GOT STUCK IN MAKE TO ORDER SCENARIO

Dear All,
Ours is a Make to order concept where in PP would run MRP against a sale order and as a result planned orders will get generated.
we under MM will convert those Plnd orders into PR'S using MD15.while doing so it is obvious that system will copy the account assignment as "E".Till this there was no problem.
i have a semi-finished product which needs to be sent for subcontracting.Now for this i could able to convert the Plnd order into P.R where the account assignment "E" and the special procurement type from MRP2 "L'" is getting captured. Then i had converted into P.O. Eventually when i am trying to issue the components referring to that P.O, the system is issuing a message as"PO HAS NO ITEMS".
Kindly suggest as to any further settings are required.

Hi Syed,
Sorry, your process isn't totally clear to me.
You wrote:
1. 'i have a semi-finished product which needs to be sent for subcontracting'
2. 'here SFG will be my finished product for which i will issue the components'
Maybe I didn't understand your problem well, but according to your statements there's inconsistency in your scenario.
1. you have SFG
2. you send this SFG for subcontracting, and you want to send components as well
3. you want to get the SFG as the result of the subcon process
In my opinion:
1. you have SFG
2. you should issue 'L'-PO for your FG, where components are: SFG, component1, component2, etc
3. as the result of the process you should get FG
(and you can solve this as third-party PO - of course if you want)
BR
Csaba

Similar Messages

  • Make to Order Scenario problem

    i want to configure a make-To-Order Scenario
    i have create an item category  ZTAK  (for Make to order items) ... and assigned it to my sales document type and the Material item category in sales view 2 is 0001 (Make to order)
    when creating the sales order i got the following message
    Transaction ZTAK PD  is not defined
    Message no. V1347
    Diagnosis
    This combination of item category ZTAK and MRP type for material PD is not allowed.
    System Response
    The system does not allow further processing of this item.
    could any one help

    Hi,
    Configuration steps:
     Create material by specifying item category group as 0001 = Make u2013 to u2013 order (Normal item)
    In MM01 Basic data tab, General item category field [0001] = Make u2013 to u2013 order, 0002 for configurable
    material
    Make u2013 to u2013 order checking group for availability check should be [02] = Individual requirements in Sales:
    General/Plant tab.
     Go to VA01 and raise the sales order by specifying this material that we created in the previous step
    Item category is TAK
    Schedule line category = CP
    Requirement type = KE [Sales order Header  Procurement  Requirement field]
    KE = Individual customer order without consumption
    (For standard items item category group = NORM)
    System determines requirement type 041-order/delivery requirements. This requirement type points requirement
    class where we can control whether the system has to carryout TOR, Availability check, and Product allocation
    functions.
    NOTE: Make sure that controlling area and fiscal year defined and maintained.
     Save and Exit
     Go to MB1C to initialize the stock
    Movement type [561]
    Specify special stock [E]
    E = Receipt without purchase order in unrestricted sales order stock
    Specify the sales order number [ ] and item number [10]
    Specify the material with quantity
     Save and Exit
     Go to MMBE and check the stock balance
     Go to VL01N do the delivery
     Go to VF01 and raise the invoice
    Hope this helps.
    Regards

  • No accounting documents posted for Make to Order Scenario

    Hi!
    We are following the make to order scenario, but for product costing following product cost by order.
    When goods receipts/goods issue are posting ( movement types: 101E & 601E), there are no accounting documents got generated.
    can you suggest any one what I have to do?
    I am OBYC settings are ok.
    regs,
    ramesh

    Hi
    Check the account assignment category in the PO and check for the relevant GL account assignment.
    It is purely the assignment.
    Also check the field status settings for the movement types.
    Reg
    Suresh

