Goods Movement through order confirmation for IS oil material

Hello Experts,
I am doing the goods issue posting through the confirmation transaction CORK for process order.  The materials that I am posting are IS oil relevant.
When Iam trying to save the confirmation, system is taking to the screen of additional quantity calculation for each materials. When I maintain the details, system is saving the confirmation. But in case if there is a change in the parameters mentioned for additional quantity calculation, system is not giving any option.
In other goods issue transactions, we can see a calculator button which will take us to the quantity calculation screen, if we double click a line item. But I dont find this option in the goods movement screen through order confirmation transactions.
Is there any way to activate it in confirmation screen also, so that we can individually maintain the qty calculation parameters of each goods issue item?.
Appreciate your earliest reply
Thanks & Regards
Prathib

No Inputs?????

Similar Messages

  • Error in Goods Movement during order confirmation

    Hi,
    I am trying to confirm a production order through CO11n,but i am getting an error in Goods Movement .
    The following message is displayed in the log -  "* Posting only possible in /11 anperiods 2008d 2008/10 in company code A100*".  Can any one guide me what should i do to confirm the order without any error in Goods Movement,
    Thanks in advance.

    Hi,
    It is advisable to correct the Goods Movement Errors in COGI in the same period (before closing the period by MM in MMPV). You cannot correct the same if the period is closed.
    Only option is you need to open the closed period in consulatation with FI and MM team members
    OR
    Delete the Error movement records in COGI and post the Goods Issue for the production order in Tcode : MB1A with movt type 261 and go inside and mention the materials which you want to issue to the order.
    Hope this will help you.
    regards
    radhak mk

  • Goods Movement on Order Confirmation

    Hi all,
    Whenever i issue a material while doing Order confirmation (IW41: Using goods movement option) , the material is issued but its cost doesnt get populated on the maintenance order. I guess i am missing some configuration end but can anybody guide me or give me hint where is the root cause lies of this problem.
    Why the material cost is not getting populated on the maintenance order.
    (Note: I am using my own Order Type not the standard one)

    hi
    I hope this is the problem in ur config
    Plant Maintenance and Customer Service - Maintenance and Service Processing - Completion Confirmations - Define Control Parameters for Completion Confirmations
    If u have tick at Materials, remove it
    It will give only plan cost, not the actual cost
    If u dont use this tick, you can do goods movement from iw41 and the cost will be calculated in the actual cost
    - Pithan

  • Goods movement in QC confirmation for inprocess operation

    Dear Friends,
    I am doing inprocess inspection for routing operations. After results recording, I get the window where I am entering yield.
    If I go to confirmation tab, I can enter the activities and qualntity. But ther I am not getting goods movement tab.
    I want assign batch no. to material in the goods movement tab.
    How can I get it?
    Please help me.
    Waiting for reply!
    Thanks!
    Kiran

    No Inputs?????

  • Problem with goods movement during operation confirmation

    Hello,
    While doing the operation confirmation,the goods movement are not posted for the components attached to that operation i.e i am not getting the quantity of the components in the "goods movement" tab while confirming.
    check points done: 1) Final confirmation tick is activated during ope. confirmation.
                                 2) Backflushing is activated for material(componenets that areattached to that operation).
    please let me know what is the reason for not getting the qty displayed in the "Goods Movement" tab
    Thank you.
    Regards
    Santosh

    hi
    Normally if you activated the backflush for the material in the order,the material wont be displayed in the goods movement tab unless you activated the All materials in the parameters for confirmation in the intial screen of IW41
    kindly check
    regards
    thyagarajan

  • Restriction to delete goods movement data during confirmation thru CO11N

    hello all
    Please let me know how to prevent the user to delete the rows in goods movement screen during confirmation through transaction CO11N ,as users are able to confirm without goods issue by deleting that rows.
    Should we contact basis person for the same
    with regards

    Dear,
    Please refer my reply in this thread,
    https://forums.sdn.sap.com/click.jspa?searchID=16368869&messageID=6047820
    https://forums.sdn.sap.com/click.jspa?searchID=16368869&messageID=6151829
    Try using transaction variants. There is a utility called GUIXT in transaction. You can write code to add a pushbutton on the desired screen by using the GUIXT. The coding syntax is provided in the SAP application help. Use transaction SHD0 to create the variants.
    http://wiki.ittoolbox.com/index.php/Implement_a_screen_exit_to_a_standard_SAP_transaction
    Hope it will help come back if any problem.
    Regards,
    R.Brahmankar

  • Dump during sales order creation for a config material (uding order BOM)

    Dear all,
    I am getting the following error during sales order creation for a configurable material
    When I click on 'Engineering' tab in the characteristics value assignment for the parent material i.e. sales order material I get dump with following message,
                                   'Field symbol has not yet been assigned'
    Thanks,
    Yogesh

    Yogesh,
    what was the problem ?
    Thanks,
    Pavan Verma
    Edited by: Pavan Verma on May 11, 2010 9:31 AM

