Goods issue dates are different in sales order & delivery

Hi,
We have a situation where in sales order schedule line tab goods issue date is 21.30.2011
but in delivery the planned GI date is 28.03.2011.
There are two line item in the sales order & in both the line items all the dates are same.
Same route is there in sales order & delivery.
In delivery Item category avalability check Off is Y(Do not check avail. when reporting results of pick.request)
All the dates(delivery,loading,Transportation planning) are different .
waiting for responce.
Thanks In advence
Susrikant

goods issue date is 21.30.2011
What was the Actual GI date in delivery??  This should be the same as schedule line date.
thanks
G. Lakshmipathi

Similar Messages

  • Post Goods Issue - Tracing backward to update Sales Order & Delivery Docs

    I have a requirement as follows. I need to do a Sales Document change and a delivery document change prior to  goods Issue being done. The situation is to prevent SAP's normal back order processing from kicking off. I am quite confused about which method to use to achieve this. Wether BAPI &/or BDC &/or User Exit ???
    Please help you will be rewarded with points....

    Hello Srinivas
    The business requires that like order line items be consolidated to one line item prior to the order going to the warehouse for picking. this will aid in picking at the warehouse as well as result in the customer invoice not reflecting more than one line item for the same material. In the case where the customer has truly ordered more than a case, i.e. 1 case 2 eaches. The documents in SAP should still reflect 2 line items.
    The business also states that there be a 1 to 1 relationship between sales order and delv note. This means any unconfirmed line items must be closed out after del. note is created for the sales order. The closing out of the sales order will stop SAP from automatically creating a backorder once the unconfirmed line items become available in inventory.
    The business also requires that all partial line items in the delv. due to stock not available at the time of picking (those line items need to be updated) with the pick qty. And the line items which were not picked need to be automatically cancelled out. In addition the order line item must be rejected with a reason code for the line item which were not picked.
    We have a daily IDOC interface which creates shipments and updates delivery qty.
    I hope that clarifies the business. Pls let me know.
    Regards

  • How to calculate Goods issue date based on the time of delivery

    Hi SAP Gurus,
    I seek your help/suggestion for the given scenario.
    The user requires calculating the GI date based on time of delivery.
    Based on the delivery priority (like Priority 1= Day 1, Priority 2= Day 2) maintained in customer master, the need is something like below-
    1st case= If Retail Customeru2019s delivery orders received before midday (Noon cut off) require to be dispatched on same working day (Day 1)
    Wholesaler customer delivery orders received before midday require to be dispatched by the next
    Working day (Day 2 Including day of receipt)
    2nd case= Retail customeru2019s delivery orders received after midday require to be dispatched by the next working day
    Wholesaler customer delivery orders received after midday require to be dispatched by on day 3
    Kindly suggest , how to proceed in this. I am new to SAP world so need ur help to tackle this.
    Thanks a lot in advance for the valuable inputs.

    What I proposed to do was,
    a. Create routes like 0 day route, 1 Day route, 2 day route etc.
    b. Route determination is based on the Shipping condition of the customer. Put in the shipping condition for the customer as 00 - immediate delivery. 01 - By Truck, 02 - By Rail, 03 - Ship etc
    c. Now, put in your route determination in such a way that routes change in the sales order with shipping condition (SC). Like, if the shipping condition is set to 00, then 0 day route comes up. Meaning immediate delivery, if SC is 01, then your normal route by truck picks up. etc.
    When the sales order is manually created, you know the time of creation. As route is one of the criteria, the material confirmation happens based on number of days you put in the route to reach the destination. Now that you have the material available for today's delivery, the delivery program can be run to create it, or it can be manually created.
    Now, when you configure the route you have to specify 'Transit duration in calendar days'.
    When you have the sales order created electronically (say thru EDI), then, you may have to ask them to send in shipping condition. Else, you have to modify the function module Idoc_input_orders in such a way that if the sales order creation time is < 12 PM, then put shipping condition as 00, else copy what ever is there in the customer.
    If you do not want to check the time manually when the user creates the sales order, then you may have to use the user exit MV45AFZZ (and I think you can use Save_order_prepare) to check the time and change the shipping condition. By this you will avoid extra coding in Idoc_input_orders and also need not bother if the user changed the route or not.
    Hope my explanation helps.
    Regards,
    Mukund S

  • Deliveries and goods issue date

    Hi,
    can any one tell me here the name of the table which can show the details of the deliveries against the goods issue date along with the sales order?
    Thanks,
    Ravi

    You can get these details in LIKP/LIPS and VBFA.

