Help me,Mass Changes to Reference Rate Routing

Hi,
I need to mass changes to reference rate routing.
but i don't know how to do it.
by using CA85N i was able to make changes to Normal routing but not reference rate routing.
so.so.so. i need your helps.
best regards.
thanks.

Hi
While entering the selection criteria make sure that you are entering the correct selection parameters. Since the routing exist in CA32, it will be come in CA95N also. Please try with correct selection parameters.
Thanks
S.Murali

Similar Messages

  • Reference Rate Routing -reg

    Hi,
    please let me know the usage of reference rate routings
    how they are advantageous to regular rate routings creations ?
    regards,
    madhu

    Dear Madhu Kiran,
    Reference Operation sets are used to create Routing which are used in Discrete scenario.
    Reference Rate routing are used to create Rate routing which are used in REM scenario.
    Also check this,
    Reference Operation Set  
    Definition
    A type of routing that comprises of a series of operations that recur frequently. It is used to create a
    routing.
    Use
    A reference operation set cannot be used directly in production.
    To reduce the effort needed to create a routing, you can
    reference the reference operation set
    All the changes you make in the reference operation set are automatically implemented in the referenced operations of the routing.
    If you have referenced a reference operation set in a routing, you can unlock this reference. In this case the operations of the reference operation set are copied into the routing and can be changed there. The connection to the reference operation set no longer exists, which means that any changes in the reference operation set are not transferred to the routing.
    use the reference operation set as a source to copy from
    Operations are copied from the reference operation set to the new routing and can also be changed there. Changes you make in the reference operation set have no effect on the routing.
    Structure
    A reference operation set has the same structure as a routing. You cannot assign a material to be
    produced to a reference operation set. It can have neither parallel nor alternative sequences.
    Regards
    Mangalraj.S

  • Differences between rate routing and reference rate routings?

    Hello PP members:
    I would like to differences between rate routing and reference rate routings
    Thanks for your time,
    Thanks Again,
    Suren R

    Hi Mr.Suren,
    As explained by other friends Routing is used in Discrete manufacturing and Rate routing is used for REM-Repetitive manufacturing.
    In addional to these types SAP has given 2 more types
    1.Reference operation set -Used in Discrete manufacturing.
    2.Reference rate routing - Used in REM.
    If similar rate routing is been used for producing many materials,then instead of entering(these steps) in rate routing of each  material you create a refrence rate routing and you enter the work centres used and the other details.After saving you get a group counter number showing reference rate routing is saved with group XXXXXXXXX.
    When you are creating rate routing for a material say A ,after giving the name and plant details in the top you will be able to see an icon "copy from" and you can select the radio button for reference rate routing and give the group counter number. or else without giving it here you have got an option to select the reference rate routing after entering into the operation screen also.
    In that particular page in operation overview screen,there will be an icon copy,there you can click that icon and you can give the reference rate routing group counter number and very easily you can create rate routing for N number of material.
    Likewise you can use reference operation set while creating routing for a material in Discrete manufacturing.This basically reduces the time in creating routing or rate routing for materials in Discrete & REM respectively
    CA01,CA02,CA03-Create,Change,display (routing)  respectively.
    CA11,CA12,CA13-Create,Change,Display reference operation set Respectively.
    CA21,CA22,CA23-Create,Change,Display rate routing respectively.
    CA31,CA32,CA33-create,change,display reference rate routing resp.
    I hope this will help you.
    If useful reward your points.
    Thanks & regards
    Karthik.

  • Difference between Routing & Rate Routing

    Hi All,
    can anyone tell me difference between Routing & Rate Routing? can we use routing for REM? if no, then what will be the effect?
    Thanks,
    Rinky

    Hi Rinky ,
                   Routing and rate routing are task list in broad manner .
    standard task list: Describes the worksteps necessary to produce a material or perform an activity without reference to an order.( that means they are created without reference to order )
    Essential objects of a task list are header, operations, material component allocations, production resources/tools and inspection characteristics.
    Together with specific dates and quantities, task list data forms an important part of the order.
    The following task list types exist in the R/3 System:
    routing
    reference operation set
    rate routing
    reference rate routing
    inspection plan
    maintenance task list
    standard network
    master recipe
    Routing is created with ca01 and rate routing by ca21 .
    Routing is used in discrete manufacuting and rate routing in repetitive .
    Rate routing generally has only one operation  and prod line instead of work centers and operations in routings .
    Both routings can be used for scheduling , cosing and capacity planning .
    Hope this was helpful answer !
    Neal
    Edited by: Neal Gibson on Jun 30, 2008 11:46 AM

