Guide me config steps for REceive and put away materials

Hi ,
I am new this module.
Please guide me all cofiguration steps for Receive and Put away materials in MM system.
Thanks,

HI,
read sap help and search on Google.or in forum
[http://help.sap.com/saphelp_46b/helpdata/en/fd/45b7ee9d6411d189b60000e829fbbd/frameset.htm]
Regards
Kailas Ugale

Similar Messages

  • Correcting discrepancies after order confirmation and put away.

    Hi, I was just wondering if there is a way to correct overages and shortages after a delivery has been received and put away. As we are very new to SAP, during a plant to plant inventory transfer, we made the mistake of confirming eight delivery orders in spite of the the fact that there were several discrepancies such as overages and shortages on several Item #'s. We have documented all the discrepancies and would now like to go into the system to make the adjustments. Is there a simple way to do this? Any help would be appreciated, thanks.

    Hi,
    One best way to adjust the overage and shortage of materials afterputaway is doing PHYSICAL INVENTORY.You can post the differences according to the overage and shortages of the material. I hope this will clear your issue. Thanking you.

  • What are the config steps for contract mass change and quota arrangement?

    Hi friends
    what are the config steps for contract mass change and quota arrangement?
    Regards
    Raj Kumar

    Process Flow
    The mass change process consists of four steps. You navigate between these steps by choosing the Next and Back buttons located at the bottom right-hand corner of the screens.
           1.      Search for contracts
    You search for and select the contracts or the contract hierarchy that you want to change.
    Contracts that have the status Closed cannot be changed.
           2.      Define mass changes
    You specify the changes you want to make.
    You make changes at header data level and at item data level by choosing the relevant change methods. A green tick appears next to each change parameter so that you can see where changes are already active.
    Once you enter this step, the documents you have selected to be changed are locked so that other users cannot make changes to them until you are finished with this process.
           3.      Simulate mass changes
    Here you can perform a trial run of your mass changes. This simulation step is optional.
    We recommend that you perform this step so that you can check how the change methods you have chosen will be processed by the system.
    You receive status messages about the change methods for each contract and can quickly see whether any errors arise in connection with the proposed changes at this stage. From this step, it is easier for you to go back and correct the error than after applying the changes.
    Background processing
    The system processes the changes in the background.
    If there are a large number of contracts to be processed, this step could take some time to complete. In this case, you can leave the transaction so that you can, for example, carry out other tasks in the meantime.
    The system sends you an e-mail once the simulation step is complete. The e-mail contains a link to the relevant screen in the application so that you can return to it when it is convenient for you to do so. If you have left the SRM application, you can only return via this link.
    Here you can see the status of the changes and, if necessary, you can correct any errors by going back to the Define mass changes step.
    The messages that you receive in the simulation step are not confirmation that a change has been performed. They simulate the messages you get after you apply the changes. You must complete the final step of the mass change process and apply the changes before they take effect.
           4.      Carry out mass changes
    Here you apply the changes to the contracts.
    You cannot reverse this step, which is why we advise you to perform the simulation step beforehand.

  • What are the config steps for contract hierarchies and vendor hierarchies?

    Hi friends
    what are the config steps for contract hierarchies and vendor hierarchies?
    Regards
    Raj Kumar

    Contract hierarchies
    A function that enables users authorized to create a purchasing contract to define relationships between super- and subordinate contracts.
    A contract hierarchy consists of one or multiple contracts and is subject to the following rules:
    The top node of the hierarchy cannot have a superordinate contract
    Every contract except for the top node has exactly one superordinate contract
    Every contract can have none, one, or multiple subordinate contract(s)
    A contract can be part of no hierarchy or exactly one hierarchy
    Note:Contract hierarchies are only available for purchasing contracts. They are not available for global outline agreements.
    You can activate this from SRM Server> Cross application settings>Activate Hierarchies for Product Categories, Vendors, and Contracts.
    Note:
    These hierarchy functions should not be reset once they have been activated.
    Similiarly you can do this for Vendor Hirerachies.
    Please visit link for more details: http://help.sap.com/saphelp_srm50/helpdata/en/43/2022b83fbc2be8e10000000a11466f/content.htm
    Thanks

  • Config Steps for Pick process from warehouse number

    Dear Gurus,
    Need the config. steps for picking process with warehouse number assignments
    Thanks

    Hi,
    You only need to assign a Warehouse number for the combination of Plant and Storage location in SPRO in assignment of organisational structures in Warehouse Mngt. If this is done, then picking will become mandatory and you can do picking either manually or automatically through LT03 or other transactions.
    If this warehouse assignment is not done, then you can put the picking quantity directly in delivery and do PGI. If this assignment is done, then you will be able to do picking only through transactions like LT03, either in foreground or background. In this case, u will not be able to manually update the picking quantity in delivery.
    Hope this helps.

