Hi,
We are using SRM5.0 ECS, with direct procurement. So MRP generated req's will flow in to SRM for sourcing, and if there is source of supply, the PO is created automatically, all is working fine. But if there are ten req's per day coming from MRP for the same material, vendor and contract, still the system is creating 10 PO's.
Is there any way, we can group them for the same contract release and create one PO. I am aware of the sourcing config, but the grouping is only available for unsourced items.
I want to group all these ten req's in to one PO with the same contract reference.
Please share your comments on this.
Thanks,
CS

Hence it is in ECS all PO will be created in SRM itself.
what above delivery dates of different purchase request.
delivery address  , organisational data.you must consider all po split criteria too..
i believe if al the data are same from sourcing select all 10 external requirement it can create one PO.
i have seen one PO for eg (one is from PR pdp (external request) + one is from sc ) if all the data are similar.
br
muthu

Similar Messages

  • Problems with sources of supply determination for external requirements.

    Hi gurus...
    My scenario is  SRM Classic Extended.
    We have a problems with sources of supply determination for external
    requirements comes from ECC. The shopping cart is created with successful
    based in the purchase requisition at ECC, but when i try to make the
    determination of sources of supply the system doesnt find any source of
    supply.
    There are a lot sources of supply creates for these parameters. The
    contracts were already replicated to ECC.
    This problem only occurs with external requirements comes from ECC, if i
    created a shopping cart directly at SRM, using the same parameters, the
    system propose the sources of supply correctly.
    Is there something that we can do?? This is the normal comportment for the souces of supply?
    Tks,
    Gustavo Nogueira

    Hello Gustavo Nogueira
    Then it is an issue.
    How are you searching the source of supply in sourcing cockpit.
    Can you replicate the issue?
    Let me know step by step,
    as per standard SAP , source of supply data must be available for shopping carts so that buyer can assign the source of supply.
    please share what source of supply you have there .

  • Link vendor evaluation with Source of Supply

    Hi Gurus,
    We have a requirement whwrein we want to have the source of supply in the purchase requisition determined automatically based on vendor Evaluation.Meaning for a particular material when i create a PR through MRP run the source of supply should be automatically populated based on the vendor who has rank 1 in the vendor evaluation carried out.Is there any user exit or BADI for the same.
    Thanks in advance.

    Hi Gurus,
    We have a requirement whwrein we want to have the source of supply in the purchase requisition determined automatically based on vendor Evaluation.Meaning for a particular material when i create a PR through MRP run the source of supply should be automatically populated based on the vendor who has rank 1 in the vendor evaluation carried out.Is there any user exit or BADI for the same.
    Thanks in advance.

  • Extreq Transfer with source of supply assigned

    Dear all,
    We are on SRM 7.0 PDP scenario.
    Purchase Requisitions with Contracts assigned are being transferred to SRM. We expect these purchase requisitions with an assigned source of supply not to be transferred to SRM.
    How can be solved?
    Thanks
    Ezequiel

    Hi Eze
    What error comes into slg1
    so how you are correcting your Purchase request?
    As manoj said is that PR is refering inforecord?
    Symptom
    You have a purchase requisition which is created from MRP. This purchase requisition has an info record and is already transferred to the SRM system. If we change the purchase requisition quantity later on, an error message "procurement profile cannot be changed" is raised and hence the changed PR cannot be transferred to SRM.
    However, you would like to allow the purchase requisition change even if an info record is present.
    Other terms
    BBP_EXTREQ_TRANSFER 6Q204 6Q 204 Material Requirement Planning
    Reason and Prerequisites
    This is a special functionality implemented for the customer.
    Solution
    Implement the attached correction instructions to enable this functionality.
    ===
    Note 1318245 - Changing the purchasing group for unreleased PReqs
    Symptom
    In ERP, you attempt to change the purchasing group of a purchase requisition in transaction ME52N. To do this, you enter a new value and confirm this by choosing "Enter". Under certain circumstances, this causes the system to issue an error message informing you that you cannot change the eprofile. When you confirm this error message, the purchasing group adopts its previous value again.
    Reason and Prerequisites
    The following prerequisites for this are known:
    1) The purchase requisition is subject to a release strategy and was not released at the time you attempted to change the purchasing group.
    2) In accordance with the attributes defined in Customizing (table T160ex), the combination of purchasing group and material group determines the system that is to process the purchase requisition. This error only occurs if changing the purchasing group results in a different processing system.
    Solution
    To elimnate this error, you have to implement the corrections contained in this note and perform the following manual corrections:
    1) Call transaction SE11.
    2) Enter the ETRANSSTAT domain and choose "Change".
    3) Switch to the "Value range" tab.
    4) Add the following fixed value to the existing fixed values:
    Fixed value = 3
    Short description (in English): Transfer conditions not fulfilled
    5) Save and activate these changes.
    reagrding inforecord issue:- I am not aware. but contracts assigned automatically to PR aftre running the report . I dont use inforecord.
    Br
    Muthu

  • Assign Source of supply is not working for contract with material group

    Dear Experts,
    I have searched all the threads and gone through before posting my query. So i would ask moderators to go through the thread properly before rejecting this.
    We have value contracts with respect to a particular material group without material and with item category W in the contract item, Please note that for the materials with this material group, the source determination is not set and source list is also not maintained.
    When we create PR for the material with this contract, and when we click on assign source of supply contracts used to get popped up, but recently from few days, when we click on assign source of supply we are getting an error " no source found for this item ".
    Can anybody help on this.
    Regards

    @ Biju,
    As mentioned earlier, we are not creating PR with reference to contract.
    first we are creating contract with item category W (material group), without material and plant details.
    we create PR with or without material with account assignment K and with the material group in the transaction ME51N, and after inputting all the fields, we click on assign source of supply, it was proposing the existing contracts with respect to material group earlier, but it is not happening for particular material group(it is working for all other material groups)
    Hope it is clear.
    @ Dev Patra,
    we are using DIEN-Service material types and we assign that particular material group to only service material type.
    we have not ticked, source list in the material master, we donot have any source list for the materials under that material group.( please check the note 457110- question number 14.)
    Regards

  • How to attach Source of Supply to Purchase requisition(by MRP)

    Hi Friends,
    Source list - we are maintaining Source list for source of supply.
    Please tell me how to attach Source of supply by means of source determination to the Purchase requisition(generated by MRP) ?. What are the configuration and transaction steps?.
    Thanks

    Define fixed indicator in the source of supply , and set the source list usage of MRP to "1 "
    Below is help from sap:
    ==================================================================
    Determining the Source of Supply via the Source List
    The system first checks whether a quota arrangement has been maintained for the material, which has a validity period that covers the requirements date of the purchase requisition.
    It then checks whether only one entry exists in the source list that is relevant to MRP. The indicator for source list usage must therefore be set for a particular vendor so that purchase requisitions and delivery schedules, which are created during the planning run, are automatically assigned to this vendor. In the case of a delivery schedule, you must also have maintained a scheduling agreement for this entry.
    If you have maintained all the entries correctly, the system creates a purchase requisition with the source of supply that is recorded in the source list.

  • Validate (check) after PReq assign source of supply with ME57

    Hi,
      I want to know if it is possible to control or check the PReq after assign source of supply with ME57. My explanation, I have a release strategy on the u201CSource of supplyu201D if it is null. When I create a PReq with the MRP by default the release strategy appear because there is no Source of supply. If I go with ME52N and put a Source of supply my release strategy disappear but if I use ME57 to assign the release stay there until I use the transaction ME52N to control(check) it. Do you know if it possible to force the control(check) with ME57?
    Regards.

    Hi Duang,
    When you create the PR manually , guess that you are not selcting the source list check box ( tick
    in the ME51N screen ),hope this should be the reason for the difference in behavior.
    Please select the tick box when you create PR in ME51N, then the manual PR also will not auto select
    the Vendor. Please test & confirm the behavior after check box selected.

  • Source of supply not populating in MRP generated PR for contract

    When I run MRP, it creates the PR, BUT, it doesn't assigned source of supply automatically.I can assigned it manually by clicking "Assign source of supply"
    Why can the MRP assign it automatically, even i maintained source list with contract number. I don't have any other vendor assigned for this material in the source list
    Can you please help? Here are my setting:
    Material masteru2022     
          Procurement type = F
    u2022     Source list indicator is checked
    Source List       
    08/02/11 To 12/31/11  vendor xxxx   Porg xxx    Agmt xxxxxxx    Fix (Checked)     MRP = 1
    **Contractu2022**   
      Document type MK (Quantity contract)
           Agreement date 8/4/11 validity End 12/31/11

    delete yor requisition and try it and run MRP again today. I cant see anything wrong in your contract and source list settings.
    I remember even one case where we deleted the source list and created it again with the same entries and then it worked.

  • Assign Source of Supply User Exit with Quota Arrangements in ME57 and ME56

    Hi there,
    We are using Quota Arrangements to define Vendor rebate levels and we have enabled User Exit EXIT_SAPLMEQR_001 to provide a more informative popup to replace standard Source of Supply popup as need to display current allocation quantities and % allocation fulfiled.
    This User Exit is invoked during Assign Source of Supply during PReq processing (More precisely during Assign Source of Supply in ME51n and Automatic Source of Supply in ME57 and ME56) which all works fine.
    When used in ME51n and Source of Supply Assigned and PReq saved, the allocated quantity against the valid Quota Arrangement (EQUK-QUMNG) is successfully updated with the relevant amount
    When using ME56 or ME57 to Automatically Assign source of Supply via the PReq list, the User Exit is invoked correctly and on selecting Vendor and saving the PReq is update correctly, however the allocated quantity against the valid Quota Arrangement (EQUK-QUMNG) is NOT updated with the relevant amount
    I have searched SAP Notes and debuged with limited success but cannot find evidence as to why this difference is happening - I assume that it has something to do with User Exit but any advice gratefully received if anyone else has experienced this issue?
    Ben

    Hello Jerry,
    source will be determine based on the following points:
    Outline Agreement
    Info record
    Quota Arrangement
    Source List
    For more information, <a href="http://help.sap.com/saphelp_47x200/helpdata/en/75/ee11b255c811d189900000e8322d00/content.htm">Click here</a>
    Hope this helps.
    Regards
    Arif Mansuri

  • Project MRP - Requirement Grouping in PR

    Dear Experts,
    Please note that I am attaching two finished goods (Material Type - FERT) in the project through network activity, on two different activity. The delivery time for the two items are different. Requirement date is one month different for the two finished goods.
    Requirement Grouping is done through automatic grouping.
    Now when I am running MRP system generates seperate planned order for two finished goods for the same raw material as the requirement date is different. If I am keeping the requirement date is same even though it is planned on different network activity system is making only one planned order for the total number of raw material required.
    Just one doubt..
    Is there any work around to club the requirements of raw material for two finished goods, whose requirement date is different, in one planned order / purchase requisition.
    Thanking you.
    Best Regards,
    Abdul.

