Goods Receipt Failed through RSMIPROACT2

Hi All,
Can anyone suggest or guide on below issue
While sending GR information to SNC through RSMIPROACT2, it is getting failed with below error
"ASN : Process DELIVERY_RECEIPT for item 000001 with status GC not allowed 224(/SCMB/DM_DLV"
Kindly suggest
thanks & Regards
Parag

Hi Parag,
This error can happen when you send POD for ASN.
In case of POD  standard SAP send GR complete only when all item in ASN is received based on ASN/ECC IBD number with reference to SNC ASN.
If you have enhanced the POD trigger for partial and full then this can occur.
Hope this helps.
Best Regards,
MJ

Similar Messages

  • Goods Receipt failed While Processing through IDOC

    Hi,
    We rae processing the GR through IDOC from PCS System.
    Goods Receipt for some Material failed in IDOC.Because of following error
    Error : Enter the shelf life expiration date
    We have checked the SLD for Material in MSC3N and it is maintained for that material.
    can yoy tell me the reason behind that ?

    Hello
    Please check the IDOC in WE19, weather the SLED filed is populating the date or not and also in exact format .
    Thanks and Regards
    Pavan

  • MIGO ( Goods Receipt) through LSMW

    Hi Experts,
             I am trying to upload data for Goods Receipt (MIGO) through LSMW. We are creating Goods receipt with respect to inbound delivery. Please let me BAPI and steps involved in it.
    Thanks in advance.
    Regards,
    M.Saravanan

    Hi Saravanan,
                           I think this bapi will serve your requrirement.
    BAPI_ACC_GOODS_MOVEMENT_POST
    Regards.
    Harish.

  • How to link imported Goods REceipt (DTW) to PO

    Hi, We are importing our Goods Receipt PO through DTW because the serial numbers are not sequential. In DTW, how do I link the added Goods REceipt to the original PO?
    Thank you!
    Jane

    Hi,
    Please check this thread:
    http://scn.sap.com/thread/1912409
    Thanks & Regards,
    Nagarajan

  • One issue regarding update open Qty. of PO in PP/DS after goods receipt through interface.

    Dear experts:
    We are implementing APO-PP/DS integrated with Non-SAP ERP system, as the standard CIF can’t be used between ERP and APO, we have to use BAPI to transfer data.
    Now we are facing a problem, after final confirmation & goods receipt of production order in ERP, the open quantity of production order should be updated in PP/DS, but we can’t find any BAPI can help on this.
    We’ve tried BAPI_MOSRVAPS_CONFHEADMULTI and BAPI_MOSRVAPS_CONFOPRMULTI for production order confirmation, but failed, as SAP said, confirmation without goods receipt will not update the order open quantity. We also tried BAPI_MOSRVAPS_SAVEMULTI3 to change the receipt quantity, but failed, as after partial confirmation, the quantity of production order can’t be changed, but we can’t find a field of “open quantity” (open quantity = total quantity – delivery quantity) in the BAPI. So how can we update the open quantity of production order in PP/DS after goods receipt from ERP?
    Appreciate for your input, thanks.
    Regards
    Kevin

    Dear Uli
    Thanks for your information, we tried it again according to your
    instruction via Function module /SAPAPO/CIF_ORDER_INBOUND, but failed.
    For import parameters:
    OBJECTTYPE = 6
    LOGSYS = “Our logical system”
    The screenshot is as following:
    In the IT_OUT table:
    ORDNR = “Production order number in our ERP system”
    ORDERGUID = “Internal order number of this production order in
    APO” (we also tried to keep this field blank)
    METHOD = C
    GR_QUANTITY = 2
    The screenshot is as following:
    The ET_RETURN has no response
    And nothing gets update in product view.
    Is there anything wrong in my parameters?
    Thanks & Regards
    Kevin
    Best Regards

  • Components were not consumed while posting the goods receipt through VL32N

    Hi Experts,
    We are into technical upgrade. We are upgrading from 4.7 to ECC 6.0. We are facing one issue. The issue is while posting the goods receipt for the subcontracting shceduling agreement through VL32N (Inbound Delivery) component materials were not consumed. While displaying the material document for the GR, could not find any compponent materials consumed with movement type 543, where as if I use the MIGO transaction code for the same inbound delivery, I could see the component materials were consumed with movement type 543.
    Could anybody tell us how to fix this issue if they come across.
    Appreciate your reply.
    Regards
    Bala

