Goods Movement for Process Order

Hi PP Experts.
Is it possible to take goods movement in TECO process order directly.
is there any other possibility for take goods movements in TECO process order?

Hi,
After TECO you can't do Goods Movements. For carrying out , GOOds Movements you need to revoke TECO in process order as following :
GO to COR2-> Process Order Menu->Functions->Restrict Processing-->Revoke Technical Completion and Save.
After revoking TECO , You can carry out Goods Movements.
Hope this helps.
Revert if any doubt.
Award points if useful.
Regards,
Tejas

Similar Messages

  • Process order goods movement for process order

    Hi PP gurus,
    In my client's company in MIGO with movement type 261 user isuing material and then doing confirmation with COR6. In migo system should not allow less quantity than mentioned in BOM. Is there any standard setting for it.
    Jayesh

    With the help User Exit you can control the said requirement.
    Best Regards,
    Raghavendra K Nayak

  • Reverse Goods Receipt for Process Order

    Dear All,
    Please tell me how to reverse the Goods Receipt for Process Order for which already QM is cleared for that Particular Lot.
    But Confirmation is still yet Pending.
    I tried MIGO - Cancel - Material Document. But it is showing a message "Process Order already processed".
    Regards
    buss

    Hi,
    Use t code MB31
    Movement type 102
    Stock type = Unristricted use.
    Reverse by entering above information then you have to manually cancel the inspection lot.
    Regards,
    Vishal

  • Error while doing Goods receipt for process order. Error code: "BS027"

    I am getting error while doing GR for a day whereas previous day(s) GR is already done and also 2 days post that day are also done successfully.
    Error :  ""Goods receipt for prodn. order" is not allowed (ORD XX-CEMTSAL) " (XX = First two characters of plant code)
    Error code: BS027.
    Thanks to all in advance.

    Hello,
    This issue would occur when you want to post a confirmation for a production order. The error message is generated if you wanted to post a backflush for a component and if this component was assigned to a sales order stock. The sales order itself was assigned to a work breakdown structure element which should be debited with the actual costs. However, the business transaction 'Confirm' is not permitted for a work breakdown structure.
    Please look into SAP Note 62367 and 64370
    Hope the information is helpful
    regards

  • Goods receipt for process order during confirmaiton

    Hi
    Gurs ,
    I have created  I could not able to GR for the process order  automatically while i am doing confirmation .
    I have mainted all the setting in the master data  like back flush indicater in the material master and back fluch indicater for the
    in work center .
    I have maintained the setting in the control key and order and PSP as well but still it is not doing 101 automatically at the time of confiramtion.

    Hi,
    i just don't know why you raised new thread as already ur previous thread is not closed
    Now just let us know whether system is throwing any error
    or what exactly happing in cofirmation screen
    Go to OPK4, here
    under goods movement there is option all components  just tick it
    then in second tab Gen individual entry tick Goods movement & termination for incorrect goods movement
    Coming to GR
    what is storage location ur giving
    just check in MMSC, whether this storage location is activated for the header material ( GR )
    Added
    Plz Go through all possible options
    [Auto GR is not happening.;
    Regards
    kumar
    Edited by: kumar kumar on Nov 10, 2009 2:25 PM

  • Trouble with unplanned goods issue for process order

    Hi experts,
    Please help me to solve this problem:
    I have a process order with auto created reservation. Then I do GI against this process order, GI is not done at once for total required material quantity but in several times.
    For one specific material, the quantity is not sufficient in one batch, so I have to insert a new line for additional quantity from another batch.
    Then this issue occurs: In some GI, the additional line is recorded with move type = 1 (planned goods issue); in other GI, it is recorded with move type = 2 (unplanned goods issue) although the (Total withdrawn quantity + Quantity in this GI) is smaller than required quantity in reservation.
    I think this issue has nothing to do with order confirmation as these two steps are independent.
    Can any one explain why this happens? and how to solve it? Because if unplanned goods issue is not recorded in Reservation, then there's an inconsistency between withdrawn quantity in reservation and actual withdrawn quantity in MB51 or COOISPI.
    Thank you very much for your help.

