Good movement requirement

We have such business that we need to transfer article A to article B  like what we can do by movement type 309 , but the quantity is different , for example , 1PC of article A transfer to 8 PC of article B ,so my question is  :
IS this possible by SAP standard movement type? if not ,can we achieve this by customizing?
MORE info: article A and B has the same article type and same basic unit of measure PC.
Edited by: deyi chen on Mar 8, 2010 3:40 AM

Hi
If you are using SAP retail system then you need to have movement type 319 for spliting structured material. OR In R/3 you can use 310 movement type also. Choose issuing material as material which can be splitted and in list maintain the other materials.
If you are have Standard R/3 only and often this scenario comes then you need to create prd.order for spliting keeping one as main componet and others as by product. You can mainatian BOM as well if you do not want to enter componenets manually in production order every time
Regards
Antony
Edited by: Antony James Vijay on Mar 8, 2010 12:13 PM

Similar Messages

  • Report Requirement for the Goods Movement

    Dear Gurs,
    I want to see the entire goods movment happend for producing one Finished material.
    Is there any std report that can show the list of good movement (261)
    Eg
    For producing 1 Qty FG I required 50 Kg of SF .
    That SF consits of 2 Raw material RM 1 and RM2  .
    RM1  Required 35 Kg and RM 2 Requires 15 Kg
    During Good Movement (261)of  -  SF
    RM1 - Batch 421 - 12 Kg 
    RM1- Batch 422 - 18 Kg
    RM1 - Batch 433 - 5 Kg
    RM2 Batch 888 - 5 Kg
    RM2 Batch 889 - 10 Kg
    During the Good Movement (261)of  -  FG
    SF Batch 1123 - 50 Kg Issued.
    With reference to the Finish material , I want to seen the goods movement happend for the FG .
    Is there any std report to seen the details at Multilevels
    Srinivasan.

    Hi,
    I donot think such Multi level Consumption Report is available. I think if use collective order concept, u can get it. Otherwise u have to pass the list Production order number for each BOM level at COOIS.
    or u have to develop customized report.
    Pradeep

  • Confirmation of Production Order without all Goods Movements

    Hello experts!
    I've tried to do a confirmation of one material that had only one level BOM with one material, but, when I try to do the Goods Movement in CO15, only the component appears. To another materials the goods movements was done for the two materials.
    I've changed routing, BOM, material record... but I didn't have success.
    Any ideas?
    Regards,
    Rodrigo.

    Dear
    You might have kept Backflashing Indicator -1 in MRP2 view  and while doing CO15-In goods movement tab -You will find BOM compoenets with movement type -261 .But your requirement is to carry out the Auto GR-101 while confirmation posting .
    Please do the following :
    1.Goto -OPJK-Define Production Scheduling Profile -Here for that scheuling profile which have been assinged in Work Scheduling view -Mark the Auto GR active .
    2.In the routing  or in the Production Order -Operation Overview screen -Goto Operation Details -Slect the last operation -Assing the Operation Control Key which has Auto GR active like SAP Stanrda PP03 .Please check in OPJ8-Slect the Operation Control key -Hit the details information -Check the Auto GR Marked .Based on this while you will do CO15 , GR-101 (MIGO-101) will happen .
    Hope it helps
    Regards
    JH

  • Goods movement failures.

    Dear Freinds,
    All my movements are getting failed during the goods movement through CO11N transaction (movements w.r.t production order). These are appearing in transaction COGI. It is giving the error saying that "No stock posting possible for this material". But without any change ... I am able to save the movement. Error is giving the below detailed description
    *"No stock posting possible for this material
    Message no. M7097
    Diagnosis
    The material belongs to a material type whose stocks are not managed on a quantity basis.
    Procedure
    Enter a different material or terminate processing.
    If required, check the setting of the material type for the plant in the Customizing system of the material master data."*
    For your information, please note that we already maintained quantity updation check box in the material type configuration.
    Regards,
    Surya.

    Dear Friends,
    Thanks for your reply. Please note the below.
    1. I have maintained the material type settings initially itself.
    2. Today I observed that... this problem is coming only for the transaction CO11N. I am not getting this problem in CO15 transaction. But as per the clients requirement, I have to go for CO11N only.
    3. This is not the problem of batch management or batch management activation / stock availability...because without correcting any data... I am able to save the goods movement in COGI transaction.
    Regards,
    Surya.

  • Posting a Goods Movement in SAP Retail Store

    In SAP Retail Store, under Inventory Management>Goods Movement>Other Movement, when entering articles and quantities, if you want to use multiple Bus. trans. or Reason for Movmt. values, you have to post them separately.  This requires you to post, exit out and then go back in and post again, etc. 
    Is there a way to post multiple Bus. trans. or Reason for Movmt. values on the same screen?

    Hi,
    Is that stock is tagged with sales order ?
    How you have HU in non HU managed location ??
    If you want to move stock then use t code HU02 and create HU in non HU manged location mentioning destination location as HU managed .
    Regards,
    Vishal

  • Create a subsequent Goods Movement for a transfer posting

    Hi Team,
    I have a scenario where the users will create a Good Movement document for transfer posting. The Stock of Material "A" is transferred to stock of Material "B" using the movement types 561 etc. Now the quantity is reduced from unrestricted stock of "A" and posted to "Stock in Transfer/Transit" of "B". The requirement is to create another Goods Movement document immediately after the above transfer posting is completed and use movement type 101 to post the same quantity to unrestricted of "B".
    I tried searching for use exits and could not find a relevant one "After Save" for goods movement online transaction. I found the MB_GOODS_MOVEMENT_UPDATE Badi but don't know how to create another goods movement document while in the update task. I'm concerned that if I call a BAPI or BDC inside the update task, it might conflict with the current transaction (transfer posting). Looking for your guidance.

    Hi Deepali,
    You can use the userexit ' ZXMCBU02 '  to write your own code. This user exit gets triggered for almost all the goods movement transaction.
    There is also a very similar BADI which you can use which gets triggered for every goods movement transaction.
    I would like to know the BADI feel free to let me know. I think the above user exit should server your purpose.
    Hope this is useful for you.
    Cheers
    VJ

  • Enhancement in MIGO for Goods Movement

    Hi Gurus,
    I got a requirement to Create a 262 goods movement materials document with reference to a Sub-Contract GR for an account assigned Sub-Contract PO thru TCODE MIGO. The details are describe as follow:
    Once the 101/543 GR movement is carried out, a 262 movement type needs to be executed to reverse the consumption of the material against the service order and bring it back to the inventory (open stock). This movement needs to be triggered once MIGO ‘subcontractor goods receipt -101/543’ is committed (saved).
    When the 101/543 GR movement transaction MIGO is saved-
    1.     User exit needs to be invoked
    2.     Check if the GR is
    o     for an account assigned (EKPO- KNTTP Acct Assignment Cat =F) Sub-Contract PO (EKPO- PSTYP  Item Category L)
    o     AND the service order number (AUFNR) exists in ZXXXXXX (ZSUBCON_VALIDATION) table
    3.     Identify the line item material in the goods receipt document (First item /against movement type 101),
    4.     Identify the service order number (AUFNR) from ZSUBCON_VALIDATION table.
    5.     Call the goods issue (262) transaction via the BAPI using the material derived via step 3 and against the service order number derived via step 4. BAPI_GOODSMVT_CREATE  post goods movements