    The post has been moved to SCM - PP
    Re: MRP - Requirement Grouping in PR   - Project Stock
    Tnx.
    Abdul.

  • Adhoc Query Requirement with Multiple Data Source

    Hi All,
    I have a Adhoc Query Requirement with Multiple Data Source. Is there any way to achive it. Other than Resultant set and bring into Model.
    Thanks
    SS

    You can compare stuff in the EL, but I don't think this is what you need.
    You can just use Java code in the backing bean class for all the business logic. You can use DAO classes for database access logic. Finally for displaying you can use the JSF tags such as h:outputText.

  • SNP - Issue with PDS as source of supply in low-level code run

    Hi All:
    I have a bunch of PDS that is giving me the following message when the SNP Low-level code is run:
    ''Invalid source 00000010382991380SLT1 S is not considered for low-level code calculation.  The source of suppy 00000010382991380SLT1   S is available actively in the Supply Chain Model. The location product for which the source of supply is intended, does not exist, however, or is no longer assigned to the model. The source of supply is therefore invalid. ''
    I tried all of the following but still did not get to work
    1. Made sure that FG and all the active component of one FG and the location and the PDS were in an active model.
    2.  Made sure that there was one production version and hence one PDS
    3.  Intialiazed the Planning area with the version
    But still would not generate the low level code for the product location.  Can some one throw share some insight and help pl?
    Thanks
    Ryan

    Could you please check whether in the Product Master, Procurement tab, the Procurement Type is set as "P - external procurement planning"? If yes, then that's the reason as the Low-Level Code is only calculated for Products that are to be planned in APO. In this case, change procurement type to X or E and it should work.
    Regards,
    Tiago

  • Source of supply  t code

    hi, can any one tell me the tcode for source of supply.or send list of tcodes in MM.
    <removed by moderator>
    thanks&regards
    rakhi
    Message was edited by: Jürgen L

