Gr should be done based on Schedule line Date

HI,
I have got a requiremnt that "GR shouldn't be done prior to Schedule line date which has been mantioned in PO""
I amn't maintaining any scheduling agreemnet .
Biswajit

Dear I haven't done the testing for this BADI.
Once I do I will let u know.
Biswajit

Similar Messages

  • Delivery Split based on Schedule line data

    Hi,
    Would need some help in determining how to proceed with splitting delivery based on Schedule line data (Date/Time).
    If S.A 1 has line item 10 with two schedule lines SL1 and SL2 which happened in different times of the day, how to split this S.A to two deliveries in delivery creation (thru VL10E).
    Please suggest.
    Thanks,
    Preema

    Hi,
    In copy control see which Split routine is there, with the help of abaper
    Copy that and create new one, an maintain your date criteria in newely created routine and assign that.
    T-code VOFM
    Kapil

  • PGI date is before Schedule Line date.

    Hi
    We have a scenario which I want to understand. There was ZERO stock on 01.04.2009 in my plant. The stock received on 14.04.2009 but while doing the GR, the posting date changed to 05.04.2009. Now a sales Order created on 14.04.2009 with schedule line confirmation on 14.04.2009. When we checked the delivery and its material document generated after PGI it shows the posting date of 04.04.2009. All the dates in Delivery has been changed to 04.04.2009, however actually the delivery created on 14.04.2009.
    Now my querry is how the system allow to do the PGI on 04.04.2009 when there was no stock for the material on that date, and the schedule line is for 14.04.2009. Is this the standard behaviour?, if yes, Can we restrict it, so that PGI can not be done before the Schedule Line Date or before the actual availability of material.
    Thanks in advance
    Regards
    Amitesh

    hi AA,
    This doesnt seems to be a Std process. GR happens for current date. and you can alter Actual PGI date but the document date (delivery) shall not be prior to MAD or Transportation planning date of Order. i guess this may require an OSS.
    Reg
    Mahesh

  • GATP scenario and Rescheduling Schedule line dates

    Hi All,
    Can anybody tell me where and how can I reschedule the Schedule line dates available from a GATP check. My requirement is as follows:
    For a GATP material, after the GATP check, I need to push the Goods Issue date AHEAD based on the DAY and TIME maintained in the Route Schedule id (VL51, VL52, VL53) for the Route, Transportation Group, Customer, Shipping Point and Shipping conditions.
    I have presently coded my development in the Enhancement option after the FM RV_AVAILABILITY_CHECK in the include FV45VFMV_MVERF_PRUEFEN. Here I have called the FM APO_SCHEDULING to get the new set of Schedule line dates by passing the Goods Issue date that I calculate based on teh Route Schedule id.
    But the problem here is that the Schedule line dates that I get here have different time intervals from the Schedule line dates that I get normally in a GATP process in a standard process. Logically I feel, these time intervals should be the same while the Enhancement is in place or not.
    Please provide me inputs if anybody had faced this issue...
    Thanks in advance,
    Susanth Kumar

    Hi
    When I see the schedule line in the sales order where in the qty in the delivered qty column (second column from the confirmed qty column) is updated item wise irrrespective of the delivery done as per scheduleline date.
    It means though the delivery and PGI is not done for the date 15.12.2008, but the qty in the delivery qty column is updated and the balace to to be delivered shows for the last date.
    So here iam able to deliver only on the last date i.e. 25.01.2009 or at a later date for the schedule line date missing in between and not on the specific date.
    Is this how SAP standard works - I was wondering why i cannot deliver any schedule line qty and date later after delivering quantities of the subsequant schedule lines.

  • Change schedule line date in VA01

    hi frnds,
    in VA01 after giving the material number and quantity system will go to AVAILABILITY CONTROL screen. here SAP will give delivery date and confirmed qty according to quantity of first screen.
    now i need to change these dates based on one field (customised field "vendor" of item level).
    where i need to write the logic?
    points will be rewarded for helpful answers
    regards,
    balu

    hi Krishna,
    i have tried it with break point. initially it was triggering. it means after giving the material number and quantity it stopped in break point. but after giving the vendor in ADDITIONAL DATA B tab of item level, it was not stopping there.
    i need to write the logic after giving the vendor, schedule line dates should modify.
    Regards,
    balu

  • Delivery Schedule line date customer receiving day dependant

    Hello Experts,
    We are working with transfers between plants with STO UB. Tha availability check is activated at storage location level and it works correctly. Now, some plants have a special day for receiving goods. Say, Plant A receives on monday, plant B receives on tuesday, Plant C receives on wednesday.,...
    We want to influence the delivery schedule line based on the goods receiving day of the requesting plant?
    ex : if the system determines delivery schedule line date on 31/01 but the receiving day of the plant is monday, so the system have to update this date to the next receiving day (04/02 = monday)
    Thanks for your help.
    Regards.
    A.

