Good receipt for production order

Hi experts,
When good receipt for production order 60003408 , it shows error "No valid order items exist for order 60003408" like this how to resolve this...
In diagnosis they were specified as change into good receipt in production order screen but in default it shows GR Non-valuated.
Thanks

Hi,
You can create production order directly from sale order at CO08.
You can create the production order without material in CO07.
CO07 specially meant for Rework order (Production order without material) 
Hope claer to you.
Regards,
R.Brahmankar

Similar Messages

  • Error during Goods Receipt for Production Order

    Hi All,
    When using MIGO to post Goods Receipt for a Production Order, I got a customize message saying that the posting is only available between 2010.08.25 to 2010.08.27.  I have checked in Business Add-in using SE19 but there are no implementation present.  I know that in Logistic Verification MIRO there is a transaction OMRM to set messages.  I would like to ask is there anything similar for MIGO.  
    Or is there any other place in Configuration which allows me to add these Customize message.
    Thanks.
    Edited by: jamison2004 jordan2004 on Jul 9, 2010 9:09 AM

    Hello Jiaul,
    Sorry I may have mislead you.  The actual error message is "Goods Receipt for Production Order XXXX can only be made on 2010.08.25 to 2010.08.27".  These two dates are the Start Date and FInish Date for the Production Order in CO03, 
    The Basic Start Date for the current Production Order is  2010.08.25
    The Basic Finish Date for the current Production Order is 2010.08.27
    I think what it means is that you can only Post Goods Receipt for the Production Order only after the Basic Start Date of the Production Order.  Do you know where I can find the configuration for this message?
    Thanks

  • Automatic Batch determination at time of Goods receipt for production order

    Hi SAP experts,
                             Greetings to you all. I wish to ask a query that how batch is determined automatically at the time of goods receipt for production order .
                             I have done the following settings:
    1.Specified batch level at material level
    2.External batch number assignment
    3.Defined production order condition table '501' (plant/material)
    4.Defined production order access sequence (order type-plant -material)
    5.Defined Production Order Strategy type.
    6.Defined Batch search procedure in Production Order.
    7.Assigned Batch search procedure to Production order type for a particular plant  , batch check not activated.
    Please let me know of any more settings to be checked for the same.
    For example, a production order is being confirmed for a quatity of 5 nos . at a time . However, the GI movement (261 movement type) for the production order components  is taking place for 1 EA qty. from 5 different batches.
    So now, how the system will define the GR (movement type 101) for the production order header material for the qty. 5 nos. EA ?
    It is desired that the system should do GR for the qty.  1 EA of the header material for the 5 different batches (batches which were automatically deteremined for the Goods issue of the components).
    Thanks in advance. good day.
    Best regards,
    RB

    HI Rahul,
    As explained earlier, for e.g., if the GR is taking place for the production order for qty. 5 nos. , and in that , if the component qty. is 1 EA for 1EA of header material ; then , the GR for the header material should take place for the same different batches from which the order components were issued for the order and not for the other batches in stock for the header material as well as components.
    I am not sure if i understand your requirement 100%.
    But let me explain you standard behaviour.
    When Confirmation for production order happens and GR is posted during confirmation , All the GR happens agaist same batch number which i sassigned in production order assignment screen.
    So for all the order qty single batch would be fixed. Say batch A1 is created for Header material for 100 qty.
    Now during components issue to production order, If 100 qty needs to be issued for compoenent B it is possible to use multiple batches of componenets ( using splilt batch functionality /or manual batch number entry agaist componenet in goods movement screen) but header batch remains the same.
    Check and Revert,
    Santosh Sarda

  • Bins problem while creating goods receipt for production order.

