses used on any Nikon body, including crop bodies. The 70-200 f/4 is too new I guess but I am sure it will show up soon. I don't have one (yet) otherwise I would have put up one already as it is trivial to generate these lens profiles yourself.

  • UC320 dial plan problem for New Zealand

    Hi all,
    Our UC320 will no longer make outbound calls to local/national New Zealand numbers. International is fine. The problem is that if I dial:
    09 375 5967, it gets normalized to +64093755967    (notice the 0 after the 64) and the call fails.
    If I dial 0064 9 375 5967 it gets normalized to  +6493755967     which is correct and the call works. My users simply won't accept having to dial the additional 0064 for local numbers.
    Any idea how to fix this?
    Cheers. 

    Hi,
    the problem as you know already is cause by your secondary extension numbers, that are perfectly overlapping with some external numbers. What is the reason for these secondary extensions ?

  • Variant Configuration - Planning tables disappearing from planning profiles

    Hi everyone,
    I'm having a strange problem with some planning profiles I've set up in MDPH for several of our configurable products. I'm getting reports from our production planners that certain planning tables within these profiles are suddenly disappearing from the profiles, along with all the values they've input for those characteristics. This is apparently happening without anyone making any changes to the profiles.
    By way of background, I've recently created several new variant models (including planning profiles) for a new series of products, several of which share characteristics with the variants that are experiencing the problem I described. Is it possible that this might somehow be impacting the planning profiles of the old variants?
    Any help is greatly appreciated. We're running 4.6c, FYI.
    Thanks,
    - Greg

    Hello Anil,
    Thank you very much for your reply. I've read both notes you referenced and they seemed very promising in that the symptoms described match what we are seeing. Unfortunately, however, they don't seem to reflect the root cause of the problem I'm seeing. Our users are logging in in English, and we have English names for the characteristics in question. Also, we are on a later patch version (55) than the one that fixed this issue (51). So I don't think this one will help us to fix the issue.
    If you have any other ideas, please let me know. Thank you again for your help on this!
    Regards,
    - Greg

  • Status Profile for Internal Order

    Hi,
    Please tell me during creation of new status profile for new internal order type under status I have mentioned LKD - Locked and PLIM - Write plan line item. What should be used its corresponding Business Transactions with No Influence, Allowed, Warning, Forbidden, No Action which i need your valuable suggestion for our new implementation project.
    Best Regards,
    Samrat

    Hi Anand,
    My query is while creating Status Profile in tcode OK02, there are various business transactions are available under status which one is No Influence or Allowed or Warning or Forbidd etc. I need to know the actual business transactions required for the status profile. Presently I have mentioned two business transactions which are Release and Write plan line item under status LKD(Locked). Release indicator is "Not Influence" and "Set". And Write Plan Line Items checked only "Allowed" as business transactions. But another user status "PLIM" I am not able to incorporte business transactons. While click on new entries A to W business transactions are appearing which are all "No Influence". But after saving the screen and back from the screen records(Business transactons) are not being saved properly.
    I want to know the actual reason... Kindly need your suggestion...
    Best Regards,
    Samrat Roy

  • Rough Cut Planning Profile-by Capacity category

    Hai,
    I am creating Rough Cut Planning Profiles in ECC6.0 for use in Standad SOP (S076). In MC35, I don't see a place where I can enter by Work center category- like I want both Machine and Labour categories as I have different times for each category.
    { when I view the rough-cut capacity situation in MC82, system displays both categroies, but it is based on only the hours I maintained for one of the categories- how do I maintain for both categories?}
    Thank you in advance:)
    Sonali
    Edited by: Sonali on Apr 28, 2009 3:05 PM

    Hello Sonali,
    Rough cut capacity planning is used only  for bottle neck resources.Analyze your process and you will come to know for the product group or material which category or machine is bottleneck.
    Create a rought cut planning profile for a production line or Workcenter or PRT or Cost(Relative cost not product cost).
    PS:Roughtcut capcity planning should not be used for all the workcenters.
    Thanks,
    Raj

  • Significance of Planning profile

    Hi PP Gurus,
    Can anybody pl tell me what is the significance of planning profile?
    I am getting an error saying maintain planning profile for the material during creation of PIR.
    regards,
    Pramod.