    Hi,
    You can use ME01 t.code to create Source list which serve as source of information.
    The other MM t.codes are:
    T Code     Header Description
    M/N2     Create free goods table
    M/N3     Display free goods table
    M/03     Create Conditions Table (Purchasing
    M/04     Change Conditions Table (Purchasing
    M/05     Displ. Conditions Table (Purchasing
    M/13     Create Condition Table (Service)
    M/14     Change Condition Table (Services)
    M/15     Display Condition Table (Services)
    M/56     Messages: Create Cond. Table: RFQ
    M/57     Messages: Change Condition Table
    M/58     Messages: Display CondTab: RFQ
    M/59     Messages: Create CondTab: Pur. Orde
    M/60     Messages: Change CondTab: Pur. Orde
    M/61     Messages: Disp. CondTab: Pur. Order
    M/62     Messages: Create CondTab: Del. Schd
    M/63     Messages: Change CondTab: Del. Schd
    M/64     Messages: Disp. CondTab: Del. Sched
    M/65     Messages: Create CondTab: O. Agmt.
    M/66     Messages: Change CondTab: O. Agmt.
    M/67     Messages: Disp. CondTab: Outl. Agmt
    M/70     Messages: Create CondTab.: Entry Sh
    M/71     Messages: Change CondTab.: Entry Sh
    M/72     Messages: Disp. CondTab.: Entry Sh.
    M_LA     Purchasing: Condition List
    M_LB     Change Condition List
    M_LC     Display Condition List
    M_LD     Execute Condition List
    MAL1     Create material via ALE
    MAL2     Change material via ALE
    MAP1     Create contact person
    MAP2     Change contact person
    MAP3     Display contact person
    MASS     Mass Change
    MASSD     Mass Maintenance
    MBBM     Batch Input: Post Material Document
    MBBR     Batch Input: Create Reservation
    MBBS     Display valuated special stock
    MBC1     Create MM Batch Search Strategy
    MBC2     Change MM Batch Determ. Strategy
    MBC3     Display MM Batch Determ. Strategy
    MBGR     Displ. Material Docs. by Mvt. Reaso
    MBLB     Stocks at Subcontractor
    MBNK     Number Ranges; Material Document
    MBNL     Subsequent Delivery f. Material Doc
    MBN1     Free goods - Create (Purchasing)
    MBN2     Free goods - Change (Purchasing)
    MBN3     Free goods - Display (Purchasing)
    MBPM     Manage Held Data
    MBRL     Return Delivery for Matl Document
    MBSF     Release Blocked Stock via Mat. Doc.
    MBSI     Find Inventory Sampling
    MBSL     Copy Material Document
    MBSM     Display Cancelled Material Docs.
    MBST     Cancel Material Document
    MBSU     Place in Stor.for Mat.Doc: Init.Scr
    MBVR     Management Program: Reservations
    MBWO     test
    MBW1     Special stocks via WWW
    MBXA     Printout of XAB Documents
    MB0A     Post Goods Receipt for PO
    MB00     Inventory Management
    MB01     Post Goods Receipt for PO
    MB02     Change Material Document
    MB03     Display Material Document
    MB04     Subsequ.Adj.of "Mat.Provided"Consmp
    MB05     Subseq. Adjustmt: Act.Ingredient Ma
    MB1A     Goods Withdrawal
    MB1B     Transfer Posting
    MB1C     Other Goods Receipts
    MB11     Goods Movement
    MB21     Create Reservation
    MB22     Change Reservation
    MB23     Display Reservation
    MB24     Reservation List
    MB25     Reservation List
    MB26     Picking list
    MB31     Goods Receipt for Production Order
    MB5B     Stocks for Posting Date
    MB5C     Pick-Up List
    MB5K     Stock Consistency Check
    MB5L     List of Stock Values: Balances
    MB5M     BBD/Prod. Date
    MB5S     Display List of GR/IR Balances
    MB5T     Stock in transit CC
    MB5U     Analyze Conversion Differences
    MB5W     List of Stock Values
    MB51     Material Doc. List
    MB52     List of Warehouse Stocks on Hand
    MB53     Display Plant Stock Availability
    MB54     Consignment Stocks
    MB55     Display Quantity String
    MB56     Analyze batch where-used list
    MB57     Compile Batch Where-Used List
    MB58     Consgmt and Ret. Packag. at Custome
    MB59     Material Doc. List
    MB9A     Analyze archived mat. documents
    MB90     Output Processing for Mat. Document
    MC.A     INVCO: Mat.Anal.Selection; Rec/Iss
    MC.B     INVCO: Mat.Anal.Selection; Turnover
    MC.C     INVCO: Mat.Anal.Selection; Coverage
    MC.D     INVCO: MRP Cntrllr.Anal.Sel. Stock
    MC.E     INVCO: MRP Cntrllr Anal.Sel. Rec/Is
    MC.F     INVCO: MRP Cntlr Anal.Sel. Turnover
    MC.G     INVCO: MRP Cntlr.Anal.Sel. Coverage
    MC.H     INVCO: Business Area Anal.Sel. Stoc
    MC.I     INVCO: Bus. Area Anal. Sel. Rec/Iss
    MC.J     INVCO: Bus. Area Anal. Sel. Turnove
    MC.K     INVCO: Bus. Area Anal. Sel. Coverag
    MC.L     INVCO: Mat.Group Analysis Sel. Stoc
    MC.M     INVCO: Mat.Group Anal. Sel. Rec/Iss
    MC.N     INVCO: Mat.Group Anal. Sel. Turnove
    MC.O     INVCO: Mat.Group Anal. Sel. Coverag
    MC.P     INVCO: Division Analysis Sel. Stock
    MC.Q     INVCO: Division Anal. Sel. Rec/Iss
    MC.R     INVCO: Division Anal. Sel. Turnover
    MC.S     INVCO: Division Anal. Sel. Coverage
    MC.T     INVCO: Mat.Type Anal.Selection Stoc
    MC.U     INVCO: Mat.Type Anal.Sel. Rec/Issue
    MC.V     INVCO: Mat.Type Anal.Sel. Turnover
    MC.W     INVCO: Mat.Type Anal.Sel. Coverage
    MC.1     INVCO: Plant Anal. Selection: Stock
    MC.2     INVCO: Plant Anal.Selection; Rec/Is
    MC.3     INVCO: Plant Anal.Selection;Turnove
    MC.4     INVCO: Plant Anal.Selection;Coverag
    MC.5     INVCO: SLoc Anal. Selection; Stock
    MC.6     INVCO: SLoc Anal. Selection: Rec/Is
    MC.7     INVCO: SLoc Anal. Selection;Turnove
    MC.8     INVCO: SLoc Anal.Selection; Coverag
    MC.9     INVCO: Material Anal.Selection;Stoc
    MC(A     SIS: Customer;Inc.Orders - Selectio
    MC(B     SIS: Variant Configuration
    MC(E     SIS: Material;Inc.Orders - Selectio
    MC(I     SIS: SalesOrg. Inc.Orders Selection
    MC(M     SIS: Sales Office; Inc.Orders Selec
    MC(Q     SIS: Employee; Inc.Orders Selection
    MC(U     SIS: Shipping Point Deliveries Sel.
    MC+A     SIS: Customer Returns; Selection
    MC+E     SIS: Customer; Sales - Selection
    MC+I     SIS: Customer Credit Memos - Selec.
    MC+M     SIS: Material Returns; Selection
    MC+Q     SIS: Material; Sales - Selection
    MC+U     SIS: Material Credit Memos; Selec.
    MC+Y     SIS: Sales Org. Returns; Selection
    MC+2     SIS: SalesOrg.Invoiced Sales; Selec
    MC+6     SIS: SalesOrg.Credit Memos Selectio
    MC$<     PURCHIS: MatGrp PurchVal Selection
    MC$>     PURCHIS: MatGrp PurchQty Selection
    MC$:     PURCHIS: Vendor Freqs. Selection
    MC$A     PURCHIS: MatGrp DelRelblty Selectio
    MC$C     PURCHIS: MatGrp QtyRelblty Selectio
    MC$E     PURCHIS: MatGrp Freq. Selection
    MC$G     PURCHIS: Material PurchVal Selectio
    MC$I     PURCHIS: Material PurchQty Selectio
    MC$K     PURCHIS: Material DelRelib Selectio
    MC$M     PURCHIS: Material QtyRel Selection
    MC$O     PURCHIS: Material Freqs. Selection
    MC$0     PURCHIS: PurchGrp PurchVal Selectio
    MC$2     PURCHIS: PurchGrp Freqs. Selection
    MC$4     PURCHIS: Vendor PurchVal Selection
    MC$6     PURCHIS: Vendor DelRelblty Selectio
    MC$8     PURCHIS: Vendor QtyRelblty Selectio
    MC-A     SIS: Sales Office Returns; Selectio
    MC-E     SIS: Sales Office - Sales Selection
    MC-I     SIS: Sales Office Credit Memos Sele
    MC-M     SIS: Employee - Returns; Selection
    MC-Q     SIS: Employee - Sales; Selection
    MC-U     SIS: Employee - Credit Memos; Selec
    MC-0     SIS: Shipping Point Returns; Selec.
    MC/B     Schedule jobs: Exceptions INVCO
    MC/E     Create Exception: EWS/PURCHIS
    MC/F     Maintain exception: EWS/PURCHIS
    MC/G     Display exception: EWS/PURCHIS
    MC/H     Create groups exception: PURCHIS
    MC/I     Change groups exception: PURCHIS
    MC/J     Display exception: PURCHIS
    MC/K     Create job for exception: PURCHIS
    MC/L     Change jobs exceptions: PURCHIS
    MC/M     Display jobs exceptions: PURCHIS
    MC/N     Schedule jobs exceptions: PURCHIS
    MC/Q     Create exception: EWS/SIS
    MC/R     Maintain exception: EWS/SIS
    MC/S     Display exception: EWS/SIS
    MC/T     Create groups exception: SIS
    MC/U     Change groups exception: SIS
    MC/V     Display exception: SIS
    MC/W     Create job for exception: SIS
    MC/X     Change Jobs: Exceptions SIS
    MC/Y     Display Jobs: Exceptions SIS
    MC/Z     Schedule Jobs: Exceptions SIS
    MC/1     Create Exception: EWS/INVCO
    MC/2     Maintain exception: EWS/INVCO
    MC/3     Display exception: EWS/INVCO
    MC/4     Create groups exception: INVCO
    MC/5     Change groups exception: INVCO
    MC/6     Display exception: INVCO
    MC/7     Create job for exception: INVCO
    MC/8     Change jobs exceptions: INVCO
    MC/9     Display jobs exceptions: INVCO
    MC?0     WFIS: Schedule Jobs - Exceptions
    MC?1     WFIS: Create Exception
    MC?2     WFIS: Maintain Exception
    MC?3     WFIS: Display Exception
    MC?4     WFIS: Create Exception Group
    MC?5     WFIS: Change Exception Group
    MC?6     WFIS: Display Exception Group
    MC?7     WFIS: Create Jobs - Exceptions
    MC?8     WFIS: Change Jobs - Exceptions
    MC?9     WFIS: Display Jobs - Exceptions
    MC:B     Schedule jobs exceptions: RIS
    MC:1     Create exception: EWS/RIS
    MC:2     Maintain exception: EWS/RIS
    MC:3     Display exception: EWS/RIS
    MC:4     Create exception group: RIS
    MC:5     Change groups exception: RIS
    MC:6     Display exception: RIS
    MC:7     Create job for exception: RIS
    MC:8     Change jobs exceptions: RIS
    MC:9     Display jobs exceptions: RIS
    MC=B     Schedule jobs exceptions: SFIS
    MC=E     Create exception: EWS/PMIS
    MC=F     Maintain exception: EWS/PMIS
    MC=G     Display exception: EWS/PMIS
    MC=H     Create groups exception: PMIS
    MC=I     Change groups exception: PMIS
    MC=J     Display exception: PMIS
    MC=K     Create job for exception: PMIS
    MC=L     Change jobs exceptions: PMIS
    MC=M     Display jobs exceptions: PMIS
    MC=N     Schedule jobs exceptions: PMIS
    MC=Q     Display exception: EWS/QMIS
    MC=R     Maintain exception: EWS/QMIS
    MC=S     Display exception: EWS/QMIS
    MC=T     Display groups exception: QMIS
    MC=U     Change groups exception: QMIS
    MC=V     Display exception: QMIS
    MC=W     Create job for exception: QMIS
    MC=X     Change Jobs: Exceptions QMIS
    MC=Y     Display Jobs: Exceptions SIS
    MC=Z     Schedule Jobs: Exceptions QMIS
    MC=1     Create exception: EWS/SFIS
    MC=2     Maintain exception: EWS/SFIS
    MC=3     Display exception: EWS/SFIS
    MC=4     Create groups exception: SFIS
    MC=5     Change groups exception: SFIS
    MC=6     Display exception: SFIS
    MC=7     Create job for exception: SFIS
    MC=8     Change jobs exceptions: SFIS
    MC=9     Display jobs exceptions: SFIS
    MCAA     WFIS: Maintain Requirements
    MCAC     WFIS: Maintain Formulas