  • Different Request Delivery Date & Goods Issue Date

    Hi SD Experts,
    Please find my queries as below:
    1. How do i configure the system to propose delivery date as today's date? Currently the system now always propose tomorrow's date but i want it to be today's date. Assuming today is 21st December but the system is always giving 22nd December. Anything that can be done inside SPRO? Inside VOV8 i just tick 'Propose Delivery Date' but i left the box empty for 'Lead time in days'
    2. Assuming today is 21st December, and i created a SO. The goods issue date is always tomorrow's date as well which is 22nd December. I want the goods issue date to follow 'Request Delivery Date'
    3. In conclusion, why is 'Request Delivery Date' is always tomorrow's date?
    Anything that can be done? Please help
    Thanks!
    Regards,
    LEE
    Edited by: YEOW LENG LEE on Dec 21, 2008 12:10 PM

    Hi lee
    A request delivery date comes if you maintain the lead time in days in VOV8 , GR time , In-house production time RLT in days in MMR , based on that the you will get the requested  delivery date If you keep the fields blank  then you will get the request delivery date as todays date only but if you have assigned factory calendar in shipping point and if you create sales order on Saturday (19/12/2008) then the delivery date will be on Monday i.e., 22/12/2008.
    Now if you want the goods issue date as different date then the delivery date should be different ,if you fill any one feild and check then you will get the different goods issue date
    Coming finally you are getting a request delivery date as tomorrow's date because of the factory calendar you have assigned to shipping point and to the CMR
    Regards
    Srinath

  • Tables for Sales Order,Delivery Doc, Billing Doc

    Hello All,
    Can anyone list the tables that are relevant for Sales Order,Delivery, Billing-Header,Item,Schedule line level as applicable.
    Regards,
    Raj

    Hi Raja Sekhar,
    Customers
             KNA1   General Data
                      KNB1   Customer Master – Co. Code Data (payment method, reconciliation acct)
                      KNB4   Customer Payment History
                      KNB5   Customer Master – Dunning info
                      KNBK   Customer Master Bank Data
                      KNKA   Customer Master Credit Mgmt.
                      KNKK   Customer Master Credit Control Area Data (credit limits)
                      KNVV   Sales Area Data (terms, order probability)
                      KNVI   Customer Master Tax Indicator
                      KNVP   Partner Function key
                      KNVD   Output type
                      KNVS   Customer Master Ship Data
                      KLPA   Customer/Vendor Link
    Sales Documents  
    VBAKUK VBAK + VBUK
                      VBUK   Header Status and Administrative Data
                      VBAK   Sales Document - Header Data
                      VBKD   Sales Document - Business Data
                      VBUP   Item Status
                      VBAP   Sales Document - Item Data
                      VBPA   Partners
                      VBFA   Document Flow
                      VBEP   Sales Document Schedule Line
                      VBBE   Sales Requirements: Individual Records
    SD Delivery Documets
    LIPS   Delivery Document item data, includes referencing PO
                      LIKP   Delivery Document Header data
    Billing Document 
    VBRK   Billing Document Header
                      VBRP   Billing Document Item
    SD Shipping Unit 
    VEKP   Shipping Unit Item (Content)
                      VEPO   Shipping Unit Header
    REWARD POINTS IF HELPFUL
    Regards
    Sai

  • Billing date(fkdat) in sales order item is not copied from Goods Issue Date

    Hi All
    we are facing problem at item level billing date field.This field should be filled with the GI Date in schedule lines shipping tab.
    but, it(billing date) is not being filled with goods issue date but, with the required deliver date at sales order header.
    Please give me a solution and the root cause. This is urgent as business is halted.
    Thanks
    Kumar

    Lakshmipati
    This is from SAP Screen
    "If invoice dates are defined for the customer, the system proposes the billing date from the invoice date calendar. If no invoice dates are agreed, then the actual goods issue date is formed on the basis of delivery related billing. In order related billing, the billing date of the order forms the basis of the billing date."
    earlier it is happening as desired.i.e., billing date=GI Date.
    but, as of now it is taken from the required delivery date.
    Please give me solution
    Kumar