    Hello Experts,
    We are working with transfers between plants with STO UB. Tha availability check is activated at storage location level and it works correctly. Now, some plants have a special day for receiving goods. Say, Plant A receives on monday, plant B receives on tuesday, Plant C receives on wednesday.,...
    We want to influence the delivery schedule line based on the goods receiving day of the requesting plant?
    ex : if the system determines delivery schedule line date on 31/01 but the receiving day of the plant is monday, so the system have to update this date to the next receiving day (04/02 = monday)
    Thanks for your help.
    Regards.
    A.

  • Schedule line date vs actual delivery date

    Hi All,
    Is there any standard report or work around available to compare customers schedule line date vs actual delivery date
    Thanks & Regards,

    Hi Abir,
    I think your talking about a "On time Delivery report" to track actual delivery against the quoted delivery.
    There is no standard report available in SAP for this.
    This is hard to track if you have maintained multiple schedule lines for a one single line item.
    (Where you maintain multiple delivery dates in schedule line level to quote  multiple delivery dates. If you have maintained multiple line items to quote multiple delivery dates, this would have been easy)
    Because you do your delivery based on your sales order line item. Not based on your schedule lines. Therefore in your delivery line item table (LIPS) you cannot see Schedule line number. Therefore you cannot compare quoted delivery against actual delivery date.
    Assuming you have maintained your multiple delivery dates in Schedule line level, this is how you have to proceed.
    - Use VL10E transaction to create delivery against schedule lines.
    - Create append structure in the LIPS table to accommodate to carry the schedule line item of sales order in each delivery document + Line Item combination.
    - Use this user-exit u2013include  MV50AFZ1. Can save the particular sales order schedule line in the LIPS, earlier created append structure field.
    Then you have the schedule line number available in the LIPS table, Now you can code your report to capture quoted delivery against actual delivery date.
    Hope this helps you !
    Anupa

  • Delivery is not possible as per Schedule line dates

    Hi Gurus,
    The schedule lines insales order are for eaxample---
    01.12.2008  -   10 pieces (quantity)
    15.12.2008  -   10
    10.01.2009  -   10
    25.01.2009  -   10
    Tried to deliver the quantity 10 dated 15.12.2008 in the last after all the materials pertaining to other dates are delivered, but system is throwing error as no schedule lines for dated 15.12.2008. But when i checked, delivery is not done for 15.12.2008 and the rest are completed.
    But system allows to deliver the balance 10 quantity either on 25.01.2009 or on a future date but not on 15.12.2008 on which delivery was not done.
    What could be the reason????
    Thanks for your help
    MM

    Hi
    When I see the schedule line in the sales order where in the qty in the delivered qty column (second column from the confirmed qty column) is updated item wise irrrespective of the delivery done as per scheduleline date.
    It means though the delivery and PGI is not done for the date 15.12.2008, but the qty in the delivery qty column is updated and the balace to to be delivered shows for the last date.
    So here iam able to deliver only on the last date i.e. 25.01.2009 or at a later date for the schedule line date missing in between and not on the specific date.
    Is this how SAP standard works - I was wondering why i cannot deliver any schedule line qty and date later after delivering quantities of the subsequant schedule lines.

  • Required Delivery Date vs. Schedule Line Date vs. Calendar

    Hello Experts,
    The Factory Calendar shows that Monday to Friday are the only working days. Now, the user created a sales order and manually entered a date that falls on a saturday. As a result, the schedule line dates were all set on saturday. Availability check is in place and stocks are available.
    My question is: Why did the system proposed saturday as the schedule line date when the calendar shows saturday is not a working day? Am i correct to conclude that the manual entry in the required delivery date in sales order is the priority in determining schedule line date? Your inputs on this scenario would be highly appreciated.
    Best Regards,
    Gene

    Even though Sat is a holiday, the system will propose a CSL and confirm the stocks but the delivery would be created only the next working day. This is controlled by the factory calendar.
    Now, the system confirms based on the stock availability on that day, this does not mean  the delivery would be created the same day. For delivery creation the factory calendar comes into play and the lead times are calculated based on the calendar.
    Regards.