  • GRC AC V10 - one approval step for manager and role owner

    Hello Community,
    I have one, perhaps easy, question. Where is it possible to maintain the solution of one approval step for manager and roleowner, if both are unique.
    E.g.:
    simple approval workflow: manager stage afterwards roleowner stage afterwards auto-provisioning
    So if the request is routed to the manager and the manager is also the roleowner of the requested authorization role (same UserID). The user has to approve one and the same request twice.
    Is it possible in V.10 to change the config that the user has only to approve the request once? And then to decide on which relevant stage settings are valid for this process.
    Thanks,
    Alexa

    Hi Alexa,
    We have had a similar questions raised in a project. In an ideal world, a single "Sign-off approval" would be a great functionality where the same user has to approve the same consecutive stages, but the reason for different stages would entail that the responsibilities entailed per stage differ, e.g. Line Manager would just check the over request, and the role owner etc may be reviewing the elegibility of a specifc role etc.
    If it is likely to be the same person reviewing the 2 consecutive stages, maybe a single stage workflow would be sufficient to cover this scenario.
    I think the logic you are trying to configure in the workflow is possible but will require alot of work with knowing how to create a clever custom workflow with BRF+ or the actual WF stuff in SAP itself.

  • Steps for portal and Microsoft LDAP server integration

    Hi,
    Could any one guide me steps for portal and Microsoft LDAP server integration. Need it urgently.
    Thanks in advance.
    Regards,
    Niraj

    Please don't cross post in multiple forums..

  • Config steps for regular ofcycle payroll

    Hi All,
    plz let me know the config steps for regular ofcycle payroll
    SD

    Hi,
    1) Firstly follow the IMG Menu path  PM>PA>Payroll data>Additional Payments-offcycle>wage types    
    Create ur desired wage types for off-cycle and configure them accordingly
    2) Now IMG >Payroll>India>Off-cycle activities>
    Configure as u need
    Maintain IT 0267 with entries like Off cycle reason.... Identifier...... Amount ..... Date...etc.
    Run payroll with the parameters u have maintained in IT 0267
    Try and revert back if any dificulties
    Nasim

  • Config Steps for Tax Depn in AA

    Can somebody share config steps for-Calculating tax depn
    so i require config doc step wise and also execution steps to calculate tax depn.
    my email id is [email protected]

    Hi sameer,
    I searched all the notes but i am not gettng that note for ECC5.0.
    Please suggest me some note numbers so that i can go through it?
    Thanks
    Priya

  • Is there a way I can create a folder for storage and put on desktop?

    Is there a way I can create a folder for storage and put on desktop?

    What you can do is move them into a sub folder where they are all grouped into one icon. Gets them off your screen, sort of.

  • Just looking steps for Lenovo and HP each model example what is link to download the driver files

    DELL offers cab file and lenovo,HP what type of driver files just looking steps for Lenovo and HP each model example what is link to download the driver files and other settings used in task sequence or package

    This should help you out:
    Lenovo: http://support.lenovo.com/en/documents/ht074984
    HP:
    http://www.deploymentresearch.com/Research/tabid/62/EntryId/55/HP-takes-the-next-step-and-provides-ready-made-driver-packages-for-MDT-and-SCCM.aspx
    My Blog: http://www.petervanderwoude.nl/
    Follow me on twitter: pvanderwoude

  • Config steps for low value assets

    could any one provide me the config steps for low value assets.
    regards
    Ramana

    Hi Ramana..
    there is diff in config for LVA from others..all it differs is the Dpe. Key.
    LVA depreciates completely in the same year as Acquired
    let me knwo if u need anything else
    regards

  • Need config steps for Multi-Mode Transportation in SD

    Hi Gurus,
    I am implementing Transportation Module in SD , I covered domestic part means Single mode .
    But Now i have complete Multi-Mode Transporatation for Export , contains Rail, Ships, i.e Multimode Transporation ,
    Please give me Config. steps for it
    Thanks
    Devdatta Joshi

    Check if the link below is helpful:
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LETRA/SDTRA.pdf
    Regards,
    Rajesh Banka
    Reward points if helpful.

  • Config Steps for LOP

    Hi,
    Request you to kindly forward me the config steps for LOP.
    Thanks & regardse
    Please take the search forum help before posting the  still if you not able to find will share you the issue

    same like the normal absence
    but u include that absence
    in valuation of absence T554C check
    or else
    PAY ROLL PAY ROLL INDIA Absence for Valuation

  • [svn] 4408: Adding Config tests for DeserializationValidators and MessageFilters

