GR durng final inspection - single inspection lot

Hello Friends,
In material master there is a key that control inspection lot creation during GR from purchasing is there any similar key for production too
Like below
For each purchase order item, batch and storage location
Thanks & Regards
Raj

Dear raju
Yes, You can use for 04 inspection ,
'X' An inspection lot for each  order ,batch & storage location- An inspection lot is only created during the first goods receipt for each PO item or production order.
Regards
gajesh

Similar Messages

  • Multiple notification against single inspection lot (03 inspection type)

    Dear friends
    While recording the defects multiple times against single inspection lot (03type) , all the defects are added in single notification, but my client requirement is they want different notification.  if any body knows please tell me.
    Note : in inspection type there is a option of multiple notification against single inspection lot, but this is
    not working (i think it will work only serial number,equipment and  functional location get changed)
    Please do the needful
    Regards

    Hi Karthikeyan
    As you mentioned it is not possible to create notification  other than based on the object types.
    A work out can be make an action box in the notification for creating another notification with the help of ABAP ( call transaction QM01) and while doing this the entire datas of the inspection lot gets copied into the notification. you may have to use a user exit also.
    Defect can be recorded in the item level by the user.
    Sounds difficult but certainly possible
    Regards
    gajesh

  • Single inspection lot for multiple plant

    Dear Experts,
    I am from pharma industry, my requirement is, there is any possibility to create single inspection lot
    for multiple plant.
    please guide.
    Thanks in advance.
    Yuvraj S. Dhotre

    Don't open multiple threads for same query. It makes the solutions to be scattered.

  • Single inspection lot for multiple operation

    Hi
    I am creating a process order having 10 operation. the 3,5 and 8 are quality inspection (inprocess inspection) & last is PP operation that is for final confirmation.
    The control key in quality operations are pi02 and for production operation are pi03.
    i am using insp type 03 in material master
    Curently only one inspection lot is trigerring for all operations hence while RR, all operation are appearing (Quality & production).
    User needs diffirent inspection lots for different quality operation.
    How can i triggere lots per QC operation??
    I would be vary thankful if i get it.
    AYK

    Hi
    Std will create one inspection lot for 1 process order
    and RR will show all operations which is related to inspection
    ask PP guy that cotrol indicator Pi03 - insp. char to be uncheck
    then it will not show those operations not relevant for inspection
    is't fullfill your requirement
    why your business needs individual inspection lot for each operation?
    give info
    Thanks
    Sami

  • Single inspection plan for all Inspection Plan usages

    Hi
    I have to prepare a single inspection plan, than can be used against inspection type '04' and '15' and '01'.
    Please tell me which inspection plan usage I should use, I tried '3' = Universal, but at inspection lot creation the system is unable to find inspection plan.
    Thanks in advance.

    My customer manufactures semi-finished good, some times he can purchase semi-finished from the market. Sample are reserved for future testing as well.
    so following inspection types are required for the same material
    1) GR against PO                '01'
    2) GR against Production    '04'
    3) Sample Management   '15'
    Almost all the time, the same specifications are tested and my customer wants to maintain a single inspection plan.
    I have one option that is to create 3 inspection types using all the above  inspection types and to use the same "Usage" say '5' in customizing of Inspection Type. But I don't know the consequences
    Please give me other solution or highlight the consequences of my solution
    Kindly help.
    Edited by: Chris SAP on May 13, 2010 11:36 AM

  • Inspect and Inspected field in Record Results:Characteristic overview

    hi,
          Can any one explain me the Inspect and Inspected field in Record Results:Characteristic overview screen. How the sample size is determined in Inspected field during lot creation.
    Muthamil

    Dear Muthamil
    This fully depends on the sampling procedure you choose. for eg if you choose 100% sampling procedure and you have lot quantity of 10 items
    Then inspect will be 10 and inspected will be 10.
    SAP gives the definition for INSPECT as  - Predefined sample size that has to be inspected for an inspection characteristic or a partial sample.
    For each inspection plan characteristic you define the amount by which the inspected sample size in the 'Insp.ed' field can deviate from the to-be-inspected sample size in the 'Inspect' field. If a characteristic (partial sample ) is closed the system checks whether the required sample size is adhered to. The characteristic (partial sample) can only be closed if this is the case.
    But for Scope not fixed, larger , smaller scope the inspected field chages based on the result recording
    SAP gives the definition for INSPECTED as   - Number of sample units that have been inspected for a characteristic or a partial sample.
    Hope this explains
    Regards
    Gajesh

  • Single Inspection lot for multiple line items.