  • Goods Movement Qty While Confirming the Order

    Hi Friends,
    While confirming the order The end user Will go to the goods movement screen and enter the actual consumed Qty (When all BOM components Are marked with automatic Back flush) For the components with 261 movement type and will enter the storage location and batch no if required .
    Now my requirement is the user should not have the access (it should be in gray) to the BOM Components qty to change
    OR
    He should not be able to change beyond the qty As per scrape % Given in Material Master or BOM.
    The Reason for this is
    Even When there is a shortage for BOM components in SL location, he is reducing/Adjusting  the required quantities as per the existing Qty ( If there is no stock then making it to ZERO also)  and confirming the order.
    Pl suggest me is there any user Exit for this or can I do it thru Standard SPRO settings.
    hari

    Hi,
    You  can make screen variant SHD0 for CO11N and hide it.
    In t code SHD0, give the transaction variant name ( say ZCO11N )of ur std CO11n.
    CO11N screen will appear, when u will save the variant, u will getgood movement tab , it will hide now.
    Activate the transaction variant.
    Regards,
    R.Brahmankar

  • Goods receipt through Inbound delivery for Sub-Contracting Purchase order

    Hi
    I am trying to do goods receipt for the inbound delivery /shipping notification created for a sub -contracting Purchase order. The Finished product and the component part are batch managed, When I try to perform PGR in VL32N , I am getting a blank screen as error message and Goods receipt is not getting triggered . I checked for OSS note and found 645119 close to my issue but not an exact match . We are in ECC 6.0 with EHP 4. Can some one clarify whether it is possible to post GR through inbound delivery for a Subcon Purchase order .
    Thanks in advance for your immediate response.
    with regards,
    Joseph Anand B

    Hi, The issue may be due to this - the component is batch managed but the batch data is blank in the component list of the Purchase Order Item. Or a batch is maintained in the PO item component list but the stock for the same batch is not available with Vendor, i.e. stock with some other batch may be available.
    In a receipt for Sub-cont PO, 101 happens for FG and 543 happens for component. But there is no option to provide the component details in a delivery. So in standard system, when 101 happens via a delivery, 543 will be posted in the background. So any error in posting 543 will result in a blank screen without any error message.
    You can fix this by maintaining correct batch in the PO component list.
    But there is another issue - you cannot do 'cancel posting' and 'return delivery' for this receipt. Only you can reverse the inbound delivery and you should know that the  recevied stock shouldn't have been processed to do reversal of inbound delivery.

  • Goods Movement After Order TECO'd

    Hello All - Question is part MM and part PM.  It involves a TECO (technically complete status) on a workorder and the ability to perform a goods issue to the workorder.
    Is there configuration to allow a goods movement (GI) to a TECO'd workorder if the material in question has been reserved/requisitioned on the workorder prior to it being TECO'd?
    I'm quite certain that goods issues to TECO'd workorders are permitted PROVIDED the material request was on the workorder prior to it being TECO'd.  There must be configuration somewhere that allows/disallows this because at this client site, NO goods movements are allowed after the order is TECO'd.
    Any help would be much appreciated!
    Thanks
    Susan Page

    hi susan
    read this... u will understand
    Technical Completion of an Order 
    Use
    You usually complete an order technically once the maintenance work planned in the order has been performed.
    Features
    You use the technical completion of an order to define the following information for the order:
    u2022     The order obtains the status Technically completed. The order is marked as complete for Plant Maintenance.
    u2022     Now you can only make the following changes:
    o     Lock and unlock the order
    o     Set the deletion flag
    o     Post goods receipts for the order
    u2022     You can still enter confirmations for a technically completed order. In order to prevent this, you must create a user status that does not permit confirmations.
    u2022     The storage location and account assignment data entered for the order are fixed and can no longer be changed. However, the order can still receive costs, for example, through incoming invoices for materials delivered and used.
    If no settlement rule has yet been maintained for the order, the system creates one automatically. If missing data makes this impossible, the system takes you to the screen for maintaining the settlement rule.
    u2022     All the existing purchase requisitions for the order are flagged for deletion.
    u2022     All the existing reservations for the order are cleared.
    u2022     All outstanding capacities which have been scheduled for the order are cleared.
    u2022     All the notifications for the order are also completed, unless prevented for one of the following reasons:
    o     The Complete notifications indicator was not set in the Complete dialog box.
    o     One or more tasks have not been completed.
    o     A user status in the notification prevents it from been completed.
    u2022     If the order was created using a maintenance plan, the date of the technical completion will be used for the further Scheduling of the Maintenance Plan.
    You can make changes to the maintenance process procedure when completing orders. You can, for example, prevent all users that are allowed to complete orders and notifications from using this data simultaneously to change the scheduling of maintenance plans. For more information, see Separate Completion of Maintenance Call Dates.
    - pithan

  • Collective order confirmation for particular codes

    Hi
      I have problem for some material codes while production order confirmation.The material codes that starts with Sxxxxxxxxxxxxxx this number are not getting confirmed. Others are get confirmed without any issue.
    Production order confirmation is not working for that particular material code.
    Please guide me what solution should I give to the customer.
    BR
    Sagar

    Hi
    This is the error message. and one more thing this is a collective order and this is happening for parent order while child order is confirmed correctly.Goods movement is done through CO27 and confirmation is done with CO11
    BR
    Sagar

