GR Processing time and QI Time

Hi Experts,
Need some clarification on GRPT and QI time in a manufacturing process.
1)Is it a good practice to include QI time in GRPT ?
2) If yes, then what are the settings required for the same ?
3) What will be the stock availability date ? Will it be -- Manufacturing Order completion Date + GRPT + QI Time ?
Please help.

GRPT in QM view is by definition "Number of workdays required after receiving the material for inspection and placement into storage". GRPT maintained in QM view will also populated in Purchasing view.
So say GRPT is maintained as 10 days and STO is created , delivery date will be today+10 days.
Now Avg. insp. duration at inspection type level, this field is used to determine start and end date of inspection lot.
So normally GRPT should include inspection duration .
I am not sure setting required other then maintain in material master.
Stock availability date should be today's + GRPT.

Similar Messages

  • LTP run ignoring GR processing time and Lead time

    Hi,
    I am trying to find out way to create a planning scenario (MS31) and run LTP (MS01) which will ignore the GR processing times and Lead times from Material master.
    I would like to use MCEC report (after running MS70 valuation) which will show the values only in my new fiscal year - for budgeting purposes. Currently because of the long GR processing times and Lead times in material master (sometimes even 60 days) - some planned values show in MCEC report 2 or 3 months before the new fiscal year and the last two periods of new fiscla year are empty.
    I would be grateful if you could help me with getting rid of these additional Times and adjusting the periods only for Report purpose. The desired final output should be that S012 table for this specific planning scenario has the values only in periods of the Fiscal year - without hitting previous Fiscal year last periods (due to lead /GR processing times).
    Thank you,
    Karol
    Edited by: Karol on Oct 12, 2010 2:50 PM

    Dear,
    Master data is taken from normal MRP views. there is no other setting is available. you can create a different matrerial number for LTP planning.
    Raj

  • How to know the process chain start time and end time

    Hi Experts,
                   How to know the process chain start time  and end time .
    Thanks in advance
    Regards
    Gutti
    Edited by: guttireddy on Feb 23, 2012 11:30 PM

    Hi Reddy,
    You may find the run time of a PC using below steps.
    1. Call SE38 > /SSA/BWT > Execute  > Enter your PC , choose the date and time > Execute. Here Run-time of a PC is displayed. (or)
    2. Call RSPC1 > Enter your PC > Execute > Goto Log view > Right click on the start Variant > Displaying Messages > Note down the start time in Chain Tab. Now Right click on the last Process type of the PC > Displaying Messages > Note down the End time in Chain Tab. The Difference b/w start time and end time gives the Run-time of your PC.
    Hope this helps.
    Regards
    Sai

  • HT4972 I have an Iphone 4 and each time I try to update to iOS 7.0.6 I receive an error message after attempting the update.  I have gone through the update process about 3 different times, and each time I get the error message after about 30 minutes.

    I have an IPhone 4 and each time I try to update to iOS 7.0.6 I receive an error message.  I have gone through te update process about 3 times and each time I get message saying there was an error and it was unable to update. 

    What is the error message, and the error number specifically? You can look it up here: http://support.apple.com/kb/TS3694

  • GR Processing Time and Delivery Time not coming in CS11 Output screen

    Hi,
    I am executing a BOM explosion report using CS11.
    In the CS11 report output I added columns for GR Time and Delivery Time using change layout option.
    After changing layout when I see the details in columns of GR Time and Delivery Time all the values are ZERO '0' for all the components in BOM.
    I checked the material master for component items and find that in MRP view values are maintained in GR Time and Planned Delivery Time field which are also seen in MARC table.
    I do not know from where CS11 is fetching the values for display of GR Time and Del. Time.
    How can we populate the values in CS11 report out put for GR Time and Delivery Time? Am I missing some master data maintenance apart from Material Master?
    Regards...

    Hi Prasobh,
    I looked at the note 101262 and it seems that it is suggesting us to create a new Z report by copying existing report and then modify the WRITE Bloack in new report to display GR Time and Del. Time.
    Is my understanding correct? If yes can you share with me the steps in some more details then mentioned in note 101262 that I need to follow for addressing this requirement.
    If no can you suggest any solution that you know by which it is possible to include GR Time and Del. Time in CS11 output without Z development.
    Regards,

  • Lead time and Route time estimation used for deliveries

    Dear Friends,
    Can anybadyu let us know how to estimate lead time and route times for deliveries, and what is the exact meaning of the these two with differences
    if possible can you please give me the configuration steps, as i know at this movement route times are maintained in the route and lead times are maintained in the material master MRP view.
    what was these field impacts in the delivery..
    requesting your view as soon as possible
    Thanks
    raju.