  • Mrp for make to order scenario

    hi gurus,
          I have got a different and challenging scenario in make to order planning. production planning has to be made on sales order basis.for eg : a particular finished product, a sale order of 100 nos is generated. but all 100 nos cannot be produced in single plant. so it has to be distributed to 2-3 plants. one more thing is, for make to order scenario, there is no fixed lot size. based on sale order quantity, planned order is created irrespective of fixed lot size maintained in material master. IF my batch size is fixed, for make to order also based on fixed based size, planned order has to be created.
      Can anybody suggest a better solution for this scenario?
    Thank you all in advance. all useful replies will be rewarded.
    regards,
    senthil

    Hello,
    For MTO, Lot for Lot order quantity is defaulted..
    So your receipt element will be as per your Sales Order.
    Try this:
    In T. Code : OMI4, for Lot Size : EX
    Change the MTO Lot size to "1" Lot-for-Lot with rounding.
    (Which is Blank by default - lot-for-lot)
    Maitain the Rounding Value in MRP-1 Screen or Use Rounding Profile..
    This Helps..
    Regards,
    Siva

  • Accounting Entry getting passed in case of Make to Order Scenario

    Hi Experts,
    In Make to Order scenario, as per my knowledge, when the goods is recieved from Production Order the Accounting entry gets passed is Inventory A/c Debit and Cost of Goods Produced Credit.
    But how is Cost of Goods Produced, which is  an expense, gets crebited? I am confused, because the above entry will create a credit balance to an expense account. Can anybody clarify this please?
    Thanks and Regards,
    Sameer Joshi

    Thanks for the reply.
    Do you mean that at the time of PGI, when the entry is posted to COGS, the amount of COP will also get transferred to COGS and then the whole amount will be posted at PGI?
    Thanks and Regards,
    Sameer

  • Customer number not in the inspection lot for a make to order scenario

    Hi All,
    I know that standard SAP will get the Customer number into Insp. lot only for insp. types 10/11/12.  I am wondering if someone know a way to get the customer no. into insp. lot for insp. type 04 where the material is make-to-order scenario and the Production/Process order has the Sales order and customer no. without activating User-exit.  The quality users want to be able to see the customer no. in insp. lot without having them to go to process order. 
    It makes no sense to me why the customer no. is not brought into insp. lot when that is available in the Prod/process order, which can further be used to select the customer specific insp. plans for 04 insp. type Insp. lot without using Variant configuration.
    Any light on this topic is appreciated.
    Thanks.

    Hi Srikant,
    I guess.........
    Normally the inspection lot refers the triggering document that are the trigger cause for them.
    - Inspection type 01: - Purchase Order and GR material document.
    - Inspection type 03: - Pro. Order Number
    The same way...
    The inspection type 10\11\12 are purely related to the SD, and directly integrates QM and SD. Hence in the inspection lot for the inspection types directly integrated to SD, it will furnish the Sales order number \ Customer.
    But the inspection type 04 is purely have it's relation to Production process. So it will have the details related to integrations it has i.e. the "Pro. Order." Hence it integrates QM-PP, it have the data related to PP (Pro Order), not the SD's one.
    But I think one way you can achieve it,
    Assign the Customer number also to the inspection plan along with the Material. So I think at the time of assigning the inspection plan to the inspection lot, it will refer the Customer number also and will display the Customer number along with Task list Group\Group Counter, in the inspection specification screen in QA03/02
    Regards,
    Shyamal

  • Consignment stock, make to order scenario

    Hi
    We have a material which produce make to stock and make to order also.
    In case of make to stock its fine. But when we are testing make to order then following is system behavour.
    Action     Mvt Type     Accounting Document               
    GR     101     No Accounting Document               
    Consignment     631     Finish Inventory     Dr      at Standard Price     
                        Consignment Inventory Change (VKA)     Cr
    PGI     633     COGS     Dr      at Standard Price     
                        Finish Inventory     Cr
    My question is why not accounting document is generated at the time of GR 101 in case of make to order scenario.

