Goods Movement Overview layout in Confirmation
Dear ,
How to set the layout for Goods Movement Overview in Confirmation T code .
Dear SAP PP,
when you are in Goods movement tab, Drag the coloums as required then
Extrem right you can find option Configuration button ( Small Button ) just click it
give the Variant name & save, so from next time same settings will appear
Regards
Madhu
Similar Messages
-
How to shift column in Goods movement overview
Dear gurus(sap pp consultant),
this is related to earlier thread which was answered by you,
i am able to drag the required column,but i did not find the table setting tab,
i am working on 4.7 version
please suggest....Aakash,
In the goods movement overview screen, on the right top corner of the first goods movement record you would see a application button with Yellow and white color that's the Table Setting function button. First change the layout as required and then click this button, and then enter the variant name and activate the check box next to it on the left side and then click the save.
Regards,
Prasobh -
Enforce "Goods movement overview" in CO11N
Hi Everyone,
There is one material A with 3 components A1, A2 and A3.
A1 and A2 are issued using picking list. A2 is set as backflushed.
When we do confirmation, if we don't go to the goods movement overview, we cannot post goods issue the exact consumed quantity of A2.
Is it possible to enforce the system to go to the goods movement overvew before save? If can... how?
Best Regards,
BinHi,
I understood that going into GoodsMovemnt overview is being compelled by the Difference between the Actual quantity issued and Planned quantity in BOM for a particular component.
After backfush, still by MB1A, we can post the goods movement against that order. (Movements 261,262)
I hope this alternative is considerable.
Otherwise Please remove the Goods issue storage location in the order or Material master. Then system prompts for this. There u can enter the quantity as u want. -
Goods movements overview in co11n
Dear friends,
In production order cofirmation (CO11n) if we click on goods movements button it will take you to new screen with goods movements overview table control. My requirement is that I want to make some quantity fields in table control as display only.
For that I tried
CONFPP01
CONFPP02
CONFPP03
CONFPP04
CONFPP05
CONFPP06
CONFPP07
And BADI WORKORDER_GOODSMVT
But of no use. Can anybody suggest me a BADI, or any other possible solution?
Thanks in advance.
Regards,
MubashirHi,
I understood that going into GoodsMovemnt overview is being compelled by the Difference between the Actual quantity issued and Planned quantity in BOM for a particular component.
After backfush, still by MB1A, we can post the goods movement against that order. (Movements 261,262)
I hope this alternative is considerable.
Otherwise Please remove the Goods issue storage location in the order or Material master. Then system prompts for this. There u can enter the quantity as u want. -
The CO11N Goods Movement Overview does not display any materials for BOM
Hello folks;
I can't seem to get a hit when searching for my particular question, which most likely is an easy one for most of you.
A new BOM was set up consiting of individual materials (no sub-assemblies).
After a production order was created (CO01) and released and a reservation was created, the user went to the CO11N transaction to process the first Operation (Issue the components to the Order).
He clicks the "Goods Movement" button and the "Enter production order confirmation: goods movement" screen that displays is blank! There are no components listed with the "261" movement type.
All the other BOM's that we process do not have this problem and their components appear except for this new BOM that was created.
What are we missing?
I'm sure this is an easy question for you folks since I am mainly an ABAP'er with some Logistics config experience.
Thanks in advance.
Scott.Thank you so much. The person who created the Routing did not click on any of the Backflush flags.
I will have them fix the Routing.
Thanks again.
Points awarded. -
Goods Movement Errror during order confirmation
Hi Experts,
I have confirmed one production order for finished good. Its status now is REL CNF DLV PRC GMPS MANC SETC.
Finsihed good has 2 HALBs. Storage loctaion for FG is XX1 and for HALB is YY1. Backflushing for FG is active.
I am trying to cancel this confirmation using CO13.But while doing so I get error as " Current Order Status XXXXXX does not allow goods withdrawal".
Could you please explain where things are going wrong? How can I change status of a confirmed order?
ThanksDear
If your production Order is already DLV , then this message will pop up because you are tring to cancel the operation confirmation where backflash is active .In that case . you need to cancel the Materials Documents throgh MBST or MIGO, then you can cancel confirmation .
I would rather suggest you to chekc the COGI error frist and then go ahead with cancelation of material sdocuments .
Couple chels can be done :
1.Check wether the stock is not IV or PGI if it MTO order
2.Check wether you have make Backflah active in MRP views of the material
3.Check the Operation where you did the operation confirmation wether Auto GR active in Operaton control key as well as Back Flash mark in Work Cnetre Basic View
investigate above points before canceling Materials documents in MBST/MIGO and then cancel confirmation in CO13
Try and revert
Regards
JH -
Goods movement in Confirmation IW42,
Hai all PM gurus,
I have activated the back flush indicator in the Material master record.I have maintained the components in the task list also.In the maintenace plan for that the particular task list, the componetns also copied - flagged the check box back flush indicator manually in the components screen. While doing confirmation by IW42, the goods movements are not posted?. In the components over view screen also, the material is not copied?. What might be the problem?. Any configuration required.hi
how you came to know the goods movement has not posted.while confirming definitely it will show message as confirmed and goods movement posted.
kindly read the sap definition for ALL components
All components on goods movements overview
Specifies that in the goods movements overview, all components are to be displayed that are assigned to the operation in question. The system posts the withdrawal of all components displayed in the overview as a backflush.