    Hi there,
    Lead time is the time in which the material will be available. It is called Replenishment lead time RLT. It is maintained in MRP view of material master. RLT can either be inhouse processing time for inhouse manufactured goods or order time + goods receipt processing time for externally procured goods.
    Whereas time mentioned in route is used to calculate transit time during delivery scheduling. That is the time taken for the goods to reach customer from shipping point.
    Both the times are imp for delivery scheduling.
    When the customer places an order, if the material is not available, then the system will take end of RLT as material availability date. From that date, it will carry forward scheduling & propose a new confirmed delivery date.
    Regards,
    Sivanand

  • I created a form with Single Choice fields, 4 days with times listed. But, I want the user to only be able to choose one time, and the time chosen to be unavailable for other users. How do I do this?

    I created a form with Single Choice fields, 4 days with times listed. But, I want the user to only be able to choose one time, and the time chosen to be unavailable for other users. How do I do this? I have 4 blocks of Single Choice fields in order for the summary page to give me each day in the final report. But, I need the user to be able to make a selection of any day and time and that apointment to no longer be available to future users when they log in. Plus, when the user clicks on the time, they are unable to change their mind and choose another time. Here's the link if you want to see what I'm talking about: 2015-2016 Workload Apportionment Review

    I'm afraid not.    It's not rocket science but you need to do some coding. 
    You'll need to find a script (php) and save it to your local site folder.  Then reference the script in your form's action attribute like so.
         <form action="path/form-to-email-script.php" >
    The input fields in your HTML form need to exactly match the script variables. 
    I'm  assuming you're hosted on a Linux server which uses PHP code.  Linux servers are also case sensitive, so upper case names are not the same as lower case names.  It's usually best to use all lower case names in your form and script to avoid confusion.
    Related Links:
    Formm@ailer PHP from DB Masters
    http://dbmasters.net/index.php?id=4
    Tectite
    http://www.tectite.com/formmailpage.php
    If this is all a bit beyond your skill set, look at:
    Wufoo.com (on-line form service)
    http://wufoo.com/
    Nancy O.

  • ESS Working Time - Start Time  and End Time in Weekly View

    Hello,
    I'm having a problem with the business package ESS - functionality Working Time (cat2).
    I need that information to Start Time and End Time appear in the Weekly View of the portal.
    In Daily View that information are already visible, but In Weekly View that information does not appear.
    Does anyone have any suggestions?
    Thank you very much your attention.
    Att,
    Jair de Oliveira Junior

    Hi Bala
    You can have clock in and clock out in a weekly view.
    you have to change the data entry profile settings.
    In general settings tab in data entry profile click the with clock times button and maintain the Period type to 02 in time settings tab.
    And you can view the weekly entry in clock in and clock out.
    Ravee
    +91.99206.33669

  • I've tried to d/l itunes 3 times and every time I get this message: .....Downloads\iTunesSetup.exe.part could not be saved, because the source file could not be read.  I have no idea what I'm doing. Does anyone have any ideas to help? Cheers.

    I've tried to d/l itunes 3 times and every time I get this message: .....Downloads\iTunesSetup.exe.part could not be saved, because the source file could not be read.  I have no idea what I'm doing. Does anyone have any ideas to help? Cheers.

    I've tried to d/l itunes 3 times and every time I get this message: .....Downloads\iTunesSetup.exe.part could not be saved, because the source file could not be read.  I have no idea what I'm doing. Does anyone have any ideas to help? Cheers.

  • If I have manually set "Start Time" and "Stop Time" for songs, and my hard drive is backed up in Time Machine, when files/songs are transferred on new hard drive, will my "Start Time" "Stop Time" options be there?

    My Macbook Pro will be going in for reimaging and my hard drive will be wiped, I want to know if all my iTunes preferences will be copied if I have backed them up on Time Machine. Specifically, if I have set certain "Start Time" and "Stop Time" for my songs, and I copy my iTunes library, will these "Start Time" and "Stop Time" options remain or will I have to manually set them one by one once again? I need a reply ASAP! Thanks so much!

