Gr blocked quantity calculation

hi all,
we have a requiement to develop a report to see gr blocked quantity of a material as it is displayes in mmbe , can anyone help me out in which table fields it is stored if it is not stored anywhre then how can we calculate this
thanks in advance
regards sarabjit

resolved

Similar Messages

  • Batch determination issue in process order Material quantity calculation

    Dear Gurus,
    We are facing issue in auto batch determination in process order (Material quantity calculation ).
    eg Material X  is active material 200 KIA used in BOM as
    10  X   200  KIA  
    20  Y   10           Filler
    30  Z
    40  X   200  KIA
    50  Y
    60  Z
    We select line item 10 and 40 and do Batch determination system proposes 2 batches for line item 10 as Batch A and B
    and for line 40 again Batch A (with 0.01 KIA) and batch B proposed which is wrong.
    For line Item 10 Batch A and B
    For line Item 40 Batch B and C or as per FIFO logic.
    As Batch A should be consumed in Line item 10 then it proposed Batch B and so on....
    We have already maintain data in COB1.
    Can any body explain what is wrong in determination.
    Regards,
    J.H.Pert

    Hi Pert,
    Follow the below link you have some idea OK.
    Any questions revert me back.
    Batch search strategy
    Regards,
    Madhu.G

  • Process Order Base Quantity calculation - WPL

    Hi,
    In COR2 when changing Total order quantity (Litres) (CAUFV-GAMNG) the Base quantity (Kgs) automatically re-calculates (CAUFV-BMENGE).
    As far as I can see this is calculated from the WPL found in the material master > additional data > units of measure e.g. 1000lts = 1255kgs.
    However if I create a process order it calcualtes with say 1.255 Kg/l, I then change the WPL in the material master, come back into the order and then change the Total order quantity. The base qty is still using the old WPL.
    My question is where does the base quantity calculation take the WPL from? If it does take it from the material master is there anyway of making the process order pick up the current WPL in the calculation and the not the previous one?
    thanks
    Tom

    Hi Pert,
    Follow the below link you have some idea OK.
    Any questions revert me back.
    Batch search strategy
    Regards,
    Madhu.G

  • Sequence of steps n Material quantity calculation functionality

    Hi, Pls advise the sequence of steps involved in MQC functionality in Master Recipe? Thank You.

    Hi Raju,
    Below are the steps you can explore.
    1. Assign Classification to component if you are using any batch classification values for calculation of other components. This you can do it in BOM section of Master recipe.
    2. Now goto calculation tab for the component of which quantity calculation is required.
    3. In this screen you can see the characteristic assigned for calculation in batch classification as per step 1.
    4. You can insert simple calculation formula using reference of these cells. The reference is simple like the references we have in excel. For example (001; 002) this given you value in 1st column & 2nd row.
    5. At the time of batch determination or quantity change in Process order please make sure to click on Calculation tab & then save. This is required to get the quantity calculated as per formula.
    Hope this will help you.
    Please let us know the industry you are working in. This will help all to help you better.
    Regards,

  • New Store Quantity Calculation

    hai..
    i have been assigned an object.
    I need to use the function exit WRPL0001 for the transaction wrp1 to calculate the total consumption for the given fiscal year.
    Inside the user exit using the article number and site, the corresponding reference site and article from store logistics view is to be read.
    Does any one know wat a store logistics view means?? also the minimum TROC should be read from store logistics view.
    Can anybody help me regarding this?

    Hi Rajesh,
    Thanks for your input.i have alredt reffer the same,
    i am working with PI.I have some doubts .Pl.clear the following.
    1)Is it mandatory to create bath determainationin PI.
    2)As our bom components vary for the header material.How could it be map in master recipe.Whether this material quantity calculation link with batch  & how it perform.
    Regards,
    Devendra

  • Blocking Quantity in Sales order

    Hi,
    We have a requirement to block Quantity in sales order.
    PP is not integrated with Sales order, its a MTO ( but actually client does not follow MTO in SAP)
    Once the production is completed for that sales order......he want to block the sales order quantity either manually or automatically ( they use a z transaction to declare production complete against sales order ) but this should not stop him doing delivery and billling.
    Please let me know how can we do this.
    Thanks
    Venkata Rama Reddy.K

