Goods Receipt with auto bin placement and auto confirm?

Hi All
I have a need to putaway and confirm a goods receipt for stock items into 1 bin.
Therefore, at GR (MIGO) the goods are receipted and places into 1 bin and confirmed as putaway.
Is there some config I need to set up or a separate transaction to use.
Thanks in advance
Darren

Hi Darren
Is the single bin always the same based upon the material or the movement?
If it is material you can implement a fixed bin putaway, or if it is movement you can do the same
Both use config and master data
Steve

Similar Messages

  • Goods receipt of pallets in WM and QM - urgent

    Hello ERP forum,
    I need some help in this problem for Goods receipt of pallets with WM and QM. 
    Customer wants to record the exact quantity of each pallet received.  They do not want to used palletization since this rounds the pallet quantities.
    Receipt of 1000 pc
    With palletization (300 pc) - not wanted
    300 pc
    300 pc
    300 pc
    100 pc
    Without palletization (preferred)
    300 pc
    300 pc
    250 pc
    150 pc
    This could be accomplished if palletization is turned off and the Goods receipt has each pallet qty as an item in the material document
    Material doc (goods movement 101)
    item
    1     matl        300 pc
    2     matl        300 pc
    3     matl        250 pc
    4     matl        150 pc
    In WM, settngs are such that one transfer requirement, one inspection lot, one TO are created for the 1,000 pc
    All is ok - except in usage decision in QM, when usage decision is taken and material is returned to vendor.
    This is because the inspection lot only refers back to one item (Goods receipt, item 1, for 300 pc).
    Save of UD gives an error, Deficit of PU GR 700 pc since the posting only looks at item 1
    I am looking for a solution to the error produced on the return to vendor.  Also if needed, to looking at the above process, and let me know if there is another solution to receive and store exact pallet quantities, but without creating an inspection lot for each pallet.  Many goods receipts are on 20+ pallets and having an inspection lot and inspection plan for each would be a paperwork nightmare and the customer has stated they will not used multiple inspection lots.
    thanks for your help!
    MK

    HI Csaba,
       Now I am trying to create GR for Inbound Dely containing the HU through MIGO and not VL32n , it is throwing the error
    Packing can only be updated via inbound delivery dialog
    Message no. VLA311
        We are into ECC 6.0 and it seems that SAP NOte 1384533 has already been implemented , but still I dont see the VLA 311 message in System Messages under the Logistic Execution path of SPRO.
       I have been reading the SAP Note 199703, but when I set the GR Assignment field of the Conf Control to blank and remove the movt type for Dely Item Cat ELN , it doesnt allow me to create HU in the Inb Dely, although it allows me to create a GR for the Inbound Dely through MIGO .
         Can you please help me in overcoming the prob.
    REgards,
    Binayak
    Edited by: Binayak Ghosh on Jun 15, 2011 4:37 PM

  • Cancellation of Goods Receipt with Credit Memo Transaction Issue

    Dear SAP Expert and Guru,
    Normally cancellation of goods receipt cannot be done when invoice has been issued. Cancellation of Goods receipt can only be done when there is the credit memo being issued in MIRO.
    The problem now is that is there any table that can tracked the linkage between Credit Memo and the Cancellation of Goods receipt?
    The goods receipt with the invoice linkage can be found in both table EKBE and BKPF. But not the credit memo and cancellation of Goods receipt.
    Thank you
    Regards
    Leonard Tan

    Dear Jeya and SAP expert and Gurus,
    You are correct, but with the document number, how am I going to get the Cancellation of GR document?
    In table BKPF and EKBE. With the invoice number (34*******) then pass it to table BKPF to get the invoice number (52*******),
    Then get the invoice number (52*******) pass it to table EKBE to get the Goods Receipt document (61*******).
    However, this only can track the transaction goods receipt and Invoice but not the credit memo with cancellation of goods receipt.
    Kindly asvise on that.
    Thank you
    Regards
    Leonard Tan
    Note : Do not quote previous reply every time,simply reply for member you want to respond.
    Edited by: Jeyakanthan A on Jul 8, 2011 3:23 PM