    Hi All,
              I am facing a problem with selection of bins while creating goods receipt for production order in transaction MB31 and MBBE.
    The order of filling bins is with respect to storage Unit not by document no, Please suggest something.
    The scene is like that.
    The bins are not filled in the proper sequence, the system checks for the empty bins and filled those later on.
    like this,.
    Typ StorageBin  SC SS    Stock Avail.st BUn GR Date    DocumentNo Storage Unit         Time   
    SLoc Batch      Re IA PutawayS Pick qty Cert. No.                                                                               
    VN1 106A088                 0        0  CS  01/25/2010    4739297 1005721391           10:00:59
    100  0001020069            60        0                                                        
    VN1 107B076                 0        0  CS  01/25/2010    4739298 1005721392           10:01:01
    100  0001020069            60        0                                                        
    VN1 108B076                 0        0  CS  01/25/2010    4739299 1005721393           10:01:04
    100  0001020069            60        0                                                        
    VN1 109A077                 0        0  CS  01/25/2010    4739300 1005721394           10:01:06
    100  0001020069            60        0                                                        
    VN1 110B079                 0        0  CS  01/25/2010    4739301 1005721395           10:01:08
    100  0001020069            60        0                                                        
    VN1 106B088                 0        0  CS  01/25/2010    4739302 1005721403           10:01:11
    100  0001020069            60        0                                                        
    VN1 123B158                 0        0  CS  01/25/2010    4739303 1005721389           10:01:13
    100  0001020069            60        0                                                        
    VN1 124A160                 0        0  CS  01/25/2010    4739304 1005721390           10:01:15
    100  0001020069            60        0                                                        
    VN1 118A133                 0        0  CS  01/25/2010    4739305 1005721396           10:01:17
    100  0001020069            60        0                                                        
    VN1 119A128                 0        0  CS  01/25/2010    4739306 1005721397           10:01:20
    100  0001020069            60        0                                                        
    VN1 120B162                 0        0  CS  01/25/2010    4739307 1005721398           10:01:22
    100  0001020069            60        0                                                        
    VN1 121B159                 0        0  CS  01/25/2010    4739308 1005721399           10:01:24
    100  0001020069            60        0                                                        
    VN1 122B159                 0        0  CS  01/25/2010    4739309 1005721400           10:01:26
    100  0001020069            60        0                                                        
    VN1 123B159                 0        0  CS  01/25/2010    4739310 1005721401           10:01:29
    100  0001020069            60        0                                                        
    VN1 124B160                 0        0  CS  01/25/2010    4739311 1005721402           10:01:31
    100  0001020069            60        0                                                        
    Thnks you,
    Anmol.
    Edited by: anmol112 on Jan 25, 2010 10:34 PM

    no replay, clossing threat.

  • Batch derivation in goods receipt for production order

    Hi all,
    i have set up batch derivation for the event 'goods receipt for production order'. The field derived is HSDAT (date of manufacture) /minimum. Although in the batch derivation monitor I can see tha the derivation was performed OK and the correct date (oldest of the components) is selected the field in the Batch is not updated. Can anyone help??

    Hi Vagia,
    Your problem sounds like derivation type issue.
    Please check your derivation type to be static for the 400 event.
    Let us know if this helped.
    Regards.
    St.Pan.

  • Early Inspection for a Goods Receipt for production order

    Dear Experts,
    This  is with respect  Early Inspection for a Goods Receipt for inspction type 04.( 03 is also active in material master)
    We made partial confirmation  250 qty for production order using t code co11n ( total qty of production order is 1000).
    made the usage decision with an acceptance and posted all open stocks. to unrestricted.
    Now  in second partial confirmation prodn order  of 250 qty was made . This suppose to be rejected .  but sytem will add this 250 qty directly to unrestricted stock .  how to over come this .
    Regards
    Sandeep

    Don't make the UD until all stock has been receipted?
    You basically approved the batch.  So why wouldn't the system put the stock to unrestricted?
    Why would you make a UD when you still have stock to be posted anyway?  You can post stock without without making a UD so why not just post some if you need it, and wait on making the UD?
    Craig

  • Goods Receipt for Production Order SDK example

    Hi all,
    Is it possible to do a goods receipt for a Production Order with the SDK?
    (I've tried but have no ideia hoe to fill the Documents & Document_Lines objects)
    If somebody could help me by providing an example, it will be great!
    Thanks all!
    mdias

    Ok, I've found the solution.
    I only need to set BaseType = 202 of my Documents object.
    Thanks anyway,
    mdias

  • Error while doing Goods Receipt for Production Order

    We have created following test data in our Development System:
    Production Order:1000016
    We have processed the abv. production order thru create, release & confirm stages.However, on doing Goods Receipt of the Order thru MB31, system is giving following error:
    Msg.No.NA M7001:Check Table TFBEFU_CR entry 10 does not exist.
    Can u pl help me in analysing the same.
    With Rgds.,
    Rakesh Kumar
    09324847499

    Hi,
    Maintain the OPK9 (Valuation Variant for the Order Costing).
    It will go thorugh..
    Otherwise revert for further discussion..
    Regards,
    Siva

  • Goods Receipt for Production Order

    Dear All,
    I am Creating a Production order manually and assigning the Project WBSE in Assignment Tab.
    Then i conformed the order. Now i am doing the MIGO for goods receipt against that Production Order.
    System is receiving the stock in Pant, not as a Project stock. But as per my requirement it should be created as a project stock.
    So please tell me what is the issue in this...
    Regards,
    Rao
    Message was edited by: Mohamed Rafi - Search forum, refer SAP Help.