    Hi
    MTO has 3 scenarios in it. (I think you either fall in Scenario 1 or 2)
    1. Where the Qty of Prod order is tagged to sales order upon GR from prod order....
    The valuation in this case happens at the std cost (CK11N).... Every thiing remains same as in MTS... You get variance as well
    2. Where Qty & Value both are tagged to the sales order (Sales order is Cost Object & Stock is Valuated stock)
    This is not recommended by SAP and should be chosen only in rare cases...
    This scenario pertains to Complex MTO, means totally manufactured based on customer demand.. Like Cars, Boeing Air Crafts, etc
    Sale order is a cost object...
    Sales order cost estimate is done when sales order is created...
    GR is valuated at sales order cost estimate... Variances are calculated based on this cost and actual cost incurred..
    PGI and Revenue post to the sales order because SO is the CO object
    Finally Sales order is settled to COPA
    3. Where Qty & Value both are tagged to the sales order (Sales order is Cost Object & Stock is Non Valuated stock)
    This is recommended by SAP
    This scenario pertains to Complex MTO, means totally manufactured based on customer demand.. Like Cars, Boeing Air Crafts, etc
    Sale order is a cost object...
    Sales order cost estimate can be done when sales order is created...
    GR is Non valuated... No Variances are calculated because GR is non valuated
    Production Order settles upon sales order.. hence, actual cost goes to sales order...
    PGI does not generate accounting doc because stock is Non Valuated
    Revenue post to the sales order because SO is the CO object
    Finally Sales order is settled to COPA
    These are the 3 possible scenarios in MTO... There might be a slight variation in Consignment scenario.... I am nt sure if the "No Accounting doc" situation at GR is OK or not
    Regards
    Ajay M

  • Make to order Scenario...

    Hi Friends,
    I have maintained all required fields for make to order scenario.....
    In MRP 3, Strategy Group- 20
    in house production time-  2 days
    But when I punched sales order , in schedule line tab of order item .....order quantity in getting confirmed before proceeding to further process in make to order ( Production order , Material Planning and before production order is getting confirmed ).
    My problem is that in make to order scenario, sales order quantity is getting confirmed before proceedings further.
    So kindly advised as to be done to get rid of this problem
    Thanks in advance
    Shailesh

    Hi Shailesh,
    Please check the configuration settings in the IMG for Availability check.
    You check have maintaining availability checking group 01 or 02 in the Material master.
    Have you assigned Checking rule AE -SD order; make-to-order stock for checking group 01 or 02 in the IMG
    Spro>sales and distribution>Basic functions>Availability check and transfer of requirements>Availability check>Availability check with ATP logic/Against planning>Carry out control for availbility check.
    I hope it will help you,
    Regards,
    Murali.

  • Make to order scenario (GR Nonvaluated indicator is on by default)

    Hello Friends,
    I am working on make to order scenario. I have assigned  planning strategy 20 to the material. Against this material i created one sales order. Now with reference to this sales order i am creating the production order by transaction CO08. While doing these when i am checking under goods receipt tab, i am finding that GR Nonvaluated indicator is on by default. Because of this when i am doing the GR against these production order, system is not generating any accounting documents.
    I am unable to find how the GR Nonvaluated indicator under Goods Receipt tab in production order is on by default, in make to order scenario.
    Kindly share your valuable input on these.
    Thanks and Regards,
    Jitendra Chauhan

    Check
    Re: GR nonvaluated flagged automatically

  • Which fields of material maintain in make to order scenario through bdc

    HELLO  !!!!!
    GURUS !!!
    I am working on make to order scenario.
    Here is batch management.
    I am giving data for uploading so for that which fields must be filled from
    basic data to costing .
    Could you give me some ref. on this topic.
    Regards,
    Nitin

