GR qty should not exceed GI qty for an order.

Dear All,
GR for an Prodn order should be restrictected if the Qty exceeds the GI qty done against the order.
Eg.The target qty for a production order is 100 MT.The GI is done for 80 MT(261),the system should allow MB31(101)only upto 80 MT not more than that against the order.
Please suggest how can I map this?
Thanks in advance.
Regards
Ankush

Dear Ankush,
in Std SAP allows Confirmation without GI
Also Allows GR without GI & confirmation
so best option is user exit
Regards
Madhu

Similar Messages

  • Return Order Qty should not exceed Reference Qty

    Hi
    The Qty of Ref Billing document is say 10, Return order is done for eg 8 for first time and for same ref document user enters 5 qty, now the total return order qty is 13, but billing doc qty is 10, where in 3qty is exceeded and system just gives a warning message and allows further. In this case how can we Restrict Return order if Qty it exceeded the reference document qty.
    I have checked the copy control settings, no use. Please through some Light.
    Regards
    Praveen Kumar......

    Hi
    But the problem is, now we have done return sales referring and billing doc qty eg. 10.
    Now again if we do return order referring the same billing document,
    system will allow to do another Return sales for same 10qty
    Is there any where we can control this feature.
    Maintain the copy control settings as suggested by the other friends
    Mainly Pos/Neg field
    While creating the second return order (sales order) referring the already referred billing document system should give some warning message
    Check that message in OVAH
    I feel some warning msg should come which you have to change to error
    Unfortunately i am not in a position to test this
    Still if the problem is not solved you need to go for suitable userexit
    Normally when you create Returns sales order with reference billing doc in that sales order if you add a new line item which was originally not there in billing doc system will very cooly accept it (not even warning message)
    This also has to controlled thro userexit ( this part is not related to your issue but i said this as an information)
    Regards
    Raja

  • Delivery qty should not exceede Sales order qty

    Dera Friends,
    System is allowing to create delivery for a higher quantity than in sales order. For eg. The sales order is created for 10 pieces and delivery is created for 20 pieces.
    We want to have a check on this. Pls guide where we can configure this. Our requiremnt is that Delivery qty should not exceede the sales order qty.
    points assured
    Krishna>C

    hi,
    Go to VTLA, select your order type and delivery type and select item category and see whether you have maintained the following:-
    Order requirements:::::101
    Item Data:::::::::::::::::::101
    Updata Document flow:::X
    Pos./neg.quantity::::::::::+

  • GRPO Qty should not exceed +/- 10% of Purchase Order

    Hi All ,
    Need Store procedure for GRPO QTY should not deviates +/-10% of the Puchase Order Qty.
    Ashish Gupte

    hI Ashish,
    You can use OPOR , POR1 , OPDN AND PDN1 TABLES AND LINK THEM WITH
    DOCENTRY , BASEREF , AND LINENUM FIELDS WITH THE CONDITION OF QTY DEVIATION.
    Let me know if this works.
    Thanks
    Malhaar

  • PO qty Should not increase PR Qty

    Hi
    Here the requirement is,
    PO qty Should not increase PR Qty
    If buyer change / increase the PO qty then the system should give error msg.
    It should not allow.
    How to do this?
    Vijay

    Hi,
    Make following message as Error in +SPRO > MM > Purchasing > Environment Data > Define Attributes of System Messages > System messages
    06                   589   Materials/services of purchase requisition & & already ordered in full

  • Delivery Qty. should not Exceed the PO Qty.

    Hi All
    My requirement is that just like Sales Order, incase of STO the delivery Quantity (delivery creayed through VL04) should not exceed the Balance Quantity PO quantity (where PO Quantity less Already delivered Qty = Balance Qty). Is there any standard customisation or Exit is available for this??
    Regards
    AA