    Hi,
    The Process goes this Way
    Sales order is created and confirmed ( by mail ) to PP that production should be started.
    PP completes the production and they update the qty against sales order number in a z transaction once production qty matches work order qty. the z transaction stops adding qty in this z t.code.
    What customer wants is once they update this ztransaction with complete Qty ( which equals sales order Qty) , the sales order item quantity should be locked automaticallly so that quantity can not be modified once this z transaction is completed.
    Hope this information provides clarity.
    Please suggest a solution.
    Thanks
    Venkata Rama Reddy.K

  • GR blocked Quantity and corresponding released quantity

    Hi,
    I want to find out GR blocked Quantity and corresponding GR released quantity (103 & its 105), kindly let me know the table link to get these data.
    Thanks,
    Kaleel

    Hi
    In table MSEG, field MBLNR will have 105 GR ref and field LFBNR will have corresponding 103 GR ref.
    With regards,
    Jeeva

  • Target quantity calculation in Production order.

    Hi Freinds,
    Target quantity of the components to be issued is calculated from the ratio from BOM of header material.
    If there is component scrap for the components mentioned in BOM then the Target quantity calcultion also considers this and increases the quantity by the Scrap percentage mentioned.
    Target quantity gets updated at the time of goods issue during confirmation
    Problem is only for orders of one material, the target quantity calculated of components is not considering scrap inspite of maintaining the scrap for components in BOM.
    Can anybody help in this matter, what could be the missing setting ?
    Thanks in Advance
    Shailesh

    Hi Shailesh,
    Please check whether the BOM where u maintained the scrap is being copied to the order. To my knowledge there is no other settings required to consider component scrap.
    I think the BOM which is copied to the order might be of different alternative BOM where you have not maintained the scrap for that particular component.
    Please check and revert.
    Regards
    Suri

  • Tcode Lp10 requested quantity calculation.

    Hi Friends,
    I want to know logic for requested quantity calculation in LP10 as I see that there is stock available for the material but qty is not calcualted in requested quantity field.
    Thanks,
    Kiran

    Hi
    Requested quantity gets calculated based on how much left over stock you have in production supply area. Suppose in PSA available qty is 100pc and if you consumed only 70pc in the production order fow which you have staged it. SO left over stock will be will reduce the requested quantity by 30pc for next production order.
    In your that may have happened, at first instance there might be some leftover stock was available, while next if might have consumed by someone
    BR
    Kamal

  • Material quantity calculation to be done upto a limit

    Dear PP experts,
    I am using material quantity calculation for acitve ingredients. The quantity of API should be calculated as per the assay recorded in inspection lot. But the additional requirement is that the API quantity should be calculated after batch determination only if the assay recorded is 99 % or below 99 %. If the assay recorded against inspection lot is more than 99 % the API quantity should remain the same.
    Pl. suggest how to proceed.
    Thanks,
    Prashant

    Dear Prashant
    If you can post this question in PP forum, may be you can get lot of suggestions.
    thanks
    G. Lakshmipathi

  • Purchase Order Open quantity calculation.

    Hi All..
    I would like your help in finding out the logic behind calculating the open quantity for a given line item of a purchase order.
    Iam aware that i should go to the EKBE table to see purchase order history. Can someone tell me what are all the conditions i need to consider to calculate the Open quantity.
    Iam able to give a value E to field BEWTP (Purchase Order History Category) in EKBE and for all the recieved records iam adding the quantity for movement type 101 and removing the quantity for movement type 102 that finally gives my total GR qty. Then iam doing Original PO qty - GR qty to get the Open qty.
    Let me know if this logic is wrong or else is there any other conditions to consider.
    Appreciate your help and will reward.
    THanks.

    subtract the PO quantity EKPO-MENGE with the delivery quantity field EKET-GLMNG
    Thanks
    Seshu

  • Purchase order quantity calculation

    Hi Guru,
    Please give me suggestions
    my client wants,  system to calculate reorder quantity and safety stock quantity. SAP should suggest them PO quantity based on the automatic reorder and safety stock calculations.
    Regards,
    Krishna