    I assume that you do t-code MIGO with GI to order.  However, the additional line you enter will not be link to reservation, therefore will be record as unplanned goods issue. 
    Two thing you can do; first configure batch determination in MM (OMJJ) and set up batch determination record (MBC1).  You can then click the button stock determ. beside qty.  The system will select the batch based on your requirement.
    Alternatively, you distribute the quantity using another button (it looks like the X sign near the copy content button).  Then you can distribute qty based on the same item.  You can enter the qty, sloc, batch in there. 
    Don't use the New Items function.

  • DOCUMENTED  GOODS MOVEMENT  FOR COLLECTIVE ORDER

    Hi Guru's
    In  the  4.6C version 
    If i got to Production order from transaction code CO03 , Read the collective order , highlight the toplevel item and ''GOTO'' in the menu bar and select Documented goods movement , the display shows the Top level order AND the Sub-Assemblies.
    ( sub-assemblies goods movement with main assembly  can be seen in the single screen)
    In the ECC 6.0 Version
    If i got to Production order from transaction code CO03 , Read the collective order , highlight the toplevel item and ''GOTO'' in the menu bar and select Documented goods movement , the display shows the Top level order only.
    To see the Goods Movement in the Sub-Assemblies  you have to go to each production order individually.
    can this be changed in ECC 6.0  exactly to that seen in 4.6c version .
    pls give me your valuable inputs at the earliest .
    Thanks for your help.
    Regards
    satish k

    Hi satish,
    In collective order struture ,Automatic goods movement will be happened between toplevel & lower level.
    Please check with "coll order goods mvt" settings for order type at OPJH For ECC 6.0 version.
    Please also check with cost analysis for Goods movement.
    Regards
    Pradeep

  • PP-PI sheet through goods issue for Process order

    Hi,
    I want to know how to post goods issue without reference of reservation number against process order through PI sheet.
      I defined one call function 'ENTER CONFIRMATION' through which I can enter into confirmation screen but after saving confirmation of process order ,generally I switched on  to transaction CO54 through which one should sent this PI_CONS message to the desired destination but in that I'm getting an error ,that it is not allowing me to post goods issue excess quantity.(WITHOUT REFERENCE OF RESERVATION NUMBER)
      how to by-pass that reservation number.
    Manually when we do MB1A it will allow us to issue more quantity but that is manually but when it is through PI sheet it is not allowing me to issue excess quantity.
    Regards,
    Amit.

    Hi,
    I want to do GI AND GR  through PI sheet ,I already used PI_CONS AND PI_PROD ,but it is not allowing me to enter quantity excess from bom quantity mentioned .it is not allowing me to override reservation quantity while making gr .
    I'm doing PI sheet with ALV based.
    For to by-pass reservation number I already made zpi_cons and zpi_prod under message category and assigned to instruction category.

  • Goods movement for production order

    is there a way that goods that are produced moves in to blocked stock and after certain period of time (eg 3 days) they move in to unrestricted use  automatically. can we do this

    Hi,
    In CO02, on "Goods receipt" tab you can set the "Stock type" in which the goods should be posted when you make confirmation.
    You can set QI stock type in material master (MM02, "Work scheduling" tab), but I'm not aware of any possibility to set Blocked stock type as default... Is there any sense to post the goods directly into blocked stock type?
    I'm afraid your requirement cannot be covered in standard system.
    Regards,
    Csaba

  • Allow Goods Movement for materials through specified storage Location

    Dear Experts ,
    In Process order while confirming the goods movement , i want that goods movement shoould be allowed only through the specified storage location that is the production store . Even if the stock is there in the other stores like the general; store , i donot want the goods movement to be done.
    Kindly guide me how can this be done ?
    Anis

    Hello VS ,
    We have maintained the Pord Storage location in both BOM & Material Master.
    Despite this in Good Movement for process order the system doesnt stop from selecting any storage .
    I want that it should not be possible to post an entry from any other store.
    Is there any other way to do it without the user exit ?
    Regards
    Anis

  • Auto Batch selection during GI for Process order

    Hi Gurus
    My requirement is that the system should select available batches of raw materials automatically during goods movement for Process order using COR6 and Goods issue for order MB1A . Could any body plz let me know the procedure in detail

    Dear,
    You need to define the batch search procedure MBC1 with serach strategy as ME01 for your material plant and movement type assign selection condition and sort rule and save the condition record.
    Please refer this thread for details,
    BATCH SELECTION DURING ISSUE
    Please come back if any problem.
    Regards,
    R.Brahmankar

