Hi All,
I have a material with WM and WM activated. What are the sequences of steps that I need to perform from after GRN - UD- till putting the stock in the Bin. After GRN the TR no and associated Inspection lot gets generated. after that I am bit confused. Please help me out with the transaction codes.
Many thanks in advance
Moderator message:
Locked. Please read SAP onlin ehelp where you can find the step by step process.
/if you have more specific question, please come back.
Edited by: Csaba Szommer on Feb 19, 2012 8:33 AM

Resolved by own.
Thanks

Similar Messages

  • GRN Without Maintaining Price in Material Master

    Hi Experts,
    We have activated the Split Valuation in Material Master and also put restriction in PO that without price maintaining in material  user can not raise the PO.
    Is there any option that we can prepare the PO or GRN without maintaining price in material master and system should pickup the price from PO itself to update the MAP.
    Regards,
    Manish Jain

    Hi,
    Naturally system will update the MAP after GRN and if your PO has info update indicator on in material TABof itee detail system
    the price will be suggested as your PO price next ime when you create Order.
    Regards

  • Profit center transfer price Without activated material ledger

    Hi
    May I use profit center transfer price without activated material ledger as well?
    Regards

    Hi Alaa
    This OSS explain the Transfer Price Activation.
    Note 122008 - Activate transfer pricesmult.valuation approaches
    ML activation is a Must.
    Arturo.

  • Activation Material Ledger with material working in price control "V"

    Hi experts!
    I have activated Material Ledger and I have a question about this..
    1) Before the activation, I have for example a material with the next values in the "Accounting 1" tab:
    Total stock = 7 UNI
    Price Control = V
    Moving price = 166 USD
    Standard price = 166 USD
    Total value = 1.162 USD  (7 UNI*166 USD)
    2) And after the Material Ledger activation, In the same material appears the next values in the "Accounting 1" tab.
    Total stock = 7 UNI
    Price Control = V
    Standar price = 166 USD
    Per.Unit price = 23,71 USD
    Inventory value = 166 USD
    I don´t understand if my total value before activation was 1.162 USD, when I have activated ML, the new value is 166 USD.
    I dont´t understand why the value for the "Per.Unit price" is 23,71USD and not is 166 USD because this is the original value before ML activation..
    I think that my inventory value must be the same before Material Ledger activation, (1.162 USD)???
    Best Regards
    Manuel

    Hi Shaubhikg:
    At first, thanks for your response.
    I have founded another material wich has the next information before the material ledger activation:
    In the Accounting 1 tab:
    Price control: V
    Moving price: 1.265,80 USD
    Total stock: 5 UNI
    Standard price: 553,00 USD
    Total value: 6.329,00 USD
    After the material Ledger production start up, the same material has the next information in USD:
    Standard price: 553,00 USD
    Per.unit price: 1.265,80 USD
    Price control: V
    Inventory value: 6.329,00 USD
    In this case the total value of the stock is the same after and before to do the activation of ML. I think that this is good..
    And can,t understand the example wich I saw you before.. In that case the Total value of the stock after activation Material Ledger is not the same that before activation..
    The material doesn´t have any modification in his unit of measure..
    Could you tell me someting about this issue??
    Best regards!!
    Manuel

  • Cancellation of GRN with QM procurement Active

    Hi All,
       After receiving the goods(MIGO) in to QI stock,the QM procurement activated,now we are unable to move the stock to unrestricted  nor cancel the GRN.
          For this GRN no Inspection lot generated,pls let me know how to use this stock or cancel the GRN
    thanks in advance
    Regards
    Raj