Use
You use this indicator to decide which components are displayed in the overview for individual time confirmation:
If you set the indicator, the system displays all the components regardless of whether or not the backflushing indicator is set for the component in the order.
If you do not set the indicator, the system only displays the components for which the backflushing indicator is set.
In addition, the material produced appears in the goods movements overview if it is to be placed into stock using an automatic goods receipt. You specify whether or not an automatic goods receipt is to take place in Customizing for the operation control key or in the production scheduling profile.
Dependencies
The indicator has no influence on the overall completion confirmation.
regards
thyagarajan -
Goods Movement through order confirmation for IS oil material
Hello Experts,
I am doing the goods issue posting through the confirmation transaction CORK for process order. The materials that I am posting are IS oil relevant.
When Iam trying to save the confirmation, system is taking to the screen of additional quantity calculation for each materials. When I maintain the details, system is saving the confirmation. But in case if there is a change in the parameters mentioned for additional quantity calculation, system is not giving any option.
In other goods issue transactions, we can see a calculator button which will take us to the quantity calculation screen, if we double click a line item. But I dont find this option in the goods movement screen through order confirmation transactions.
Is there any way to activate it in confirmation screen also, so that we can individually maintain the qty calculation parameters of each goods issue item?.
Appreciate your earliest reply
Thanks & Regards
PrathibNo Inputs?????
-
Problems with goods movements cancelling network confirmations
Hello experts,
I'm having some problems with goods movement when cancelling network confirmations.
I assign a component for a operation in the project builder (CJ20N). Then when I execute a confirmation for that operation in CN25 everything works correctly, I can assign the time for the confirmation and SAP automatically carries the component assigned to the operation. Once I have done the confirmation the goods movements and the hours have a correct account assignment.
The problem is that if I cancel this confirmation, the hours are correctly cancelled but the component is still there. If I try to cancel the goods movement with MIGO it is no possible because the system says that must be cancelled with the corresponding transaction (CN29) but, as I have said, the system does not cancel it.
On the other hand, If the goods movement goes to COGI transaction and then I post-process the error, If later I cancel the confirmation, everything works correctly.
Does anybody know why this could happen?
Thanks and regards
LauraHi
I think this question was raised earlier also. The best way is to allot a fixed time slot for your users so as to avoid clash. I suppose i explained that the master data of any material is stored at one place only and if you schedule a background job for this then all your good movement transaction will be in que and performed in orderly manner.
If automatic posting is not possible then use the time slot method.
Krishna -
Batch Classification Screen for Goods Movements
SAP Gurus,
Very recently (24. April), we experience the following issue: (PP-PI Process Order)
At the moment of process order confirmation, for any new batch assigned in the good movement overview, there's no pop-up of batch classification screen which allow our user to entry the classification data. And this functionality works fine in the past.
Do you have an idea that how it happens? We checked the configuration OMCV and master data as well, the settings are all fine to me.
Best regards,
VincentDear Vincent,
I think you talk about the 101 movement, don't you? In this case this is not possible at all, check SAP note 85310
Because goods movements can be decoupled from confirmations and
processed in background, it was decided that this functionality would
not be implemented; therefore this is Standard R/3.
Solution
As a work around for this you have the following options:
1. Classify your batch manually through Batch Master Maintenance.
2. Turn off automatic goods receipt and classify your batch through the
pop-up that is presented during MM goods receipt.
3. Do not create your batch during Order Processing. Instead have the
system create it during confirmation and at this time you will be
able to classify your new batch from the Goods Movement screen
COMPONENT>BATCH MANAGEMENT>CREATE BATCH.
Note :
If you want that your batch is classified in the background you can set
in the transaction OMCV (classify batches within goods movement
overview) that the classification is to happen in the background. You
can then utilise the user exit EXIT_SAPMM07M_004 to valuate the
characteristics if it is valid for
your release.
Regards,
Sabine -
Issue of goods movement in co11n
hello,
anybody please guide me.
i am doing production order confirmation in co11n. i am using control key as pp03 in routing. during goods moment posting i am not getting storage location column in goods movement overview screen. how can i resolve this issue.
Thanks & Regards
BhaktaDear Baktha,
Extream right in in description row you can find option ( button ) Configuration button
it will have three cloours i.e blue, yellow & white click that and check if any variant is set
if set remove it it will resolve the issue
if notthing is set in configuration button then
Check if any transcation variant if set for CO11N
you can check for transcation variant in SHDO
if possible take Abaper help on SHD0
Regards
Madhu -
Expected Goods Movement in GATP
Hi Experts
Has anybody used the Expected Goods Movement (EGM) functionality in Global ATP ? I'm trying to find out if it requires EWM as a pre-requisite.