    Revision: 4408
    Author: [email protected]
    Date: 2009-01-06 12:56:35 -0800 (Tue, 06 Jan 2009)
    Log Message:
    Adding Config tests for DeserializationValidators and MessageFilters
    CheckInTests: passed
    Added Paths:
    blazeds/trunk/qa/apps/qa-regress/testsuites/config/tests/messagingService/validation/
    blazeds/trunk/qa/apps/qa-regress/testsuites/config/tests/messagingService/validation/good MessageFilterTest/
    blazeds/trunk/qa/apps/qa-regress/testsuites/config/tests/messagingService/validation/good MessageFilterTest/error.txt
    blazeds/trunk/qa/apps/qa-regress/testsuites/config/tests/messagingService/validation/good MessageFilterTest/services-config.xml
    blazeds/trunk/qa/apps/qa-regress/testsuites/config/tests/messagingService/validation/good ValidatorTest/
    blazeds/trunk/qa/apps/qa-regress/testsuites/config/tests/messagingService/validation/good ValidatorTest/error.txt
    blazeds/trunk/qa/apps/qa-regress/testsuites/config/tests/messagingService/validation/good ValidatorTest/services-config.xml
    blazeds/trunk/qa/apps/qa-regress/testsuites/config/tests/messagingService/validation/mult ipleGoodMessageFilterTest/
    blazeds/trunk/qa/apps/qa-regress/testsuites/config/tests/messagingService/validation/mult ipleGoodMessageFilterTest/error.txt
    blazeds/trunk/qa/apps/qa-regress/testsuites/config/tests/messagingService/validation/mult ipleGoodMessageFilterTest/services-config.xml
    blazeds/trunk/qa/apps/qa-regress/testsuites/config/tests/messagingService/validation/nonE xistingMessageFilterTest/
    blazeds/trunk/qa/apps/qa-regress/testsuites/config/tests/messagingService/validation/nonE xistingMessageFilterTest/error.txt
    blazeds/trunk/qa/apps/qa-regress/testsuites/config/tests/messagingService/validation/nonE xistingMessageFilterTest/services-config.xml
    blazeds/trunk/qa/apps/qa-regress/testsuites/config/tests/messagingService/validation/nonE xistingValidatorTest/
    blazeds/trunk/qa/apps/qa-regress/testsuites/config/tests/messagingService/validation/nonE xistingValidatorTest/error.txt
    blazeds/trunk/qa/apps/qa-regress/testsuites/config/tests/messagingService/validation/nonE xistingValidatorTest/services-config.xml
    blazeds/trunk/qa/apps/qa-regress/testsuites/config/tests/messagingService/validation/patt ernFilterLoggingMessageFilterTest/
    blazeds/trunk/qa/apps/qa-regress/testsuites/config/tests/messagingService/validation/patt ernFilterLoggingMessageFilterTest/error.txt
    blazeds/trunk/qa/apps/qa-regress/testsuites/config/tests/messagingService/validation/patt ernFilterLoggingMessageFilterTest/services-config.xml
    blazeds/trunk/qa/apps/qa-regress/testsuites/config/tests/messagingService/validation/wron gTypeMessageFilterTest/
    blazeds/trunk/qa/apps/qa-regress/testsuites/config/tests/messagingService/validation/wron gTypeMessageFilterTest/error.txt
    blazeds/trunk/qa/apps/qa-regress/testsuites/config/tests/messagingService/validation/wron gTypeMessageFilterTest/services-config.xml
    blazeds/trunk/qa/apps/qa-regress/testsuites/config/tests/messagingService/validation/wron gTypeValidatorTest/
    blazeds/trunk/qa/apps/qa-regress/testsuites/config/tests/messagingService/validation/wron gTypeValidatorTest/error.txt
    blazeds/trunk/qa/apps/qa-regress/testsuites/config/tests/messagingService/validation/wron gTypeValidatorTest/services-config.xml

Maybe you are looking for

  • ERROR ITMS-9000: "Unable to parse apple display options file: com.apple.ibooks.display-options.xml" at Book (MZItmspBookPackage)

    Hi, I'm En32, now trying to publish my first iBooks (epub). The package I created is always rejected to deliver with following error. Does anyone who can provide me a solution ? === error === Package Summary: 1 package(s) were not uploaded because th

  • How to use Oracle Help in developer 10g

    Hi! First i'm sorry for my bad english I'm a student in computer science and i have a projet to make with Developer 10g. My teacher want us to make a Help file for the user but he don't know how to do it with developer 10g. So i've made some research

  • ITunes libaray sorting ablums... skips the "The" in albums titles...

    Why in the latest version of iTunes 7 does it not sort the album titles with the word "The"?? Is there anyway to turn this back on other than changing the setting "Sort By" field and adding the "The" back in? Ta! Stickymicky

  • Lighting: Daylight or Cool White CFL? 5000K or 6507K iMac White Point?

    Hi. When using the iMac (late 2009) in a small room. I can't find any 5000K bulb just the regular CFLs. Is it more ergonomic to use the daylight or the cool white CFL (bluish white vs. brownish or yellowish white) overhead light (room's volume is 29s

  • Query: Group And Flag

    Hello every one. I have following data Table 1: ID     LOC     ST 1     30     12 gate 2     25     65 Jfk 3     45     45 Water 4     65     888 st 5     105     west st 5     110     north pole 6     999     wash. st 6     888     ind. ave Table 2: