Header batch manufacturing date to be update after 261 movt  of any compane

Dear all ,
we have one requirment in that ....suppose we have one Process order , we done companent batch determiantion
now what happens whenever we do confirmation ..means 101 then Manufacturing date at Header bacth updates , ( the 101 date is set as Manufacturing date. ...Now when we do picking i.e goods issue of any companenet under order , that date shud
be there as manufacturing date for that header batch .
pls suggest.
Regards,
Prerna

Hi Prena,
Could you please post your solution how you acheived this? I have the similar requirement to populate batch manufacturibng date as process order confirmation date.
Your help is appritiated.
Thanks,
Jyoti

Similar Messages

  • Process order release date as batch manufacturing date

    Hi All,
    We have automatic batch creation during the release of the process order. Now the requirement is that proess order release date should be updated as Batch manufacturing date in the corresponding Batch data (MSC3N). How this can be done.
    Regards
    Vinamrath

    Hi Vinamrath,
    Hope your proess order release date and the batch creation date are same.
    In such case go to txn CT04 (create Characteristic) and create a  Characteristic say  "Batch manufacturing date". Then in the tab Addnl data maintain the table name as "MCH1 or MCHA" and Field name as "ERSDA" (created on-this is the batch creation date).
    In case your  proess order release date and the batch creation date are not same, then there is a field called " HSDAT" -date of manufacture.you can maintain this field name in addnl data.
    Maintain this Characteristic in classification (CL02)
    Then this will get updated in the batch and same can be viewed in MSC3N
    Regards
    Hari
    Edited by: Harikris_83 on Sep 29, 2011 3:05 PM

  • Population o batch manufacturing date automatically through process mesages

    Hi gurus,
    We sre using control recipe to download data into MES system and uploading data through process message to do the confirmation and goods receipt. We are using batch management and calculating shelf life expiration date at the time of confirmation using manufaturing date + shelf life. Now the issue is, through process message we are not able to populate batch manufacturing date automatically and getting confirmation error after sending the process message to SAP. In process messgae category we are using characterics PPPI_END_DATE,PPPI_EVENT_DATE, PPPI_START_DATE as a date field.
    Can anybody suggest how can we populate batch manufacturing date automatically through process mesages.
    With thanks
    Rajib Pathak

    thanks

  • Batch Manufacturing date

    Hi there,
    my customer controls the stock they manufacture with batch numbers.
    The customer wants the due date of the production order to be inserted in the manufacturing date field on the batches setup screen  when completing the production order.
    I have tried without any luck...can someone please help me with this...
    thank you
    Kind regards
    Ian

    Hi Ashis
    I am aware of the function of maintaining batches, but this happens after the production process has been completed.
    I need to populate the manufacturing date during the production process...
    e.g. Production has been completed, the user opens a receipt from production and selects the production order, when adding the receipt from production the batch setup screen appears and the user can complete the batch details for the item manufactured, on this screen they want the manufacturing date to be populated automatically from the Production order due date...
    I will try to use UDF's to see if it works...
    Thank you

  • Batch Classification data not getting updated during the GR of the PO

    Dear Gurus,
    While doing the GR of the Purchase order the classification data for the batch should get updated .However we can see those data in MSC2N (Change batch) but not in MSC3N (Display Batch) .While consultuing with SAP we found that the data in MSC3N is directly picked in the AUSP table but the data in MSC2 N  reads the information directly from the
    reference table field (MCH1-LWEDT & MCH1-LIFNR .My Qusetion is why this the AUSP entries are not getting updated during the GR itself.
    Sumit Mohan

    Hi Sumit,
    I am not sure about your question, but if you want to populate the classification data during goods receipt then you need to maintain characteristics values in material master for classification tab under class type batch i.e. 022. After then it will apper during goods receipt for characteristics value for batch.
    Regards,
    Bhagat

  • BIA Master Data Index Not Updated After Change Run

    In BIA it shows master data 0VERSION table /BI0/SVERSION has 360 records which matches with the number of entries in SE16 /BI0/SVERSION.  One record was added to 0VERSION so now SE16 /BI0/SVERSION shows 361 records.  I did a change run for this infoobject 0VERSION but the BIA index for /BI0/SVERSION still only show 360 records. I expect it to show 361 records after the change run.  Is this a bug?  Thanks.