    MCAE     WFIS: Activate Updating
    MCAF     WFIS: Standard Analyses
    MCAG     WFIS: Customizing; Standard Analyse
    MCAH     WFIS: Organization View - Selection
    MCAI     WFIS: Process View - Selection
    MCAJ     WFIS: Object View - Selection
    MCAK     WFIS: Group View - Selection
    MCAL     WFIS: Sample Scenario - Selection
    MCAM     WFIS: Append Structure
    MCAN     WFIS: Selection Program
    MCAO     WIS: Application PM/QM/SM Selection
    MCAP     WIS: Delete Data
    MCAQ     WIS: Correct Data
    MCAR     WIS: Transfer Data
    MCAT     WFIS: Display Evaluation Structure
    MCAU     WFIS: Change Evaluation Structure
    MCAV     WFIS: Create Evaluation Structure
    MCAW     WFIS: Display Evaluation
    MCAX     WFIS: Change Evaluation
    MCAY     WFIS: Create Evaluation
    MCAZ     WFIS: Execute Evaluation
    MCA7     INVCO: Execute Evaluation
    MCB&     INVCO: Set up statis. for stck/reqt
    MCB)     INVCO: Long-Term Stock Selection
    MCB%     INVCO: Set up stats. for parm. anal
    MCBA     INVCO: Plant Analysis Selection
    MCBC     INVCO: Stor. Loc. Analysis Selectio
    MCBE     INVCO: Material Analysis Selection
    MCBG     INVCO: MRP Cntrlr Analysis Selectio
    MCBI     INVCO: Business Area Anal. Selectio
    MCBK     INVCO: MatGrp Analysis Selection
    MCBM     INVCO: Division Analysis Selection
    MCBO     INVCO: Mat.Type Analysis Selection
    MCBR     INVCO: Batch Analysis Selection
    MCBV     INVCO: Parameter Analysis Selection
    MCBZ     INVCO: Stck/Reqt Analysis Selection
    MCB1     Inventory Controlling
    MCB2     INVCO: Create Evaluation Structure
    MCB3     INVCO: Change Evaluation Structure
    MCB4     INVCO: Display Evaluation Structure
    MCB5     INVCO: Create Evaluation
    MCB6     INVCO: Change Evaluation
    MCB7     INVCO: Display Evaluation
    MCC1     Inventory Controlling
    MCC2     Inventory Information System
    MCC3     Set Up INVCO Info Structs. from Doc
    MCC4     Set Up INVCO Info Structs.from Stoc
    MCDA     PURCHIS: Create Evaluation
    MCDB     PURCHIS: Change Evaluation
    MCDC     PURCHIS: Display Evaluation
    MCDG     PURCHIS: Execute Evaluation
    MCD7     PURCHIS: Create Eval. Structure
    MCD8     PURCHIS: Change Eval. Structure
    MCD9     PURCHIS: Display Eval. Structure
    MCE+     PURCHIS: Reporting - Subseq. Settlm
    MCEA     PURCHIS:Long-Term Plg Vend.Analysis
    MCEB     PURCHIS:Lng-Term Plg Mat.Gr.Analysi
    MCEC     PURCHIS:Long-Term Plg Mat. Analysis
    MCER     PURCHIS: Service Purch.Qty-Selectio
    MCES     PURCHIS: Service Purch.Val-Selectio
    MCE0     Purchasing Information System
    MCE1     PURCHIS: PurchGrp Analysis Selectio
    MCE2     PURCHIS: Update Diagnosis Purch.Doc
    MCE3     PURCHIS: Vendor Analysis Selection
    MCE5     PURCHIS: MatGrp Analysis Selection
    MCE7     PURCHIS: Material Analysis Selectio
    MCE8     PURCHIS: Service Analysis Selection
    MCE9     Purchasing Information System
    MCGC     RIS: Season: Mvmts + Stk - Selectio
    MCGD     RIS: POS: Sales - Selection
    MCGE     RIS: POS: Matl Aggr. POS - Selectio
    MCGF     RIS: POS: Cashier - Selection
    MCGG     RIS: Cust./Material Grp - Selection
    MCGH     RIS: Customer/Material - Selection
    MCGJ     RIS: POS: POS Balancing - Selection
    MCGK     RIS: Matls w/ additionals- Selectio
    MCGL     RIS: Sales data: Customers- Sel.
    MCG1     Rough-Cut Planning Profiles
    MCG2     Var. standard anal. def. sett. IS-R
    MCG3     Call Self-Defined Analyses: Retail
    MCH+     RIS: Display Evaluation Structure
    MCH:     RIS: STRPS/Mvmts + Stock - Selectio
    MCHA     RIS: Till Receipt/Matl - Selection
    MCHB     RIS: Till Receipt - Selection
    MCHC     Companion sales
    MCHG     RIS: Purchasing: Mvmt+Stck-Selectio
    MCHP     RIS: Material: Mvmt+Stck - Selectio
    MCHS     RIS: Promotion - Selection
    MCHV     RIS: Material/Add-On - Selection
    MCHY     RIS: Create Evaluation Structure
    MCHZ     RIS: Change Evaluation Structure
    MCH0     Retail Information System
    MCH1     RIS: Execute Evaluation
    MCH2     RIS: Create Evaluation
    MCH3     RIS: Change Evaluation
    MCH4     RIS: Display Evaluation
    MCH6     Update Maintenance: RIS
    MCH7     RIS: Update Diagnosis; SP Change Do
    MCH8     RIS: Perishables - Selection
    MCH9     RIS: Inventory Controlling - Stores
    MCIA     PMIS: Customer Notification Analysi
    MCIS     Call Up PM Standard Analyses
    MCIZ     PMIS: Vehicle Consumption Analysis
    MCI0     Plant Maintenance Information Syste
    MCI1     PMIS: Object Class Analysis
    MCI2     PMIS: Manufacturer Analysis
    MCI3     PMIS: Location Analysis
    MCI4     PMIS: Planner Group Analysis
    MCI5     PMIS: Object Damage Analysis
    MCI6     PMIS: Obj.Statistic.Analysis
    MCI7     PMIS: Breakdown Analysis
    MCI8     PMIS: Cost Evaluation
    MCJB     MTTR/MTBR for Equipment
    MCJC     FunctLoc: Mean Time Between Repair
    MCJE     PMIS: Info System
    MCJ1     PMIS: Create Evaluation
    MCJ2     PMIS: Change Evaluation
    MCJ3     PMIS: Display Evaluation
    MCJ4     PMIS: Execute Evaluation
    MCJ5     PMIS: Create Evaluation Structure
    MCJ6     PMIS: Change Evaluation Structure
    MCJ7     PMIS: Display Evaluation Structure
    MCKA     OIW Metadata
    MCKB     TIS selection version tree
    MCKC     User-spec. TIS select. version tree
    MCKH     Selection version tree: Sales
    MCKI     Selection version tree: Purchasing
    MCKJ     Selection version tree: Stock
    MCKK     Selection version tree: Production
    MCKL     Selection version tree: Quality
    MCKM     Selection version tree: Plant Maint
    MCKN     Selection version tree: Retail
    MCKO     Selection version tree: General
    MCKP     User-spec. selec. vers. tree: Sales
    MCKQ     User-spec. sel. vers. tree: Purchas
    MCKR     User-spec. sel. vers. tree: Stock
    MCKS     User-spec. sel. vers. tree: Product
    MCKT     User-spec. sel. vers. tree: Quality
    MCKU     User-spec. sel. vers. tree: PM
    MCKV     User-spec. sel. vers. tree: Retail
    MCKW     User-spec. sel. vers. tree: General
    MCKY     WFIS: Selection Versions (User-Spec
    MCKZ     WFIS: Selection Versions (General)
    MCK0     Plant Maintenance Information Syste
    MCK1     Create Hierarchy
    MCK2     Change hierarchy
    MCK3     Display hierarchy
    MCK4     Change SAP OIW Hierarchy
    MCK5     Display SAP OIW Hierarchy
    MCK6     Create Customer OIW Hierarchy
    MCK7     Change Customer OIW Hierarchy
    MCK8     Display Customer OIW Hierarchy
    MCK9     Maintain Customer OIW Info Catalog
    MCLD     WM: Material Flow - Selection
    MCLH     WM: Movement Types - Selection
    MCL1     WMS: Stck Placemt.+Remov. Selection
    MCL5     WMS: Flow of Quantities Selection
    MCL9     WM: Material Plcmt/Removal:Selectio
    MCM+     WFIS: Create Selection Version
    MCM-     WFIS: Change Selection Version
    MCM/     WFIS: Display Selection Version
    MCM%     RIS: Create Selection Version
    MCM?     RIS: Schedule Selection Version
    MCMA     INVCO: Display selection version
    MCMB     INVCO: SelecVers: Schedule job
    MCMC     PPIS: Create selection version
    MCMD     PPIS: Change selection version
    MCME     PPIS: Display selection version
    MCMF     PPIS: SelectVers: Schedule job
    MCMG     QMIS: Create selection version
    MCMH     QMIS: Change selection version
    MCMI     QMIS: Display selection version
    MCMJ     QMIS: Selection Version:Schedule Jo
    MCMK     PMIS: Create selection version
    MCML     PMIS: Change selection version
    MCMM     PMIS: Display selection verison
    MCMN     PMIS: SelectVers: Schedule job
    MCMO     Create selection version
    MCMP     Change selection version
    MCMQ     Display selection version
    MCMR     Selection Version: Create Variant
    MCMS     Selection Version: Change Variant
    MCMT     Selection Version: Display Variant
    MCMV     Selection version: Schedule job
    MCMX     RIS: Change Selection Version
    MCMY     RIS: Display Selection Version
    MCMZ     RIS: Selection Version: Schedule Jo
    MCM0     INVCO: Change selection version
    MCM1     SIS: Create selection version
    MCM10     TIS: Create selection version
    MCM11     TIS: Change selection version
    MCM12     TIS: Display selection version
    MCM13     TIS: Selection Version: Schedule Jo
    MCM2     SIS: Change selection version
    MCM3     SIS: Display selection version
    MCM4     SIS: Selec. version: Schedule job
    MCM5     PURCHIS: Create selection version
    MCM6     PURCHIS: Change selection version
    MCM7     PURCHIS: Display selection version
    MCM8     PURCHIS: SelectVers: Schedule job
    MCM9     INVCO: Create selection version
    MCNB     BW: Initialize Stock Balances
    MCNR     Number Range Maintenance: MCLIS
    MCOA     QMIS: Cust. analysis; Lot overview
    MCOB     QMIS: General Results for Customer
    MCOC     QMIS: Cust. Analysis Quant. Overvie
    MCOD     QMIS: Quantitative Results for Cust
    MCOE     QMIS: Customer Analysis Q Score
    MCOG     QMIS: Customer Analysis Lot Counter
    MCOI     QMIS: Customer Analysis Quantities
    MCOK     QMIS: Customer Analysis Expense
    MCOM     QMIS: Customer Analysis Level/Disp.
    MCOO     QMIS: Customer analysis - insp. lot
    MCOP     QMIS: Cust. Analysis Item Q Not.
    MCOV     QMIS: Cust. Anal. Overview Q Not.
    MCOX     QMIS: Customer Analysis Defects
    MCO1     RIS: OTB - Selection
    MCO2     OTB: Copy Planning Type
    MCO4     Create OTB Planning
    MCO5     Change OTB Planning
    MCO6     Display OTB Planning
    MCO7     Create OTB Planning
    MCO8     Change OTB Planning
    MCO9     Display OTB Planning
    MCPB     Operation analysis: Dates
    MCPD     Production order analysis: Dates
    MCPF     Material analysis: Dates
    MCPH     Work center analysis: Dates
    MCPI     Menu: Production Info System
    MCPK     Operation analysis: Quantities
    MCPM     Production order anal.: Quantities
    MCPO     Material analysis: Quantities
    MCPQ     Work center analysis: Quantities
    MCPS     Operation analysis: Lead time
    MCPU     Production Order Analysis: Lead Tim
    MCPW     Material analysis: Lead time
    MCPY     Work center analysis: Lead time
    MCP0     Shop Floor Information System
    MCP1     SFIS: Operation Analysis Selection
    MCP3     SFIS: Material Analysis Selection
    MCP5     SFIS: Material Analysis Selection
    MCP6     Goods rcpt analysis: repetitive mfg
    MCP7     SFIS: Work Center Analysis Selectio
    MCP8     Goods rcpt analysis: repetitive mfg
    MCP9     SFIS: Select Run Schedule
    MCQ.     SFIS: Kanban analysis selection
    MCQA     Call Up QM Standard Analyses
    MCR:     Std Analyses: User Settings; CALL
    MCRB     LIS: Generate Evaluations
    MCRC     Charact. Texts for Eval. Structures
