Help for  Planning  Layout in 4Th Currency in FI SL Currency 0SL

Dear friend,
One of my customers wants to create one Planning Layout for 4th in  FI SL  ( Planning in Profit Center), in table FAGLFLEXT  but I didn´t find any information how to configure that.  I have asked SAP but I did get any good answer from them.
My customer wants to clear some wrong data from this field 0SL currency. I have already did one but SAP inserted 0 for the other currency if I not flaged conversion field. If I flaged this field SAP wants to converte the data.
But for eraser the wrong data in 4th currency we need not converte and not filled the others currency.
Please, could some one send one material to create this layout or t-code for eraser this data?
Best regards and Thanks,
Roberta Fernandes
SAPFICO

Just to ask.  Are you coining your own phrase "is not ready for input" or it is the system giving you this message?  If it is the system, then the problem lies in your planning layout columns.
I believe you are working with a special purpose ledger.  Planning with SPL can sometimes be very tricky.  You may want to do the following:
1. Check the Z-tables to see if they contain any data if you've not already done so yet. Especially the Z table which ends with the letter "P".
2. Save the excel sheet as a template with data in text format.
3. Set your planner profile with t.code GLPSET
4. Use GLPLUP to upload your data
I do not believe the problem is with the ledger customizing but hey I may be wrong.
Good Luck,
Elias

Similar Messages

  • Need a help regarding planning layout

    Hi,
    I am designing a planning layout in OPO1. I have defined a column for Cost Eelemnt and next four columns with Period and Fiscal years, for these each column in the header line, i typed "&$1". Also created a Total Forecasted column for the sum of these four columns. While Saving the layout getting error as "Text variable &$1 has an invalid replacement rule." When checked the message, under procedure it says "If you want the replacement to occur as specified, you must define the missing characteristic in the layout. Otherwise enter a characteristic which has already been selected."
    It would be great, if any one can tell about defining the missing characteristics in steps.
    Regards,
    Naren.

    Hi Sampath,
                    Planning layouts are basically used for planning the costs, here you can define user defined layouts ana assign the same to planner profile..
    after that, you can default the planner profile KPO4 and run the t-code CJR2 to plan the costs.
    Basically it is used for cost planning
    Rgds
    Sudhir Reddy

  • I want some help for the layout of MuCow widget

    Hii
    I was browsing the musethemes.com website and I saw that they used two column layout for most of their widget, so my question is how to achieve that..
    Thanks..

    This "ability" is really not an ability at all... it's set up automatically in the background. If you put all of your bool (checkmark) items together, and if the labels for them are of so-many characters, then they will automatically display in two columns. The ability to format the flyout panel is something we're all hoping for someday! :-)  Until then, if you rearrange your bool parameters, then you may condense the flyout panel just a bit. Good luck!

  • Planning Layout 8A-157

    I all,
    I would like to find the list of planning layout available on SAP, and especially the planning layout 8A-157.
    I would like to customize it via Report Painter, but I couldn't find it anywhere in the system up to now.
    I tried transactions CJR2, KPF6, KEPM, KP65.
    Thanks for your help.

    Hi
    Planning layouts you can find in GRR2.. You cant customize layouts starting with a numeric no... You can copy it, make changes and give it a name starting with Y or Z
    Once you define this form, click on "Create report" button in the form and your report will be created
    Ajay M

  • Does planning layouts need aggregates?

    Hi all;
    I have a debate with one of my co-worker about the need of aggregates in a cube for the sake of planning layouts. My understanding is we need aggregates to uptimize the reporting performance faster. But he is saying that for SEM trans cubes, we need aggregates for planning layouts. I thoughts when they write the data into planning layouts it writes into the cubes not into the aggregates directly and when we do the rollup then we maintained the aggregates with those new data.
    Am I wrong or he is wrong? anyone...pls...because of this reason we have huge number of aggregates into the trans cubes.
    thanks.

    Hi,
    Can any one clarify my doubts.
    1. In which table the document data will store when you maintain documents in the Planning Layout?
    2. Will documents get copied from one version to another version when we do version copy?
    3. If yes (document will get copied when we do version copy)what if you want to maintain separate document for each version?
    4. What is the procedure when you want to print your documents along with the report?
    Could you please any one help me out I need the answers very very urgently.
    Thanks,
    Kiran

  • Planning Layout for Statistical Key

    Hello. Good Morning.
    Does anybody know how to enter the field Transaction Currency as a variable in a planning layout for Statistical Key?
    Please kindly answer me.
    Thank you very much.
    Best Regards,
    Antonio

    I try again as you said, it's ok. But I don't know why I can't do like before. Could you help me find the reason. Below lists all the data needed.
    Gen. data selection:
    Field Name          | Values
    Fiscal Year            Variable entry
    Period                   Variable entry From To
    Company Code      Variable entry
    Version                  Variable entry
    Statistical Key Fig. Variable entry
    data entry columns:
    Profit Center | Description | Quantity | Unit |
    Thanks in advance.
    Alex
    Edited by: Alexandro Miao on Jun 2, 2008 10:12 PM
    Edited by: Alexandro Miao on Jun 2, 2008 10:13 PM

  • Input Help (F4) does not work for Planning Functions in Web

    Hi Gurus,
    I am working in BI-Integrated Planning.
    When I execute a planning function from web layout (through Web Application Designer), the "Input Help" does not work. When I give F4 it takes me to the initial planning layout screen from the planning function variable screen without any action being performed.
    But the "Input Help" works fine when I have to select for the variable from the initial selection to open the planning layout.
    Can anyone suggest me any fix for this...
    Thanks!!!