  • Calculation of goods issue date in sales order with routes

    Hello Gurus,
    This is my first post on SCN, I'm excited to share a new little problem I have.
    I have configured my routes determination as per our requirements.  For example, I have one route configured in 0VTC such that the transit duration is 1 hour.
    When I create a sales order, I enter that route (1 hour transit.dur) under shipping on the line item.  Then I set a delivery date sometime in the future to test out my config.  Looking at the shipping "Goods Issue Date", I see that the date is 2 hours earlier than my delivery date.  It's supposed to be 1 hour.
    I looked through many forums and found no help on this.  My factory calendar is configured such that all days, including weekends and holidays are production days.
    Please advise at your earliest.
    Thanks,
    Mido

    Hi TW Typewriter,
    Yes, I am changing the date in the "schedule lines" tab for the sales order to a date next week, say May 23, 2014.  When I click on the display "Shipping" info, I see:
    1) Delivery date: 05/23/2014 - 00:00
    2) GI Date: 05/22/2014 - 22:00:00
    The expectation is to have the GI date 23:00:00 since my config for the route on the sales order is for 1 hr of transit time only.
    See attached

  • Good Issue date in the Sales order should 1 day difference from the MBDAT

    For the particular customer, i want to have difference of 1 day in between the material availability date & good issue date in the schedule line. As per standard i can't made any changes in route and shipping point. Suppose material availability date in sales order is 22.09.2010 than my good issue date should be 23.09.2010 in the sales order. Any body having any idea how can we handle this case and what are things we need consider impact of this change.
    Regards,
    Srinivas.

    Hi,
    I think you can easily enable this in Route scheduling /Delivery scheduling. You have to maintain the load time and pick/pack time as the total of 8hours. If this is done, then after material availability date, one more day will be added and the final day will be considered as GI date.
    If you dont want to do this, you only have to enable this by Z by using a user exit where you can add one day to the MBDAT and update that in GI date.

  • How to fetch post goods issue date and sales order creation date

    Hi All,
    How to find out the difference between SD Sales Order Item Creation Date and final Post goods issue Date. I would like to know how to fetch those dates and what is the relationship between the tables from which i will get the dates.
    Please let me know the solution .
    Thanks in advance.

    Hi,
    Sales order creation date is when u raise a sales order in favor of the customer using VA01.......using ATP logic system purposes the material availability date....
    after saving ur sales order...when u raise the Delivery using VL01n  w.r.t to OR...than u have to perform picking ....In the picking Tab...specify the amount to be picked than press Post Good Issue....means the goods left the company premises ..
    You can the fetch the values using tables-  Use T code   SE12  or SE16
    Vbak-----order header
    Vbap-----order item
    Vbek-----order schedule line
    Likp-----Delivery header
    Lips----Delivery item

  • Regarding Goods issue date and order date.

    Hi All,
    Could you please tell me from where we can fetch Goods issue date and Order date.
    Waiting for your reply.

    Preeti,
    Goods issue date/order date of what ?
    Goods can be issued in a number of ways, in reference to many types of documents.  In each case, the GI date and order date are found in different places.
    Please elaborate your request.
    Best Regards,
    DB49

  • Purchase order delivery shedule tabl , no Good issue date, loading date.?

    Hi Experts
      We found some Purchase order, in po item, it is without goods issue date, loading date and so on.
    Material has set ATP check on mrp3. what's possbile wrong? something wrong for matieral setup or others?
    Thanks
    Alice

    Hi
    Really thanks for your help. You mentioned " SD delivery of the sending plant is created and processed."
    Do you mean in material master , the sales view -delivery plant will impact this po GI date and Loading date? It maybe something wrong?
    Thanks
    Alice

  • Collective Invoice - Actual Goods Issue date

    Hi Friends,
    Collective invoice topic has been discussed many times but I didn't find exact solution to solve my issue.
    From sap help and few other threads it is learnt that Billing type, Billing date, Payer, Billing unit, Terms of payment, Incoterms, Letter of credit should be same to have collective invoice. During my tests it is understood that apart from those Actual Goods Issue date (Post Goods Issue) date should be same to have collective invoice for different sales orders/deliveries. In my tests SAP didn't consider Billing date but it did consider Actual GI date. In other words, even the billing date and other requirements are same invoice split happend due to different Actual GI date. However collective invoice created even though the billing date is different but Actual GI date is same.
    My user creates one sales order and one delivery for a customer once in a week (so 4 orders/deliveries in a month) and creates Invoice by end of the month with collective invoice. So based on the above tests I can ask the user to create sales orders, deliveries every week but perform Post Goods Issue month end and then create invoice so that collective invoice can be done. But the issue is they want to do the Post Goods Issue every week because the stock levels should reduce on weekly basis. So how can we create collective invoice even though the Post Goods Issue is done weekly (so Actual GI date will be different)
    Any idea? Please let me know if further information required.
    Thank you