    As far as I'm aware the start & stop times are stored in the library database, not the media files. If you backup/restore/transfer the whole library then the settings are included. If you create a complete copy of your iTunes folder on another drive you can connect to that copy by holding down option/alt as you start iTunes so you can check that everything is working properly before you send the Macbook away.
    tt2

  • Please help me fix this problem it's driving me crazy. I have tried installing and reinstalling photoshop EXTENDED several time and each time i lunch it ask me for the serial number in which i entered it once entered nothing happens

    Please help me fix this problem it's driving me crazy. I have tried installing and reinstalling photoshop EXTENDED several time and each time i lunch it ask me for the serial number in which i entered it once entered nothing happens

    Hi Glenn,
    Kindly try out the steps mentioned in the link below and see if you are able to serialize your software.
    Sign in, activation, or connection errors | CS5.5 and later, Acrobat DC
    Try Solution 2: Clean up cached user login information.
    Please share the results after performing the steps.
    Thanks,
    Atul Saini

  • How to track the login time and logout times of clients

    hai
    please give me the solution
    suppose there are 5 systems connected in LAN.
    how to track the login time and logout times of clients
    for a given time(may be one day or 1 hour) using any programming language.
    please give me the solution

    When the client logs in you write the client's ID and the current time to a database. Likewise when the client logs out. Assuming of course that you have a program that knows when those events occur.

  • Usage dependency is created at Build time and installation time

    Hi,
    The infrastructure guys have selected the usage dependency as Build time and Installation time, while creating software components.
    "Y" SWC is created as depedency for "X" software component.
    In SLD(software catalog),  we are able to view the Y component as dependency in X component(at both build time and installation time).  In usage dependency we are able to view Y component but when we click Y component in usage dependecy we are also able to view X component. Is there any problem with this ?
    There is another issue. we are able to view basis object(in IR) in Y component but not in X component.  Actually as per the above configuration basis object in IR should appear in X component.
    Please refer to another forum which may give you some more idea.("BPM - Message interfaces of one component are not appearing in another comp") pasted on 17 Nov,2006.
    Please could you provide us the inputs.
    Thanks,
    Ramesh

    hi,
    as you see per my weblog try choosing Installation Time
    /people/michal.krawczyk2/blog/2005/08/26/xi-are-you-independentfrom-your-dependencies
    more about it on:
    http://help.sap.com/saphelp_nw04s/helpdata/en/d4/8d784289b4de54e10000000a155106/content.htm
    Regards,
    michal
    <a href="/people/michal.krawczyk2/blog/2005/06/28/xipi-faq-frequently-asked-questions"><b>XI / PI FAQ - Frequently Asked Questions</b></a>

  • In SharePoint Calendar lists, fields [Start Time] and [End Time] do not exist at the Site Column level.

    <header style="box-sizing:border-box;color:#777777;line-height:1;font-size:13px;padding-right:46px;margin-bottom:3px;font-family:'Helvetica Neue', arial, sans-serif;">
    </header>
    I'm doing SP app development and have the following problem.
    I need to check Start time and End Time in SharePoint Calendar using CAML query and then add a new event to Calendar list using the Start time and End Time that user has entered in 2 datapickers
    in the form.
    function AddCalendarListItems() {
    var SD = document.getElementById("datepicker1").value;
    var SThh = document.getElementById("St1").value;
    var STmm = document.getElementById("St2").value;
    var ED = document.getElementById("datepicker2").value;
    var EThh = document.getElementById("Et1").value;
    var ETmm = document.getElementById("Et2").value;
    var T = document.getElementById("Title").value;
    var S1 = SThh;
    SD = SD.slice(6, 10) + "-" + SD.slice(0, 2) + "-" + SD.slice(3, 5) + "T" + SThh + STmm + ":00Z";
    ED = ED.slice(6, 10) + "-" + ED.slice(0, 2) + "-" + ED.slice(3, 5) + "T" + EThh + ETmm + ":00Z";
    //alert("SD= " + SD + " , ED= " + ED);
    var siteUrl = SiteCollurl + "/SharePointApp11";
    var clientContext = new SP.ClientContext(siteUrl);
    var oList = clientContext.get_web().get_lists().getByTitle('Calendar');
    var ListItemCInfo = new SP.ListItemCreationInformation();
    var newEvent = oList.addItem(ListItemCInfo);
    newEvent.set_item("Title", T);
    newEvent.set_item("EventDate", SD);
    newEvent.set_item("EndDate", ED);
    newEvent.update();
    clientContext.executeQueryAsync(Function.createDelegate(this, this.onQueryAddCalendarSucceeded2), Function.createDelegate(this, this.onQueryAddCalendarFailed2));
    function onQueryAddCalendarSucceeded2(sender, args) {
    alert("Success");
    function onQueryAddCalendarFailed2(sender, args) {
    alert('Add new item to the calendar failed. ' + args.get_message() + '\n' + args.get_stackTrace());
    But I receive the following error:
    Add new item to the Calendar failed. Column 'Start time' does not exist. It may have been deleted by another user.
    I've checked and 'Start time' does exist. So it seems in SharePoint Calendar lists, field [Start Time] and [End Time]  exist but do not exist at the Site Column level.
    Please advise.