    Hi,
    Try checking below SAP notes
    Note 645119 - Problems with subcontracting using delivery
    338119 - Goods receipt in inbound delivery for SC order
    Hope this helps
    Reg
    Dheeraj

  • Goods Receipt is allowed through MIGO  for PO's though they hav the confirm

    Goods Receipt is allowed through MIGO  for PO's though they hav the confirmation control key. where as its should allow based on ASN(inbound Delivery).
    Not sure if any system changes has to be made or anything else. please suggest.
    Thanks

    Hi Dear <
      You can also recived the goods  with reference to inbound Delevery,
    1  Select  In Confirmation  Tab Con con key while in  Creating PO
    2  Create a Inbound delevry from T.code: VL31n
    3 Once you create the Inbound delevery wth reference to PO, The inbound delevery no will be propulated in  Confirmation Tab of PO
    4 you can Do the mIGO  with reference to that Inbound delevery

  • Goods Receipt through the RF menu, open delivery?

    I am trying to do a good recepit through the RF menu. Once I click on the goods receipt , it takes me to the screen which asks for PO/delivery #, Material # and quantity.
    When I enter in the PO, mat # and Qty , it gives me the error message "No Open Delivery"
    So I went through the RF screen overview documentation which also says that "Material must exist in the order and in the open delivery"
    Can anyone please explain what this means and how can I create an open delivery?
    Thanks

    Hi, The issue may be due to this - the component is batch managed but the batch data is blank in the component list of the Purchase Order Item. Or a batch is maintained in the PO item component list but the stock for the same batch is not available with Vendor, i.e. stock with some other batch may be available.
    In a receipt for Sub-cont PO, 101 happens for FG and 543 happens for component. But there is no option to provide the component details in a delivery. So in standard system, when 101 happens via a delivery, 543 will be posted in the background. So any error in posting 543 will result in a blank screen without any error message.
    You can fix this by maintaining correct batch in the PO component list.
    But there is another issue - you cannot do 'cancel posting' and 'return delivery' for this receipt. Only you can reverse the inbound delivery and you should know that the  recevied stock shouldn't have been processed to do reversal of inbound delivery.

  • Goods receipt through Inbound delivery for Sub-Contracting Purchase order

    Hi
    I am trying to do goods receipt for the inbound delivery /shipping notification created for a sub -contracting Purchase order. The Finished product and the component part are batch managed, When I try to perform PGR in VL32N , I am getting a blank screen as error message and Goods receipt is not getting triggered . I checked for OSS note and found 645119 close to my issue but not an exact match . We are in ECC 6.0 with EHP 4. Can some one clarify whether it is possible to post GR through inbound delivery for a Subcon Purchase order .
    Thanks in advance for your immediate response.
    with regards,
    Joseph Anand B

    Hi, The issue may be due to this - the component is batch managed but the batch data is blank in the component list of the Purchase Order Item. Or a batch is maintained in the PO item component list but the stock for the same batch is not available with Vendor, i.e. stock with some other batch may be available.
    In a receipt for Sub-cont PO, 101 happens for FG and 543 happens for component. But there is no option to provide the component details in a delivery. So in standard system, when 101 happens via a delivery, 543 will be posted in the background. So any error in posting 543 will result in a blank screen without any error message.
    You can fix this by maintaining correct batch in the PO component list.
    But there is another issue - you cannot do 'cancel posting' and 'return delivery' for this receipt. Only you can reverse the inbound delivery and you should know that the  recevied stock shouldn't have been processed to do reversal of inbound delivery.