    Hi,
    You should not activate insp type for an material if Quality insp stock (Not managed by insp lots ) is already existing for that material. 
    In plant level QM settings in SPRO , you have "insp type for insp stock " under Insp lot creation tab. Based on the insp type mentioned here , you can create insp lot for already existing insp stock while activating the insp type using transaction QA08.
    Ref the help tips provided by SAP for the "Insp type for Insp stock " field.
    Inspection Type for Available Stock in Quality Inspection
         The system creates inspection lots using the inspection type entered  here, if quality inspection stock is available when a stock-relevant  inspection type is activated. This applies to quality inspection stock, which is not managed by inspection lots.
         When activating using transaction QA08 "Mass change of QM inspection setup", inspection lots are created in the background that manage the already available inspection stock.
         The parameters to control inspection lot processing (for example, the quality score procedure) are copied from the default values of the inspection type entered here.
    Hope this will helps you
    Regards
    K.M.Arun

  • Internal activity material cost not displayed in report s_alr_87013558

    Hi all,
    I have an material attached to the internal activity.
    this internal activity is inturn attached to a network
    which inturn attached to a WBS.
    After the PR and PO creation of the material attached
    the cost report s_alr_87013558 shows values in the
    WBS element not in the network activity to the material
    was attached
    How to catch the cost value to network activity instead of WBS elment
    Can anybody have a clue why it is happening
    Thanks and Regards
    pv

    hi sreenivas,
    thank you for the suggestion
    in budget report the actual and commitment value is pulled
    to respective network activity or wbs element depending upon the account assignment category during the automatic PR
    creation from CJ20n
    In my scenario during automatic PR creation it is Q(project make to order) instead of N(network).
    Can you throw some light to this where in
    i can generate auto PR with account assgnment category N
    for a material attached to network through internal activity
    Note:
    to catch the cost we also need to activate the cost rel indicator in purchasing doc tab for material in cj20n
    regards
    pv

  • Error in Activating Material ledger

    Hi experts,
    I'm trying to activate the material ledger  first time to the plant. Then an error is displaying. The error is
    The value "001" was entered in the field "LFDNR"
    This is not possible  because it is a numeric field  where only numbers may be entered.The length of the field is 000005.
    Enter only numeric vallues in this field.
    psl do favour to me.
    Thanks
    Reddy.P.S

    Hi ,
    Have you completed the following configuration :
    1     Assign Currency Types to Material Ledger Type [OMX2]
    2     Assign Material Ledger Types to Valuation Area [OMX3]
    3     Maintain Number Ranges for Material Ledger Documents [OMX4]
    4     Configure Dynamic Price Changes [OMX5]
    5     Reasons for Price Changes
    6     Define Movement Type Groups of Material Ledger [OMX7]
    7     Assign Movement Type Groups of Material Ledger [OMX0]
    8     Define Material Update Structure [OMX9]
    9     Assign Material Update Structure to a Valuation Area [OMX8]
    10     Activate Actual Cost Component Split [SPRO]
    11     Activate Distribution of Usage Variances [SPRO]
    For OMX1 .. what price determination you are using . Are you using "3" .
    If you already have some other plant active , compare the configurations using transaction CKM9.
    Once all configurations are completed , then only use CKMSTART.
    Regards
    Sarada

  • Material ledger activation in existing plant

    Hey all
    We have a plant in our Production client which was recently created. The materials in this plant have No released cost but we have PO's and movements in this plant.
    Now we are planning to activate Material ledger for this plant. Can anyone advise me on the things that i need to take over of before activating material ledger. Like Closing PO's, MM period, the time of cost run after ML activation and all the Cutover activities that I need to take care of.

    Hi,
    You should activate ML at the beginning of the period. All open orders should be closed.
    Please review note 596558. It contains all recommendations for activating Material Ledger.
    Best regards,
    Antje

  • Standard cost estimation after goods movement when material ledger is activ

    Hi!
    our client is activated material ledger, for some materials standard cost estimation is done till marking but not released.
    goods movements have been posted for those materials.
    Now system is not allowing to release the standar price for those material in the current period, as material ledger expects same price for entrie period.
    what is the alternative way to update the standard price for those materials ( with out reversing the goods movements).
    regs,
    ramesh

    Hi Ramesh,
    When you are using Material Ledger, after goods movemnets for materials, no need to change the standard cost estimate as Actual costing run will take care to derive the PUP price.
    If there is no standard cost estimation release for sold materials (e.g.FG), you will get an error message duirng the billing document release to accounting. To aviod this error, if you are using split valuation (valuation types) and mixing ratios (CK91N & CK94), try with the below steps:
    Create a new valuation type for the same material
    Crate CK11N & CK94,
    Run CK11N
    Run CK24.
    Then release the billing document.
    Let me know if you need more details.
    Thanks & Regards,
    ADI

  • Material Ledger activation (COML) - multiple plants in single company code.

