Has anyone picked materials from one storage location but confirmed TO to different storage location?

The business does not want to use MRP areas to segregate materials between service part and production. What they want to do is separate service parts on deliveries at our shipping storage types (915/916) from MRP view. This requirement is primarily for our international shipping area. We may pick parts for an international shipment and the parts will sit on the delivery - not goods issued because we don't want to invoice - for up to 3 months. During that time, MRP sees the inventory so replenishment is not done in a timely fashion or parts may get stolen from the shipment for a production requirement because the inventory is seen.
Could one solution be to create a non-MRP relevant storage location (say 1200) and place the shipping storage types in this storage location?  Then when the transfer order creates, the system would show the source to be from the MRP relevant SLoc (1100), stype (130), bin (A-01-A), - these are examples - with the destination to be to non-MRP relevant SLoc 1200, stype 915, bin (dynamic using the delivery number) 0080745298? Has anyone had this type of request or know of a way to satisfy the business requirements without different MRP areas? They also do not want to have two transfer orders - one with a 601 movement and one with a 311 movement.
Any known solutions or outside-the-box thinking would greatly appreciated.
Marla

I don't have the solution, just some critical questions and hints
Even a non-MRP relevant storage location can be warehouse managed.
The stock is shown in any stock list as long it is not goods issued, no matter if it is stored in a
non-MRP relevant storage location.
Stock that is picked for a delivery is not available for others, it is reserved. A delivery is a MRP element and hence should be taken into consideration in the planning run.
A non-MRP relevant storage location will only solve your planning issues if you move the material there if it is not yet picked  and allocated to a delivery.
Do your thieves really use SAP to check if the stock is there, or do they just see the stock in the warehouse? As said, the non-MRP relevant storage location will not solve this issue since the stock is still visible.

Similar Messages

  • Transfer material from one storage location to another storage location

    Is there any bapi  to transfer material from one storage location to another storage location

    Hi,
    You need to use the below BAPI
    BAPI_GOODSMVT_CREATE
    Regards
    Sudheer

  • Need to create a report: all materials in one storage location incl. value

    Hello,
    we have the requirement to create a report: all materials in one storage location incl. value.
    What are the database-tables we need to use in the report?
    Is there a standard transaction which shows all materials on one storage location?
    Thanks a lot.
    Kind regards
    Manfred

    Hello,
    MB52 is ok - but not good performance.
    What are the important tables we need to join in an own report?
    Kind regards
    Manfred

  • How to move materials from one sloc to another sloc  materials are more tha

    Hi,
    Can any one help me on this issue How to move materials from one sloc to another sloc  materials are more than 1000
    and from existing sloc to new sloc which is Hum managened i need help onthis issue thanks

    hi
    use T-code: MB1B Transfer Posting
    Movement type:
    311 Transfer posting storage location to storage location in one step
    The quantity is transferred from unrestricted-use stock of the issuing storage location to unrestricted use in the receiving storage location.
    Possible special stock indicators: E, K, M, Q
    313 Stock transfer storage location to storage location in two steps - removal from storage
    The quantity is transferred from unrestricted-use stock of the issuing storage location to stock in transfer in the receiving storage location.
    Possible special stock indicators: None

  • How to transfer all materials from one plant to other plants?

    How to transfer all materials from one plant to other plants?

    Hi
    To transfer stock in one step  between plants belonging to same company code use movement type "301" and using transaction code "MIGO". IF you like in two step it helps to monitor stock in transit use movement type "303" and "305".
    303 Transfer posting plant to plant in two steps - removal from storage
    305 Transfer posting plant to plant in two steps - placement in storage
    to transfer stock between plants of diffrent company code go for stock transpor order using tcode "me21n"
    hope it helps

  • How to transfer blocked stock from one storage loc to other storage loc

    Hi,
    Kindly let me know the procedure to transfer the blocked stock from one storage location to other storage location within a plant.
    Regards
    Rajesh

    I guess you have to convert it to unrestricted type before you can transfer, then reconvert it back to blocked.
    Not too sure.
    Regards,
    Srihari

  • How to transfer stock from one storage type another storage type

    Hi Guys
    I have 10 items
    How can I transfer all in One Single Transfer order  from one storage type to another storage type
    I need to take TO print for all these 10 TO items

    Hi,
    Goto LT01 transaction with Movment type = 999 and stock category = Required stock category. Create a PCN and process the remaining process so as to change the stock type.
    Regards,
    Dilli Babu R

  • I'm having the same buffering issues that other users are having when I try to send a short video from my Iphone 4S to my Apple TV.  Has anyone heard back from Apple on this bug ?