    Hi Matt,
    There are lots of Exits and BADI available in this transaction. See which suits you.
    Enhancement                                                                               
    MB_CF001                                Customer Function Exit in the Case of Updating a Mat. Doc.   
    MBCF0011                                Read from RESB and RKPF for print list in  MB26              
    MBCF0010                                Customer exit: Create reservation BAPI_RESERVATION_CREATE1   
    MBCF0009                                Filling the storage location field                           
    MBCF0007                                Customer function exit: Updating a reservation               
    MBCF0006                                Customer function for WBS element                            
    MBCF0005                                Material document item for goods receipt/issue slip          
    MBCF0002                                Customer function exit: Segment text in material doc. item                                                                               
    Business Add-in                                                                               
    MB_DOCUMENT_UPDATE                      BADI when updating material document: MSEG and MKPF          
    MB_DOC_BADI_INTERNAL                    BAdIs During Creation of a Material Document (SAP Internal)  
    MB_ME_CSGMT_BADI_SAP                    BAdI: Consignment Processing - Stock Transfer                
    MB_MIGO_BADI                            BAdI in MIGO for External Detail Subscreens                  
    MB_MIGO_ITEM_BADI                       BAdI in MIGO for Changing Item Data                          
    MB_PHYSINV_INTERNAL                     Connection: Core Inventory and Retail AddOn                  
    MB_QUAN_CHECK_BADI                      BAdI: Item Data at Time of Quantity Check                    
    MB_RESERVATION_BADI                     MB21/MB22: Check and Complete Dialog Data                    
    MB_RESERVATION_SCR                      Screen BAdI for Retrofit DFPS                                
    MB_RESERVATION_UPCHD                    BAdI for Creation and Changing of Manual Reservations        
    MB_RES_BAPI_CHANGE                      BAdI: Execution of Changes to Reservation Fields             
    MB_RES_BAPI_CREATE1                     BAdI: Adoption of Customer's Own Fields as Reserv. Fields    
    MB_RES_BAPI_DETAIL1                     BAdI: Display of Customer's Own Fields in Reservations       
    MB_STOR_LOC_BADI_GTS                    BADI to Check and Change Storage Location (GTS Fct. Only)    
    MB_DOCUMENT_BADI_SAP                    BADI for Creation and Changing of a Material Document        
    ARC_MM_EBAN_CHECK                       BAdI: Enhancement of Archivability Check (MM_EBAN)           
    ARC_MM_EBAN_PRECHECK                    BAdI: Enhancement of Archivability Check (MM_EBAN)           
    ARC_MM_EBAN_WRITE                       BAdI: Enhancement of Scope of Archiving (MM_EBAN)            
    ARC_MM_EINA_CHECK                       BAdI: Enhancement of Archivability Check (MM_EINA)           
    ARC_MM_EINA_WRITE                       BAdI: Enhancement of Scope of Archiving (MM_EINA)            
    ARC_MM_INVBEL_CHECK                     BAdI: Enhancement of Archivability Check (MM_INVBEL)         
    ARC_MM_INVBEL_WRITE                     BAdI: Enhancement of Scope of Archiving (MM_INVBEL)          
    ARC_MM_MATBEL_CHECK                     Prüfung ADD-ON-spezifischer Kriterien für MM_MATBEL          
    ARC_MM_MATBEL_WRITE                     Check Add-On-Specific Data for MM_MATBEL                     
    MB_CHECK_LINE_BADI                      BAdI: Check Line Before Copying to the Blocking Tables       
    MB_CIN_LMBMBU04                         posting of gr                                                
    MB_CIN_MM07MFB7                         BAdI for India Version exit in include MM07MFB7              
    MB_CIN_MM07MFB7_QTY                     Proposal of quantity from Excise invoice in GR               
    MB_DOCUMENT_BADI                        BAdIs During Creation of a Material Document                 
    Regards,
    Atish

  • Reversal document type for cancelation of goods movement

    Hi
    I have one queries, my client requirement is for every reversal document - document type should be YY. I created document type YY and maintain in every document type in FI for reversal document type.
    The document which is posted through FI and if we take the reversal of that perticular document document type is coming YY only.
    But the document which is posted for goods movement document type is coming WA, WE &  WL and if we take the reversal for that document system generating same document type WA, WE &  WL .
    Awaiting for your reply.
    Regards
    Anjan

    Hi Anjan,
    Pls try tocde OMBA
    Regards,
    Kiran

  • Is it possible to do goods movement with reference to PR or STR?