  • Goods Receipt with respect to Handling Unit (Transaction u0096 MIGO)

    Hi All,
    A delivery is created for stock transport order for goods movement from Plant XXXX (Storage Location – YYYY) to Plant XXXX (Storage Location – ZZZZ).
    Handling Units are packed on delivery and delivery is post goods issued from Plant XXXX (Storage Location – ZZZZ).
    While posting goods receipt (Transaction – MIGO) without selecting “Via Handling Units” system populates the “packaging material” line item whereas when “Via Handling Units” is selected (in other words – when tried to post Goods Receipt with respect to Handling Units) system doesn’t populate the associated “packaging material”.
    Requirement is to populate “packaging material” line item while posting Goods Receipt with respect to Handling Unit.
    Plz guide me.
    Satish

    Hi Vatcan,
    Chek the Inbound Delivery 1st weather you refer the right PO in it
    You can also chek in  PO i
    1 Me23n Go to confirmation tab here you can see the  Inbound delivery  quantity
    2 Chek  which reference document you recived the goods,  (i.e You recived the goods with reference to PO or  Inbound delivery)
    2 Coz if you refer the inbound delivery then syestem will deafult show the inbound quanity
    And yes the actual quanity will update in inbound delivery if you refer the inbound deivery while reciveing the goods

  • Goods Receipt with respect to sales order

    hi,
        goods receipt with respect to sales order ,that sales order is prepared with reference to quotation
    erroer is
    Account assignment cannot be carried out because of different origin no.
    Message no. V1134
    Diagnosis
    The sales document to which you want to refer is based on sales document 20000005 and item 000010. Therefore, the settlement and possibly inventory management are carried out using the number of the preceding document.
    System Response
    This entry is not allowed.
    Procedure
    Enter the document and the item number of the preceding sales document

    Hi,
    Refer the sales quotation number for GR instead of the sales order number.
    Regards,
    Ravi Kumar C.

  • Find a bapi for Creates a Goods Receipt with correspond to Inbound Delivery

    hi expert!
    exist a bapi for tcode:MIGO_GR ( Goods Receipt with correspond to Inbound Delivery)
    i know one bapI  BAPI_GOODSMVT_CREATE can Creates a Goods Receipt,
      but i can't know to use it to Creates a Goods Receipt with correspond to Inbound Delivery.
    or other bapi exist for MIGO_GR?
    Best Regard!

    Hi Vatcan,
    Chek the Inbound Delivery 1st weather you refer the right PO in it
    You can also chek in  PO i
    1 Me23n Go to confirmation tab here you can see the  Inbound delivery  quantity
    2 Chek  which reference document you recived the goods,  (i.e You recived the goods with reference to PO or  Inbound delivery)
    2 Coz if you refer the inbound delivery then syestem will deafult show the inbound quanity
    And yes the actual quanity will update in inbound delivery if you refer the inbound deivery while reciveing the goods

  • PO Goods Receipt with Serial / Batch number with DI API

    I am creating PO Goods Receipt with DI API. This works fine. But when i have items with serial numbers and batch numbers in the same PO, then i am getting either of the following errors:
    1. [OITM]Item has no serial number management
    2. [OIBT] Invalid Item Code.
    I debugged the code and the values i set seems to be correct. I am using VB.Net and SAP 2004 with Patch 23.
    Thanks
    Anand

    Anand,
    When you are working with a Serialized item in the first scenario, have you tested working with the item in the Business One application itself?  Have you tried to have the system assign a serial number for the item when issuing a Goods Receipt?  Do you get the same issue through the Business One interface.  With respect to working with Batches, have you setup the Batches for inventory items through the Business One interface yet?  If you have not setup Batches, this would be why you would not have any data in the OIBT table.
    HTH,
    Eddy