    Hi,
    You may consider writing a routine under copying requirements so that invoice is not split even if the Actual GI date is different.
    Consider the following [thread|Collective billing; for more info.
    Regards,
    Amit

  • Which Factory Calendar is used to determine the Sales Order delivery date

    Hi ,
    There is Factory calendar assigned to sales Org and shipping point as well.
    I want to know which Factory calendar is used to determine the promise date on sales order acknowledgement and which one is used to determine the delivery date?
    Appreciate your help/inputs.
    Regards,
    Ram

    Ramy,
    I am not sure what you mean by 'promise date'.  For a given sales order item confirmation schedule, the system calculates the following dates:
    Delivery Date
    Goods Issue date
    Loading Date
    Material Availability date
    Transportation planning date.
    These dates are dependent upon what you have configured, and what your master data is.  If you have transportation scheduling turned on (IMG>SD>Basic Functions>Delivery scheduling and transportation scheduling), then the durations are:
    Route duration (transit), - affected by factory calendar assigned to the route (0VTC, that's a zero)
    Picking time, packing time, Transportation planning time, and Loading time- affected by the factory calendar assigned to the shipping point (OVLZ, not a zero)
    In addition, the Material availability date will be affected by the calendar assigned to the plant (WB03).  The calculated dates may also differ on a given order schedule line, based on whether the sales order is backward scheduled or forward scheduled.  This is particularly important when the calendars all have different holiday schedules.
    Standard SAP help on the matter, with a couple of nice pictures.
    http://help.sap.com/saphelp_erp60/helpdata/en/dd/5607e7545a11d1a7020000e829fd11/frameset.htm
    Rgds,
    DB49
    Edited by: Dogboy49 on Feb 16, 2010 5:08 AM

  • Planned Goods Issue date

    Hi,
    We have the system set up as follows:
    When the user enters the delivery date, and then material, route determination occurs. If, for example, there is a lead time of two days on the route, the Goods Issue date is set to two date before the delivery date.
    The user can enter many items.
    If, for different reasons,  the lead time is only a day, the user has to drill down on each item multiple times to change the Goods issue date. We are looking for a quick way, something similiar to "Fast change of delivery date" to change the goods issue date.
    Please share your experineces or proposals on the above problem for the user.
    Thanks in advance,
    Finbarr

    Hi ,
    You can use TA - MASS . Enter object type - BUS2032(for sales orders) on initial screen and select sales item data.
    Next screen enter selection fields like sales order no and items. After giving order no and item range , execute and enter all new values for any item data fields. After pressing button "carry out mass change", don't forget to press save button.

Maybe you are looking for

  • Technical design options for File to File scenario

    Dear all, I need some inputs on the below requirement. SAP BW system has to send some reporting data to one of the end systems. 1. What are the ways of interfacing between SAP BW and SAP XI. (I mean RFC, IDOC or File based mechanism) 2. The proposed

  • A/P-1602E doesn't ditect 5508 controller

                       Hi all, I have a wireless controller with version 7.2 . access point AIR-LAP1142N-E-K9 is working fine but access point  AIR-CAP1602E-E-K9 doen't join the group(it's getting ip address and the see the mac address asw ell.) .Anyone

  • Date and timestamp code

    Hi Experts, I've a table which contains date and timestamp in single field. Now I need to do look up on this table. But this table can contain multiple records on same day.  I need to take record which has lower data and timestamp. How can I write a

  • Logic crashes at startup 32bit, help please

    hi everyone I'm recently getting unexpectedly quit when I start logic project in 32 bit mode, there is no problem with opening in 64bit but in 64bit mode, despite 8gig ram and i7 cpu, logic is extremely slow with tons of Overload etc.. error , so i a

  • How can I Join song?

    I want to create a slide show and not have the music loop. How can i join multiple track so they appear as one and then put it in my slide show?