    My client wish to follow following process for fulfilling the material requirement.
    1. User will create Purchase Requisition or stock transport requisition.
    2. Purchase dept. will check the stock and will ask stores to issue the goods if available. This goods movement should be reflected in PR as history. There won't be any creation of PO or STO.
    3. If stock is not available then Purchase dept will create a PO or STO.
    In the above process, can reservation be used instead of PR or STR ?  However problem is, this will lead to material getting reserved (Blocked), system will not allow goods movement (issue) for other issuances (for other departments who has not created reservation) if sufficient stock is not available in storage location.
    What is the best possible solution for this?
    Thanks in advance,
    Sanjog

    Hi,
    As per i understand your Problem i am suggesting.
    See as you said the stock is already present in the system or stores this means previously it has been received with any GR based on PO. so you have the PO. and now why you want a amend in the system when there is defined sequential process steps in SAP for STO's or for any purpose.
    Creation of GR/GI/TR's are important at user levels for moving the material's but at the time of audit/ Checks in SAP how you will deal with it i dont know. as all the database are made in such a format so that you can generate each and every Report of movement/ or material in SAP so that your client will also find some clear picture of there store's.
    so try to convince your client for standard processes in SAP.
    Regards
    Ninad Kshirsagar

  • Goods Movement Qty While Confirming the Order

    Hi Friends,
    While confirming the order The end user Will go to the goods movement screen and enter the actual consumed Qty (When all BOM components Are marked with automatic Back flush) For the components with 261 movement type and will enter the storage location and batch no if required .
    Now my requirement is the user should not have the access (it should be in gray) to the BOM Components qty to change
    OR
    He should not be able to change beyond the qty As per scrape % Given in Material Master or BOM.
    The Reason for this is
    Even When there is a shortage for BOM components in SL location, he is reducing/Adjusting  the required quantities as per the existing Qty ( If there is no stock then making it to ZERO also)  and confirming the order.
    Pl suggest me is there any user Exit for this or can I do it thru Standard SPRO settings.
    hari

    Hi,
    You  can make screen variant SHD0 for CO11N and hide it.
    In t code SHD0, give the transaction variant name ( say ZCO11N )of ur std CO11n.
    CO11N screen will appear, when u will save the variant, u will getgood movement tab , it will hide now.
    Activate the transaction variant.
    Regards,
    R.Brahmankar

  • Goods movement from Maintenance order

    Hi Experts
    I have the following scenario,
    I have a component ( with Material master) in the maintenance order  and i use Item category N to trigger  a Purchase requisition. The Pur Req is converted to Purchase Order and then the GR is done directly to the order .
    Now i have not used this Component  and want to make a goods movement to place it in stock. So the requirement is to move the material from Maintenance Order to the Storage location .
    How and which movement type can i use to do this ?
    Please help
    KK

    Hi,
    Click the below link for more information
    http://sap-img.com/plant/in-pm-how-to-return-material-backflushed.htm
    regards,
    Venkatesan Anandan

  • Accouting issue on goods movement

    There is one scenario in my client. They are some material in the stock and want to withdraw for the consumption. Right now, The issue is they do goods movement in the legacy system and balance is 0. they want to transfer all data to SAP including goods movement 201. The user get a balance in the account, but it should be zero also. I don't know where this amount come from.  But there is error during interface transfer, SAP won't allow them to proceed becuase there is error.
    The error message 'Fld selectn for mvmt type 201 / acct 15670000 differs for Cost center (010)'.
    Is there anyone here can explain what's the process of accouting debit/credit process during 201? And give me some workaround for this issue...