  • Inbound IDOC to post goods receipt with inbound delivery as reference

    Kindly let me know the message and IDOC type for
    Inbound IDOC to POST GOODS RECEIPT  with inbound delivery as reference
    I tried using WMMBXY but it didn;t work.
    Pls let me know asap.Your help is appreciated.
    Thanks and Regards
    Priti
    Edited by: Priti Adukia on Feb 11, 2008 4:48 AM

    Hi Nicole,
    What I've to do is quite the same as the case. Outbound and Inbound are in the same SAP system. If I've good understanding, I must set partner profile as follows :
    INBOUND - Parter LI with
                            Message DESADV
                            Operation code DELS
    OUTBOUND - Partner KU
                            Message DESADV
                            Operation code ???
    Please advise
    Suchart

  • Goods receipts with GTIN barcode thru RF

    Hello Experts,
    In order to perform Goods receipts with a custom RF transaction, we need to scan the material number and PO number on the pallet that is sent by vendors.these barcodes are external barcodes from the vendor. Our vendors are using GTIN codes on the pallets, is it possible to scan these barcodes with RF solution ? is that involved some custom code in the RF development, where these barcode type is supported by SAP system?
    Thanks in Advance

    Hello,
    Based on my understanding below are my answers.
    Your question: is it possible to scan these barcodes with RF solution ?
    Asnwer: Yes. Through RF Gun you can scan and get the details
    Your Question: is that involved some custom code in the RF development,
    Answer: Yes. Because this GR is based on the GTIN scan number.
    You Question: where these barcode type is supported by SAP system?
    Answer: You can see in SPRO: LE: Mobile Data Entry: BarCode. where you can give the Bar code type.. Generally now a days Most Gtin numbers are UPC/EAN128 type.
    Coming to the process What my understanding is.... you need to have custom RF Z TCode (Program) required to sacn and process based on material and PO number.
    You can do GR directly by using functional module for VL01n/MiGO if WM is required then use functional module to create TO and confirm module to confirm....
    All i can say is anything you can so through costume program that can be assigned to RF menu management screen.
    hope i answer your questions based on my understanding.....
    thanks.
    tkreddy

  • Good receipt with/without GR assignment

    Dear all,
    I am little puzzle to get an understanding in difference between...
    Goods receipt with GR assignment
    and
    Goods receipt without GR assignment.
    Can please anyone let me know in details.
    Thanks a lot in advance,
    Cheers!

    perhaps let me be more clear.
    above query is related to Confirmations -related goods issue.
    In customization-in purchasing- under confirmation- under set up conformation control .............there is an indicator to select / or not to select GR assignment indicator ...............in order to post the GR with reference to vendor confirmations.
    I wanted to enquire why and what is the functionality of this GR assignment and how system is going to react ........when we do select OR when we do not select that indicator.
    Hope this well help any body to get some idea of my query.
    Cheers!

  • Batch needs to be created 1st then post goods receipt with inbound delivery

    Hi,
    We are having split valuated materials with batch managed, we need to post goods receipt with inbound delivery.
    When we create inbound delivery with PO batch is blank which is correct.
    Now when we try to post GR with IBD in VL32N we need to put batch, but we are getting error message as batch is not available in receiving plant.
    In this case we have to create batch 1st with MSC1N and then we can put batch number in Vl32N and can post GR.
    If material is not split valuated we can put batch manualy(Without creation in MSC1N) in VL32N and it is allowing to post GR with batch.
    Can you please let me know this behaviour, is there any SAP note available about this behaviour.
    Thanks
    Sudhir

    Hi Uwe,
    Can an inbound WHSCON IDoc used for doing both the goods receipt in the PO and the update of the message flow in the delivery?
    The binary answer would be no. You should use WMMBXY or MBGMCR instead.
    But if we are doing goods receipt against Inbound delivery then answer is YES with additionally E1EDL18-QUALF = 'PIC' populated. But please remember no partial receipt is possible against Inbound Delivery.
    We should populate E1EDL20-VBELN with our Inbound delivery number and line item info should go to E1EDL24.
    I have done a similar interface recently where we are doing receipt against Inbound delivery. But our case was a bit complex because we had to support against Inbound delivery. So we had to go for a custom solution on top of IDOC_INPUT_DELVRY.
    Hope this helps. Let me know if you have more questions.
    Regards,
    Rudra