    Hi Thao,
    I see one of 3 possible scenarios:
    1) You load 0VERSION as a part of master data load (from flat file or another system). You see your 11th record in version "M" after load and then you run change run that makes "A" version of the record. ---> BIA index should be automatically updated. If not - open OSS message to SAP.
    2) You load transactional data in an InfoCube, and it has new value for characteristic 0VERSION. ---> In this case you need to run roll-up of this new load request in the InfoCube to let BIA index be in-sync.
    3) You are modifying 0VERSION manually (e.g. SQL INSERT statement), so system is not aware of new record at all. ---> You need to run the mentioned single-table-index program to update BIA index.
    Is it any of these 3 scenarios, or you have the 4th one?
    Regards,
    -Vitaliy
    Edited by: Vitaliy on Aug 19, 2008 1:59 PM

  • Date - Time auto update after login on portal

    Hello,
    I have portal server 71. update 2 installed.
    the date and time which is shown after login gets updated on refresh only.
    is it the default behaviour? yes then what can be done to update automatically?
    regards,
    sumant

    yeh i know that.
    however i thoght sun must have provisioned that atleast.
    let see how i can manage. :)
    thanks
    sumant

  • Actual end date is not update after closing a change

    Hi,
    We are using SCSM 2012, now I want to make report on which changes have been closed in the last month. In som way all the changes that have been closed in SCSM do not have an actual end date, all the changes that I have imported from our old tool does. It
    looks like SCSM does not update this field by itself, but I can't find a field in the change managment module in which I can provide the actual end date.
    How does SCSM 2012 copes with this?
    Kind regards, Marco Jansen

    Hi Greg,
    We are actually testing this now, as MS is not planning to solve this issue on a short term. The use of the last modified date is casuing u a lot of trouble now as we have had an change on our change form casuingthe last modified for all change to be set
    to the date of the change. That was the end of my closing data.
    We are now getting the WA in place from Netviaconsulting, but that is not a complete solution. Not all change reach a state of complete before they are closed. Sometime you will close a change that is cancelled ,rejected or failed. this means that when
    triggering on an update of the record every update will set the actual enddate. Besides when setting the actual enddate on the status closed, the date is update every time the worflow runs.
    We just want the actual enddate to be filled  when a change comes to the status closed from any other status, but this sets the actual enddate on every status change of the change. in some strange way ewe cannot figure this out.
    If anybody has the correct configuration for this workflow it would be very useful. Most prefereably MicroSoft in this case.

  • Copy manufacturing date to batch characteristics in REM confirmation

    Hi to everyone,
    I have a situation that when goods receipt occurs with movement 131 in MFBF, manufacturing date is not updated in batch. How can I copy the value as batch characteristics?
    please advice,
    best regards..

    Hi,
    If you want the value as batch characteristic you need to:
    1. Create the characteristic in trn. CT04, with reference to field MCHA-ERSDA (or MCH1-ERSDA if your batch management is cross-plant)
    2. Create a class in trn. CL02 and include the characteristic in it.
    3. Assign the class to your material in Material Master.
    Hope it helps.
    Regards,
    mr.

  • BAPI_GOODSMVT_CREATE - Batch Expiry Date......

    HI Im,
    using this BAPI to post a goods movement from one location to another in the same plant.
    The stock is being posted to a specific Batch.  When I do this the material document gets created okay and the stock moves.
    The problem is that the batch expiry date is not updating.  The stock I'm moving has a later expiry date than the current date.  If I do this manually in MIGO it works fine and updates the batch expiry date with the later date.
    Has anyone else experienced this or know of a work around ?