    Hi -
    Material Ledger activation (COML)- multiple plants in single company code.
    In large mfg plant - process industry (proposed to dived into number of production plants), Matrial 'a'  is produced in plant 'a'.Material 'a' is input to procude matl 'B' in plant 'B"..so on and so forth.
    We are activating Material Ledger (COML) for actual costing purpose. Question -During multi level price determination, will the variance of lower level materials ( produced in lowerlevel /other plants in our case) be rolled up to higher level materials (in a different plant). please let me know if it really works, if yes what are the guidelines (if any) .
    Please advise ASAP.
    Thanks
    Chris
    Edited by: Chris Farr on Oct 23, 2008 11:12 AM

    Hi Chris,
    from a business point of view there is a  difference that you might take into consideration: The valauation level will always be on material and plant combination. That means, the division into several virtual plants will usually lead to different actual prices for the same material in each plant. That might happen for example when you carry over stocks from last month into the current month in one plant, while the other plant has only receipts from the current month.
    That might me desired, but often it is not. If the mutiple plants are in reality only one location it might be hard to explain why the prices differ between plants.
    best regards,  Udo

  • Whether PO Creation,GRN & MIRO Possible for material w/o Profit Center ?

    Hai SAP Gurus,
    Whether PO Creation,GRN & MIRO Possible for material w/o Profit Center ?
    1) I want control it. So no user can create a Master without profit Center even select Basic Data 1 & Basic Data 2..
    kindly Guide me clearly

    You asked a similar question in your previous thread
    Re: Is it possible to Create Material Master without Profit Center ?
    You can make the profit center field Mandatory , steps have been specified in the above thread.
    Profit center field comes in "General plant data storage 2"  view and "sales plant data"  views only.  so if a material is made with basic 1,2 views only , it wont come into the picture.  But that shouldnt be a problem  , coz  its not Possible to create PO.GRN and MIRO  for a material with only Basic views.
    Raviraj

  • Batch management separately for packaging / fuel material

    Hi experts,
    to be very clear , batch management is activated for all type of materials like raw material and finished goods.
    For packaging material and fuel material i didnt activate batch management.
    my issue is to maintain batch for packaging and fuel material with batch no. separately.
    if any customization or through any exits / badi ?
    i also maintain for stock at  batch level .
    regards
    dks

    Hi,
    If batch is not activated for Material type packaging / fuel material...and stock /PO/GRN/IV exists for those material, then its impossible to to acitivate batches for those materials whose stock /PO/GRN/IV exists ...
    If you want to maintain batches for these material types then you have to reverse all documents and you have to clear all stocks, which will be tedious job.
    Better from future when ever you create new material for those material types, then activate the batch management check box.

  • C+ 131 (Error message) material price will be negative

    Hi
    While transfering normal stock to project stock, system responding with error message as "material price will be determined negative value".
    Material ledger is already activated - Material price indicator is "V" - e.g., if the material price is below    10$ while doing the MB1C: Stock transfer, system responding as said above. If i increase the material price using MR22, system is not giving any error message and allowing me to post. Here, material is spare part (procured from outside).
    Is there any config settings which caused the error message ?
    Please share your thoughts if anybody has faced this type of error earlier before.
    Thanks in advance for your reply.
    VVR

