GR based invoice link between GRN doc and invoice doc

Hi experts,
We have a requirement where we need to develop a Purchase report for that I need some details as follows.
1.) When MIRO is done w.r.t GRN, in which table the link between GRN and Invoice is found,
2.) provide me with the tables in which the Invoice details are stored.
Thanks in advance.

Hi,
Go to EKBE table. That is the purchase order history table. Here u can get the GRN,MIRO and all.

Similar Messages

  • Link Between Accounting Document and Invoice Document

    Hi,
    I need to map the following path for data fetching as per clint requirement.
    G/L a/c >Accounting Document->Invoice Document--->PO Document.
    I don't find the link between Accounting Document--->Invoice Document.
    Pls let me know from which table i can find this link.
    With Regards
    Punesh Sharma

    Hi Punesh ,
    Following tables would be helpful -
    BKPF , BSEG  , RBKP and RSEG
    Regards
    Nilesh

  • One to One link between VBRP items and BSEG items

    Hi All,
    I am working on a program where I have to link between VBRP table items against BSEG table items.
    But in BSEG, the invoice items are summarised based on Material Number, profit center etc..
    Is there a way to divide them, like any other table which holds the data transferred to accounting from sales exactly as it is in the invoice tables (VBRP).
    If there is no such table, can any one help me figure out a logic where I can didvide the items of BSEG table exactly like the items of table  VBRP.
    Any help or input will be very highly appreciated.
    Thanks in advance
    Phani

    Thanks for the Replies Ramani and Monika...
    I alraedy have a relation between the Accounting Doc and Billing Doc (VBRP-vbeln to BSEG-belnr).
    what I am looking for is the Item wise one to one mapping.
    i.e  Assume that we have 4 items in VBRP under one Billing Doc....
    2 items have Similar Materials (Assume XYZ) and same Profit center (eq..MNO123)
    and the Other 2 items have material (ABC) and Profit center (PQR6789).
    Now these appear in Bseg as only 2 items, all the items with similar materials, profit center etc will be clubbed in Bseg (While Accounting). I.e In BSEG you will only find 2 entries for the above 4 items of VBRP.
    I need to divide the data that I am getting from BSEG exactly as they are in VBRP.
    Pls suggest if you know of any table where I can find this.....If not a table.., then a way to figure out the division of these BSEG items exactly as the VBRP items.
    Brgds
    Phani

  • FAX Sending - Link between SOST items and PO Data

    Hi all,
    We have a message type to send FAX to the vendors.
    This is tracked in SOST.
    There are some FAXes which get failed and are to be tracked individually in SOST.
    We need to make a report which gets all the failed PO #s.
    We are not able to arrive at the db link between the items in SOST and the PO data.
    Can anyone of you let us know how this can be done ?
    Thanks in advance.
    Regards,
    Vivek K

    Thanks for the Replies Ramani and Monika...
    I alraedy have a relation between the Accounting Doc and Billing Doc (VBRP-vbeln to BSEG-belnr).
    what I am looking for is the Item wise one to one mapping.
    i.e  Assume that we have 4 items in VBRP under one Billing Doc....
    2 items have Similar Materials (Assume XYZ) and same Profit center (eq..MNO123)
    and the Other 2 items have material (ABC) and Profit center (PQR6789).
    Now these appear in Bseg as only 2 items, all the items with similar materials, profit center etc will be clubbed in Bseg (While Accounting). I.e In BSEG you will only find 2 entries for the above 4 items of VBRP.
    I need to divide the data that I am getting from BSEG exactly as they are in VBRP.
    Pls suggest if you know of any table where I can find this.....If not a table.., then a way to figure out the division of these BSEG items exactly as the VBRP items.
    Brgds
    Phani

  • Link between Credit Memo and Dispute Case

    Hi,
    Please help me. How to Link between Credit Memo and Dispute Case
    Thaks,
    Vinod.