  • Goods Receipt with production order in WM

    Hi all,
              My client requirement is whenever i am issuing  goods to the production order the stock reserved to production order, once i confirmed the  TO stock level  reduced.Once production  completed when i put the goods receipt with production order the stock increased for finished goods only at storage location level not  upto warehouse level.
    when i put goods receipt with others the stock increased in  warehouselevel upto my destination bin(as i configured).My requirement is how to move goods to my  destination bin when goods receipt for production order. any configuration required? solve my issue
    i am maintaining configuration as
    i)in omlj iam using movt type-103, source as 901(scr checked),dest as 003,reqirement type-orders.
    ii)in omlr i am assigning 103wm mov type to 101 im type.
    whether  my configuration is correct or i have to do any other configuration ?..i am not maintain any production staging process is it necessary?
    appreciate your help always
    ramesh

    To consolidate your requirements once again
    You want imediate TO creation for components. (It is configured & working fine now)
    You dont want imediate TO creation for finished goods, only in the case of GR for Productio order. Right?
    If Yes, you need to have a small configuration setting (if it is missing)
    In OMLR Create TO immediately Indicator should be space "Do not initiate TO creation" (not X) for 101 F - 103

  • Creating goods receipt with refernce to PO number using BAPI_GOODSMVT_CREAT

    Hi Gurus,
    I have a requirment where in, I need to create a goods receipt with reference to a PO number which has been created by BAPI_PO_CREATE1, using another BAPI BAPI_GOODSMVT_CREATE.  How can I do this? what are all the values that I need to fill in GOODSMVT Create BAPI.
    Please help its very urgent... Need to submit by EOD.
    Thanks,
    Suma