    Dear AA
    I have searched in MM forum and found this thread which is relevant to your requirement
    Forum post in ERP - Logistics Materials Management (MM): STO - How to control Over delivery ?
    STO - How to control Over delivery ?
    Hope this helps you
    SAP has a logic for not controlling the over delivery in STO  in standard (unlike sales order  to delivery we have the controls in Zero VLP or 0VLP for this) because STO happens between plants of a same company code or different company codes .The movement of stocks are between plants But in a normal sales the delivery happens to a customer who is actually a third person and hence a user can misuse the delivery quantity
    A plant and an external customer cannot be treated as same
    Hence in SAP standards over delivery is not controlled in standard settings like item category etc
    Regards
    Raja

  • Order QTY should not exceed than reference document

    Dear Gurus,
    I am creating a Release order with reference to Contract. Ex. order qty is 100 in Contract, while doing sale order it should not allow to change the order qty more than 100 [not more than Ref. document qty]. I have tried in VTAA, completion rule.. but it still allows.
    Pls thro some light on this.
    Regards
    Praveen...

    Hi Sreebha,
    DO NOT COPY PASTE OTHERS STATEMENT
    Check the below link from where it is copied:[Lock Quotation Changes when Sales Order is already Created;
    Regards,
    Amitesh Anand

  • Invoice qty and value should not exceed po qty/value

    Is there a way where we can make tolerance zero in case of invoicing i.e i want to restrict the variance between PO qty/value and Invoicing qty/value.
    Gurus help me...
    Regards,
    Satyendra

    the problem still persists.
    When i make message 087 as error and try to post invoice for greater qty (than po), after GR, it allows me giving warning message (081) that Invoice qty is greater than GR qty. Because 087-error message will be effective for POs with out GR.
    So can we have a check for POs whose GR is done for PO qty, but doesnt allow me to post invoice greater than PO qty
    Regards,
    Satyendra

  • PO Qty should not Amended after GR

    Hi friends
    i have to do PO Qty should not Amended after GR finished . IS there any BADI Enhancements points please let me know i guess
    this is BADI ME_PO_PRICING_CUST  i have tried it but it is not working for me or i missing some thing .please give suggestions what i need to do .And  the same time  there is also  required for particular user it should be allow to change
    REgards
    Rk

    Hi when GR is done and it is allowing to change it comes under PO amendment
    ask functional if amendment can be stopped
    regards
    m.a

  • Delivery block at item level in sales order,Qty should not be confirmed

    Dear all
    We have a below requirment
    We will have multiple line items in sales order and put delivery block at item level.If delivery block is put at item level it should not confirm the qty and pass on to MRP
    But if we put at header level delivery block,schedule line qty at item level are not getting confirmed.So requirements are not passed to MRP-This is correct .Working as per SAP standard configuration.
    Can you tell how to activate the same for item level delivery block.if same delivery block is put at item level,it is confirming the quantity.But we don't want confirmation of qty to happen.
    Can you give us solution
    Regards
    Sudha

    We had similar issue , there will be confirmed quantity but the requirement will not transfer to MRP , We used Item category configuration ( Copied new item category assignment and it should behave as Inquiry item category)
    Check OVZ7 T code for customizing the u201CDelivery Blocku201D in your sales document to block Confirmation block
    Check the  customizing OVZ8: if the flag  Transfer of Requirement
    Transfer of requirements of the requirement class should be ON.
    In the sales order the requirement type is determined by the combination sales order item + MRP type.
    Refer SAP Help URL below
    [Setting a Delivery Block |http://help.sap.com/saphelp_470/helpdata/en/93/744bf2546011d1a7020000e829fd11/content.htm]

  • Delivery Qty should not cross order Qty

    Hi friends,
    When I am doing delivery for the qty more than the order qty, it is accepting. My scenario is delivery should not allow the qty more than the ordered qty. Delivery should be done only for the ordered qty.         I think it is possible. So can anyone tell me the settings for this?
    Rama rao

    Dear Arul,
    In your sales order, check which is the item category that is getting triggered.
    Can find it in in the item level , near to Customer Material Numb field.
    or double click on the item.
    you can see the item category in the TOP near to your material and sales document item.
    Now go to vov7 and select this item category and change the Completion Rule to B as advised.
    Check and revert back.
    Thanks & Regards,
    Hegal K Charles