    Dear Team,
    While cancellation of GRN document system is showing the message like  C+ 131 (Error message) material price will be negative.
    As per the analysis the concern Po was belongs to 2008 the material price was 85 MAP.Gooda receipt completed on 22.04.2010.The qty of the gr document is 51.
    Now we are unable to cancel the GRN document systemis showing the error message like the above mentioned.
    Note: My MAP price 11 rs.I need to know howthe system is reduced this level.where i can see that.Kindly advice to proceed further.
    Regards,
    Suma Nalluri

  • Posting Actual Costs at Material Level

    Hi All
    For our standard costs we will have BOM Components, Activities from Routings and additive costs. We also have activated Material Ledger and will use it for Actual Costing, the objective being that each and every actual cost will be brought to the SKU level. For BOM components and activities that is no problem since it will be done through settlement.
    However for cost components that have additive costs how do we settle them to the material ledger? Do we need to do MR22 for difference between standard and actual? Is there a way to do this through a template allocation or some other allocation method?
    Thank you

    Hi
    Lets assume, you have Std cost of 100 USD involving Material + Labor and an additive cost of 10 USD entered manually from CK74N...
    During production order processing - You would issue material components and confirm Labor hrs... Say, this amounts to 120 USD as against the std cost of 100 USD...
    However, in prod orders, there will be nothing posted against the additive std cost of 10 USD... If you wish, you need to post it either through template allocation from some cost centers or use some assessment cycle or transfer manually from KB11N or use a costing sheet
    Regards
    Ajay M

  • Posting periods in material management

    hi mm gurus,
    i m fico guy, i need some help form ur side. the t.c. MMPV is closing the posting periods in MM is it right, then what is OMSY?  as per as my knowledge in MM we have a chance to open only 2 periods,  in OMSY the periods belogs open periods? or closed Perids?
    my question in OMSY the periods belongs open or closed?
    can u explain please.
    thanqu

    The T code OMSY is for Activating Material Management against a Company code.
    Maintain the Material Master company code in OMSY.
    This is done when you want :
    1.  To create a material master record, the control record must exist for the company code for which you want to create your master record.
    2.  To set up a company code, enter the current period here. 
    3.  When changing the Allow backposting or Disallow backposting indicators 
    You can also use MMRV to set the Allow/Disallowed backposting indicators.
    The current and previous period is shown on both transaction codes.
    As MMPV is only Used for Opening  / Closing MM Periods.
    There are a number of activities that are managed by period in the materials ledger including:  certain stock totals valuations, price units, goods movements, etc.
    MMPV executes program RMMMPERI to close the current period and open the new one. 
    Please Go thru the Link :
    http://www.sapcustomization.com/help/scr/OMSY-Maintaining%20Company%20Code%20for%20Materials%20Management.htm
    Regards,
    Ashok

Maybe you are looking for

  • Facetime no longer working with mavericks

    I've used facetime for a while now to talk to family out of the country. Since I've upgraded to mavericks I can't log in with my apple id and password (which are both correct as I can log in to app store with them). Facetime cycles between log in pag

  • XMP data not showing up in the custom file info panels when upgraded to CC

    For several versions of Photoshop, I have been able to use a modified custom file info panel to input, update, and track psd files. With each version of photoshop there are always some changes in the way the object data is handled. The lastest challe

  • "No Signal Input" on external VGA monitor

    About a year ago my 4 yr emac that I gave my dad starting having the video on the built in display go out periodically. When it started happening more and more, rather than get a whole new computer, we purchased a 22 widescreen VGA monitor and hooked

  • Can't drag keywords to top level in the keyword HUD

    After having imported my iPhoto library into Aperture 3, I found the keyword HUD cluttered with all of my 300+ keywords, many of which were duplicated. No idea why that is, but anyway. Some of them now live on top level, some on second floor under th

  • Auto open/close option not visible in settings on iPad mini

    We have a new iPad mini running iOS 7.0.4 Noticed that the auto switch on/off function was not working. What is more confusing is that in settings there is not the option to switch it on/off. Any ideas?