    Linking a credit note has nothing to do with EHP4 or 5. You have to do a config sertting:
    Dispute Management-Process Integration with Accounts Receivable Accounting-Assignment of Open Credits and Payments-Activate Assignment of Open Credits and Payments
    And make sure the business adapts the correct process:  When you reverse a charge on a debit invoice you have to make sure the credit is properly linked to the debit note.
    If this is the case then the credit will show up in the dispute case.
    Rgds,
    Richard

  • Link between ABC Indicator and Priority

    Hi friends,
    My client requires the Link between ABC Indicator and Priority. i.e., While creation of notification, based on the ABC indicator assigned in the Equipment, Priority should be selected.
    Is it possible, if possible please help me out to resolve this issue.
    With Best Regards,
    Dev

    Hello,
    Yes you can acheive this by Development use the Below User Exit or Fubctional Module to get it done
    User Exit-->QQMA0014 QM/PM/SM: Checks before saving a notification
    BADI-->NOTIF_EVENT_SAVE Change When Saving Notification
    When Notification create against the Equipment which Having ABC Indicator it will stop Notification while Saving the Notification By checking The ABC Indicator on Equipment and Proposes Priority which You already defined in Configuration with Proposed New Dates for Notification Completion Dates.Notification save allowed once you fill Exact value of Priority.
    Regards,
    Rakesh

  • Link between f-48 and Miro

    Hi
    I have posted advance payment in f-48
    and Invoice verification also over in MIRO
    Then how we can give link between f-48 and MIRO

    Hi,
    You have posted down payment, so this amount remains in separate recon. a/c with special GL indicator.
    First of all you have to transfer/clear this amount to normal GL account through transaction F-54.
    If you have received full inv. amount as advance, you can clear both Inv & Payment line items.(F-44)
    Otherwise you have to clear these line items when you receive remaining bal. amount of the invoice.
    Rgds
    Murali. N

  • Is there link between account receivable and payroll module ?

    In Account Receivable :( I have This Case )
    How to record a sale to an employee? How to record it as an employee loan without effecting bank or cash records.     
    is there link between account receivable and payroll module ?
    this solution i suggets bellow , is valied solution?
    Define Invoice transaction type "Employee Sales "
    This Type will affect (Receivable ) Employee Account
    In Payroll Module :
    ( Manually )TheEmployee Sales invoice will sent to payroll department to extract amount from employee , this extract Will credit the same "Receivable" Employee account

    Employee Loan in AR can be tied with Element Balance of payroll.you should have to develop some mechism to get the money from AR and update into Payroll element balance, this way you can manage your employee loan without touching bank.
    There is no seeded functionality comes with AR that have such capability.

  • Are there any links between HR organisation and user roles in R12

    Hi
    Do you know if there are any links between HR organisation and user roles i.e. can a role be assigned to an organisation in R12?
    Thanks
    Sean

    The thread stack sizes also depend on the type of threads you are
    working with.
    If you are working with POSIX threads :
    % man -s 3C pthread_create
    or if you are working with Solaris threads :
    % man -s 3C thr_create
    For these 2 cases, the default stacksize is 1MB for a 32-bit process.
    If you do not wish to use this default value, the man pages show
    you how to change this size in your code.
    There is a 3rd type of threads which you could be using that are
    generated by the compiler when doing compiler parallelization.
    By compiling with -xparallel or -openmp=parallel, the compiler
    can automatically parallelize loops in your code and create
    threads to do this work.
    For these type of threads, the default size is 4MB. However you
    can control this behavior through the environment variable
    ${STACKSIZE}
    The ${STACKSIZE} units are in KB, so to set your compiler
    generated threads stacksize to 8MB, you would say :
    % setenv STACKSIZE 8192
    If you are using Studio 11 as your compiler, see the "OpenMP
    API User's Guide" at :
    http://docs.sun.com/app/docs/doc/819-3694?a=load
    and look at section 5.5, "Stacks and Stack Sizes"

  • Link between control record and infotype 0003.

    Hi all,
    Can anybody explain me, what is the link between control record and infotype 0003?
    Thanks & Regards,
    Lucky.

    Hi,
    Control record is a heart of payroll area(pa03)
    Conrtol record alswa based on payroll area where it determines the current payroll period for the exact date
    It defines the payroll past for retro active accounting recongnation.
    It lock the master data and teh time data to prevent changes from being made during the payroll run, this lock is valid for the paryroll past and the payroll present changes with effect the future can still be made.
    It determines the earliset retrocatice a/cing period.
    In simple control record is to control the payroll status of the employee
    Payroll Status:(IT 0003)
    The Payroll Status infotype (0003) contains data for Payroll Accounting and Time Evaluation.
    The system automatically creates this infotype when the employee is hired. In general, the system updates the infotype and writes the changes to the payroll past.
    You can change the payroll status of an individual employee using Payroll/Retroactive Accounting and Time Evaluation.
    Thanks
    Vibin

  • How can i create link between ipad(xcode) and webserver?