  • Goods movement in collective order

    Hi all,
    We have ticked the indicator for 'Goods movement for collective order' in OPJH, still we are not getting required results. The goods receipt against the child order does not occur.
    Please help.
    SmanS

    Hi Dear Can u please explain..how you solved this..
    Regards
    Raghu

  • Bapi bapi_goodsmvt_create for goods receipt of process order

    Hello All ,
    I am trying to a GR with MIGO for a process order .Its giving me error like
    Content of order 2000002339: 100001374 transferred to interface (IMSEG): 100001374
    I am not able to trace the error out .I am passing the below parameters .pls check
    gmhead-pstng_date = sy-datum.
    gmhead-doc_date = sy-datum.
    gmhead-pr_uname = sy-uname.
    gmcode-gm_code = '02'.   "01 - MB01 - Goods Receipts for Purchase Order
    itab-move_type  = '101'.
    itab-mvt_ind    = 'F'.
    itab-plant      = '1AAE'.
    itab-material   = '100001374'.
    itab-entry_qnt  = '1'.
    itab-move_stloc = 'B100'.
    itab-stge_loc   = 'B100'.
    itab-orderid  = '002000002339'.
    append itab .
    CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
      EXPORTING
        goodsmvt_header             = gmhead
        goodsmvt_code               = gmcode
      TESTRUN                     = ' '
    IMPORTING
        goodsmvt_headret            = wa_head
       materialdocument            = lv_mblnr
      MATDOCUMENTYEAR             =
      TABLES
        goodsmvt_item               = itab
      GOODSMVT_SERIALNUMBER       =
        return                      = errmsg
    Pls reply ..
    Thanks .

    HI ...
    Since this is a production order ,i used the GM code as '02'.bcoz the documentation says the same .
    There are the following types of transactions/events:
    1. GM_Code 01: Goods receipt for purchase order
    2. GM_Code 02: Goods receipt for production order
    3. GM_Code 03: Goods issue
    4. GM_Code 04: Transfer posting
    i also tried changing it to '01' ,its not working still...
    Pls reply
    Thanks .

  • Different movement types for Goods Issue for different Order Types

    Hello Experts,
    Can we maintain different movement types for Goods Issue for different Order Types at the time of automatic creation of reservations?
    Thanks and regards,
    Satyajit

    Satyajit,
    Folow the link given,
    Re: How to add new movement types when creating reservation?
    Hope this helps you.
    SmanS

  • Tick for goods movement in production order

    Hi,
    I have one query with reference to tick for goods movement in production order.
    Where it comes from as soon as i released the order.
    Is there any customized setting or it is stanadard functionality?
    Tushar

    Hi,
    I am not sure about which tick you are talking. So pls clarify exactly which check boxes you are talking in Production Order.
    If you are talking about check boxes of Goods Receipt,  GR Non valuated & Delivery Completed check boxes then those are standard SAP functionality which comes automatically at the time of creation / release of the order.
    Revert with more details in case your query is not resolved.
    Regards,
    Tejas

Maybe you are looking for

  • Problem with query in cursor (Oracle 8i)

    Hi all, Following query works perfectly fine if I test it in my development environment SELECT dt,       (SELECT 'Y'          FROM dual         WHERE EXISTS (SELECT 'x'                         FROM top_days t                        WHERE t.date = dt)

  • OSB sbconsole "Test Console" service is not running

    Hi all, A problem in the osb domain sbconsole I am facing during testing of proxy/business services. When clicking on the "Launch Test Console" icon I got following error: Error Accessing Test Configuration "Test Console" service is not running. Cont

  • What generation is my ipad air

    wwhat generation is my iPad Air?

  • OTL: Timekeeper Layout, Custom Choice List

    I have created a custom choice list on timecard. I have modified all templates (Time entry, confirmation, review and notification) I am using. But when I create the timesheet through timekeeper I am not seeing those choice lists. How can I see custom

  • Getting control references which are in tabs

    Hello, In a labview vi, we can successfully get all the control references, including references to tab controls.  We would also like to get at the control references of controls which are contained within the tabs.  We've been hunting around the met