    hi
    hope this code will help you,.
    Reward if help.
    REPORT ZRICH_0001 .
    Structures for BAPI
    DATA: GM_HEADER  TYPE BAPI2017_GM_HEAD_01.
    DATA: GM_CODE    TYPE BAPI2017_GM_CODE.
    DATA: GM_HEADRET TYPE BAPI2017_GM_HEAD_RET.
    DATA: GM_ITEM    TYPE TABLE OF
                     BAPI2017_GM_ITEM_CREATE WITH HEADER LINE.
    DATA: GM_RETURN  TYPE BAPIRET2 OCCURS 0 WITH HEADER LINE.
    DATA: GM_RETMTD  TYPE BAPI2017_GM_HEAD_RET-MAT_DOC.
    CLEAR: GM_RETURN, GM_RETMTD. REFRESH GM_RETURN.
    Setup BAPI header data.
    GM_HEADER-PSTNG_DATE = SY-DATUM.
    GM_HEADER-DOC_DATE   = SY-DATUM.
    GM_CODE-GM_CODE      = '04'.                                " MB1A
    Write 971 movement to table
    CLEAR GM_ITEM.
    MOVE '412'                 TO GM_ITEM-MOVE_TYPE     .
    MOVE 'Q'                 TO GM_ITEM-SPEC_STOCK.
    MOVE '3800533484'  TO GM_ITEM-MATERIAL.
    MOVE '1'     TO GM_ITEM-ENTRY_QNT.
    *MOVE 'PC'    TO GM_ITEM-ENTRY_UOM.
    MOVE '1060'  TO GM_ITEM-PLANT.
    MOVE '0007'  TO GM_ITEM-STGE_LOC.
    *MOVE '0901'   TO GM_ITEM-MOVE_REAS.
    MOVE 'P203601001' TO GM_ITEM-WBS_ELEM.
    MOVE 'P203601001' TO GM_ITEM-VAL_WBS_ELEM.
    APPEND GM_ITEM.
    Call goods movement BAPI
    CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
         EXPORTING
              GOODSMVT_HEADER  = GM_HEADER
              GOODSMVT_CODE    = GM_CODE
         IMPORTING
              GOODSMVT_HEADRET = GM_HEADRET
              MATERIALDOCUMENT = GM_RETMTD
         TABLES
              GOODSMVT_ITEM    = GM_ITEM
              RETURN           = GM_RETURN.
    IF NOT GM_RETMTD IS INITIAL.
      COMMIT WORK AND WAIT.
      CALL FUNCTION 'DEQUEUE_ALL'.
    ELSE.
      COMMIT WORK AND WAIT.
      CALL FUNCTION 'DEQUEUE_ALL'.
    ENDIF.
    WRITE:/ GM_RETMTD.
    LOOP AT GM_RETURN.
      WRITE:/ GM_RETURN.
    ENDLOOP.
    check the BAPI_GOODSMVT_CREATE.
    Functionality
    You can use this method to create a material document for a goods movement.
    You can only create one material document each time you call up the method.
    You can use a simulation function before posting the goods movement to check how the data is updated in the database. The standard system is configured so that the goods movement is posted immediately without simulating beforehand.
    Ensure that you transfer the data in the same way as it is run in the database, for example,
    Material number 18-figure with leading zeros
    Batches with uppercase letters
    Note that for all transactions/events listed below, the posting date is entered in the header data of the material document. In the BAPI2017_GM_HEAD_01 interface, fill the PSTNG_DATE (import structure GOODSMVT_HEADER) field.
    Notes
    Authorization check check
    In the MM Inventory Management component, the method does not execute any authorization checks.
    Note that during a posting of a goods movement, depending on the business transaction of the system, authorization objects of other applications can also be checked.
    Transfer
    The following information about the material document that is to be created is transferred to the method:
    a structure with header data
    a structure with the code for the movement
    a table with the item data
    a table with the serial numbers
    The posting is carried out in the SAP R/3 via the MB_CREATE_GOODS_MOVEMENT function module.
    Confirmations
    Messages are returned in the Return parameter. The parameter documentation shows the return codes and their meanings.
    Further Information
    The method can only carry out your function if no error messages were generated in the Return table. This is the case if the header data and all the items were processed successfully.
    Transaction control is not implemented. The calling program therefore has to execute the Commit Work itself after this method has been successfully called (in other words, if no errors were reported in the Return parameter).
    Which fields have to be filled during the various transactions/ events?
    The following sample scenarios demonstrate which fields have to be filled for which business transactions/events (code).
    There are the following types of transactions/events:
    1. GM_Code 01: Goods receipt for purchase order
    2. GM_Code 02: Goods receipt for production order
    3. GM_Code 03: Goods issue
    4. GM_Code 04: Transfer posting
    5. GM_Code 05: Other goods receipts
    6. GM_Code 06: Reversal of goods movements
    7. GM_Code 07: Subsequent adjustment to a subcontract order
    Entering the movement indicator
    Depending on the transaction, you must enter the following in the movement indicator:
    GM_Code 01 (Goods receipt for purchase order): B
    GM_Code 02 (Goods receipt for production order): F
    For all other transactions, you leave the field blank.
    For 1: GM_Code 01: Goods receipt for purchase order
    Purchase order known
    The following fields have to be filled:
    Purchase order
    Purchase order item
    Movement type
    Movement indicator
    Quantity in unit of entry
    ISO code unit of measurement for unit of entry or
    quantity proposal
    The following fields may have to be filled in some cases (incomplete listing):
    Shelf life expiration date (if it has been configured like this in the system)
    Reason for movement (if it has been configured like this in the system)
    Batch (if the material is handled in batches and batch numbers are not assigned automatically)
    Storage location (if a storage location has not been specified in the purchase order item)
    The following fields can be filled (incomplete listing):
    Stock type
    Item text
    Unloading point
    Delivery completed indicator
    You cannot fill the following fields (incomplete listing):