    Hi
    I am populating the item data like:
    *- Populate item data
      LOOP AT i_items_trans.
        CLEAR ibapigm_item.
    *- Convert the matnr backto 18 char form (External)
        CALL FUNCTION 'CONVERSION_EXIT_MATN2_INPUT'
          EXPORTING
            input            = i_items_trans-matnr
          IMPORTING
            output           = i_items_trans-matnr
          EXCEPTIONS
            number_not_found = 1
            length_error     = 2
            OTHERS           = 3.
        IF sy-subrc <> 0.
    MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
            WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
        ENDIF.
        ibapigm_item-material   = i_items_trans-matnr.
        ibapigm_item-plant      = x_user-werks.
        ibapigm_item-stge_loc   = x_user-lgort.
        ibapigm_item-move_type  = '101'.   "Goods Receipt
        ibapigm_item-mvt_ind    = 'B'.     "Goods Movement for PO
        ibapigm_item-po_number  = i_items_trans-ebeln.
        ibapigm_item-po_item    = i_items_trans-ebelp.
        ibapigm_item-gr_rcpt    = sy-uname.
        ibapigm_item-quantity   = i_items_trans-ktmng.
        ibapigm_item-base_uom   = i_items_trans-meins.
        ibapigm_item-entry_qnt  = i_items_trans-ktmng.
        ibapigm_item-entry_uom  = i_items_trans-meins.
        ibapigm_item-batch      = i_items_trans-charg.
        APPEND ibapigm_item.
      ENDLOOP.
    Header data like:
      MOVE: sy-datum TO bapigm_head-pstng_date,
            sy-datum TO bapigm_head-doc_date,
            sy-uname TO bapigm_head-pr_uname,
            v_mblnr  TO bapigm_head-ref_doc_no,
            con_bfwms_bestand TO bapigm_head-ext_wms.
    *- Document Header Text
      IF NOT v_bktxt IS INITIAL.
    *- Preceed "INV=" to the Invoice number entered
        CONCATENATE 'INV='(003) v_bktxt INTO v_bktxt
        SEPARATED BY space.
        bapigm_head-header_txt = v_bktxt.
      ENDIF.
      MOVE gmcode_01 TO bapigm_code-gm_code.
    And calling the BAPI as:
      CALL FUNCTION 'BAPI_GOODSMVT_CREATE'
        EXPORTING
          goodsmvt_header  = bapigm_head
          goodsmvt_code    = bapigm_code
        IMPORTING
          goodsmvt_headret = bapigm_headret
        TABLES
          goodsmvt_item    = ibapigm_item
          return           = ibapigm_ret.
    *- Commit on Success
      IF NOT bapigm_headret-mat_doc IS INITIAL.
        CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'.
      ENDIF.
    Havent faced any problem so far...
    Did you populate <b>EXPIRYDATE</b> in  structure <b>BAPI2017_GM_ITEM_CREATE</b>? If yes, see in debugging, whatz happening to this value.
    Regards,
    Raj

  • Error message 00 344 : No batch input data for the screen SAPMF02D 0324

    Hi Experts,
    We are working with SAP CRM 4.0 and SAP R/3 6.20
    We have an important number of BDocs (type 'BUPA_MAIN' ) in status  E02 with the error message
    00 344 : 'No batch input data for the screen SAPMF02D 0324'.
    Can any one help us to explain the cause of this message and how to resolve it ??
    Thanks you in advance for your help !
    Best regards,
    Nabil.

    Any ideas ?
    We really appreciate your help !

  • HT1657 2 rented movies disappeared before due date when I updated my ipad software

    2 rented movies disappeared before due date when I updated my ipad softawre.  Any way to get them back?

    You will need to try contacting iTunes support and explain and see if they will grant you a re-download : http://www.apple.com/support/itunes/contact/ - click on Contact iTunes Store Support on the right-hand side of the page, then probably Purchases, Billing & Redemption

  • Manufacturing date updation

    Hi,
    We are using Discreete manufacturing in our SAP system. Currently we are implementing SAP one of our foundry unit. They wants to enter the Manufacturing date at the time of Production confirmation screen. In repetetive system, Tcode MFBF, manufacturing date is availble. But we are using CO11N for confirmation. In that Screen, Dates header is availbe. The Start executin date & Finish execution date field is available.
    I want to know, whether i can use this filed for Manufacturing date updation.
    Regards
    R Vaithiyanathan

    Hi ,
    You can bring LOBM_HSDAT characterisitc using BMSM traxn. Assign this Char in Batch class of finished material.
    CO11n( If you have selected auto goods receipt)  or MIGO on production order will update MCH1--> HSDAT field.
    You can pullout from table/ batch master data.
    Hope it helps,
    Jatin