    MCRE     Material Usage Analysis: Selection
    MCRG     Change Settings: PPIS
    MCRH     Display Settings: PPIS
    MCRI     Product Cost Analysis: Selection
    MCRJ     Prod. Cost Analysis: Repetitive Mfg
    MCRK     Prod. Cost Analysis: Repetitive Mfg
    MCRM     Reporting Point Stats.: Selection
    MCRO     Matl consumptn anal.: repetitive mf
    MCRP     Matl consumptn anal.: repetitive mf
    MCRQ     Call Standard Analyses: PP-IS
    MCRU     PP-PI: Operation Analysis Selection
    MCRV     PP-PI: Process Order Analysis
    MCRW     PP-PI: Resources Selection
    MCRX     PP-PI: Material Usage Analysis
    MCRY     PP-PI: Product Cost Analysis
    MCR1     SFIS: Create Evaluation
    MCR2     SFIS: Change Evaluation
    MCR3     SFIS: Display Evaluation
    MCR4     SFIS: Execute Evaluation
    MCR7     SFIS: Create Evaluation Structure
    MCR8     SFIS: Change Evaluation Structure
    MCR9     SFIS: Display Evaluation Structure
    MCS/     Mass Generation: Info Struct./Updat
    MCSA     SIS: Create Evaluation
    MCSB     SIS: Change Evaluation
    MCSC     SIS: Display Evaluation
    MCSG     SIS: Execute Evaluation
    MCSH     Call Std. Analyses of Customer Appl
    MCSI     Call Standard Analyses of Sales
    MCSJ     Call Standard Analyses of Purchasin
    MCSK     Call Standard Analyses of Stocks
    MCSL     Call Shop Floor Standard Analyses
    MCSM1     TIS: Create evaluation
    MCSM2     TIS: Change evaluation
    MCSM3     TIS: Display evaluation
    MCSM4     TIS: Execute evaluation
    MCSM5     TIS: Create evaluation structure
    MCSM6     TIS: Change evaluation structure
    MCSM7     TIS: Display evaluation structure
    MCSR     Standard Analyses External Data
    MCSS     Display Log: Gen. Info Structure
    MCST     Display Log: Gen. Updating
    MCSX     Archive Statistical Data
    MCSY     Reset Time Stamp: LIS Generation
    MCSZ     Convert LIS Statistical Data
    MCS1     Standard Analyses; General Logistic
    MCS7     SIS: Create Evaluation Structure
    MCS8     SIS: Change Evaluation Structure
    MCS9     SIS: Display Evalaution Structure
    MCTA     SIS: Customer Analysis - Selection
    MCTC     SIS: Material Analysis - Selection
    MCTE     SIS: Sales Org. Analysis - Selectio
    MCTG     SIS: Sales Office Analysis Selectio
    MCTI     SIS: Sales Empl. Analysis Selection
    MCTK     SIS: Shipping Pt. Analysis Selectio
    MCTV01     SIS: Sales Activity - Selection
    MCTV02     SIS: Sales Promotions - Selection
    MCTV03     SIS: Address List - Selection
    MCTV04     SIS: Address Counter - Selection
    MCTV05     SIS: Customer Potential Analysis
    MCT0     Initial SIS Screen
    MCT1     Standard SDIS Analyses
    MCT2     Initial SIS Screen
    MCUA     TIS: Shpt analysis
    MCUB     TIS: Shipment Analysis: Routes
    MCUC     TIS: ShipmentAnaly: MeansOfTranspor
    MCUD     TIS: Shipment Analysis: Shipping
    MCUE     TIS: Shipment Analysis: Stages
    MCUF     TIS: Shipment Analysis: Material
    MCU0     Transportation Info System (TIS)
    MCU1     Create LIS Unit
    MCU2     Delete LIS Unit
    MCU3     Call Standard Analyses: Transportat
    MCVA     QMIS: Vendor Analysis Lot Overview
    MCVB     QMIS: General Results for Vendor
    MCVC     QMIS: Vendor Analysis - Qty Overvie
    MCVD     QMIS: Quant. Results for Vendor
    MCVE     QMIS: Vendor Analysis Quality Score
    MCVG     QMIS: Vendor Analysis - Lot Numbers
    MCVI     QMIS: Vendor Analysis - Quantities
    MCVK     QMIS: Vendor Analysis - Effort
    MCVM     QMIS: Vendor Analyis - Level & Disp
    MCVO     Vendor Analysis - Lots Overview
    MCVP     QMIS: vendor analysis items Q notif
    MCVQ     Quality Management Info System QMIS
    MCVR     SIS: update diagnosis - order
    MCVS     TIS: Update Diagnosis: Transportatn
    MCVT     SIS: update diagnosis - delivery
    MCVV     SIS: update diagnosis - billing doc
    MCVVK     SIS: Updating - Sales Activities
    MCVW     INVCO: Update Diagnosis MatDoc
    MCVX     QMIS: Vendor analysis defects
    MCVY     INVCO: Update Diagnosis AcctngDoc
    MCVZ     QMIS: Ven. Analysis- Q Not. Overvie
    MCV0     Purchasing Information System
    MCV1     QMIS: Vendor analysis - insp. lot
    MCV3     QMIS: Material analysis - insp. lot
    MCV5     Call Up Price List w.Stepped Displa
    MCV6     Call Up Indiv. Customer Prices List
    MCV7     Call Up List of Price Groups
    MCV8     Call Up Material/MatPrcGroup List
    MCV9     Call Up List of Incomplete Document
    MCW_AA     IMG Retail
    MCWIS     FK Simulation Inventory Document
    MCWRP     FK Simulation Invoice Document
    MCW1     PURCHIS: Evaluate Payment Header
    MCW2     PURCHIS: Evaluate Payment Item
    MCW3     PURCHIS: Evaluate VBD Header
    MCW4     PURCHIS: Evaluate VBD Item
    MCW5     Payment: Simulate Updating
    MCW6     LIS Setup for Agency Documents
    MCXA     QMIS: Material Analysis-Lot Overvie
    MCXB     QMIS: General Results for Material
    MCXC     QMIS: Matl Analysis - Qty Overview
    MCXD     QMIS: Quant. Results for Material
    MCXE     QMIS: Matl Analysis - Quality Score
    MCXG     QMIS: Matl Analysis - Lot Numbers
    MCXI     QMIS: Material Analysis - Quantitie
    MCXK     QMIS: Material Analysis - Effort
    MCXM     QMIS: Matl Analysis - Level & Disp.
    MCXP     QMIS: Matl. Analysis - Q Notif. Ite
    MCXV     QMIS: mat. analysis overview Q not.
    MCXX     QMIS: Material analysis defects
    MCX1     QMIS: Create Evaluation
    MCX2     QMIS: Change Evaluation
    MCX3     QMIS: Display Evaluation
    MCX4     QMIS: Execute Evaluation
    MCX7     QIS: Create Evaluation Structure
    MCX8     QIS: Change Evaluation Structure
    MCX9     QIS: display evaluation structure
    MCYA     Delete Jobs: Exceptions
    MCYB     Plan Jobs: Exceptions
    MCYG     Exception Analysis INVCO
    MCYH     Exception Analysis: PURCHIS
    MCYI     Exception Analysis: SIS
    MCYJ     Exception Analysis: PP-IS
    MCYK     Exception Analysis: PM-IS
    MCYL     Exception Analysis: QM-IS
    MCYM     Exception Analysis: Retail IS
    MCYN     Exception Analysis: LIS-General
    MCYO     Exception analysis: TIS
    MCYO0     Schedule Jobs: Exceptions: TIS
    MCYO1     Create Exception: EWS/TIS
    MCYO2     Maintain Exception: EWS/TIS
    MCYO3     Display Exception: EWS/TIS
    MCYO4     Create Exception Group: TIS
    MCYO5     Change Exception Group: TIS
    MCYO6     Display Exception: TIS
    MCYO7     Create Job for Exception: TIS
    MCYO8     Change Jobs: Exceptions: TIS
    MCYO9     Display jobs: Exceptions SIS
    MCYY     WFIS: Exception Analysis
    MCY1     Create Exception EWS/LIS
    MCY2     Maintain Exception EWS/LIS
    MCY3     Display Exception (EWS/LIS)
    MCY4     Create Group Exception
    MCY5     Change Group Exception
    MCY6     Display Exception
    MCY7     Create Job For Exception
    MCY8     Change Jobs: Exceptions
    MCY9     Display Jobs: Exceptions
    MCZ1     Create LIS Inbound Interface
    MCZ2     Change LIS Inbound Interface
    MCZ3     Display LIS Inbound Interface
    MC0A     Number Range Maintenance: Key Figs.
    MC0C     Number Range Maintenance: Info Sets
    MC00     Logistics Information System (LIS)
    MC01     Key Figure Retrieval Via Info Sets
    MC02     Key Fig.Retrieval Using Text String
    MC03     Key Fig Retrieval via Classificatio
    MC04     Create Info Set
    MC05     Change Info Set
    MC06     Display Info Set
    MC07     Create Key Figure
    MC08     Change Key Figure
    MC09     Create Field Catalog
    MC1/     External Data: Maintain Formulas
    MC1A     Maintain Formulas/Requirements
    MC1AT     Maintain Formulas/Requirements
    MC1B     SIS: Maintain Requirements
    MC1BT     TIS: Maintain requirements
    MC1D     SIS: Maintain Formulas
    MC1DT     TIS: Maintain formulas
    MC1F     PURCHIS: Maintain Requirements
    MC1H     PURCHIS: Maintain Formulas
    MC1J     SFIS: Maintain Requirements
    MC1L     SFIS: Maintain Formulas
    MC1N     INVCO: Maintain Requirements
    MC1P     INVCO: Maintain Formulas
    MC1Q     INVCO: Display Formulas
    MC1R     Display Formulas/Requirements
    MC1S     QMIS: Maintain Requirements
    MC1T     QMIS: Display Requirements
    MC1U     QMIS: Maintain Formulas
    MC1V     QMIS: Display Formulas
    MC1W     PMIS: Maintain Requirements
    MC1X     PMIS: Display Requirements
    MC1Y     PMIS: Maintain Formulas
    MC1Z     PMIS: Display Formulas
    MC10     Perform Analysis
    MC11     Create Evaluation
    MC12     Change Evaluation
    MC13     Display Evaluation
    MC14     TIS: Maintain requirements
    MC15     TIS: Maintain formulas
    MC16     LIS: Delete Evaluation Structure
    MC18     Create Field Catalog
    MC19     Change Field Catalog
    MC20     Display Field Catalog
    MC21     Create Info Structure
    MC22     Change Info Structure
    MC23     Display Info Structure
    MC24     Create Update
    MC25     Change Update
    MC26     Display Update
    MC27     Create Evaluation Structure
    MC28     Change Evaluation Structure
    MC29     Display Evaluation Structure
    MC3V     U3 update
    MC30     Update Log
    MC35     Create Rough-Cut Planning Profile
    MC36     Change Rough-Cut Planning Profile
    MC37     Display Rough-Cut Planning Profile
    MC38     Number range maintenance: MC_ERKO
    MC40     INVCO: ABC Analysis of Usage Values
    MC41     INVCO: ABC Analysis of Reqmt Values
    MC42     INVCO: Range of Coverage by Usg.Val
    MC43     INVCO: Range Of Coverage By Reqmts
    MC44     INVCO:Analysis of Inventory Turnove
    MC45     INVCO: Analysis of Usage Values
    MC46     INVCO: Analysis of Slow-Moving Item
    MC47     INVCO: Analysis of Reqmt Values
    MC48     INVCO: Anal. of Current Stock Value
    MC49     INVCO: Mean Stock Values
    MC50     INVCO: Analysis of Dead Stock
    MC59     Revise Planning Hierarchy
    MC6A     Sales and Operations Planning
    MC6B     Sales and Operations Planning
    MC61     Create Planning Hierarchy
    MC62     Change Planning Hierarchy
    MC63     Display Planning Hierarchy
    MC64     Create Event
    MC65     Change Event
    MC66     Display Event
    MC67     Init.graphics screen: genl.plg.hier
    MC7E     ALE Configuration for Info Structur
    MC71     Evaluation: Product Group Hierarchy
    MC72     Evaluation: Product Group Usage
    MC73     Evaluation: Material Usage; Prod.Gr
    MC74     Transfer Mat. to Demand Management
    MC75     Transfer PG to Demand Management
    MC78     Copy SOP Version
    MC79     User Settings for SOP
    MC8A     Create Planning Type
    MC8B     Change Planning Type
    MC8C     Display Planning Type
    MC8D     Mass Processing: Create Planning
    MC8E     Mass Processing: Change Planning
    MC8F     Delete Entry in Planning File
    MC8G     Schedule Mass Processing
    MC8H     Maintain User Methods
    MC8I     Mass Processing: Check Planning