  • Goods Issue- Process Order Confirmation

    Hi,
    During Process order confirmation, in Goods Movement tab the BOM components with qty are displayed. But some components OTHER than BOM items ISSUED for the process order is not displayed in the goods movement tab. Why?
    Is there any additional configuation to be done?
    Thanks....
    JK
    Edited by: J K on Apr 15, 2008 6:04 AM

    Hi
    As said by Mr sateesh,
    If u r doing confirmation phase/operation wise(COR6), then the material assign to phase/operation is only seen according to phase/operation wise.so have to check in which phase u have confirm the component quanity.
                    or
    If u confirm the process order collectively(CORK), then their must missing in OPK4 (confirmation Parameter) of All component tick at Goods Movement.
    Kindly check the same & coem back if their is any other issue
    Parminder

  • Problems with goods movements cancelling network confirmations

    Hello experts,
    I'm having some problems with goods movement when cancelling network confirmations.
    I assign a component for a operation in the project builder (CJ20N). Then when I execute a confirmation for that operation in CN25 everything works correctly, I can assign the time for the confirmation and SAP automatically carries the component assigned to the operation. Once I have done the confirmation the goods movements and the hours have a correct account assignment.
    The problem is that if I cancel this confirmation, the hours are correctly cancelled but the component is still there. If I try to cancel the goods movement with MIGO it is no possible because the system says that must be cancelled with the corresponding transaction (CN29) but, as I have said, the system does not cancel it.
    On the other hand, If the goods movement goes to COGI transaction and then I post-process the error, If later I cancel the confirmation, everything works correctly.
    Does anybody know why this could happen?
    Thanks and regards
    Laura

    Hi
    I think this question was raised earlier also. The best way is to allot a fixed time slot for your users so as to avoid clash. I suppose i explained that the master data of any material is stored at one place only and if you schedule a background job for this then all your good movement transaction will be in que and performed in orderly manner.
    If automatic posting is not possible then use the time slot method.
    Krishna

  • Good Movement at the confirmation of an operation

    Dear All,
    I tried to make good movement when I maked an confirmation for an operation.
    I configured whit TC: OPK4 automatic good movement and whit TC: OP67 I choosed option automatic good movement for control key.
    However, when I maked an confirmation (TC: CO1F), the system didn't propose the material from BOM, for issues, or the finished good to get in stock.
    And an additional question: if I have many operations on the routing and each of them have the same control key (PP01, for example) the system cannot accept any automatic good movement.
    What can I do in this case?
    Thank you very much for the answers.
    Regards,
    Marian

    Hi,
    You are trying progress confirmation right...
    As per my knowledge for production order confirmation you could findth egoods movement...
    in CO15 or CO11N...
    For th e second question if u have N number of operations then you could confirm operation wise in CO11n and for first operation goods issue and for the final operation goods recipet will happen
    Regards,
    sravanthi
    Edited by: Sravanthi683 on May 21, 2009 10:34 AM

  • Order termination for shoratge of material during Mass Confirmation COHV

    Hi,
    I am doing automatic goods issue (261 MT) while confirmation of order with tcode co15. If any shortage of raw materials is there, system terminators the goods movement with message and confirmation will not be done. This functionality is working fine while doing with tcode co15.
    But, when i do mass confirmations using tocde COHV even though the shotage of materials is there confirmations are taking place without issue of any goods to the order. This is wrong. Here also i want to terminate the goods movement with out any confirmation if there is shotage of any materials. Can any one please suggest what to do??
    Thanks in advance.
    Ramagiri.

    Dear Brahmankar,
    When i am using COHV mass confirmation of order if stock of one material is not available,even though other materials stock is available system is cancelling entire goods movement and confirmation is taking palce only with labor hrs. Here i am getting zero material cost. I checked in COGI , there is no faliure of any materials. Pl suggest.
    Ramagiri

Maybe you are looking for

  • MBP with i7 feels and is sluggish

    My MBP with i7 CPU, 2.66 Ghz, 4 GB RAM and a 5400 rpm drive is sometimes rat slow. I often see a spinning pointer or the finder freezing even for seconds. I am sure that this somehow related to IO. I used 'fseventer' to check for IO operations but I

  • Restricted key figure

    HI, can any body explain me what is the difference between Restricted key Figure and the filter option in BEX reporting.

  • Outlook 2013 connecting to Groupwise 2012 any solution?

    I have been looking for an answer to this question, I have a MS exec that has just been hired in a company that I support. He wants his calender and scheduling to work with the outlook 2013 client. They currently have a Groupwise 2012 sp2 server inst

  • SMTP Send Timeout

    Is it possible to configure a send timeout for outgoing SMTP messages, so that SAP regards the send order as failed if the timeout expires before the remote server accepts the data with "250 OK" ? I test with a MiniSap 710 system. It seems that when

  • Drag & Drop, call a method if list changes.

    Hi there, I have two spark lists,backed up by Array Collections, both of which accept drag & drop either to move objects between them or to reorder within the lists. I have a method which is called on drop which resets some properties of the object t