The SAP Help link seems to show this under GATP, but gives examples from EWM, so I'm not sure.
Business requirement is that in certain cases, show some inventory as 'available' a few days before it posts as goods receipt. EGM seems to meet the requirement, but we don't have EWM in scope.
Thanks
Rishi MenonHi,
1.Please keep the tick mark for the All components for Goods movements in OPK4,Confirmation parameters
As per the SAP Help
2.If you set the indicator, the system displays all the components regardless of whether or not the backflushing indicator is set for the component in the order.
3.If you do not set the indicator, the system only displays the components for which the backflushing indicator is set.
In addition, the material produced appears in the goods movements overview if it is to be placed into stock using an automatic goods receipt. You specify whether or not an automatic goods receipt is to take place in Customizing for the operation control key or in the production scheduling profile.
I think it can be helpful
Thanks
Balaram -
Good Movement button when CO11N
Dear SAPper,
I wonder why the good movement overview screen in CO11N always shown my component
although it had been GI with MB1A?
we design the production with GI -> confirmation -> GR
so there is no backflush and no auto GR
I check our material master and workcenter, the backflush indicator is not set
I check customizing of confirmation paramater, quantity is not proposed
Where can i check so the good movement overview in CO11N should not show component
and when invoke CO11N we always get message
"Confirmation can only be save in good movement overview"
Please help.
Best regards,
Freddy HaDear All,
Yes, i see, prod order that is generated before the change of opk4 is not effected again.
new prod order is effected
Thanks all.
Good day.
Best regards,
Freddy Ha -
MB26 : ERORR : goods movement are incorrect
Hai SAP experts,
After the MRP run , the planned orders created gets converted to production orders .So as per BOM , the components require to produce the ordered material gets reserved against that production order & Is shown as orders in stock requirement list for component materials . When i go to MB56 t code , and given details and execute that one It showing different components and system assign automatically storage location and batch number.At the time of save its showing error
" goods movement are incorrect "
ThanksHai,
I am MM consultant .Before that i am not working on reservation for production order . I dont know what the use of MB26,
As per discussion with my collegues , they told that in MB26 ,system shows the goods movement overview .When you click save button i.e , Post button ,then goods are posted but here its showing error
GOODS MOVEMENTS ARE INCORRECT .
This error comes only at the time of 261 mvt type GI to Production order .
IN the case of 311 this error is not getting .Give me suggestions
Thanks
Edited by: babbullu on Oct 20, 2011 3:10 AM
Edited by: babbullu on Oct 20, 2011 3:10 AM -
Dependent goods Movement was incorrect
Hi all
I am having an error in my COGI whenever I confirm a collective order. Error says that "Dependent goods Movement was incorrect". What does that mean?There could be a program error in standard SAP. I would suggest you to search in OSS, I found the following notes and error RU523 will be raised for different settings in IMG due to bug,
458140 RU523: Incorrect grouping of dependent goods movements
793058 RU523: Incorrect summary of dependent goods movements
389690 Collective order confirmation: Storage location transfer
354564 Collective order:dependent goods movement incorrect
577515 RU523: Incorrect summary of dependent goods movements
374707 Confirmation:goods movement with separate valuation
542451 COGI: Entries with C6013 without error date/error time
576663 RU523: Unnecessary summary of dependent goods movements
412329 COGI: Problems with dependent goods movements
331421 Confirmation: Goods movement with split valuation
513786 Dependent goods movements are separated
327137 Problems with dependent goods movements as of Release 4.5
412329 COGI: Problems with dependent goods movements
680650 Cannot get initial context or service "FILE".
1453716 SXS library: Missing function modules
Maybe you are looking for
-
Hi All I have done a simple file_2_file and SOAP_RFC scenario. Both of them are perfectly working fine. Now I did a simple file_2_file scenario using BPM and this doesn't work. When I go the transaction SXI_CACHE, it shows as "Cache contents are o
-
I recently bought the Ipod nano and when I plugged it into my computer, my old old version of itunes told me I needed to upgrade to 7.5 I have dial-up on this laptop, so it took over 6 hours to download Itunes. I installed itunes without a hitch, but
-
Add new line in Journal Voucher by DI exception
Dears, When I create the Journal Vourcher by DI, I got the exception when I execute the following function JournalVoucher.JournalEntries.Add() After search from forum, some people suggest that I should reinstall DIAPI or delete the SM_OBS_DLL folder.
-
HT4970 How do I delete a reminder list
I have two reminder lists and the completed one also. How do I delete one of them; it was created in error when I got the phone.
-
LG Cosmos - Mobile Email Gmail Credentials Problem
I usually use a Droid but I broke on Friday and I'm waiting for an insurance replacement (it was on backorder, so I'm looking at two weeks.) I can't go that long without a phone so I decided to reactivate my old pre-smartphone, an LG Cosmos. I instal