GR from Maintenance Order
Hi All, Please help in the below issue,
there's a spare part material valuated with split valuation as follows:
Defected avg price 10/EA
Used avg price 20/EA
New avg price 30/EA
From PM module, one EA from defected valuation type issued and the accounting doc shows value of 10 (correct), after finishing maintenance work on this part it will receipt in the same sloc but with valuation type Used,
the issue is when GR from order the accounting doc shows value of 20 (debit stock with 20) the current price in master data while the actual cost from maintenance order is 200 how to make the GR valuated with actual cost from maintenance order which is 200.
Your help will be highly appreciated, Thanks in advance.
Greetings Hossam,
Looks like what you are trying to achieve is to implement the Refurbishment Order process.
In the standard system, you can use the Order Type configured as a refurbishment order to settle the actual cost to your stock value.
Say that you have the material master created with split valuation, as you mentioned.
Defective avg price 10/EA
Refurbed avg price 20/EA
New avg price 30/EA
Say you have 1 EA of Defective material at €10 , your refurbishment Order actual cost total is €15 , your material price is Moving Average, and you have no other stock. You would then issue the Defective part to the order with mvt type 261 (Order total cost goes up to €25). Then you would receive the 1 EA Refurbed part from the refurbishment Work Order with movement type 101. (Order total cost drops to €5). You would subsequently settle the Work Order total to the stock of the Refurbed valuation, raising the moving price from €20 / EA to €25 / EA.
Please refer to the documents on Refurbishment process, search the SCN, and feel free to ask any specific questions.
Refurbishment Order - Customer Service (CS) - SAP Library
Creating a Refurbishment Order - Customer Service (CS) - SAP Library
Similar Messages
-
Goods movement from Maintenance order
Hi Experts
I have the following scenario,
I have a component ( with Material master) in the maintenance order and i use Item category N to trigger a Purchase requisition. The Pur Req is converted to Purchase Order and then the GR is done directly to the order .
Now i have not used this Component and want to make a goods movement to place it in stock. So the requirement is to move the material from Maintenance Order to the Storage location .
How and which movement type can i use to do this ?
Please help
KKHi,
Click the below link for more information
http://sap-img.com/plant/in-pm-how-to-return-material-backflushed.htm
regards,
Venkatesan Anandan -
Automatic Reservation from Maintenance Order
Hi,
I have a problem. Generally from Maintenance Order type PM01 under Order Category 30, when we give some materials requirement, SAP automatically generate reservation for those materials and take the GL as Consumable Item.
But in my case, that GL has to be changed depending on what perpose we are using the material. But Manual reservation is not allowed for the order category 30 and no GL can be changed for automatic reservation.
Can anybody suggest any way-out so that we can give our desired GL No. for the reservation for Maintenance order (say Order type PM01 under category 30 which is SAP internal).
Thanks in advance,
SatadalThanks for your answer. Actually I found that place, it is determined from OBYC transaction with a combination of GBB (A/c Key) and VBR (A/c Modifier).
But for same movement type261, I need manual G/L allocation at runtime. i.e. depending upon case to case, the G/Ls will be different. So, different movement type perhaps would not serve the purpose.
Basically I need to over-write the G/L for automatic reservation created from PM in the PM01 order type with category 30 where manual reservation is not allowed.
Can you suggest any way out so that I can actually over-write the G/L for automatic reservation- through SPRO or some kind of development...
Thanks
Satadal -
PR Delivery Date Issue from Maintenance Order
Hi All,
We have a scenario -
- Create Maintaince Order (IW31)/Assign Basic Start Date and Basic Finish Date.
- Auto PR Generated from Maintenance Order but the delivery date in PR is Basic Finish Date.
My client's requirement is Auto PR will pick up the Delivery date as Basic Start Date. What settings do we need to Do for this scenario and on wht basis the delivery date is decided in PR wrt to Maintenance Order?
Regards
PankajHi SAP Gurus,
Any updates how to solve this issue?
Regards
Pankaj -
Is possible create PO from maintenance order?
From IW31 I can create a PR, and then PO in reference to PR.