    Hi,
      We have a scenario while receiving goods.We receive boxes and want to print labels.For eg we have a Purchase Order and receive 10 Items and a material document is created for 10 qty and a Inspection lot is created.
    Since we want to print a label for each item we propose to create a line item on a GR thus creating 10 line items.
    The problem is we get 10 Inspection Lots which we dont want.
    Our requirement is to print 10 labels by having ...
    1.One material Document with QTY 10 and one Inspection Lot with QTY 10.
    2.Have 10 line items in GR to print lables but have one Inspection Lot.
    We do not have batch management activated.
    Thanks in advance for help.
    Regards
    SM

    Hi SM,
    It's very easy,
    If I am not wrong you are asking about the inspection type 01, correct?
    Then go to material master->Qm view>Inspection set up---> now for the detailed information for inspection type 01,, set the option "FOR EACH MATERIAL, BATCH AND STORAGE LOCATION" ( i know you are not batch managed but set this option) for the field "Control InsLot"
    Have the fresh PO and then GR, system will do exactly as you asked for,
    Regards,
    Shyamal

  • Raw material issue for inspection from inspection lot

    Hello friends,
    My sample size is fixed i.e.75 gm for all  raw material quality testing. I have defined sampling procedure with sampling type "fixed sample". I want that this amount should be decreased from total lot quantity when i am posting it to unrestricted use. i.e. for 10 kg inspection lot quantity, 9.925 kg quantity should be posted .Now, system propose whole quantity for stock transfer from quality to unrestricted after usage decision.
    Waiting for reply!
    Thanks in advance!!

    Dear Kiran
    1)  System doesnot take decimal in samples. if your basic unit is KG and you procure 10kg material system will consider sample amount as 1 kg. it will not take 0.075kg as the sample.
    2) Other option is make the procurement in GMs but that  will be difficult for purchaser to handle
    3) or esle make use of this exit and do the posting based on that
    QEVA0009 - UD: Predefinition of quantity to be posted to sample stock 
    This will help
    Regards
    Gajesh

  • Inspection of First Lot

    For New Product there will be quality check for first lot, and if its OK then there will not be any quality check for next lots.
    How to map this?
    thanks
    ashish

    dear friend,
    you need to post your question in Quality Management (QM) forum
    regards,

  • Inprocess inspection & 04 Inspection

    Gurus,
    When i am working with both 03 & 04,can i make GR for production order and take the material stock skipping 04 inspection?

    When i am working with both 03 & 04,can i make GR for production order and take the material stock skipping 04 inspection?
    Yes you can skip 04 inspection also.Also you can deactivate post to inspection for 04 inspection type.
    But this is strange that you have activated 03 & 04 but still you want to skip the same.
    Also remember you can use DMR in 04 also & skip the lot.
    You can take mass UD in QA10.
    Also you can use QA41 for scheduling.
    Regards
    Sujit

  • Inprocess inspection reassigning inspection plan

    Hi,
    I generated an inprocess inspection through 03 inspection type. But inspection characteristics where not there in the routing. Later I created inspection characteristics in routing.
    When I tried to assign this task list by resetting sample calculation T Code- QAC3, it is saying confirmation already done.
    Could anyone tell me how can I reset sample calculation and re assign my newly created routing.
    I want to create an inspection lot with MIC's which I updated later or after confirmation.
    I request anyone to help me.

    Hi,
    Follow the below any case for soln.
    Case 1:
    Go to CO02 (Production order change mode) enter order number
    In order over view screen go to Function -> Inspection lot -> Delete and create and save the order. Now system will create the new inspection lot with new spec.
    Case 2:
    Go to Result screen for existing inspection lot click add characteristics icon add character one by one and do the result recording .
    check and revert back.
    Regards,
    S.Babusingh

  • Set up Calibration Inspection in Inspection Interface

    Hello,
    I’m currently designing an inspection interface “front panel” for a program that detects faults in caps. I’ve been having a look at some of the features that are offered in the interface and I was wondering if there is a way I can perform an edit calibration in the inspection interface. Thanks for any response.

    Actually, the Calibration step in VBAI allows you to dynamically relearn calibrations based on previous points. The simple calibration and point distance calibrations allow you to use previous points to update the calibration. On the second tab of the calibration step, check the relearn option. All calibration types allow you to dynamically adjust the calibration origin/angle based on previous points using the same relearn flag in the calibration step.
    If you want to permantely update the calibration, you can check the "Save Image Calibration to File" option on the first tab of the calibration step.
    Hope this helps,
    Brad

  • Single Check lot two house banks

    Hi All
    We have a requirement where we need to use the same check lot for two house banks.
    For example, check number 102 is printed from house bank 1.
    And i am printign next check from house bank 2, in that case it should generated check number 103
    How can i accomplish this task.
    Any inputs will be rewarded
    Thanks
    Rajesh