  • Incorrect Header Dates in DataSource 2LIS_04_P_ARBPL after enhancement of AFKO fields GLTRP, GSTRP, GLTRS, GSTRS

    Hi experts,
    we enhanced the BI Standard content DataSource 2LIS_P_ARBPL "Work Center View from PP/PP-PI" with the AFKO (Order Header) Date fields
    - GLTRP (Basic fin. date)
    - GSTRP (Bas. start date)
    - GLTRS (Sched. finish)
    - GSTRS (Sched. start)
    - GLTRI  (Actual finish)
    - GSTRI  (Actual start)
    After the statistical setup of the application 04 (t/code OLI4BW) there are incorrect (regarding to the AFKO table) Date information for the fields GLTRP, GSTRP, GLTRS, GSTRS.
    t/code CO03 "Production order: Header"
    Table AFKO "Production Order Header"
    Table CAUFV
    PSA Table of DataSource 2LIS_04_P_ARBPL
    The Date information of the fields GLTRP, GSTRP, GLTRS, GSTRS not equals to the information in CO03, AFKO, CAUFV:
    Any ideas or experiences?
    Many thanks in advance and best regards,
    Michael

    Hi Anshu,
    thanks for your reply!
    yes, the release version settings in t/code OPL5 are relevant for the update.
    Helpful SAP Notes:
    - 787807 - Different data for a request in the R/3 and BW systems
    - 100082 - Change is not updated after release
    Regards,
    Michael

  • SLED /Manufacture date update.

    Hi Gurus
    We have some issue in  SLED . Production  done and batch is upadate with manufacture date and expiry date. later this was stock tranfered to other plant ( Australia) having received a batch in Australia & updated the manufacture date & expiry date correctly,  a quantity of the same sku/batch was, one month later received in India and when they performed the receipt (MIGO transaction) entered  different Manufacture date / expiry date, which has apparently updated the dates on the batch details in the Australian plant.
    Actually, while doing the MIGO this is update manually, so the the batch is tagged to the wrong expiry date.
    Is it possble to control this from manual override, to control the wrong entry.
    Santha

    No.  The receivers need to be trained that if they receive batch from another plant, and it is an SAP batch, they should not update it.  They are provided warnings at the time of receipt that the batch already exists which should clue them in.  In addition, the manufacture date from Australia should have been correct and the expiration date would be correct anyway.  So I would be more concerned about, and inquiring as to how, where and why they got the manufacture date they used instead.  Having a mfg. date, and hence the expiration date of a batch is a very serious issue and violation of most company procedures, not to mention of regulatory and customs agencies.
    I'm sure there is probably a user exit that can used to check the data before saving.  You should check with a purchasing person to check the available user exits for MIGO if you want to go that route.
    FF

Maybe you are looking for

  • Can iMove files be save on iCloud or on a WebDAV sever also can you add a password lock in Apple config

    I have a cart of iPads in my high school. Each iPad is shared by several students in different classes throughout the day. A clever student in one class decided to lock one of them. We have already unlocked it by restoring it, etc., but I'd like to p

  • How to change the recipients in workflow?

    I'm not  a workflow expert. Please help me how to change the recipients in workflow. The approver already resigned and we would like to change it to a new approver. We already deactivated the user and I stiil see him in SOST. In some releases, he is

  • Is there a case for creatiing more than on flat file sourece system in BI 7

    Hello BI/BW Friends: What are the Best practices / recommendations for the number of flat file interfaces, Flat file source systems to be created in a BI/BW system. I need to load 20 flat files into a BI 7.0 system. Is there a best practice in this c

  • IPad and proxy settings for more than AppStore and Safari?

    Why am I having problems w/ most apps and the proxy settings?  My corp. network requires proxy settings to get to the internet and only the AppStore and Safari (and a few specifically designed apps) will use the proxy settings.  All other apps simply

  • Forms Design and SQL Query

    Dear Friends, I have a ledger table. My client wants to see ledger of selected customers. Hence I have to design a parameter entry screen in forms for the report wherein the user can select customers and execute and the selected data passes to report