Is possible create directly PO from maintenance order? how?
thx for attentionHi Paolo,
It is not possible to create a purchase order directly from a maintenance work order. The standard SAP process is as follows:
Create a component for external procurement on the work order - this results in the creation of a purchase requisition. The purchase requisition is then processed by the purchasing officer - the source of supply is assigned and the purchase requisition is then converted into a purchase order. If the component referenced a material master, the material may be specified on a contract/source list. In this case, the vendor and the price can be automatically deteremined during PO creation. If the material isn't on contract however, the purchasing officer may need to manually assign the correct vendor details and the price.
The assumption is that the maintenance personnel are not purchasing experts - they just place a request for the product, and manual intervention is required from the appropriate purchasing expert within the company before this request can be sent to an external vendor.
Regards,
Monika -
Material Gate Pass from Maintenance order?
Dear SAPIENTS,
Is there any system to issue returnable material gate pass from maintenance order in case of sending material outside for repairing. I want to keep track of material through maintenance order i.e the reason.
Regards,Hi,
There is no STD SAP Functionality Available but You can Develope the Customising Smart Form to get this fuctionality.
Also You can get The information about the Outgoing Material in TC MB51 if your making The Reservation Of that Material agianst the Vendor,while sending that material outside.
Regards,
Rakesh -
Printing Shop Papers from Maintenance Order Urgent !!!
Hi All,
I am in need of Printing Shop papers from Maintenance order , i know that the configuration of this thing is done through SPRO
Plant Maintenance and customer service ->
Maintenance and Service Processing -> Maintenance and Service Orders -> Print Control -> Define Shop Papers, Forms and Output Programs
, but i want that when we give Print command through Maintenance order a smartfrom should trigger which i have developmed.
My problem is that i am not able to configure the Print control for SMARTFORMS.
What to do , Please suggest.
Regards,
Rachit KhannaAmol,
Standard config doesnt provide the functionality to set the default selection dependant on PLANT. You will have to get the help of developer to do an implicit enhancement (Only If you are in ECC 6.0) to accomplish the same.
Reagrds
Narasimhan -
Plan Component from Maintenance Order
Hi,
When i plan a component from maintenance order I use item category N with key MATE.
But i woul plan component for purchase requisition on project stock( account assign Q) directly from Maintenance Order. Allow I insert item category N in the field ad near insert the value 2 for project stock.
When i release the order the system blank the field and i don't create a Purchase requisition with project stock but i purchase requisition with account assignement F
Because the system put away the field blank?, I must done another customizing, or i must utilize another KEY?
Thank youHi,
When you make Item cat as N it means they are non stock .
For non stock & with F order as account assignment system creates PR.
if you want this componenet as Project stock them there are following ways
1.Make PR with item cat as Q & make PR on WBS or PS System.
System will post direct entries.
2.Make normal stock PR then issue against WBS by order
Settle the maintenance order to WBS element
3.Get material as normal stock material issue with 221 mvt against WBS or PS system.
Systme will make enties to WBS.
Ramesh -
Plan material from Maintenance Order
How i can plan from Maintenance order a material with accaunt category Q(special stock) for create a RDA
Thank youHi,
I already have plan component from maintenance order but when i insert item category N for create a Purchase requisition and insert item category 2 for stock project Q the system blank the field and Don't create a purchase requisition with account assignment Q.
Because the system put away the field blank?
There are any way for create purchase requisition with account category Q?
The BAPI that you suggest me can avoid this problem?
Thank you. -
Catalog procurement from Maintenance Order
Hi Gurus,
My client is implementing Punchout Catalog from SAP ECC 6.0. we are not into SRM server. I made the settings in Web services ID and Description and i am able to do shopping from Vendors URl and return back to SAP ECC.
Now 1) they want to populate the Vendor name automatically into SAP, which is not getting carried.
2) I want to link the Punchout Catalog to Work order scenario also. For that i need to define the Order type and Catalog in the Link "Interface for Procurement Using Catalog" under the node Plant Maintenance and Customer service which i am not getting.
Please advice me what needs to be done or what settings or any BADI needs to be activated on this issue.
Thanks for your response in advance,
I am not sure is this the right place to post this thread. Please advice.
Thanks,
Saakithyan.Hi,
I already have plan component from maintenance order but when i insert item category N for create a Purchase requisition and insert item category 2 for stock project Q the system blank the field and Don't create a purchase requisition with account assignment Q.