    Hi Pankaj,
    Thanks for u r reply.
    My client want SAP should calculate reorder and safety stock level. Because my client uses more than 30000 materials. manual  reorder and safety stock calculation for each and every material is not possible.
    So kindly suggest me how to configure in SAP for Calculation of reorder and safety stock level.
    Regards,
    Krishna

  • Projected on hand quantity calculation logic

    Hi ,
    I am trying to extract information for projected on hand quantities.
    Here were my findings
    1. MTL_SUPPLY_DEMAND_TEMP
    this table has one column called ON_HAND_QUANTITY which stores Projected on hand quantity based on accumulating supply and Demand ( as per trm), However this table is a temporary table and data is also session specific, data will be gone once the session get closed.
    2. From Inventory user guide I got a point that "The projected on hand quantity of the item is , defined as Current Available + all future sources of supply and - all future sources of demand."
    Now my question is
    a. Is there a direct table for calculating projected on hand quantity in application.
    b. How do I calculate current available quantity then future source of suuply and future sources of demand.
    Thanks in advance

    Hi:
    ~ There is no direct table to get the projected inventory details.
    ~ Current on hand Qty for a given item shall be obtained from ON HAND QTY table.
    For calculating the future supply upto a patricular date, all the expected supplies such as Receipts, Jobs, Internal SO transfer, etc to be considered.
    For calculating the future demand, qty required for SO demand, forecast demand, ISO demand etc to be considered.
    Projected Inventory = Current Stock (OHQ) + Expected Supply - Expected Demand.

  • Automatic KANBAN quantity calculation requirement -reg

    Hi,
    As of now we enter  no.of KANBANS and KANBAN quantity  while creating control cycles for the material to be operated through KANBAN. The KANBAN quantity is decided at user level and updated  which is causing many discrepencies .
    the requirement is can system calculate the KANBAN quantity automatically driven from the requirement calculated based on finished products PIR quantity ?
    1. is it possible  that when MRP runs for the finished product  system calculated the KANBAN quantity for those BOM items of the Finished products which are marked as relevant for KANBAN.
    2. if it is possible then what and all settings and other things required ?
    3. any side effects?
    please provide some inputs
    regards,
    madhu kiran.

    Hi,
    Pls. find inputs for respective queries as below :
    1. Yes it is possible with using Kanban with MRP , pls go through the following link for details about Kanban with MRP :
    [KANBAN With MRP  |http://help.sap.com/saphelp_erp60_sp/helpdata/en/cb/7f932e43b711d189410000e829fbbd/frameset.htm]
    2. For Automatic Kanban Calculation pls go through the following link which gives all detailed settings & requirements for the same :
    [Automatic Kanban Calculation  |http://help.sap.com/saphelp_erp60_sp/helpdata/en/cb/7f932e43b711d189410000e829fbbd/frameset.htm]
    3.There are no side effects of automatic kanban calculation because It is Std Functionality given by SAP.
    Hope this helps resolve your issues.
    Revert in case any doubt.
    Regards,
    Tejas
    Edited by: Tejas  Pujara on Apr 29, 2009 6:58 AM

  • Threshold quantity calculation for one previous periods

    Hi,
    There is a requirement to calculate the Threshold quantity if we give calender month(april 2007) it has to pick the back 12 months shipped quantity (month wise)
    starts from march 2007 to feb 2006. and finds the active months(shipped quantity for that month shoulbe > 0) then it calculates the threshold quantity as
    for eg.,
    jan  feb  mar  apr may jun  jul   aug sep  oct nov dec  total
    100 200 100  100 50   100 200  50  100  60 200  100 1360
    threshod qty : (1360/12)*8 = 907
    here 8 is threshold factor
    jan  feb  mar  apr may jun  jul   aug sep  oct nov  dec  total
    100 200    0  100 50   100 200     0  100  60 200  100 1210
    threshod qty : (1210/10)*8 = 968
    the selection screen input is calendar month eg., 04/2007  (april/2007)
    Please give the logic for calculating the above with steps
    please specify any FM for these.
    Thanks in advance

    Hi Viswa,
    Thank you for your prompt reply. I tried with your answer, when I ran AFAB with posting period 1, I am getting below error.
    "You want to carry out a repeat depreciation posting run in period 001. However, the last posting run was for period 006.
    Start the repeat run again using period 006".
    Kind Regards
    Shanid

Maybe you are looking for