  • Change schedule line date

    Dear All,
    I have a requirement where required delivery date for one divisions material
    in sale order and STO should automatically propose todays date plus 10 days i.e.
    if any sale order or STO created today then required delivery date in STO and
    SO should show 24.10.2010.
    Accordingly we have maintained planned delivery time in material master 10 days in MRP2
    view and it is working fine but another requirement is that user can reschedule the
    delivery and he can change the schedule line date in So (RV45A-ETDAT) before or after
    10 days in VA02 but it is not allowing to change it is considering todays date + 10 days.
    In STO it is allowing for change the delivery date (MEPO1320-EEIND).
    Plz advice how I can make the field RV45A-ETDAT changeable in sale order through VA02.
    Regards,
    sps.

    Hello,
    If you want a sales order to have the requested delivery date automatically populated with today's date +10 business days, this can be maintained via the following SPRO path:
    SAP IMG --> Sales and Distribution --> Sales --> Sales Documents --> Sales Document Header --> Define Sales Document Types
    Go into the sales document type you would like to maintain.  In the section "Requested delivery date/pricing date/purchase order date", there is a field Lead Time in Days.  Put 10 in here, and the requested delivery date will automatically be set to +10 days when an order is being created.
    Planned delivery time in the material master is for when you're out of stock and the system proposes the next available delivery date.  If you have stock on hand, when the availability check runs the system will use the line level delivery date.  At order entry, when a line item created this line level delivery date is taken from the requested delivery date.
    I hope this helps you.

  • Schedule Line Date Changed By Standard Code After User Exit

    We've implemented USEREXIT_MOVE_FIELD_TO_VBEP to conditionally change the schedule line date (it changes VBEP-EDATU) when sales orders are being created.  This functions correctly when VA01 or EDI is used.  However, when the order is created using BAPI_SALESORDER_CREATEFROMDAT2, standard code executing after the user exit changes the schedule line date to an incorrect value. 
    The user exit correctly changes the schedule line date; then later on in the execution subroutine VBEP_FUELLEN_VBEPKOM in include FV45EFEP_VBEP_FUELLEN_VBEPKOM is executed which changes the date on line 37 using the value in US_VBEPKOM-EDATU.  US_VBEPKOM-EDATU is in scope in the user exit, but earlier in subroutine VBEP_FUELLEN_VBEPKOM (line 12 to be exact) this variable is updated with the value in US_VBEPKOM1-EDATU, which is not in scope during the user exit.  So, USEREXIT_MOVE_FIELD_TO_VBEP doesn't have access to US_VBEPKOM1-EDATU and can not ensure that the correct value is used later on in subroutine VBEP_FUELLEN_VBEPKOM.
    I noticed at the end of subroutine VBEP_FUELLEN_VBEPKOM it calls USEREXIT_MOVE_FIELD_TO_VBEPKOM.  I could update VBEP-EDATU here to correct the error whenever the order is created using the BAPI, but it would be nice to have a solution that could be implemented only in USEREXIT_MOVE_FIELD_TO_VBEP without also having to implement USEREXIT_MOVE_FIELD_TO_VBEPKOM.
    So my question: is there a way to update the schedule line date in USEREXIT_MOVE_FIELD_TO_VBEP where it won't be changed later in subroutine VBEP_FUELLEN_VBEPKOM when the order is created using the BAPI?

    Hi Caetano,
    thanks for your suggestion
    Yes, we use firm zone for few of the vendors. there the system don't change the schedule lines.
    Also for the stock transfer PR's there is no firm zone and the lead time is one day. in this case it changes everyday after the MRP run.
    the stock transfer PR's leads to the creation of Schedule lines from the source plant. Since this PR gets changed everyday. the alerts coming out of MD07 gets changed and we really did not know if this order is delayed or not.  In the source plant we use the firm zone to avoid moving the schedule line. But then the alerts are always not correct.
    is there any setting which helps in not moving the PR everyday without using " start in the past"
    thanks
    Nagendra Kumar

  • Purchase Ord delivery date changes SO schedule line date?