    I'm having the same buffering issues that other users are having when I try to stream a short video from my Iphone 4S to my Apple TV
    Has anyone heard back from Apple on this bug ?

    Try the following steps, check whether things are working after each step where appropriate, before trying the next.
    Check AirPlay is turned on on the Apple TV (turn it off and on if it already is)
    Check that both devices are on the same network (Settings > Wifi, on the mobile device and Settings > General > Network, on the Apple TV).
    Restart the Apple TV (Settings > General > Restart).
    Restart the Apple TV by removing ALL the cables for 30 seconds.
    Restart your router. (Also try removing it’s power cord for at least 30 seconds)
    Restart your mobile device.

  • BAPI to move materials from one plant to another

    Hi,
    I'm looking for a BAPI to move materials from one plant to another. Currently i'm carrying out the steps manually in transaction 'HUMO'.
    Kindly let me know if there is a BAPI available for the same.
    Thanks & Regards,
    Esha Raj

    Hi,
       To copy material from one plant to another plant we can do by MM01 TRANSACTION also, check below link it is helpful.
    [link1|Re: copy material from one plant to another]
    Thanks,
    Asit Purbey.

  • How can I transfer contacts from one iPad to a new iPad with different iCloud addresses?

    how can I transfer contacts from one iPad to a new iPad with different iCloud addresses?

    One way would be to e-mail them from yourself to yourself. That would totally avoid the different ID issue.

  • How can I delete an Apple ID from one device and replace it with a different ID on that same device?

    How can I delete an Apple ID from one device and replace it with a different ID on that same device?

    Tthe brute force method: start with Settings > iCloud and turn off Find My (you will need the password), then change the iCloud ID, then go to the apps such as Messages, FaceTime, etc, and delete the Apple ID and enter the new one.

  • Has anyone successfully managed to get VZW to raplace Fascinate with a different phone?

    Has anyone successfully managed to get VZW to raplace Fascinate with a different phone?
    If so, could you share with me on how you convinced VZW to do it?(which department?)
    I love my Fascinate, but not when it can't get calls.  I would prefer to have a Fascinate with
    zero problems, but that appears unlikely.   So I guess my best option is to get a different
    phone(Samsung, Motorola, or others)
    Thanks!

    I successfully got a swap out of my Fascinate with a Droid Incredible 2. 
    I private messaged VZW agents on these forums the following message and through the course of 3-5 days I successfully was granted an expception and allowed to swap out my device (with no contract extension or upgrade eligiblity extenstion). This was after several phone calls and numberous wasted hours trying to convince them the Fascinate was not a good phone. 
    If I have been rude in any way during this message, I sincerely apologize, I did not mean it. I am a frsutrated owner of a bad piece of electronics. I am aware it is not VZW's fault, but I think you need to stand beind the phones you sell and rectify situations that are bad. 
    I am a Samsung Fascinate owner and to say the least this phone has been the biggest source of frustration I have ever had to endur in the 20+ years I have owned a cellular phone. 
    The have been number rous issues with my original phone and the replacement (certified replacement) phone I have gotten. These issues include, but are not limited to:
    1. glitchy UI
    2. constant forecloses and freezes
    3 auto reboots 
    4. inoperable phone for 20 - 30 minutes at a time. Can't access apps, can't make calls, can't send texts, phone is useless to me.
    5. not receiving calls/texts
    6. missing voicemails
    7. increased battery drain
    8. random flickering of screen lights while using the phone.
    Now I have performed the following steps at the suggestion of VZW tech support on both my orginal phone an replacement phone
    1. Hard resets, factory resets 
    2. Soft resets,
    3. Clear cache on the phone
    4. Removing apps 
    5. Updating roaming capabilities 
    After all these issues and all the suggestion on fixes, the phone still performs poorly and is not a reliable phone at all. Like I stated previously i am beyond frustrated. 
    I am aware these problems are software issues not a hardware issue; a refurbed Fascinate will not correct them. Hard resets do not fix the problems. I have scoured the message boards on this website (VZW forums) and I am aware the VERIZON is aware of all these issues with multiple Fascinate users.
    I am asking to be allowed to swap my Fascinate for another, DIFFERENT model of phone. I am fine if that is a refurb, as long as it is a DIFFERENT model of phone and not a Fascinate. I know this is possible because users on your very own forum are stating it has been done. I am asking it be done in my case
    Best thing I can say is stick to it....sitck to you guns and don't back down and don't be allowed to think there is afix when there is not. 

  • Has anyone recently installed the newest i-tunes but it won't recognise their phone is connected even though it makes the ping noise?

    Has anyone recently installed the newest i-tunes but it won't recognise their phone is connected even though it makes the ping noise?