    Hi, I'm a new to iPad development and i need help,
    i'm not good with english but i try to explain my question:
    how can i create link between ipad(xcode) and webserver?
    (the webserver ".NET" with driver odbc is connected with DB Oracle)
    so, how can my ipad application access to the Oracle DB?
    Create a webservice (.NET) to be place between iPad and DB, is this correct?
    how can i do it?
    which are libraries to include in the xcode's framework?
    thx

    I think the following URL will be your best answer:
    http://stackoverflow.com/questions/3510468/connecting-iphone-to-an-odbc-database

  • Link between Schedule lines and delivery quantity

    Hi all,
    At the item level in a sales order, can anyone tell me the link between schedule line data and delivered quantity.
    Schedule line data can be found in VBEP and delivery qty can be found in LIPS. But I want the link between the two. For which partcular date in the schedule line item the delivery qty is displayed.
    Thanks in advance.

    Hi Amol and Rahul,
    Actually I dont want the link between sale order and delivery, I want the link between schedule line dates and delivery qty.
    Hope I am clear.
    Thanks in advance.
    Edited by: Rajini R M on Sep 11, 2008 6:12 AM

  • Link Between Service Notification and Sales Order

    Hi All,
    In our business process, we will create sales order from Service Notification and we can see the same in the Document flow. But when i check in the VBFA table, there are no entries. I would like to know how the document flow is updated without updating the VBFA Table or is there any other table gets updated for this flow.
    Please guide me.
    With Regards
    Vinu.N

    Hello Vinu
    For one Sales Order # figures in Notification header table- VIQMEL-VBELN.
    Similarly Notification # figures in Sales Order Header table- VBAK-QMNUM
    That is a solid link right there.
    I Also guess technical objects like Equipment, Serial number also form link between the Sales and Service Documents.
    Also check out the logic in document flow program RIBELF20, may be it will give you the clues to the problem.
    Hope this helps.

  • Link between process order and sales order for planning strategy 52

    Hello,
    I investigate the possibility of a link between "sales order" and "planned order / process order" for the usage of planning strategy 52 (planning w/o final assembly, make to stock).
    I know, this is not conform to the basics of planning strategies (EITHER make to order OR make to stock) and I suspect it would be a modification. Of course we have the alternative "make to order" - strategy 50, but we do not want to use individual customer stocks.
    Is anybody there with similar customer requirements or project experiences?
    Thanks in advance,
    Joerg
    Message was edited by:
            Jörg Demtschuk

    Hi Jorg,
    To my understanding if you need hard pegging then in SAP only Individual requirement is possible.
    Or else you need to create a custom transactions/table to identify Sale order and when ever a process order is created by selecting the sale order record, the process order detials should also get updated against that.
    You need to take the help of ABAP expert for this,
    Regards,
    Prasobh
    Reward points if this was useful

  • Link between Purchase order and Attachment list

    Hi All,
    I got a requirement like Purchase orders are from moved from one system to another system.There was a bug in BDC program
    so some Attachment list of the purchase orders are not moved properly to the another system.
                                                   Now my client want a report to generate the Purchase orders which is having attachment list.
    I did not find any table link between Purcahase order and Attachment list.
                                                  So Plz provide me the link between purchase order and attachment list.
    Thanks,
    Ram

    You mean service for object services?
    if yes then u have to create one custom report for Generic Object Services   ( like notes , attachment  , url )

Maybe you are looking for

  • Installing update we had power failure and system will not boot

    We do not have a current working back-up, how do I re-install the os w/o erasing the entire hard drive?  We have a Intel Imac with snow leopard on it.

  • Problems with lighting in After Effects CC using Mavericks

    I recently upgraded to Mavericks this week and installed the Adobe patch so that AE CC will work properly. I am having issues in a comp where I have an ambient light placed in the comp with no keyframes throughout the comp. As I scrub through the tim

  • Tips for double sided printing

    Hi team. I have been working on a document which is in various sizes. In essense its like tabs you pull out from a sleeve, so each one is exactly 2.3cm smaller than the last. They work their way up to the size of UK size A4 Outputting from indesign p

  • Zen Touch software and AC adaptor compatible with Vision

    I just got the Vision: M and I'm wondering if I can use the software and AC adaptor I got with my previous player, the Touch with the Vision: M.

  • Setting up a document camera with Automator

    Here's my setup: I have a document camera stand, tripod, clamp light, all that. My goal is to be able to set a document on the stand, run an Automator script (or AppleScript) and have an image of the document saved as a PDF in a desired folder. I thi