    Hi All,
    Can somebody help me here what went wrong with indesign cc extension so that copy/paste does not work in input type element text
    Regards,
    Alam

  • Planning Layout for Activity Rate

    Hi
    My Client is a German Company. Controlling Area currency is EURO, It has operations in India also.
    For India, required to create BDC for Activity rate planning.
    1. Is it necessary to create separate Planning Layout for INR currency?..I did not find any currency in standard layout.
    2. Please explain how it works. whether it takes Cost Center currency or Controlling Area currency?
    Regards
    Pradeep Veer
    Edited by: Pradeep Veer on Feb 9, 2011 7:13 AM

    Hi,
    The standard setting for the leading currency plans the transaction currency for costs and the controlling area currency for prices. This is the Standard design. Please review 100379 & 183556 for further information on this.
    Please pay attention to the following section of note 100379:
    'Note: you can only change these settings in the following  Transactions: KP97 (as of Release 3.1I) and KP98 (as of Release
    4.6), as well as CP97 and CP98 (as of Release 4.6C). However, you  should only carry this out after you have taken Note 183556 into  account.'
    regards
    Waman

  • Hi All, please help me...Real time cube planning layout creation...

    Hi All,
    Could you help me on below process please.
    Iam working with BI7.0. I have real time cube (daily sales) and user need to access and update/add records accordingly.
    So for this real time cube I have to create planning layout with the data. User can see that data and update/add.
    I dont how to create planning layout (i heared that rsplan) how to show the data.
    Also I need some help on ABAP, I need to map some fields from a table.
    Actually from a flat file iam uploading data into ODS. In ODS has 3 more extra infoObjects.
    Ex: Shopping mall code, tenent number and outlet number info i have to pick contract number from table with routine and pass that contact number into ODS one field. It means Contact number will not come from flat file, thats what need table and routine.
    So for that I have to create one table (SE11) with all the information. and i have write routine.
    I have to read flat file 2 fields( like A and B) and check the value in a table and get the value C and put into ODS one field. I have to do this with routines.
    In the table have A, B and C values. Table also I have to create. so also please can u tell me some steps.
    Could you please help on this. Also with process chains for this.
    Thanks in advance!
    anil

    Hi Anil,
    If you go to RSPLAN there you can go to Portal link (it must be configured properly in system)
    In portal there will be wizard where you can easily go step by step and create planning functions and sequences like below:
           1.      You choose the appropriate InfoProvider.
           2.      You create one or more aggregation levels.
           3.      You create one or more filters.
           4.      You create one or more planning functions.
           5.      You create a planning sequence.
           6.      You test the planning model.
    which is clearly explained in below link
    http://help.sap.com/saphelp_nw70/helpdata/en/43/1d2440301a06f4e10000000a422035/frameset.htm
    after doing this you can create a query on aggregates you have created above and then make query input ready i.e planning enabled for keyfigures you want like mentioned in below link:
    http://help.sap.com/saphelp_nw70/helpdata/en/43/1d023a41130bd5e10000000a422035/frameset.htm
    then you can run query in Analyzer and save it as a work book after proper drilldown which can be used as template.
    Hope you understood basic thing, as you going on doing u will know clearly every thing.
    Ravi

  • How to implemented Planning Layout for other plan

    Hi,
    I have one planning layout for X plant now I want to use same layout for anothr plant. Can I copy the same layout for another plant...? If yes pleast let me know the step with tr.code.
    In this senario what I have to copy Planning area, Level or layout...?
    Your help will be highly appreciated. I will assign full mark.
    Regards
    Manoj

    Hello,
    Why don't use restrict your layout by a variable based on the plant? This variable could for instance be put on the planning level.
    Then just add this variable in your planning application via UPSPM.
    The variable can be an authorization variable, exit variable, user specific variable...
    Rgds,

  • Need Planning Layout help...,?

    Hi all,
    In planning layout what is the procedure to make proper settings. and also what is the conditions in there. can anyone explain it plz. if any doc's having any one on this, plz. send it [email protected] waiting for yours valuable reply.
    Thanks in advance.
    Regards,
    Kiran.