    Hi
    Your requirement cannot be met, I suppose.  Cheque lots are created per house bank, account ID and company code.  System only keeps track of the cheque lot numbers (say 001-100).  While creating a cheque lot of another house bank, you can use the same range.  System interprets these as two separate cheque lots.  There is no other identifying criteria for the system to sense from the cheque stationery to distinquish between different banks.  It is for the users to preserve a cheque lot separate for each house bank.  If you use the same cheque lot also, system will keep the track of the cheque number with respect to a particular house bank only.  What I mean to say, if you use the same cheque lot for two house banks, once you print the cheque from one house bank, it reduces that cheque number from the range no matter you are printing it from one house bank or another.

  • H323 inspect in a single class with match criteria

    Hi, I trying to apply this to make sure only inspect h323 traffic in a single host (that's a Video Conference host), but don't works. Only works when I applied the inspect in the inspection_default class.
    Here is the config:
    access-list 100 extended permit ip host x.x.x.x any
    access-list 100 extended permit ip any host x.x.x.x
    class-map h223_VC
    match access-list 100
    policy-map global_policy
    class inspection_default
      inspect dns preset_dns_map
      inspect ftp
      inspect ip-options
      inspect rsh
      inspect rtsp
      inspect skinny 
      inspect esmtp
      inspect sqlnet
      inspect sunrpc
      inspect tftp
      inspect sip 
      inspect xdmcp
      inspect pptp
      inspect icmp
      inspect netbios
      inspect icmp error
    class h223_VC
      inspect h323 h225
    It´s possible? or is something wrong?
    Thanks a lot for your help

    Hi,
    When you have it in the global policy you only H323 H225 or you also have H323 ras?
    What do you see if you run this commands?
    packet-tracer input tcp 1025 1720
    sho service-policy flow tcp host host  eq 1720
    How do you test it?
    Luis Silva
    "If you need PDI (Planning, Design, Implement) assistance feel free to reach"
    http://www.cisco.com/web/partners/tools/pdihd.html

  • Inspection Lot Creation after GR

    Dear PP/QM Masters,
    I have question regarding inspection lot creation after goods receipt.
    There will be GR once at the end of the shift with batch number. As batch generated during shift will be different, there will be multiple GR entry. But for every material only one result recording per shift is required and not for all batches generated. So, how to avoid creation of so many inspection lot? Automatic Inspection lot creation is required hence no question of manual creation of inspection lot.
    I checked function module ‘QAPP_CUST_IP_CREATE’ for inspection point functionality but its description “You can use the available function module to generate inspection points for the inspection during production already when the inspection lot is created.” Can I use function module ‘QAPP_CUST_IP_CREATE’ for restricting creation of inspection lot after GR?
    Request all Masters to help me in solving this.
    Thanks and regards,
    Devang

    Dear All,
    First of all thanks a lot for your response.
    I checked ‘Control Inspection Lot’ setting but even that can not solve my problem as in our case though GR with confirmation will be once in a shift (though in system shift is not defined) but batches will be different and hence material document will be separate. And requirement is to have single inspection lot per shift even if batches and material documents are separate.
    One option is to have multiple line items for GR in MB31 or MIGO or in COR6N. But all this transaction allows only one line item for GR against process order. So, can you suggest any function module or option to have multiple line items for GR.
    Thanks and regards,
    Devang

Maybe you are looking for

  • Lock screen and other app stuck on zoomed mode

    I noticed that my lock screen is stuck on zoomed mode. When I'm in my home screen it's in standard view. Also I'm having the same issue with my apps. Apps like Pinterest, Tumblr, Swarm, Twitter looks fine but other apps like Facebook and Instagram ar

  • IPod touch no longer 'compatible' with dock

    Hi all, I have a Kitsound Boomdock iPod dock. My 3rd generation iPod touch is apparently no longer compatible with this devices. Or no longer supports it. Sometimes it gives an error message along those lines and sometimes doesn't bother. I know the

  • How can i email a document from numbers?

    Im trying to e mail a document I created in numbers, when I go to mail to pdf. doest go thru

  • Workflow Portlet in other languages

    Has anyone managed to get the default Workflow Portlet working for languages such as Chinese. The current symptoms are: (1) When using default portlet and the Chinese character in the subject is unrecognizable. (2) When clicking the subject to show t

  • Can Airport Express n join a Linksys  wireless network ?

    If I already am able to connect to a g airport express, is there anything else that would be keeping me from getting a n unit to connect? I have a Linksys Wireless-N broadband router. I was able to start and go through the initial setup of adding two