    Hi,
    I am purchasing a drop ship item as per sales order. The account assignment in the purchase order is the Sales order. 
    Why in some cases the schedule line date in the sales order changes when I change the delivery date in the purchase order? whereas in other cases it does not.
    Please help me out with this question.
    Sincerely.
    Puja

    Puja,
    The SO schedule line date should not change when you change the purchase order delivery date.
    However, if you change the PO del date, AND a user performs re-ATP against the sales order, OR if you are running backorder processing (rescheduling) of sales docs, then the SD item/schedule date may change to match the changed availability situation caused by the change of the delivery date of the PO.
    Look in the sales order in VA03, then Environment>changes.  Look to see if anyone or anything has 'touched' the SO item that is home to the schedule lines that were affected.
    Regards,
    DB49

  • Schedule line data change in Sales order

    Hi,
    Is there any FM to update the confirmed quantity BMENG (Confirmed qunatity filed in Schedule line data) of a Sales order?
    I have checked BAPI "BAPI_SALESORDER_CHANGE" but couldnt find a field for confirmed quantity.
    Thanks,
    Manoj

    Hi manoj,
    You can do it in userexit_move_field_to_vbep..
    Remeber to change both xvbep as well as vbep field values..
    also modify structure xvbep for the cureent loop pass..
    it should work..
    For eg:
    LOOP AT XVBep.
        xvbep-field1 = value
              MODIFY XVBep  TRANSPORTING field1.
        ENDLOOP.
    vbep-field1 = value
    Can u check this..
    Best Regards,
    navin fernandes.

  • Schedule Line date is considering Sat and Sun

    Our facoty calendar (US) does not include any Saturday or Sunday as a workday.  However, when we enter an order for 3 day delivery, Saturday and Sunday are counted.  The schedule line date changes ONLY if the 3rd day falls on a Saturday or Sunday.  For instance, and order entered on Friday, the 18th will bring in a schedule line date of Monday, th 21st.  This is 3 days, but we don't work on Sat or Sun, so we really need to the schedule line date to be Wednesday, the 23rd.  Now if we enter the order on Thursday, the 17th, the schedule line date will still be Monday, the 21st because the 3rd day fell on a Sunday.  Is there any way NOT to count Saturday and Sunday at all as workdays?  Thank you for your help.

    What function you choice?  please show with me, my company has the same trouble, I think SAP not good in this function (Propose the delivery date)
    Thanks so much.
    Edited by: hieulm_VietNam on Feb 24, 2010 8:07 AM

  • Schedule line data

    Hi gurus,
    How can we see the changes in schedule line data. i.e. all changes in delivery date in open sales orders.
    Thanks in advance.

    Hi,
    goto environment in Va02/Va03 and click on Changes.
    There enter your schedule line instead of item. You can see all the changes for the schedule line.
    Hope it helps.

Maybe you are looking for

  • Https call from SAP SOAP client tool

    Hi, in order to call a webservice via https using the SAP SOAP client tool, I've done the following: 1. The Client cert field filled with my personal certificate from IE (pcert.pfx) 2. The Trust store field left as it was (cacerts file of the jre). W

  • How do I create a Public Group on the Calendar Server?

    How do I create a Public Group on the Calendar Server? <P> Anyone can create Private Groups or Member Only Groups. You must be given administrative rights to create Public Groups on the Calendar Server. The Calendar Server Admin (SYSOP) can give anyo

  • IPhone will not update (error code 1) will not restore even in DFU mode (error code 1)

    I bought the iPhone 4S from a friend, and I came to wiping it manually from the handset, no problems found however during the initial steps the iPhone was unable to validate on the apple servers (with the carrier stuck on searching). So, I plugged th

  • Is it possible to create materialized view log file for force refresh

    Is it possible to create materialized view log file for force refresh with join condition. Say for example: CREATE MATERIALIZED VIEW VU1 REFRESH FORCE ON DEMAND AS SELECT e.employee_id, d.department_id from emp e and departments d where e.department_

  • Downtime Management Notification Users in Satellite Systems

    Hi folks, I'm starting to set up Solution Manager Downtime Management. It's kind of cumbersome but I realize it is new functionality and will get better over time. I'm trying to set up the notification users but when I select "Notification Settings"