    Hi,
    I find the settings as below.
    Item cat: L
    Priority
    Plant        2
    Project     1
    Sales Ord     3
    Regards,
    Rao

  • Goods Receipt with production order in WM

    Hi all,
              My client requirement is whenever i am issuing  goods to the production order the stock reserved to production order, once i confirmed the  TO stock level  reduced.Once production  completed when i put the goods receipt with production order the stock increased for finished goods only at storage location level not  upto warehouse level.
    when i put goods receipt with others the stock increased in  warehouselevel upto my destination bin(as i configured).My requirement is how to move goods to my  destination bin when goods receipt for production order. any configuration required? solve my issue
    i am maintaining configuration as
    i)in omlj iam using movt type-103, source as 901(scr checked),dest as 003,reqirement type-orders.
    ii)in omlr i am assigning 103wm mov type to 101 im type.
    whether  my configuration is correct or i have to do any other configuration ?..i am not maintain any production staging process is it necessary?
    appreciate your help always
    ramesh

    To consolidate your requirements once again
    You want imediate TO creation for components. (It is configured & working fine now)
    You dont want imediate TO creation for finished goods, only in the case of GR for Productio order. Right?
    If Yes, you need to have a small configuration setting (if it is missing)
    In OMLR Create TO immediately Indicator should be space "Do not initiate TO creation" (not X) for 101 F - 103

  • Error while doing Goods receipt for process order. Error code: "BS027"

    I am getting error while doing GR for a day whereas previous day(s) GR is already done and also 2 days post that day are also done successfully.
    Error :  ""Goods receipt for prodn. order" is not allowed (ORD XX-CEMTSAL) " (XX = First two characters of plant code)
    Error code: BS027.
    Thanks to all in advance.

    Hello,
    This issue would occur when you want to post a confirmation for a production order. The error message is generated if you wanted to post a backflush for a component and if this component was assigned to a sales order stock. The sales order itself was assigned to a work breakdown structure element which should be debited with the actual costs. However, the business transaction 'Confirm' is not permitted for a work breakdown structure.
    Please look into SAP Note 62367 and 64370
    Hope the information is helpful
    regards

  • Goods receipt for subcontracting order! BAPI_GOODSMVT_CREATE

    I wanna use BAPI "BAPI_GOODSMVT_CREATE"  to create goods receipt for subcontracting order.
    But it says that this combination is not possible.  Combination of my movement type and this BAPI.
    What can i do to solve it?
    thanks in advance.