    Hi,
    GOTO OMJJ and select movement type check box and enter there enter  201 movment type and then in that screen double click on  the field selection (batch input session) again in that screen double click on 201 cost center for GI in that goto  account assignment in that check cost center is required or suppress, here cost center field status setting should be same as GL account field  status setting ,in the GL field status in OBC4 and set the same field staus in 201 GI for cost center movement type.
    Hope you are clear any issues revert back.
    regards,
    Santosh kumar

  • Restrict all goods movements for materials untill the latest costing run ex

    Hi dudes,
    1 here i have a requirement that i need to restrict all goods movements in the month for all materials(SFG,FG) untill the latest costing run(standard cost estimate) on 1st of each month.
    2. Can we restrict the status of process order in such a way that Conformation can be done only after the goods issues against production order. The goods receipt can be done only after the conformation of the process order.
    Thanks in advance.
    Robert.

    Robert,
    Procedurally you can block, by not opening the current period, before the costing run is completed, just when you wanted to release the cost estimate, at that time you can lock all users and then open the next period and then release your cost estimate and then unlock all the users. You need to work with your Basis/MM/FICO guys to have this procedure implemented.
    On the GI Check before confirmation and Confirmation check before GR, you can use Confirmation and GR releated User exits to check. There are many posts on this topic, a simple search on this forum would take you to the thread.
    Regards,
    Prasobh

  • Goods movements overview in co11n

    Dear friends,
    In production order cofirmation (CO11n) if we click on goods movements’ button it will take you to new screen with goods movements’ overview table control. My requirement is that I want to make some quantity fields in table control as display only.
    For that I tried
    CONFPP01
    CONFPP02
    CONFPP03
    CONFPP04
    CONFPP05
    CONFPP06
    CONFPP07
    And BADI WORKORDER_GOODSMVT
    But of no use. Can anybody suggest me a BADI, or any other possible solution?
    Thanks in advance.
    Regards,
    Mubashir

    Hi,
    I understood that going into GoodsMovemnt overview is being compelled by the Difference between the Actual quantity issued and Planned quantity in BOM for a particular component.
    After backfush, still by MB1A, we can post the goods movement against that order. (Movements 261,262)
    I hope this alternative is considerable.
    Otherwise Please remove the Goods issue storage location in the order or Material master. Then system prompts for this. There u can enter the quantity as u want.

  • Goods movement in collective order

    Hi all,
    We have ticked the indicator for 'Goods movement for collective order' in OPJH, still we are not getting required results. The goods receipt against the child order does not occur.
    Please help.
    SmanS

    Hi Dear Can u please explain..how you solved this..
    Regards
    Raghu

Maybe you are looking for

  • Problem Activating Source system RSAR 374, RSAR 375

    Hi all, Hoping you can help me with this issue. I have two systems,one R/3 4.7 system and another BW 3.0B system.Both are recently installed. created user in client 800 on R/3. created user in client 100 on BW. i established RFC destination between b

  • Where can I find a replacement for this?

    This adapter (I guess) broke/got bent so now I'm using the extension cord to charge my MacBook Pro. Where can I buy a replacement for this?: http://i41.tinypic.com/kced7k.jpg http://i41.tinypic.com/2u90jsg.jpg Also, what's it called?

  • Keyboard shortcut to bring back minimized windows

    This is probably a numskulled question, but my search terms haven't turned up the answer yet, so.... I'm a recent switcher, and in Windows if you have a minimized window and switch back to that app, the window reappears. In Leopard, as far as I can t

  • Scope of "user" in jsp

    Hi. here is some code for a jsp to pull some data out of an HTML form. <jsp:useBean id = "user" class="collect.CollectData" scope = "session"/> <jsp:setProperty name = "user" property="*"/> <%@ page import="java.util.*,java.sql.*,javax.naming.*,javax

  • Workflow Mailer Configuration...

    I am configuring workflow mailer notification for sending notifications from oracle apps to email of the apps users.For this I have used organization's mail server(SMTP server) as the outbound server for sending the notifications.But this method is w