    Account assignment fields (account assignment is adopted from the purchase order)
    Reservation
    Receiving/issuing material
    Receiving/issuing plant
    Receiving/issuing storage location
    In the case of a purchase order item with the "subcontracting" item category, only the GR item in the interface is to be transferred. The system automatically determines GI items.
    Purchase order unknown: Shipping notification known
    The following fields have to be filled:
    Delivery
    Delivery item
    Movement type
    Other fields, such as those under "Purchase order known". The system determines the relevant purchase order item via the delivery/delivery item.
    Purchase order unknown: Purchase order should be created automatically
    The following fields have to be filled:
    Material number
    Plant
    Storage location
    Vendor
    Movement type
    Movement indicator
    Quantity in unit of entry
    ISO code unit of measurement for unit of entry
    The following fields may have to be filled in some cases (incomplete listing):
    Shelf life expiration date (if it has been configured like this in the system)
    Reason for movement (if it has been configured like this in the system)
    Batch (if the material is handled in batches and batches are not assigned automatically)
    The following fields can be filled (incomplete listing):
    Stock type
    Item text
    Unloading point
    You cannot fill the following fields (incomplete listing):
    Account assignment fields (automatic creation of purchase order items with account assignment is not supported)
    Reservation
    Receiving/issuing material
    Receiving/issuing plant
    Receiving/issuing storage location
    Purchase order unknown: A purchase order should not be created
    The following fields have to be filled:
    Material number
    Plant
    Storage location
    Vendor
    Movement type
    Movement indicator
    Quantity in unit of entry
    ISO code unit of measurement for unit of entry
    The following fields may have to be filled in some cases (incomplete listing):
    Shelf life expiration date (if it has been configured like this)
    Reason for movement (if it has been configured like this)
    Batch (if the material is handled in batches and automatic assignment of batch numbers is not set)
    The following fields can be filled (incomplete listing):
    Special stock indicator
    Item text
    Unloading point
    Goods recipient
    The following fields cannot be filled (incomplete listing):
    Account assignment fields (automatic creation of purchase order items with account assignment is not supported)
    Reservation
    Receiving/issuing material
    Receiving/issuing plant
    Receiving/issuing storage location
    Receiving/issuing batch
    The input combinations listed above for the GM_CODE 01 can be combined within an input table so that they can be posted in a material document. Items can also be posted for different purchase orders, provided that all the purchase orders refer to the same vendor.
    Transfer of subcontracting components
    During the posting of the ordered material of a subcontract order with movement type 101, for the transfer of the subcontracting components, the filled unique identification of the document line (LINE_ID) is also required.
    More information on LINE_ID and PARENT_ID
    The following fields have to be filled for the components:
    Unique identification of the document line
    Identification of the immediately superior line
    Material number
    Plant
    Storage location
    Quantity in unit of entry
    The following fields can be filled for the components:
    All other fields in the method that are included in this list.
    The following fields cannot be filled for the components:
    All fields that are not included in the list above. The movement indicator must be initial.
    Additional fields in goods-receipt-based invoice verification
    When you post a goods receipt to purchase order with movement type 102, an issue with reference to a previously posted goods issue, the following fields must also be transferred:
    REF_DOC_IT (LFPOS): Item of a reference document
    REF_DOC (LFBNR): Document number of a reference document
    REF_DOC_YR (LFBJA): Fiscal year of a reference document
    Only when you transfer these fields is it guaranteed that the reference to the original goods movement stay the same.
    For 2 GM_Code 02: Goods receipt for production order
    The following fields have to be filled:
    Order
    Movement type
    Movement indicator
    Quantity in unit of entry
    ISO code unit of measurement for unit of entry or
    quantity proposal
    The following fields may have to be filled in some cases (incomplete listing):
    Shelf life expiration date (if the system has been configured like this)
    Reason for movement (if the system has been configured like this)
    Batch (if the material is handled in batches and automatic batch number assignment is not set)
    Storage location (if storage location has not been specified in the order)
    The following fields can be filled (incomplete listing):
    Order item (co-product)
    Stock type
    Item text
    Unloading point
    "Delivery completed" indicator
    The following fields cannot be filled (incomplete listing):
    Account assignment fields (the account assignments are adopted from the purchase order)
    Reservation
    Receiving/issuing material
    Receiving/issuing plant
    Receiving/issuing storage location
    Receiving/issuing batch
    For 3 GM_Code 03: Goods issue
    Goods issue without reference to a reservation
    The following fields have to be filled:
    Material number
    Plant
    Storage location
    Movement type
    Movement indicator
    Quantity in unit of entry