    >
    Julia Nikiforva wrote:
    > I wanna use BAPI "BAPI_GOODSMVT_CREATE"  to create goods receipt for subcontracting order.
    > But it says that this combination is not possible.  Combination of my movement type and this BAPI.
    >
    > What can i do to solve it?
    >
    > thanks in advance.
    Might work
    report zbapi_goodsmovement.
    parameters: p-file like rlgrap-filename default
    'c:\sapdata\TEST.txt'.
    parameters: e-file like rlgrap-filename default
    'c:\sapdata\gdsmvterror.txt'.
    parameters: xpost like sy-datum default sy-datum.
    data: begin of gmhead.
    include structure bapi2017_gm_head_01.
    data: end of gmhead.
    data: begin of gmcode.
    include structure bapi2017_gm_code.
    data: end of gmcode.
    data: begin of mthead.
    include structure bapi2017_gm_head_ret.
    data: end of mthead.
    data: begin of itab occurs 100.
    include structure bapi2017_gm_item_create.
    data: end of itab.
    data: begin of errmsg occurs 10.
    include structure bapiret2.
    data: end of errmsg.
    data: wmenge like iseg-menge,
    errflag.
    data: begin of pcitab occurs 100,
    ext_doc(10), "External Document Number
    mvt_type(3), "Movement Type
    doc_date(8), "Document Date
    post_date(8), "Posting Date
    plant(4), "Plant
    material(18), "Material Number
    qty(13), "Quantity
    recv_loc(4), "Receiving Location
    issue_loc(4), "Issuing Location
    pur_doc(10), "Purchase Document No
    po_item(3), "Purchase Document Item No
    del_no(10), "Delivery Purchase Order Number
    del_item(3), "Delivery Item
    prod_doc(10), "Production Document No
    scrap_reason(10), "Scrap Reason
    upd_sta(1), "Update Status
    end of pcitab.
    call function 'WS_UPLOAD'
    exporting
    filename = p-file
    filetype = 'DAT'
    IMPORTING
    FILELENGTH =
    tables
    data_tab = pcitab
    EXCEPTIONS
    FILE_OPEN_ERROR = 1
    FILE_READ_ERROR = 2
    NO_BATCH = 3
    GUI_REFUSE_FILETRANSFER = 4
    INVALID_TYPE = 5
    OTHERS = 6
    if sy-subrc <> 0.
    message id sy-msgid type sy-msgty number sy-msgno
    with sy-msgv1 sy-msgv2 sy-msgv3 sy-msgv4.
    exit.
    endif.
    gmhead-pstng_date = sy-datum.
    gmhead-doc_date = sy-datum.
    gmhead-pr_uname = sy-uname.
    gmcode-gm_code = '01'. "01 - MB01 - Goods Receipts for Purchase Order
    loop at pcitab.
    itab-move_type = pcitab-mvt_type.
    itab-mvt_ind = 'B'.
    itab-plant = pcitab-plant.
    itab-material = pcitab-material.
    itab-entry_qnt = pcitab-qty.
    itab-move_stloc = pcitab-recv_loc.
    itab-stge_loc = pcitab-issue_loc.
    itab-po_number = pcitab-pur_doc.
    itab-po_item = pcitab-po_item.
    concatenate pcitab-del_no pcitab-del_item into itab-item_text.
    itab-move_reas = pcitab-scrap_reason.
    append itab.
    endloop.
    loop at itab.
    write:/ itab-material, itab-plant, itab-stge_loc,
    itab-move_type, itab-entry_qnt, itab-entry_uom,
    itab-entry_uom_iso, itab-po_number, itab-po_item,
    pcitab-ext_doc.
    endloop.
    call function 'BAPI_GOODSMVT_CREATE'
    exporting
    goodsmvt_header = gmhead
    goodsmvt_code = gmcode
    TESTRUN = ' '
    IMPORTING
    goodsmvt_headret = mthead
    MATERIALDOCUMENT =
    MATDOCUMENTYEAR =
    tables
    goodsmvt_item = itab
    GOODSMVT_SERIALNUMBER =
    return = errmsg
    clear errflag.
    loop at errmsg.
    if errmsg-type eq 'E'.
    write:/'Error in function', errmsg-message.
    errflag = 'X'.
    else.
    write:/ errmsg-message.
    endif.
    endloop.
    if errflag is initial.
    commit work and wait.
    if sy-subrc ne 0.
    write:/ 'Error in updating'.
    exit.
    else.
    write:/ mthead-mat_doc, mthead-doc_year.
    perform upd_sta.
    endif.
    endif.
    FORM UPD_STA *
    form upd_sta.
    loop at pcitab.
    pcitab-upd_sta = 'X'.
    modify pcitab.
    endloop.
    call function 'WS_DOWNLOAD'
    exporting
    filename = p-file
    filetype = 'DAT'
    IMPORTING
    FILELENGTH =
    tables
    data_tab = pcitab
    EXCEPTIONS
    FILE_OPEN_ERROR = 1
    FILE_READ_ERROR = 2
    NO_BATCH = 3
    GUI_REFUSE_FILETRANSFER = 4
    INVALID_TYPE = 5
    OTHERS = 6
    endform.

  • Is it possible to do goods receipt for purchase order by mb31

    Hello friends,
    I have created one purchase order.Now i want to do goods receipt for that purchase order.I know that throught migo and movt type 101, i can do this.But guys i have one doubt over here.Can i do the goods receipt for purchase order by Transaction code MB31(Goods Receipt for Order).
    When in Transaction code mb31 i put the purchase order number, system gave me the error,"order 44000000298 not found or not permitted for goods movement".Message no. c6001.
    So guys what do you think in this matter?is it possible to do goods receipt for purchase order by mb31.If yes than how to resolve this error.
    Thanking you guys in advance.