    Hi,
    Its like I have given for the Raw Material what are all the required fields and this is as per the scenerio which we follow and i think this helps you..
    MBRSH     Industry Sector
    MTART     Material Type
    DYTXT     
    WERKS     Plant
    LGORT     Storage location
    MAKTX     Material Description
    MEINS     Base unit of measure
    MATKL     Material Group     
    SPART     Division
    BSTME     Order Unit
    EKGRP     Purchasing Group
    KAUTB     Automatic PO
    XCHPF      Batch MAnagement
    EKWSL     Purchasing valu key
    WEBAZ     GR Processing Time
    USEQU     Quota arrangement Usage
    DISMM     MRP Type
    DISPO     MRP Controller
    DISLS     Lot Size
    BESKZ     Procurement type     
    LGFSB     S.Loc for Ep
    PLIFZ     Scheduling margin key
    FHORI     Planned Delivery Time
    RWPRO     Coverage Profile
    STRGR     Strategy Group
    VRMOD     Consumption mode
    VINT1     Backward Consumption Period
    VINT2     Forward Consumption Period
    MTVFP     Availability Check
    SBDKZ     Individual/Collective     
    BKLAS     Valuation Class
    VPRSV     Price Control Indicator
    VERPR     Value/Price
    EKALR     With Qty Structure
    Hope This Helps you.. is it clear
    Regards,
    Sravanthi
    Edited by: sravanthi nemani on Dec 29, 2008 1:38 PM

  • How to show the internal batch number for order in make to order scenario

    Hi !!!
    Gurus!!
    I am working on make to order scenario .For delivery of order may I see the batch no.of esch order.
    How system will get the internal number batch.
    I have config. batch management.
    What should be the next process.
    Regards,
    Nitin

    Hi,
    QI am working on make to order scenario .For delivery of order may I see the batch no.of esch order.
    A. Yes you can see batch number for each order
    QHow system will get the internal number batch.
    A. there are two possiblities assign you batch number at production order before release or assign batch or each GR at the time of executing GR transaction.
    QI have config. batch management.
    A.In Material master you also have to tick for batch managemnt relevency
    QWhat should be the next process.
    A. Consult again if any thing missing
    Regards,
    Syed

  • Make to Order Scenario Process Flow

    Hi Friends -
    I am looking for simple Make to Order scenario with BOM Components with Routing.
    The process flow I want to execute -
    1. Create a Sales Order for a Finished Product (Product should have a BOM for Production)
    2. Do the product Materials Planning for the Sales Order through MD50
    3. Get all the dependent material requirements (both for products as Planned Order and also for BOM Components - all the BOM components should also be planned)
    4. Convert Planned Order for Product to Production Order
    5. Convert Planned Orders for BOM components to Purchase Requisition
    6. Confirm Production Order
    Pls correct me if I my process flow is wrong or requires modification.
    I will appreciate if you can validate the above process flow and guide me to execute the same in the system.
    Pls help me on configuring the system and setting up the materials and related master data for the same.
    Thanks in advance
    Purnendu

    Dear GSL - Pls check the following details
    1. I have created a Material Master data for Finished Product (FERT).
    2. I have assigned Item Category Group - 0004, and General Item Category group as 0004 ( Make to Order / Assembly).
    3. I have assigned MRP Type PD in MRP 1 View and Strategy Group 20 (Make to Order Production) in MRP 3 View.
    4. Now created a Universal (Type 3) BOM for the product with one material component.
    5. Now also created a Routing for the Material with two operations having PP01 a control key.
    6 When I try to create a Sales Order for the finished material it is giving message
    Configuration not possible for material 747 : Reason 3 --> Help
    Message no. V1360
    Diagnosis
    This may have been caused by one of the following:
    1. The configuration profile for the material allows or requires the bill of materials to be exploded during order processing. However, a plant has not been specified in the item.
    2. The configuration profile of the material allows or requires the bill of materials to be exploded during order processing, but the order quantity in the item must be greater than 0.
    3. A configuration profile has not been maintained
    or
    A configuration is not permitted for the material
    or
    4. The configuration profile of the material allows or requires the bill ofmaterials to be exploded during order processing. However, the system could not determine a date because important data is missing from the item (see incompletion log).
    This message is also coming in the Incompletion log f the sales order.
    I have not checked the Configurable Indicator for the material in the Basic Data 2 view of the materials master, but still the message related to Configuration is coming.
    Pls help e on this.
    Thanks and warm regards
    Purnendu