  • Goods Receipt for Inbound Delivery through MIGO

    Hi All,
    Can anyone pl. explain me in steps the process of GR for Inbound Delivery from MIGO transaction.
    Also I need the process of reversing this goods receipt done.
    For certain inbound deliveries a dump occurs in the program SAPLIE01 in 'EQUIPMENT_ADAPT_BUSVIEWS' fn module.
    I need to analyse the reason for the dump. Here is the extract from the dump
    <b>IF WA_EQUI IS INITIAL
      keine Equidaten vorhanden => EXCEPTION
    --->       RAISE ERR_ADAPT_BUSVIEWS . ENDIF.                     </b>                                          
    Advance Thanks

    Hi Sanjay and Srikanth,
    Thank you for the correction. I was just wondering over this number.
    Sanjay, regd the release level, it is 0017 for SAP_APPL.
    In brief, when GR is done for an inbound delivery, a fn moudle equipment_adapt_busviews is called, in which if the equipment data of the material (wa_equi) is initial, it gives dump.
    1. This fn module is called 3 or 4 times while the posting is done through MIGO
    2. In the 4th call, the parameter wa_equi is initial - which gives the dump.
    3. While debugging, when I reach this point,if I restart the debugging, I find that the posting is completed !!!! (so something happening after posting of GR gives the dump)
    4. I have to reverse this GR for replicating the same again.
    Any further clues !!
    Regards
    Aadarsh

  • Failed GR Reversal through RSMIPROACT2

    Hello,
    Can anyone suggest / guide on below issue
    While sending the GR reversal data through RSMIPROACT2 it is getting failed in SXMB_MONI with below error
    SAP:Stack>Error while processing message payload An error occurred when deserializing in the simple transformation program /1SAI/SASA149DFD904DAE7E738DF The value ' 210.000-' is not in the value range of the XML schema type 'decimal' or it does not meet the specified limitations</SAP:Stack> 
      <SAP:Retry>M</SAP:Retry>
      </SAP:Error>
    Thanks & Regards
    Gaurav

    Hi Gaurav,
    Maintain below setting.
    SPRO >> SCM Basis >> Logistics Inventory Management Engine (LIME) >> Basic Settings >> Application-Specific Settings >> Determine Global Customizing Settings for Each Client
    Check the negative stock check box.
    Regards,
    Nikhil

  • "Quantity falls into negative inventory" Error when importing Goods Receipt through DTW

    Hi,
    We extending the automation between our production plant an SAP Business one.
    We're using DTW import "Goods Receipt PO" currently and want to extend this to internal productions based on Production Orders.
    I've created three csv files to create the import. OIGN, IGN1 an SNRT (as we use serial number based products)
    Some remarks:
    - The stock is sufficient to do the production. No negative stock is created by this the production order.
    - The used materials are all based on "backflush", so should be handled automatically
    - Using the SAP GUI everything goes well. No errors.
    hereby the files I've used (the actual serial number file is of course longer):
    OIGN:
    DocNum;DocType;HandWritten;DocDate;PartialSupply
    DocNum;DocType;Handwrtten;DocDate;PartSupply
    1;dDocument_Items;tNO;20140402;Y
    IGN1:
    ParentKey;LineNum;BaseType;BaseEntry;BaseLine;Quantity
    DocNum;LineNum;BaseType;BaseEntry;BaseLine;Quantity
    1;0;202;92;;49
    SRNT:
    ParentKey;LineNum;InternalSerialNumber;ManufactureDate;ReceptionDate;Notes;BaseLineNumber
    DocNum;LineNum;DistNumber;MnfDate;InDate;Notes;DocLineNum
    1;0;0409001;20140331;20140402;Firmware=SD-TRPE v1.12 y13m10d16;0
    1;1;0409002;20140331;20140402;Firmware=SD-TRPE v1.12 y13m10d16;0
    1;2;0409004;20140331;20140402;Firmware=SD-TRPE v1.12 y13m10d16;0
    1;3;0409005;20140331;20140402;Firmware=SD-TRPE v1.12 y13m10d16;0
    What am I doing wrong? Do we need the handle the goods issue manually when using DTW instead of the auto backflush method in SAP?
    Looking forward to your response.
    Kind regards,
    Vincent

    Hi,
    Please check SAP note:
    841270
    - How to import serial numbers correctly via the DTW
    Please advice your decimal setting for quantity at general settings.
    Thanks & Regards,
    Nagarajan

  • SAP R/3 goods receipt and issue process through RF

    Dear All,
    We need the below information.
    In order to setup RF enabled goods receipt and goods issue what basic infracture we need to have.
    we are not intersted in using WM module, with out WM we can go for this ??
    Is this the right forum to post this question...
    Abdul Raheem

    Hi.
    I've just carried out this architecture. You have to check 2 things:
    1- Are your DB software levels the same? (AIX + Windows)
    2- Have you checked connectivity from client to DB server?
    Regards,
    Fatih Erten