Because the system put away the field blank?
There are any way for create purchase requisition with account category Q?
The BAPI that you suggest me can avoid this problem?
Thank you. -
PR from Maintenance Order - Material Purchase
Dear Experts,
Likewise we can generate Servide PR against Maintenance Order, also it picks service data frrom Maintenance Order....Similarly can we generate PR for Material Purchase against Order also it should pick Material from component that we have enetered in Maintenance Order ..is it possible??
Thanks
DMHi
Deletion of PR from Maintenance Order is not possible because the PR is created automatically
This PR will get deleted automatically when you cancel//teco/complete the order
Otherway around is you can always block the PRs
Regards
Kartik -
Deletetion of service PR from maintenance order
Hi Experts ,
Is it possible to delete service PR from maintenance order. If it is created from order due to some problem I want to delete it ,so is it possible ?
With best regards,
AVI DDS.Hi
Deletion of PR from Maintenance Order is not possible because the PR is created automatically
This PR will get deleted automatically when you cancel//teco/complete the order
Otherway around is you can always block the PRs
Regards
Kartik -
Multiple doc type setting for service PR generated from Maintenance order
Hi Gurus,
My client has multiple company code and has different document type for PR and PO as per the company code. For generating the service PR from maintenance order system take the document type of PR defined in the config.
Is it possible to define multiple document type for service PR depend on the company code/ Plant level?
Kindly help.
Regards
DPHi Ravi,
I used the User Exit COZF0001 . Since we can assign only one PR doc type in the config .
I have assigned one PR doc type in configuration which will work for a company code and all their respective plant. So in this case user exit wont do any job for changing the doc type.
You will defined a condition in the User exit saying that if company code /plant which you get it from maintenance order is not same (Config ) then provide the PR doc type which you want to create for respect plant or company code.
I dont have coding right now with me. You need a small coding to be done to create the separate PR doc type in EBAN-BSART
with respect to plant . Check in your configuration at what point of time you are creating the PR either in saving or release of MO. You can take the even to activate the User exit.
Consult your ABAPer they can do in 10 min.
DP -
Authorization control of PR creation from maintenance order
Hi,
I want to control creation of PR through maintenance order (Service as well as material PR) for only some users with the use of authorization object control.PR should not be created for this users.
Can anyone suggest me which authorization object I have to control to acheive the expected result.
Regards,
YogeshThanks Yawar,
Your solution is perfectly works for me. Earlier solutions are also useful the things is you have to first activate the authorization object through SE24,that means change the Check indicator from N (Not checked ) to C (Check )or CN(Check & maintain)
Regards,
Yogesh -
Mass Removal of component from Maintenance Order Component list
Hi Gurus,
I had a long list of material which have been set with deletion flag. With this list, I had remove them from BOM using CS20. Does anyone knows how to remove a component from the maintenance order component list based on that material had set deletion flag in material master & that GI had not been done? Appreciate your help.
Best regards,
David TanI guess we dont have std function to do this..
I will suggest to take help of an abaper & create a code to find material & delete from orders.
Regards
Maybe you are looking for
-
Creation of multiple nodes in target IDOC as per field from sender file
Hi SapAll. here i have got a requirement in an File To Idoc Interface. the requirement is there will be one field under sender file which will be repeating for multiple records(ItemCount),here pi need to check the value of this field for each recor
-
Portal Password Reset Application In webdynpro for ABAP
Hello Friends, I am new to WDA . I want to create a Password Reset application in WDA like this [http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/f0c09b9d-52e0-2d10-3981-86bfa8e19dc3?quicklink=index&overridelayout=true] Can someone
-
Sir, I once again facing problem of HTTP Server it again not started the file contain the following entries where didn't show any duplicate entries but HTTP server couldn't start please help me. Oracle Appachae file contain following entries # Advanc
-
SHOULD I UPGRADE FROM 10.6.8?
-
Wiki - or even better a script - to create a PKGbuild from a PPA
i would like to test Conky manager, it is available for Ubuntu, and still not in AUR. I said to myself, lets contribute with my first PKGbuild, but, I did not found a guide at Google, not at ARCH wiki too, at least not easily - perhaps it does exist