    Hi Pramod,
    As you know, we use configurable material when the scope for varaints are more. Generally, when we created sales order for the configurable material, we choose different characteristics for the selection of the finished product. So, information flows to production which is already configured. But in the case of MTS, the system does`nt configure the material on its own. Initially, you need to configure for the material, only then your dependent requirements will be defined. So, whenever you enter PIR, the requirements are created for the materials that are configured in the planning profile. Hope you got the point cleared.
    Reward if cleared and close the thread.

  • To create req for new BOM component

    hello all,
    i confirm the order and now i need to add one more component to the header material for the same order.
    how can i create requirement for new BOM component.
    what i done is i 1st cancel the confirmation. then go for read PP mater data. after that should i run the MRP for header material to create planned order for new BOM component?
    regards

    Dear,
    If you have execute any transaction like GI confirmation then read PP master data will not work.
    Best way you can cancel the confirmation and reveres the good issue by 262 movement type. Then do TECO to the order all reservation get deleted.
    Then update the BOM with new component and run MRP with planning mode-3 delete and recreated. It will create planned order then convert it to production and go ahead.
    Regards,
    R.Brahmankar

  • Planning profile MDP6/MDPH and MD 61

    dear sir
    can i have many planning profiles for a material?
    if so let us say i have two planning profile P1 and P2
    in MD 61, demand management t code while creating demand for a material say A with quantity 10, sap is taking a planning profile (first time i can choose from multiple planning profile).after saving MD 61 sap will create the demand with planing profile say P1.
    now i want to create the demand for another 5 quantity of same material A with another planning profile P2.
    but because of ealier demand of 10 with planning profile P1 it is not considering second profile P2.
    is ther any method such that i can attach P1 for 10 quantity and P2 for 5 quantity when the material is same A,where A is a configurable material and i am using varient configuration.
    thanking you
    srinivas

    Hi,
    I don't think its possible. But you can try with different Planning Version.
    Rg.

  • How do I create a default profile for all users of a computer in Windows 7/Vista for Firefox versions above 8? I'd like all new users on a computer to get the same defaults, bookmarks, homepage, etc...

    I have found help for this on older versions of Firefox, but I can't seem to find anything for the latest versions above 8. There must be someway to accomplish this for imaging on a large scale.

    You can create a defaults\profile template folder in the Firefox program folder for new profiles the same way as in older versions. That folder only isn't there anymore because all files have been moved to the omni.ja(r) archive, so you need to create it yourself.

Maybe you are looking for

  • Front End Patch Schedule

    Hi there, We are in an upgrade project, and for planning purposes are wondering when are planned FEPs for BI 2004s going to be released? I understand that 902 is now out there, but what about the future? I can't find anything on the service marketpla

  • When creating a report, "Available Data Sources" is missing options.

    Background: I am running Crystal Reports XI Developer edition. Here are the steps to expose the problem: 1.  Create a new standard report (Ctrl-N). 2.  Available data sources - expand "Create New Connection" 3.  I expect to find "Field Definitions On

  • Parent/child records from same table

    I want to create a query that is a union such that the 2nd resultset is based on the 1st resultset. I have a table that has parent/child records in the same table. Table: EVENTS EVENT_ID PARENT_EVENT_ID CREATED_DATE (other columns) if PARENT_EVENT_ID

  • Why can't I sign in to Facebook anymore?

    Up until about two days ago, I could sign in to Facebook with no problem. Now all I can do is go to the "Friends" page. Why?

  • How it's possible to add ODBC source to windows resources?

    Hi. I'm using DB Connectivity Tools and MS Access Driver to connect to the database. My VI reads previous created data link. My problem is that I need do EXE file, and doesn't know how I can set the ODBC source in Windows directly in LabView, and cre