    MC8J     Reprocess Mass Processing
    MC8K     Copy/Delete Planning Versions
    MC8M     Read Opening Stocks
    MC8N     Delete forecast versions
    MC8O     Reset Generation Time Stamp
    MC8P     Standard SOP: Generate Master Data
    MC8Q     Aggregate Copy
    MC8R     RESET: Status for Planning Objects
    MC8U     Calculate Proportional Factors
    MC8V     LIS Planning: Copy Versions
    MC8W     LIS Planning: Delete Versions
    MC8X     SOP: Distribution Scenario - Select
    MC8Y     SOP: Distribution Scenario - Displa
    MC8Z     SOP => Key Figure Assignments
    MC80     Delete and activate versions
    MC84     Create Product Group
    MC85     Display Product Group
    MC86     Change Product Groups
    MC9A     Flexible Planning: Gen. Master Data
    MC9B     Calc. Proportions as in Pl.Hierarch
    MC9C     Reports for Flexible Planning
    MC9E     Info Structure: Add to General Char
    MC9F     Info Structure: Delete All Charact.
    MC9K     Maintain Available Capacity
    MC90     Tsfr.to Dm.Mgmt.: Mat.from any IS
    MC91     Initial Graphic: Product Groups
    MC92     Initial: Product Groups; Hierarchie
    MC93     Create Flexible LIS Planning
    MC94     Change Flexible LIS Planning
    MC95     Display Flexible LIS Planning
    MC97     Number Range Maintenance: MC_SAUF
    MC98     Maintain Planning Objects
    MC99     Display Planning Objects
    MDAB     Planning File - Set Up BATCH
    MDAC     Execute Action for Planned Order
    MDBA     BAPI planned order processing
    MDBS     MPS - total planning run
    MDBT     MRP Run In Batch
    MDC7     Start MD07 by using report
    MDLD     Print MRP List
    MDLP     MPS
    MDL1     Create Production Lot
    MDL2     Change Production Lot
    MDL3     Display Production Lot
    MDM1     Mail To Vendor
    MDM2     Mail to Vendor
    MDM3     Mail to Customer
    MDM4     Mail to MRP Controller
    MDM5     Workflow: Mail to MRP Controller
    MDPH     Planning Profile
    MDPP     Demand Management
    MDPV     Planning variant: Initial screen
    MDP0     Independent Requirements
    MDP1     Create combination structure
    MDP2     Change combination structure
    MDP3     Display combination structure
    MDP4     Maintain combinations
    MDP6     Modeling
    MDRE     Checking Plnng File In BCKGRND Mode
    MDRP     Distribution Resource Planning
    MDSA     Display Serial Numbers
    MDSP     Change BOM Explosion Numbers
    MDUM     Convert Planned Orders into PReqs
    MDUP     Maintain Project New Key Assignment
    MDUS     Assign New Key to WBS Elements
    MDVP     Collective Availability Check PAUF
    MDW1     Access MRP control program
    MD00     MRP : external procurement
    MD01     MRP Run
    MD02     MRP - Single-item; Multi-level -
    MD03     MRP-Individual Planning-Single Leve
    MD04     Display Stock/Requirements Situatio
    MD05     Individual Display Of MRP List
    MD06     Collective Display Of MRP List
    MD07     Current Material Overview
    MD08     Reorg. MRP Lists
    MD09     Pegging
    MD11     Create Planned Order
    MD12     Change Planned Order
    MD13     Display Planned Order
    MD14     Individual Conversion of Plnned Ord
    MD15     Collective Conversion Of Plnd Ordrs
    MD16     Collective Display of Planned Order
    MD17     Collective Requirements Display
    MD19     Firm Planned Orders
    MD20     Create Planning File Entry
    MD21     Display Planning File Entry
    MD25     Create Planning Calendar
    MD26     Change Planning Calendar
    MD27     Display Planning Calendar
    MD4C     Multilevel Order Report
    MD40     MPS
    MD41     MPS - Single-item; Multi-level -
    MD42     MPS - Single-item; Single-level -
    MD43     MPS - Single-item; Interactive -
    MD44     MPS Evaluation
    MD45     MRP List Evaluation
    MD46     Eval. MRP lists of MRP controller
    MD47     Product Group Planning Evaluation
    MD48     Cross-Plant Evaluation
    MD50     Sales order planning
    MD51     Individual project planning
    MD61     Create Planned Indep. Requirements
    MD62     Change Planned Indep. Requirements
    MD63     Display Planned Indep. Requirements
    MD64     Create Planned Indep.Requirements
    MD65     Change Standard Indep.Requirements
    MD66     Display Standard Indep.Requirements
    MD67     Staggered Split
    MD70     Copy Total Forecast
    MD71     "Copy Reference Changes"
    MD72     Evaluation; Charac.Plnng Techniques
    MD73     Display Total Indep. Requirements
    MD74     Reorganization: Adapt Indep.Reqmts
    MD75     Reorganization: Delete Indep.Reqmts
    MD76     Reorg: Delete Indep.Reqmts History
    MD79     "PP Demand Mngmt - XXL List Viewer"
    MD81     Create Customer Indep. Requirements
    MD82     Change customer indep. requirement
    MD83     Display Customer Indep. Requirement
    MD85     List Customer Indep. Requirements
    MD90     Maintain Number Range for MRP
    MD91     Maintain No. Range for Planned Orde
    MD92     Maint.No.Range for Reserv/Dep.Reqmt
    MD93     Maintain Number Range: MDSM
    MD94     Number range maint.: Total reqs
    MEBA     Comp. Suppl. BV; Vendor Rebate Arr.
    MEBB     Check Open Docs.; Vendor Reb. Arrs.
    MEBC     Check Customizing: Subsequent Sett.
    MEBE     Workflow Sett. re Vendor Reb. Arrs.
    MEBF     Updating of External Busn. Volumes
    MEBG     Chg. Curr. (Euro); Vend. Reb. Arrs.
    MEBH     Generate Work Items (Man. Extension
    MEBI     Message; Subs.Settlem. - Settlem.Ru
    MEBJ     Recompile Income; Vendor Reb. Arrs.
    MEBK     Message.; Subs. Settlem.- Arrangmen
    MEBM     List of settlement runs for arrngmt
    MEBR     Archive Rebate Arrangements
    MEBS     Stmnt. Sett. Docs.; Vend. Reb. Arrs
    MEBT     Test Data: External Business Volume
    MEBV     Extend Rebate Arrangements (Dialog)
    MEB0     Reversal of Settlement Runs
    MEB1     Create Reb. Arrangs. (Subseq. Sett.
    MEB2     Change Reb. Arrangs. (Subseq. Sett.
    MEB3     Displ. Reb. Arrangs. (Subseq. Sett.
    MEB4     Settlement re Vendor Rebate Arrs.
    MEB5     List of Vendor Rebate Arrangements
    MEB6     Busn. Vol. Data; Vendor Rebate Arrs
    MEB7     Extend Vendor Rebate Arrangements
    MEB8     Det. Statement; Vendor Rebate Arrs.
    MEB9     Stat. Statement; Vendor Rebate Arrs
    MEDL     Price Change: Contract
    MEIA     New Structure Doc.Ind. Cust. Sett.
    MEIS     Data Selection: Arrivals
    MEI1     Automatic Purchasing Document Chang
    MEI2     Automatic Document Change
    MEI3     Recompilation of Document Index
    MEI4     Compile Worklist for Document Index
    MEI5     Delete Worklist for Document Index
    MEI6     Delete purchasing document index
    MEI7     Change sales prices in purch. order
    MEI8     Recomp. doc. index settlement req.
    MEI9     Recomp. doc. index vendor bill. doc
    MEKA     Conditions: General Overview
    MEKB     Conditions by Contract
    MEKC     Conditions by Info Record
    MEKD     Conditions for Material Group
    MEKE     Conditions for Vendor
    MEKF     Conditions for Material Type
    MEKG     Conditions for Condition Group
    MEKH     Market Price
    MEKI     Conditions for Incoterms
    MEKJ     Conditions for Invoicing Party
    MEKK     Conditions for Vendor Sub-Range
    MEKL     Price Change: Scheduling Agreements
    MEKLE     Currency Change: Sched. Agreements
    MEKP     Price Change: Info Records
    MEKPE     Currency Change: Info Records
    MEKR     Price Change: Contracts
    MEKRE     Currency Change: Contracts
    MEKX     Transport Condition Types Purchasin
    MEKY     Trnsp. Calc. Schema: Mkt. Pr. (Pur.
    MEKZ     Trnsp. Calculation Schemas (Purch.)
    MEK1     Create Conditions (Purchasing)
    MEK2     Change Conditions (Purchasing)
    MEK3     Display Conditions (Purchasing)
    MEK31     Condition Maintenance: Change
    MEK32     Condition Maintenance: Change
    MEK33     Condition Maintenance: Change
    MEK4     Create Conditions (Purchasing)
    MELB     Purch. Transactions by Tracking No.
    MEL0     Service Entry Sheet
    MEPA     Order Price Simulation/Price Info
    MEPB     Price Info/Vendor Negotiations
    MEPO     Purchase Order
    MEQB     Revise Quota Arrangement
    MEQM     Quota Arrangement for Material
    MEQ1     Maintain Quota Arrangement
    MEQ3     Display Quota Arrangement
    MEQ4     Changes to Quota Arrangement
    MEQ6     Analyze Quota Arrangement
    MEQ7     Reorganize Quota Arrangement
    MEQ8     Monitor Quota Arrangements
    MERA     Comp. Suppl. BV; Cust. Rebate Arrs.
    MERB     Check re Open Docs. Cust. Reb. Arr.
    MERE     Workflow: Sett. Cust. Rebate Arrs.
    MERF     Updating of External Busn. Volumes
    MERG     Change Curr. (Euro) Cust. Reb. Arrs
    MERH     Generate Work Items (Man. Extension
    MERJ     Recomp. of Income; Cust. Reb. Arrs.
    MERS     Stmnt. Sett. Docs. Cust. Reb. Arrs.
    MER4     Settlement re Customer Rebate Arrs.
    MER5     List of Customer Rebate Arrangement
    MER6     Busn. Vols.; Cust. Reb. Arrangement
    MER7     Extension of Cust. Reb. Arrangement
    MER8     Det. Statement: Cust. Rebate Arrs.
    MER9     Statement: Customer Reb. Arr. Stats
    MEU2     Perform Busn. Volume Comp.: Rebate
    MEU3     Display Busn. Volume Comp.: Rebate
    MEU4     Display Busn. Volume Comp.: Rebate
    MEU5     Display Busn. Volume Comp.: Rebate
    MEWP     Web based PO
    MEWS     Service Entry (Component)
    MEW0     Procurement Transaction
    MEW1     Create Requirement Request
    MEW10     Service Entry in Web
    MEW2     Status Display: Requirement Request
    MEW3     Collective Release of Purchase Reqs
    MEW5     Collective Release of Purchase Orde
    MEW6     Assign Purchase Orders WEB
    MEW7     Release of Service Entry Sheets
    MEW8     Release of Service Entry Sheet
    MEW9     mew9
    ME0M     Source List for Material
    ME00     
    ME01     Maintain Source List
    ME03     Display Source List
    ME04     Changes to Source List
    ME05     Generate Source List
    ME06     Analyze Source List
    ME07     Reorganize Source List
    ME08     Send Source List
    ME1A     Archived Purchasing Info Records
    ME1B     Redetermine Info Record Price
    ME1E     Quotation Price History
    ME1L     Info Records Per Vendor
    ME1M     Info Records per Material
    ME1P     Purchase Order Price History
    ME1W     Info Records Per Material Group
    ME1X     Buyer's Negotiation Sheet for Vendo
    ME1Y     Buyer's Negotiat. Sheet for Materia
    ME11     Create Purchasing Info Record
    ME12     Change Purchasing Info Record
    ME13     Display Purchasing Info Record
    ME14     Changes to Purchasing Info Record
    ME15     Flag Purch. Info Rec. for Deletion
    ME16     Purchasing Info Recs. for Deletion
    ME18     Send Purchasing Info Record
    ME2A     Monitor Confirmations
    ME2B     POs by Requirement Tracking Number