    Hi Kiran,
    here are the conditions / settings that determines the planning layout definition / design.
    http://help.sap.com/saphelp_sem40bw/helpdata/en/d6/b13ed98b8211d3b7360000e82debc6/content.htm
    for more, go here
    http://help.sap.com/saphelp_sem320bw/helpdata/en/09/078a4b016311d393850000e8a597a0/content.htm
    hope it helps

  • HOW to Restrict the input Help for 0MATERIAL in the BPS Layout

    Hi,
    I have requirement to Restrict the input Help for 0MATERIAL  in the BPS Layout.
    For Example if the Planning Package is Restricted to SALES ORGANISATION ( 3000 )  then the system shuold  check the 0MAT_SALES  where SALES ORGANISATION IS "3000" )AND PASS THE Material Numbers to the 0material list.
    I have Copied the standard Funtcion group  "UPF_VARIABLE_USER_EXIT"  to Z fucttion and have attached to Z Variabe as User Exit .
    this Variable is  Attached to 0material in the Planning Pakage. So tha now the 0MATERIAL is restricted to the variable which is having the User Exit.
    But how to acces the Values of Planning Package for which the Layout is bein Executed from this Z User Exit ???
    I Know how to restrict the input help, but my only problem is that how to get the values of Planning package through this User Exit.
    Please suggest if it is possible.
    Regards,
    Nilesh Labde

    Hi Nilesh,
    As I understand from your question,you know how to restrict but the issue is to know the value in the package with which you need to restrict.
    There are two tables which can help you finding the value used in package for sales organisation:
    1. UPC_PACKAGE
    2. UPC_OPTIOS
    How to use ?
    From UPC Package you will get one GUID, Hit the second table UPC_OPTIOS with this GUID.
    In field "FIELDNAME" enter the name of the characteristic whose value is req (sales organisation in your case)
    Hope this helps you
    Mann

  • Transport for delete planning layout

    is it possible to create a transport request for deletion. i would have to delete a planning layout i created using FAGLPLC(new g/l planning). i do not use this anymore and would like to delete it from the system and propagate the same to other environment(testing) . could you please let me know if it is possible to do so.

    thanq,
    ur correct that, looks like, ONLY standard lay outrs r transportable. bcoz, when I used my_alv_layout, I did  NOT see the SETTINGS option in MENU, instead there is ?????????????????????????????
    1) So, Is there any alternative for my requirement?
    OR
    2) pls. see my other thread, with title, Can I TRansport a table entry of LTDX, which DELIVERY CLASS is E, ALLOWED?
    Its about the TRANSPORTING the same new entry content from TABLE of LTDX , as its "E" type?
    and
    3) pls. let me know, Wht is the flag to show the alv field as CURRENCY?
    thanq
    Edited by: Srinivas on Mar 18, 2008 2:50 AM

  • Add a field currency in a specific planning layout

    Hello all,
    I create a new planning layout for activity with transaction KP75 actually I use 2 fields , activity and plan fixed price and I would like to add a filed to display the currency of the company code.
    Is it possible and how to do that?
    Thanks in advance.
    Regards
    Jean-Marc

    Hi,
    If you want to add more field in the layout,then go in change mode.Then select the layout & go to edit menu & select the new lead colum here it will add new colum now put the description & save.
    Regards,
    Raj

  • I have a USB cable for my iPod touch 4th gen. I have tried almost everything to make my windows computer find my iPod touch but its not finding it. Any help on this issue?

    I have a USB cable for my iPod touch 4th gen. I have tried almost everything to make my windows computer find my iPod touch but its not finding it. Any help on this issue?

    If not successful:
    Try DFU mode and then restore
      How to put iPod touch / iPhone into DFU mode « Karthik's scribblings
    Try another USB port and cable
    Try another computer to help determine if you have an iPod or computer problem

Maybe you are looking for

  • Regarding creation of application-

    Hi...    Am trying to create a new WebDynpro application in SAP Netweaver Developer Studio.Version:7.0.14.. When i create an application its saying that "Not Enough memory on the Disk"...Can anyone suggest me regarding this  problem.. Regards, Mrinal

  • Pretty stupid problem while installing XP on a macbook

    First thing, please excuse me if there're mistakes in this message, I'm not a native english speaker. Anyway, I've got a little problem. I'm trying to install XP on my macbook. I already did it before, but my hard drive crashed -while my external bac

  • Calling Function Module RV_ORDER_FLOW_INFORMATION in a Loop!

    Hi Guys, I need to fetch SD document Flow data into Bw for which I have created an Extractor using function modules. I am using a Standard FM  "RV_ORDER_FLOW_INFORMATION" which is called in the LOOP as below. LOOP AT VIT_VBRK INTO VFL_VBRK.     CLEAR

  • Transferring results of material cost estimates to COPA

    Hi, I heard that it is possible to transfer the standard prices of materials estimated in material cost estimate to COPA. Which transation is used for this purpose? Regards, Karol

  • --- •• WORKING WHITE BALANCE FOR YELLOW TINT Z1 ••

    Hello Guys, I'm here to bring some HOPE for those users who won, I mean who got Z1 from the lottery yellow tint issue. I am an XDA user since then and I found a thread saying that the Japanese version of Xperia Z1 SO-01F got white balance settings ye