  • Possible to Update ERS indicator on PO after Goods Receipt

    He all,
    We had failed to update the ERS settings in the plant data view of the vendor master purchasing data. We have about 1000 PO that were supposed to be paid through ERS but are now not invoiced. Is it possible to set the ERS Indicator after Goods Receipt?
    Thanks,
    Justin

    You can change the Purchasing Group on the Org. Data tab in the PO header in ME22N.  If you have PO release strategies they will not be reset unless PGrp is a characteristic in your release strategies and you change PGrp to a value outside of the range the strategy is using.
    Also, in your system you may not be able to change the PGrp if the screen layout changes the field to display once a GR is posted.  You can see this in the document type field selection or "Define Screen Layout at Document Level".  If the PO release strategies are used, you may need to check the changeability setting for the Release ID.
    Hope this helps.
    Edited by: Paul Shrewsbury on Apr 4, 2011 3:06 PM

  • Early Inspection Lot Creation on Goods Receipt

    I work for a company that melts steel into batches referred to as Heats.  Each of these Heats are processed through various steps to create tubing.  In the tubing operations multiple Heats are applied to production orders but the integrity of each Heat is always maintained.  If we do a Goods Issue for 6 Heats into a production order, we expect to do a Goods Receipt of 6 Heats from that production order and inherit all of the Heat related characteristics for each Heat processed.  At certain points we do laboratory tests for chemisties and properties of each Heat.  These tests are run while the order is being processed through other operations but need to be recorded against the batch.  We are thinking that we need to do Goods Receipt Inspection with Early Inspection Lot Creation.  It looks like this method will create a single Inspection Lot upon release of the Production order.  Is there a way to create multiple Inspection Lots that will correspond to Heat batches prior to the actual Goods Receipt?

    6 partial GR (Heats) are done against 1 production order? Then, you will have one inspection lot and one usage decision for the entire lot (03 / 04: Goods Receipt Inspection with Early Inspection Lot Creation.).
    Think this: Each heat can be one sample/ inspection point each, in case of early goods receipt. So, if you have 6 samples: 3 pass and 3 fails, then do the Usage decision on 3/6th of the quantity at the end of the test: this needs to done manual stock psting while doing the UD.
    So, you do the inspection at the sample levels, but not at multiple inspection lot level.
    There is a way to create mutiple inspection lots on partial GR for the same process order.
    The logic lies like this, if your previous inspection lot is reset on usage decision, then you will get a new inspection lot when doing a partial GR.
    If the UD is not reset case:
    (a) Usage decision open: It will increase the QI stock in the same inspection lot. This means no new inspection lot creation.
    (b) Usage decision done: It will post to unrestricted, thinking that the rest of the sample is OK!! So, again no new inspection lot creation.
    This I tried on 04 inspection type. I am not sure on 03. Hope this helps!!

Maybe you are looking for

  • 0x80070241 error when I try upgrade Vista to Win 7 Pro

    Hi, I've tried unsuccessfully to upgrade bootcamp Windows Vista to Windows 7 Pro 32 bits. I burned the ISO file and I always get the error : 0x80070241 unable to copy files... when I try to upgrade I redownload the iso upgrade. Same result. I tried t

  • Disk is too slow or System Overload. (-10009)

    Hello all, I'm running a G4 PowerBook, with 1.67 GHz, and 1.5 GB DDR SDRAM. My Logic set-up is Logic Pro 7 and a Motu 828mkII. My present Logic project contains 7 tracks, with EXS24 through 6 tracks and Sculpture through the last. The instruments wer

  • How to extract a tpz file contents ?

    Hi to all, does anybody know how to extract a tpz file without using XI ? I mean, I want to see the contents of the tpz file to get some code. Thanks in advance.

  • Can't access the filter gallery in CS3

    I'm in the process of editing an image and I can't access the filter gallery...it's not active under the filter >filter gallery...I started out with a CR2 raw file...what am I doing wrong?

  • Is it possible to have a calendar and reminder list with the same name?

    I migrated from MobileMe to iCloud on the first day. MobileMe was then set up with my MacBook and so in iCal i saw my calendar events duplicated. I didn't like this so I tried deleting the MobileMe calendars first, then realised I couldn't delete all