  • I want to raise Credit note but Qty should not be reversed

    Hi All,
    i am raise A/R invoice qty 10 total amount 10,000, i want to raise a A/R Credit note for the same invoice but only deduct amount 1000 where the qty should not be reversed.
    Thanks & regards,
    Mobin

    Mobin,
    Instead of copying the invoice to a credit note, you can create a service type credit note in itself so you don't need to choose any items, just the amount.
    Regards,
    Nat

  • Delivery quantity should not exceed order quantity

    Hi,
    in delivery delivery quantity should not exceed order quantity what should i do
    please let me now what should i do it is urgent
    Thanks in advance
    Srinivas

    Hi,
    You may consider an enhancement with a user exit:FORM USEREXIT_SAVE_DOCUMENT_PREPARE in include MV50AFZ1.
    Here you can put additional conditions to check the delivery qty and also can put a message for the user to correct the delivery qty in case he has manully increased it.
    Please reward points if this helps.
    Hemant

  • PO values should not exceed PR values

    Hello
    PR value should proposed while creation of PO wr to PR, whenever Info records
    are not mainatained and PO values should not exceed the defined limit
    Regards
    sapman

    Hi,
    You cann't restrict the PO value based on PR value, because the PO value is taken from Info record, Previous PO or Manual entry.
    But PR value is from Material master or Manual entry.
    Moreover PO value also includes other conditions like discounts/freight/duties etc on the net value so there is no fixed value for PO net price.
    But PR will be always a fixed price means either from Material master or Manual entry based on the cost of the material.
    So SAP has provided only qty restiction from PR to PO ( Message no. 06076)
    but not for the PR value to PO value.
    rgds
    Chidanand

  • PO Value should not exceed PR value ~ Control required

    Hi All,
    I wanted to make PR number has mandatory for PO, i did it with the help of customising settings with doc type.
    Now I want to make PO Value should not exceeds the PR Value.
    How to make it in settings. or Is thr ant way available to make it (like any User exit, Enancement).
    Also can any one tell how to control(make with Doc type).Like only for direct PO, or only indirect PO.
    Can anyone help me out to do so.
    Regards,
    Nagaraj S
    Edited by: Nagaraj  S on Sep 2, 2009 6:10 AM

    Hi Nagraj,
    The funcionality you are talking on - checking tolerance limits between
    PReq and PO document - was developed for Public Sector, it uses
    the values in the FMIOI table to perform the check.  If the PReq does
    not have an FM account assignment, no FMIOI record will be written and
    the check cannot take place.
    In order to assign tolerance key limit to PReq document type please
    use following path:
    Path is: SPRO -> Public Sector Management -> Functions for US Federal
    Government -> Integration -> Materials Management ->
    Document-to-Document Tolerances
    I am not sure if something like this is there in normal case
    regards,
    Lalita

Maybe you are looking for

  • CRYSTAL XIR2 ActiveX viewer Freezed

    Post Author: [email protected] CA Forum: Other Hi, I integrated the CRViewer in my C++ application. I try to display report with field parameters (static and dynamic). Sometime all works fine during a long period, the parameter popup windows is displ

  • Linksys WRT54GS and AX WDS with WPA

    I have researched everything in these forums and I thank all for their hard work. Am I to conclude that if I want to use the AX as a bridge (WDS) that I can only use WEP encryption? I tried following the instructions with WPA and when I plug the AX b

  • PL/SQL parser -- OTN Please reply

    The contents of the xml file is as follows. <Node1> <Node2> <Node3>asdf</Node3> <Node4>jklm</Node4> </Node2> <Node5> <Node6>xyza</Node6> <Node7>abcd</Node7> </Node5> </Node1> The schema design is such that in Node2 table I can directly insert Node3 a

  • How to use labview to create a Menu?

    Hi I would like to use labview 8.0 to create a Menu interface, anyone can tell me how to do it? Thanks, Mike

  • RMAN BACKUP Warnings

    Hi, I have these warninigs : RMAN-06207: WARNING: 3 objects could not be deleted for DISK channel(s) due RMAN-06208: to mismatched status. Use CROSSCHECK command to fix status List of Mismatched objects ========================== Object Type Filename