    ISO code unit of measurement for unit of entry
    The following fields may have to be filled in some cases (incomplete listing):
    Special stock (e.g. sales order, project, vendor etc.)
    Shelf life expiration date (if the system is configured like this)
    Reason for movement (if the system has been configured like this)
    Batch (if the material is handled in batches and automatic batch number assignment is not set)
    Account assignment fields
    The following fields can be filled (incomplete listing):
    Special stock indicator
    Item text
    Unloading point
    Goods recipient
    The following fields cannot be filled (incomplete listing):
    Reservation
    Receiving/issuing material
    Receiving/issuing plant
    Receiving/issuing storage location
    Receiving/issuing batch
    Goods issue with reference to a reservation
    The following fields have to be filled:
    Reservation number
    Reservation item
    Record type of the reservation
    Movement indicator
    Quantity in unit of entry
    ISO code unit of measurement for unit of entry
    The following fields may have to be filled in some cases (incomplete listing):
    Shelf life expiration date (if this has been configured in the system)
    Reason for movement (if this has been configured in the system)
    Batch (if the material is handled in batches and automatic batch number assignment is not set)
    Storage location (if not planned in the reservation)
    The following fields can be filled (incomplete listing):
    Special stock indicator
    Item text
    Unloading point
    Goods recipient
    The following fields cannot be filled (incomplete listing):
    Movement type
    Material
    Plant
    Account assignment fields
    For 4 GM_Code 04: Transfer posting
    Transfer posting without reference to a reservation
    The following fields have to be filled:
    Material number
    Plant
    Storage location
    Movement type
    Movement indicator
    Quantity in unit of entry
    ISO code unit of measurement for unit of entry
    The following fields may have to be filled in some cases (incomplete listing):
    Receiving material
    Receiving plant
    Receiving storage location
    Receiving batch (if material is handled in batches and you want to change batches)
    Receiving/issuing special stock (e.g. sales order, project, vendor etc.)
    Shelf life expiration date (if this has been configured in the system)
    Reason for movement (if this has been configured in the system)
    Batch (if the material is handled in batches and automatic batch number assignment is not set)
    The following fields can be filled (incomplete listing):
    Special stock indicator
    Item text
    Account assignment fields (for automatic posting lines: Expense/income from stock transfer)
    The following fields cannot be filled (incomplete listing):
    Reservation
    Transfer posting with reference to a reservation
    See goods issue with reference to a reservation
    For 5 GM_Code 05: Other goods receipts
    Other goods receipt without reference to a reservation
    See goods issue without reference to a reservation
    Other goods receipt with reference to a reservation
    See goods issue with reference to a reservation
    For 6 GM_Code 06: Reversal of goods movements
    You can use the Cancel method to reverse goods movements. But you may also want to cancel a goods movement without referring to a material document (see the Cancel method).
    If you want to work without referring to the document, you have to fill the field BAPI_GM_ITEM_CREATE-XSTOB in the interface (import table GOODSMVT_ITEM). In this case, the system converts the movement type assigned in the interface to the reversal movement type. Alternatively, you can set the reversal movement type in the interface. In this case, the BAPI_GM_ITEM_CREATE_XSTOB field must be transferred blank.
    If you want to cancel a goods movement with reference to a reservation (without using the Cancel method) you can only transfer the field BAPI_GM_ITEM_CREATE_XSTOB if it is filled. Movement types are not transferred when you post with reference to a reservation, as the movement type is contained in the reservation item.
    For 7. GM_Code 07: Subsequent adjustment to a subcontract order
    Ordered material of subcontract order
    The following fields have to be filled:
    Unique identification of document line (can be assigned to anything)
    Posting date in document header
    Document number of purchasing document
    Item number of purchasing document
    Material number check
    Plant check
    Movement type (select movement type 121)
    Movement indicator (must be O)
    Further entries are not allowed. The entry quantity for the ordered material of a subcontract order must be zero.
    Components
    The following fields have to be filled:
    Unique identification of document line (can be assigned to anything)
    Identification of the immediately superior line
    Plant
    Material number check
    Quantity in unit of entry; can also be negative
    The following fields can be filled:
    Storage location
    All other fields in the method that are included in this list.
    The following fields may not be filled:
    All fields that are not in the list above. The movement indicator must be blank.
    More information on LINE_ID and PARENT_ID
    Additional fields in goods-receipt-based invoice verification
    When you post a subsequent adjustment, the following fields must also be transferred:
    REF_DOC_IT (LFPOS): Item of a reference document
    REF_DOC (LFBNR): Document number of a reference document
    REF_DOC_YR (LFBJA): Fiscal year of a reference document
    Only when you transfer these fields is it guaranteed that the reference to the original goods movement stays the same.