    Hi Khojasteh,
    Use “EventDate” for Start Time field, and “EndDate” for End Time field. They are the internal name of the two fields, you can check it in the column settings page url like “Field=EndDate”.
    If it isn’t the issue, please debug the code, in which line the error occurs.
    Thanks,
    Qiao
    Forum Support
    Please remember to mark the replies as answers if they help and unmark them if they provide no help. If you have feedback for TechNet Subscriber Support, contact
    [email protected]
    Qiao Wei
    TechNet Community Support

  • In Material Master Screen,functionally what is Safety time and safety time

    In Material Master Screen,functionally what is Safety time and safety time indicator in the MRP Screen.Pls explain its functionality

    Hi,
    The safety time / actual range of coverage ensures that the planned warehouse stock covers the requirements of a defined number of days. It therefore serves as a time float and thus works alongside the safety stock, which acts as quantity float.
    The system simulates bringing the requirements forward by the specified number of days and the planning for the receipts, created for these requirements in the planning run, is also brought forward by this number of days.
    Prerequisites
    ·   You have set the Safety Time indicator in the material master record (MRP 2 View) to define whether the safety time is only to apply to independent requirements or to all requirements.
    ·    In the material master record (MRP 2 View), in the Safety Time/Actual Range of Coverage field, you have entered the number of workdays by which the requirements are to be brought forward.
    ·    If, in addition to this actual range of coverage, you also want to define a different number of workdays in certain periods or a safety time less than one day then, in Customizing for MRP in the activity Define Period Profile for Safety Time/Actual Range of Coverage you can define a period profile and assign it to the material in the material master record.
    Regards,
    Vijay

  • I have put my serial number in several times and each time it is invalid now what?

    I have put my serial number in several times and each time it is invalid now what?

    Serial number in what program?
    Are you sure you have a serial number and not a redemption code?
    Redemption Code http://helpx.adobe.com/x-productkb/global/redemption-code-help.html
    Serial number and activation chat support (non-CC) may help
    http://helpx.adobe.com/x-productkb/global/service1.html

Maybe you are looking for

  • How do i delete an icloud and make a new one

    I need help!!! Can i delete my ICloud account on my daughters I pad mini and make her a new one and still keep mine??

  • How do I restore the entire system from a Time Machine external drive?

    Hello everyone, Up front - I have searched through numerous threads but have not yet been able to solve my problem - even though it is presumably easy for many. So... I had to bring in my late 2009 27" iMac to Apple to replace the hard drive - mine w

  • Re: Remove and check cartridge on right.

    I own an Officejet 7310 All in One. I have received an error that reads "Remove and check cartridge on right". After removing and inspecting the nearly full black cartridge, I could not identify any abnormalities. After reinsertion, the error returns

  • RTP Media Stream with "Third Party SIP Device" always through CUCM

    Hello, i have i quite strage problem on one of my customers locations: we have a cucm 7.1.5(SU4) with the cucm in the datacenter. And we have a small location(branch office) which has a small wan connection to the datacenter (1MBit/s). In this locati

  • Adobe Reader XI - Can't open PDF files

    My mother has Adobe Reader XI installed on her laptop and still can't open PDF files. We've tried uninstalling and installing several different versions and nothing seems to work. Can someone please help? Thank you.