    ME2C     Purchase Orders by Material Group
    ME2J     Purchase Orders for Project
    ME2K     Purch. Orders by Account Assignment
    ME2L     Purchase Orders by Vendor
    ME2M     Purchase Orders by Material
    ME2N     Purchase Orders by PO Number
    ME2O     SC Stock Monitoring (Vendor)
    ME2S     Services per Purchase Order
    ME2V     Goods Receipt Forecast
    ME2W     Purchase Orders for Supplying Plant
    ME21     Create Purchase Order
    ME21N     Create Purchase Order
    ME22     Change Purchase Order
    ME22N     Change Purchase Order
    ME23     Display Purchase Order
    ME23N     Display Purchase Order
    ME24     Maintain Purchase Order Supplement
    ME25     Create PO with Source Determination
    ME26     Display PO Supplement (IR)
    ME27     Create Stock Transport Order
    ME28     Release Purchase Order
    ME29N     Release purchase order
    ME3A     Transm. Release Documentation Recor
    ME3B     Outl. Agreements per Requirement No
    ME3C     Outline Agreements by Material Grou
    ME3J     Outline Agreements per Project
    ME3K     Outl. Agreements by Acct. Assignmen
    ME3L     Outline Agreements per Vendor
    ME3M     Outline Agreements by Material
    ME3N     Outline Agreements by Agreement No.
    ME3P     Recalculate Contract Price
    ME3R     Recalculate Sched. Agreement Price
    ME3S     Service List for Contract
    ME308     Send Contracts with Conditions
    ME31     Create Outline Agreement
    ME31K     Create Contract
    ME31L     Create Scheduling Agreement
    ME32     Change Outline Agreement
    ME32K     Change Contract
    ME32L     Change Scheduling Agreement
    ME33     Display Outline Agreement
    ME33K     Display Contract
    ME33L     Display Scheduling Agreement
    ME34     Maintain Outl. Agreement Supplement
    ME34K     Maintain Contract Supplement
    ME34L     Maintain Sched. Agreement Supplemen
    ME35     Release Outline Agreement
    ME35K     Release Contract
    ME35L     Release Scheduling Agreement
    ME36     Display Agreement Supplement (IR)
    ME37     Create Transport Scheduling Agmt.
    ME38     Maintain Sched. Agreement Schedule
    ME39     Display Sched. Agmt. Schedule (TEST
    ME4B     RFQs by Requirement Tracking Number
    ME4C     RFQs by Material Group
    ME4L     RFQs by Vendor
    ME4M     RFQs by Material
    ME4N     RFQs by RFQ Number
    ME4S     RFQs by Collective Number
    ME41     Create Request For Quotation
    ME42     Change Request For Quotation
    ME43     Display Request For Quotation
    ME44     Maintain RFQ Supplement
    ME45     Release RFQ
    ME47     Create Quotation
    ME48     Display Quotation
    ME49     Price Comparison List
    ME5A     Purchase Requisitions: List Display
    ME5F     Release Reminder: Purch. Requisitio
    ME5J     Purchase Requisitions for Project
    ME5K     Requisitions by Account Assignment
    ME5R     Archived Purchase Requisitions
    ME5W     Resubmission of Purch. Requisitions
    ME51     Create Purchase Requisition
    ME51N     Create Purchase Requisition
    ME52     Change Purchase Requisition
    ME52N     Change Purchase Requisition
    ME52NB     Buyer Approval: Purchase Requisitio
    ME53     Display Purchase Requisition
    ME53N     Display Purchase Requisition
    ME54     Release Purchase Requisition
    ME54N     Release Purchase Requisition
    ME55     Collective Release of Purchase Reqs
    ME56     Assign Source to Purch. Requisition
    ME57     Assign and Process Requisitions
    ME58     Ordering: Assigned Requisitions
    ME59     Automatic Generation of POs
    ME59N     Automatic generation of POs
    ME6A     Changes to Vendor Evaluation
    ME6B     Display Vendor Evaln. for Material
    ME6C     Vendors Without Evaluation
    ME6D     Vendors Not Evaluated Since...
    ME6E     Evaluation Records Without Weightin
    ME6F     Print
    ME6G     Vendor Evaluation in the Background
    ME6H     Standard Analysis: Vendor Evaluatio
    ME6Z     Transport Vendor Evaluation Tables
    ME60     Screenpainter Test
    ME61     Maintain Vendor Evaluation
    ME62     Display Vendor Evaluation
    ME63     Evaluation of Automatic Subcriteria
    ME64     Evaluation Comparison
    ME65     Evaluation Lists
    ME80     Purchasing Reporting
    ME80A     Purchasing Reporting: RFQs
    ME80AN     General Analyses (A)
    ME80F     Purchasing Reporting: POs
    ME80FN     General Analyses (F)
    ME80R     Purchasing Reporting: Outline Agmts
    ME80RN     General Analyses (L;K)
    ME81     Analysis of Order Values
    ME81N     Analysis of Order Values
    ME82     Archived Purchasing Documents
    ME84     Generation of Sched. Agmt. Releases
    ME84A     Individual Display of SA Release
    ME85     Renumber Schedule Lines
    ME86     Aggregate Schedule Lines
    ME87     Aggregate PO History
    ME88     Set Agr. ***. Qty./Reconcil. Date
    ME9A     Message Output: RFQs
    ME9E     Message Output: Sch. Agmt. Schedule
    ME9F     Message Output: Purchase Orders
    ME9K     Message Output: Contracts
    ME9L     Message Output: Sched. Agreements
    ME91     Purchasing Docs.: Urging/Reminding
    ME91A     Urge Submission of Quotations
    ME91E     Sch. Agmt. Schedules: Urging/Remind
    ME91F     Purchase Orders: Urging/Reminders
    ME92     Monitor Order Acknowledgment
    ME92F     Monitor Order Acknowledgment
    ME92K     Monitor Order Acknowledgment
    ME92L     Monitor Order Acknowledgment
    ME99     Messages from Purchase Orders
    MFBF     Backflushing In Repetitive Mfg
    MFHU     Backflushing In Repetitive Mfg
    MFI2     Actual Overhead: Run Schedule Heade
    MFN1     Actual Reval.:  PrCstCol.   Ind.Pro
    MFN2     Actual Reval.:  PrCstCol.   Col.Pro
    MFPR     Process Inspection Lot for Versions
    MFS0     LFP: Change Master Plan
    MF00     Run Schedules
    MF02     Change Run Schedule Header
    MF03     Display Run Schedule Header
    MF12     Display Document Log (With ALV)
    MF20     REM Cost Controlling
    MF22     Versions: Overview
    MF23     Linking Versions Graphically
    MF26     Display Reporting Point Quantity
    MF27     Update Stats for Planned Quantities
    MF30     Create PrelimCostEst - ProdCostColl
    MF4R     Resetting Reporting Points
    MF41     Reverse Backflush (With ALV)
    MF42     Collective Backflush
    MF42N     New Collective Entry
    MF45     Reprocessing Components: Rep.Manuf.
    MF46     Collective Reprocessing; Backflush
    MF47     Open Reprocessing Records / Pr.Line
    MF50     Planning Table - Change
    MF51     Print Production Quantities
    MF52     Planning Table - Display
    MF53     Maintaining Variants-Production Lis
    MF57     Planning Table - By MRP Lists
    MF60     Pull List
    MF63     Staging Situation
    MF65     Stock Transfer for Reservation
    MF68     Log for Pull List
    MF70     Aggregate Collective Backflush
    MGWA     Change Components for Prepack
    MGWB     Change Components for Full Product
    MGW0     Create Components for Set Material
    MGW1     Display Components for Set Material
    MGW2     Create Components for Display Matl
    MGW3     Display Components for Display Matl
    MGW4     Create Components for Prepack Matl
    MGW5     Display Components for Prepack Matl
    MGW6     Create Components for Full Product
    MGW7     Display Components for Full Product
    MGW8     Change Components for Set Material
    MGW9     Change Components for Display Matl
    MIBC     ABC Analysis for Cycle Counting
    MICN     Btch Inpt:Ph.Inv.Docs.for Cycle Ctn
    MIDO     Physical Inventory Overview
    MIE1     Batch Input: Phys.Inv.Doc. Sales Or
    MIGO     Goods movement
    MIGR1     KW: Conversion of enh./rel. (global
    MIGR2     KW: Conver. of Enh/Rel/Origin (sel.
    MIK1     Batch Input: Ph.Inv.Doc.Vendor Cons
    MILES     Infrastructure Navigator
    MIMD     Tansfer PDC Physical Inventory Data
    MIM1     Batch Input: Create Ph.Inv.Docs RTP
    MIO1     Batch Input: Ph.Inv.Doc.:Stck w.Sub
    MIQ1     Batch Input: PhInvDoc. Project Stoc
    MIRA     Fast Invoice Entry
    MIRCMR     Material Reconciliation
    MIRO     Enter Invoice
    MIR4     Call MIRO - Change Status
    MIR6     Invoice Overview
    MIR7     Park Invoice
    MIS1     Create Inventory Sampling - R/3
    MIS2     Change Inventory Sampling
    MIS3     Display Inventory Sampling
    MIS4     Create Inventory Sampling - R/2
    MIS5     Create Inventory Sampling - Other
    MITT     Test Tool Administration
    MIV1     Batch I.:PhInDoc f.Ret.Pack.at Cust
    MIW1     Batch I.;PhInDoc f. Consigt at Cust
    MI00     Physical Inventory
    MI01     Create Physical Inventory Document
    MI02     Change Physical Inventory Document
    MI03     Display Physical Inventory Document
    MI04     Enter Inventory Count with Document
    MI05     Change Inventory Count
    MI06     Display Inventory Count
    MI07     Process List of Differences
    MI08     Create List of Differences with Doc
    MI09     Enter Inventory Count w/o Document
    MI10     Create List of Differences w/o Doc.
    MI11     Recount Physical Inventory Document
    MI12     Display changes
    MI20     Print List of Differences
    MI21     Print physical inventory document
    MI22     Display Phys. Inv. Docs. f. Materia
    MI23     Disp. Phys. Inv. Data for Material
    MI24     Physical Inventory List
    MI31     Batch Input: Create Phys. Inv. Doc.
    MI32     Batch Input: Block Material
    MI33     Batch Input: Freeze Book Inv.Balanc
    MI34     Batch Input: Enter Count
    MI35     Batch Input: Post Zero Stock Balanc
    MI37     Batch Input: Post Differences
    MI38     Batch Input: Count and Differences
    MI39     Batch Input: Document and Count
    MI40     Batch Input: Doc.; Count and Diff.
    MI9A     Analyze archived phy. inv. docs
    MKH1     Maintain vendor hierarchy
    MKH2     Display vendor hierarchy
    MKH3     Activate vendor master (online)
    MKH4     Activate vendors (batch input)
    MKVG     Settlement and Condition Groups
    MKVZ     List of Vendors: Purchasing
    MKVZE     Currency Change: Vendor Master Rec.
    MK01     Create vendor (Purchasing)
    MK02     Change vendor (Purchasing)
    MK03     Display vendor (Purchasing)
    MK04     Change Vendor (Purchasing)
    MK05     Block vendor (Purchasing)
    MK06     Mark vendor for deletion (purch.)
    MK12     Change vendor (Purchasing); planned
    MK14     Planned vendor change (Purchasing)
    MK18     Activate planned vendor changes (Pu
    MK19     Display vendor (purchasing); future
    MLRP     Periodic Invoicing Plans
    MLS5     Import Standard Service Type
    MLS6     Report for Standard Service Catalog
    MLV1     Conditions: Services
    MLV2     Create Total Price (PRS)
    MLV5     Change Currency (Contracts)
    MLV6     Create Other
    ML01     Create Standard Service Catalog
    ML02     Maintain Standard Service Catalog
    ML03   