  • Post Goods Receipt with HU

    Hi,
    I need to do Post Goods receipt for HU ( inbound delivery).
    I'm using the fn module WS_DELIVERY_UPDATE_2.
    For that,i've updated the vbkok_wa structure with the below data
      i_vbkok-vbeln    = delivery number
      i_vbkok-lgnum    = warehouse
      i_vbkok-SPE_AUTO_GR = 'X'.
    Please let me know what all parameters are required to be updated for the fn module WS_DELIVERY_UPDATE_2 to do post goods receipt for hu.
    Thanks and regards,
    Poornima
    Edited by: poornima v on Jun 17, 2009 4:45 PM

    Hi,
    I need to do Post Goods receipt for HU ( inbound delivery).
    I'm using the fn module WS_DELIVERY_UPDATE_2.
    For that,i've updated the vbkok_wa structure with the below data
      i_vbkok-vbeln    = delivery number
      i_vbkok-lgnum    = warehouse
      i_vbkok-SPE_AUTO_GR = 'X'.
    Please let me know what all parameters are required to be updated for the fn module WS_DELIVERY_UPDATE_2 to do post goods receipt for hu.
    Thanks and regards,
    Poornima
    Edited by: poornima v on Jun 17, 2009 4:45 PM

  • Goods receipt with DELVRY03

    Hi,
    Is it possible to make a goods receipt with idoc DELVRY03.
    THanks in advance.

    Hi Omar,
    No, but you can use message type WMMBXY and IDoc type WMMBID02.
    Hope this will help.
    Regards,
    Ferry Lianto
    Please reward points if helpful.

Maybe you are looking for

  • Max number of Messages using Channel API?

    We have a 2-port CAN card (series 2) runing at 500kB. When we use channel API to setup 9 messages (about 20 signal-channels) at 100Hz update rate in a write task - the data is constant, set to repeat output last sample (therefore butffer size is not 

  • How do I get my pc to recignize my 3gs iphone when I plug in the USB to sync and backup

    When I plug the USB into my pc and 3gs Iphone itunes does not recognize it as being plugged in.  I have no trouble with my Ipad.  I have tried different USB ports. The most current version of Itunes is being used.  What can I to do sync and backup my

  • What software is required?

    I want to develop desktop based application inlcuidng animations. Please suggest me with the easiest software and coding language. The project is basically an accident simulator. We are planning to have set of buttons in the toolbar(draw road, inset

  • Use of sOutputFormat for WebI reports in OpenDocument

    Can we use sOutputFormat as output parameter in Opendocument for Web intelligence reports. I tried this but, no result. FYI I am trying this in 3.1 environment. -Raghu

  • Deactivate check-out and check-in request

    The SAP-delivered process for maintaining a solution via a maintenance project is the following: 1. In the Solution Directory, select process structure element (business or interface scenario, business process, or process step). 2. Click "Request" bu