  • Re Sales order stock in make-to-order scenario

    Hi
        While doing make-to-order scenario after doing production order confirmation for the raw material the reserved stock is reduced but sales order stock is not reduced. how to solve this.
    Thanks
    Antony

    Dear,
    If you are using strategy 20 then please note,
    You also must maintain the following master data settings for the finished product:
    Strategy group 20 on the MRP screen
    Item category group (such as NORM) on the Sales Organization screen
    Sales Order -> MRP -> Customer Stock Finished Product -> Delivery -
    +
       ^                                                                                |
       |                                                                                |                                                --      Reduction--
    Goods Issue for Delivery and Reduction of Planned Independent Requirements
    After goods issue for the delivery (choose Logistics -- Sales and distribution -- Shipping --Delivery --Create), the stock/requirements list is reset
    Regards,
    R.Brahmankar

  • ATP - Make to Order Scenarios

    Can anyone advise how ATP works for make to order scenarios?  In the first place, shd there be ATP for make to order scenarios?  Since the production order created is associated directly with that particular sales order.
    1. w/o assembly processing
    I noticed SO for this case is always confirmed based on lead time towards customer.  However, any date changes in the production order does get updated into SO schedule lines.  Why is this so?  In the event if there's any delay, material availability shd be change due to change in order completion date.  Why is different from case with assembly processing?
    Thanks
    Peter

    ATP:
    Available-to-promise is the quantity of a material or part still available to MRP which can be used for new sales orders.
    Available to Promise. It is the process of checking the available quantities of a material. The ATP quantity is equal to warehouse stock plus the planned receipts (incoming stocks). ATP takes in to account all movements into and out of the warehouse.
    If selected, it can check the stock examined for ATP that can be safety stock, stock in transfer, stock in quality inspection, & blocked stock, although the planned receipts & planned issues of the stock associated with ATP may be purchase orders, purchase requisition, planned orders, production orders, reservations, dependent reservations, dependent requirements, sales requirements & delivery requirements.
    The ATP quantity is calculated according to the following formula: ATP quantity = warehouse stock + planned receipts - planned issues.
    JP

  • Getting error while doing make to order scenario

    Hello Sap Gurus,
    While doing make to order scenario(strategy 20),when i am giving customer requirement through md81(using reqmt type KE),i am getting the following error,"Receiver category is not allowed by settlement profile SD1."
    Could you guys help me in solving this error.In settlement profile SD1  i have checked that valid receivers material,sales order are kept as optional,then also getting error.

    Hi Jitendra
    Can u confirm what setting is kept against reciever "sales order"? Is it kept as settlement required or optional? Ideally it should be "required"
    Also provide the error message number which u are getting
    Rgds

Maybe you are looking for

  • Hi! how can I set the time machine/capsule back-up intervals? Heron 2

    HI! EVERYBODY, HOW CAN I SYNC 2 TIME CAPSULES INSTALLED IN TWO DIFFERENT LOCATIONS, MAIN HOME AND SUMMER HOME? THANK YOU FOR YOUR HELP. MERCi HERON2

  • I have Mac OS 10.6.8  and get "An internal FaceTime error occurred".

    Is there a fix in the works.  Apple says click only once on icon but this is to no avail for me.  Would REALLY like to use facetime on my MacBook without having to go into the root directory to modify something that should already be modified in the

  • Unknown File, Out of Memory

    When opening my project sequence across a gigabit Ethernet connection to an Xsan, I first get: File Error: Unknown File, followed by: Error: Out of Memory. The Sequence is full of Jpegs, Tiffs, and some 10-Bit Uncompressed. How can I get to view this

  • Update Symbol and Symbol Script without removing from Document library

    Is there a way in fireworks CS5.1 to update a symbol and the corresponding symbol script without removing it from the document library like it suggests in the below article http://www.adobe.com/designcenter/fireworks/articles/frwcs3_richsymbol_print.

  • Album issues....

    Does anyone else have this issue and if so how do you solve.......under my artists on the nano I will have...say....10 songs from nirvana....there will be one nirvana category that has 7 songs and then another nirvana listed under Artists with 3 song