    MB31 is for doing goods receipt of production order

  • Auto goods receipt against production order

    is it possible to do auto goods receipt against production order of (material with serial number)
    if not please suggest me solution
    please also tell me possibility of enchancement
    for goods receipt against production order
    sunil

    Hi
    If you check mark the auto goods receipt in the control key used in the work center used in the routing then you can have auto goods receipts posted for the production order against a confirmation.
    Rathnakar

  • Error while doing Good Issue for Production Order using BAPI

    Hi All,
    I am facing an error like 'u2018Content of order 1011907: MDT218AJ10 transferred to interface (IMSEG): T-86410-71".
    I have written the code as below. Please let me know what is missing when using the BAPI 'BAPI_GOODSMVT_CREATE'. What is the cause of this error ?
    *Action in Transaction (GM_CODE)
    *GM Code for Goods Issue for Production Order is 03
      gs_gmcode-gm_code = '03'.
    *Header Data
    *Posting date
      gs_header-pstng_date = sy-datum.
    *Document date
      gs_header-doc_date   = sy-datum.
    *Item Data
    *Material
      gs_item-material  = zptp_s_rf_migo_261-matnr1.
    *Movement Type
      gs_item-move_type = '261'.
    *Movement Indicator
      gs_item-mvt_ind   = 'F'.
    *Stock Type
      gs_item-stck_type = 'F'.
    *Plant
      gs_item-plant     = gv_plant.
    *Storage Location
      gs_item-stge_loc  = gv_str_loc.
    *Quantity
      gs_item-entry_qnt = zptp_s_rf_migo_261-menge2.
    *Unit
      gs_item-entry_uom = gv_uom.
    *ISO code for unit of measurement
      gs_item-entry_uom_iso = gv_uom.
    *Order Number
      CALL FUNCTION 'CONVERSION_EXIT_ALPHA_INPUT'
        EXPORTING
          input  = zptp_s_rf_migo_261-aufnr
        IMPORTING
          output = gs_item-orderid.
    *Reservation Number
      gs_item-reserv_no = gv_resv_num.
    *Reservation Item
      gs_item-res_item = gv_resv_itm.
    *Reservation Type
      gs_item-res_type = gv_resv_type.
      APPEND gs_item TO gt_item.
    Calling BAPI_GOODSMVT_CREATE to create the Material Document Number
      CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
        EXPORTING
          goodsmvt_header       = gs_header
          goodsmvt_code         = gs_gmcode
        IMPORTING
          goodsmvt_headret      = gs_headret
        TABLES
          goodsmvt_item         = gt_item
          goodsmvt_serialnumber = gt_serial
          return                = gt_return.
    Thanks in Advance.

    hi,
    did you look at message ?
    System says, there are differences between the interface data and the order data. It can be anything. I think you should check
    data in the interface . 
    this is the long explanation of your message :
    Diagnosis
    When calling the function module MB_CREATE_GOODS_MOVEMENT or the BAPI GoodsMovement.CreateFromData (BAPI_GOODSMVT_CREATE) to post a goods receipt for a production order, there are differences between the interface data and the order data.
    Example: The order was created for plant 0001, but plant 0002 is passed on in the interface.
    The system checks this for the material and the order item.
    System response
    Due to this difference, the system cannot post the goods receipt.
    Procedure
    Check the data in the interface (IMSEG-WERKS, IMSEG-AUFNR). If necessary, correct the plant or the order number in the interface.
    << Moderator message - Point begging removed >>
    Edited by: Rob Burbank on Feb 6, 2012 11:24 AM

Maybe you are looking for

  • TMS Setup - One package to two seperate landscapes

    My customer has one development instance that services two test and production landscapes for seperate geographical regions. This is a new installation and they are developing using packages. They currently belive that they can transport the objects

  • White screen of death after installing Macfuse

    I had a well running MacPro hexa 3.2 (upgraded from a quad 2.6G hz) under ML and since I needed to backup some files from an ext3 drive I looked up how to mount them. The proposed solution was to install both OSXFuse and Fuse-ext2, which I did. I cou

  • Problem relating to  enhancement to 0002

    Dear Freinds                 I have requirement where i have to add a custom field in the infotype 0002 so i have enhanced the infotype . I am doing the infotype enhancement for the country hongkong (Molga = 27).                Now when i am trying t

  • ??? black or green screens

    Downloaded new version of Adobe Reader 10.1.4, but did not delete old version before installing Adobe help suggests a plug in may have been lost when I deleted old version Re installed new version but still only seeing all black or all green screens

  • ISE RBAC question

    when configuring ISE administrator access and leveraging AD external identity source to authenticate users- Is there a way to define an identity source sequence so that if ISE loses connection to AD the user can still authenticate using a secondary m