  • GOA not picked up as source of supply in R/3 when converting PR to PO

    Hi
    We are currently using SRM 5.0 extended classic scenario. Here we are using Global outline agreements which will get replicated to backend R/3 system and can be used as source of supply while converting a Purchase requisition to Purchase order. The aim is to use Global outline agreements instead of Info records which will be more flexible.
    Once MRP run is done, based on requirement Purchase requisitions are created. Using ME57 we convert the PRs to Purchase orders by assigning source of supply. At this point I would expect the GOA to be picked up,whcih is created against this product. But this is not happening as of now.
    Please let me know if there is configuration or prerequisites that need to be done for this.
    Also when I am trying to assign the GOA manually in PR, it is throwing the error as 'Item category of contract does not match with Item category in PR', even though both has Item category as 'Standard'.
    << Moderator message - Everyone's problem is important >>
    Regards
    Edited by: Rob Burbank on Nov 15, 2010 3:15 PM

    Hi
    GOA is not source of supply Indeed.
    whatever you have distributed the GOA as a Purchasing contract is a real  source of supply.
    if the contract is available in ECC , then it is a valid source of supply for your purchase request.
    Can you use the same contract for any other manual / PM /PS purchase request?
    Are you assigning same material contract to your purchase request ?
    the problem is for only MRP PRs or all PRs.
    Muthu

  • Source of Supply in PR not filled correctly

    Hello,
    Could somebody explain me why Source of Supply is sometimes not filled with appropriate data ?
    Here is my detailed case :
    I have maintained a quota between 2 suppliers.
    For supplier 1, I have a contract and no PIR.
    For the supplier 2, I have only a PIR.
    In the source list, I put the contract for supplier 1 and an entry for supplier 2. Both are relevant for MRP.
    I am putting some independant requirements on the material (MD61) and running the MRP.
    The PR are well splitted between the 2 sources, but in the PR associated to supplier 2, PIR is not indicated in Source of Supply and sometimes even Purchasing Organization is not found.
    In the cases Purchasing Organization is found, but not the PIR, when I am converting the PR in PO, the PIR is found at PO creation.
    I do not understand what is missing for the system to put all information directly in PR.
    Thank you for your help !
    Laetitia

    first of all. just one source in the source list can be MRP relevant.
    if you flag more than one, then the you cannot be sure which source SAP is determining, either the first or the last.
    anyhow in case or quota arrangement, SAP first checks the Quota arrangement, and later checks the source list, e.g. to determine if delivery schedules have to be created or if the source is valid at all.
    The quota arrangement has no information about purchasing org. hence  this info cannot be filled

Maybe you are looking for

  • Assigning Roles to Users and Groups

    Hi, We have installed EP 5.0 SP4...with Content Management...we configured the LDAP to Portal......all the users are maintained through LDAP only...the problem is assigning the Role's to user..here in portal how to assign the roles to the users...we

  • HT3383 What has happened to capture pages from the thumbnails in Pages 5?

    I recently upgraded from Pages 09 (which I loved) to Pages 5 (which I now hate). I can no longer right click the thumbnails and capture or copy a page. Is this a glitch or just a very bad program?

  • F110 APP run problem

    Hi Experts,   We have run the F110 for one of my client. We have entre the proposal and Payment run is started suddenly the systrem shows a yellow message "Payment run has been schedule XX/XX/XXXX Time. JOB WAS NOT RELESED". I have even check for ven

  • How to make OAS use SSL

    I'm trying to install SSL under OAS 3.0.0. There's a note in a documentation, that I can generate a request for CA by <b>genreq</b> utility. I can't find it. Where's it placed and does it exist at all? Can i use request generators from other web serv

  • Connecting to EM, isql*plus

    hi all, after entering my isql*plus or EM URL, it dos not connnect it always replys CANT CONNECT TO SERVER or sometimes WINSOCK ERROR..... i just installed oracle 10g, i have tried reinstalling it but it is still the same. when i finshed installing i