    Give this a shot http://support.apple.com/kb/ts1538

  • Picking multiple quants from one storage bin

    Hello all,
    I have a client that purchases copper wire in pallets that are stored initially in storage bins.  During goods issues to production the pallets are split up and, when material is put back in the warehouse,  storage bins end up with multiple quants that are partial pallets.  When they issue goods, the system, using FIFO, picks quants from multiple bins even though one bin has sufficient quantity.  That forces the warehouse staff to pick from multiple bins rather than one. 
    Is there a way to make the system pick all of the material from a single bin even if there are multiple quants?
    Thanks,
    Ross

    Strategy A: Partial Quantities First  
    With this picking strategy the FIFO principle is overridden in order to optimize the management of stock in the warehouse
    http://help.sap.com/erp2005_ehp_04/helpdata/EN/c6/f844b74afa11d182b90000e829fbfe/frameset.htm

  • Has anyone used more than one event for one project?

    Hi,
    I have an opinion about Final Cut Pro X that hasn't changed since my first few days with it.  I waited to see if I would get used to it.  But, after a fair amount of time, I still am not comfortable with 'Events' and 'Projects'.  The separation of the media and projects creates more problems than solutions with my workflow.
    The purpose of it was to add flexibility for both the professionals and consumers using it, but my first impressions are still the same.  The new Event and Project system adds complexity to organization and archiving.  I wouldn't write this if it wasn't enough of a hindrance for me, that I encounter constantly.  I think the new Final Cut Pro X is incredible, but this issue is definitely important to me.
    Has anyone out there used more than 1 Event for 1 Project?  Some of us create more than 1 Project for an Event, to make different version of a video, or for brainstorming, or to make a part 1 and part 2 of a video, but I've never had more than 1 Event for 1 Project.  I don't need to use the media from multiple Events for the same Project.  And I've never used it for a reason.  I don't think someone will want to use their Hawaii vacation footage for a Denver vacation project, and a Florida vacation project.  I think we should bring back the connection between Events and Projects in a meaningful way. 
    This is a throw back to the older days, but that's not always a bad thing.  Let us keep our projects, or timelines, in the Events folder.  Make an area above the JPG section, and PNG section, and MOV section, and call it the Projects section.  Then we can easily find our Projects and add a new Project every time we need it, and organize our files quickly - without having to keep track of more windows. Final Cut Pro X is all about being more simplified than other video programs, and I think this goes right along with that idea.
    Thanks,
    - David

    My original fear was that FCPX was just going to be iMovie Pro... It so is not!
    People use the interface in different ways. I think that's what most of us like about it, it's flexibiity to accommodate different types of workflows.  For me, I use the Events browser mostly like I'd be using the Finder. All the imported clips I use are referenced by the hard disks on which they reside. I know where to find them in the Event Browser and I know where to find them in the Finder.  I use a lot of stock footage and therefore *reuse* a lot of stock footage from project to project. I'm not going to re-import duplicates into different events because I don't find that the least bit convenient and I do find it a terrible waste of precious HD real estate.
    But that's me.
    Some people like to load up everything they're going to use in a single project in a single event... I get that. You can command click your way through a bunch of clips, type E and everything is automatically arranged on your storyline in the order you selected the clips. That is *awesome*!! Instant storyline (/timeline.) Furthermore, for those that need to share projects, it's easier to bundle up the events and projects if they're all together (albeit in two different folders) on one disk (— at least they are always at the top level of the drive and easy to find.)
    Keeping your Events media in a different location (satellite drives) and keeping your current project on your *fastest* drive is probably the fastest way to edit (particularly if your satellite drives are Firewire or Thunderbolt [peer-to-peer interfaces don't hog system resources].) There is little cross interference in disk accesses that way. So essentially, you can keep FCPX dealing with original clip data that doesn't need to be quite as fast, reading and writing to slower drives on your system, while letting it plow through the heavy work on your fastest access drive (usually your internal HD.)
    By no means is FCPX "more simplified". It has a huge amount of power. It has all the best parts of Color, Soundtrack Pro and Motion built in. It allows you to explore *ideas* in real time rather than having to plan for them a week in advance [layout, round-tripping plans to Color, STP and/or Motion for titling or effects.]  You can grab and move around elements anywhere on your "palette" with simple mouse moves and an occasional key press. The list goes on. Bottom line, it doesn't matter how you organize your events or your projects. It's all about the finished product. And for me, I can turn that around in about 1/5th the time (not claiming it's great — but I think better results in 20% of the time, on average, than it would have taken in Studio.) [Not a professional video editor -- I'm a graphic designer, and I develop Motion graphics for FCPX to make all "you guys" look better.]

Maybe you are looking for