  • Mass changing of folder names in CRM under tcode COMMPR01

    Hi Experts,
    Good day!
    I would like to ask help regarding mass changing of folder names in CRM in tcode 'COMMPR01' under documents tab. I tried to change the folder name of one material but it only updates the folder name for that specific material and not for the whole CRM box. Is there a way for me to do a mass change of name for the folders in CRM? Can this be done in customizing(SPRO)?
    Thank you,
    Christian del Rosario

    Hi Christian,
    Welcome you post on the forum.
    However, here is not for question of your CRM module. It is the forum for SAP Business One E-Commerce and Web CRM. If you are not using B1, close your thread.
    Thanks,
    Gordon

  • Mass Changes to Rate Routing

    Dear All,
    We were trying to carry out mass changes to Rate Routing,
    by using CA85N we were able to make changes to Normal routing but not rate routing, in CA85N we were able to select only three types of task lists ie N, S & Q. Also checked in CWEB here also only the three types of task lists were provided for selection. Is there any other way for carrying out mass changes to rate rouitng, or settings in the above transactions.
    Regards
    Mithun

    Dear Mithun,
    In my understanding only CEWB can help you to some extent,otherwise you may have to develop some
    BDC's or LSMW's.
    Regards
    Mangalraj.S

  • Mass change in routing - operation details - machine times

    Dear all,
    I want to do mass change in machine times of aprox 20 materials in routing.
    So can anyone guide me for the procedure.
    Thanks.
    Edited by: sapsarang on Aug 19, 2009 1:39 PM

    HI ,
    As suggested by Mervin,better option is record in LSMW for CA02 transaction.
    For creating LSMW ,please refer the link which explain the step by step procedure.
    http://nabiljirani.com/SAP/SAP%20ABAP/SAP%20brain/LSMW_STEPS.doc
    https://wiki.sdn.sap.com/wiki/display/CRM/LearningLSMWStepbyStep!!!
    Hope it helps
    Edited by: Girish  Adaviswamy on Aug 20, 2009 6:59 AM
    Edited by: Girish  Adaviswamy on Aug 20, 2009 7:00 AM

  • Mass change in routing

    Dear gurus,
    how can i changes std value in rate routing for more than one at same time
    thanks in advance
    umesh

    using CEWB transaction, you can be able to do it.
    refer to the link for more details
    [http://help.sap.com/saphelp_erp60_sp/helpdata/en/79/517c3545413671e10000009b38f889/frameset.htm]
    Edited by: vishal ashar on Mar 4, 2009 8:12 AM

  • Mass change for QM at operation level in routing

    Dear Experts,
    I have to carry out mass change for Quality Management at operation level in routing. The steps that I am carrying out for an individual record are as follows.
    1.     CA02
    2.     Inspection point 100 is maintained at header level
    3.     Go to operation level
    4.     At operation level work center and control key have been maintained
    5.     Double click on operation
    6.     When I scroll down here I go to Quality Management: Inspection Points view.
    7.     There by default in Insp.pointCompletion system shows the option as u201CQuantity, valuation (production) and radio button selected default indicates u201CQty-relatedu201D
    8.     I want to change these options as only u201CValuationu201D and u201CNo relationu201D respectively
    My queries are,
    1.     Is there any T-code available to carry out these changes in mass?
    2.     Is it possible to do this without any Z development?
    I am doubtful about using LSMW here. I would be highly grateful to you if someone can help me step by step.
    Thanking you,
    Anand Rao

    Hi Sujit,
    Thanks for your reply!
    I tried CWBQM. Unfortunately could not succeed. I think may not be feasible through CWBQM.
    But I came across T-Code CEWB . There I opted "SAP_OPERATION" as working area and it worked. Its quite useful T-Code.
    Thanks again for your input.
    Regards,
    Anand Rao

  • Rate Routing Changes

    Hi All,
    Is there a possibilty to find out the changes made in the Rate Routing of a BOM regarding to Component Allocation over a period of time.
    Regards,
    R. Vijayakumar

    Dear Rajavelu,
    Try the standard report CA60,for task list type R - Rate Routing,include the check box for for all the options under Detailed Change
    documentation for and execute the report for some date range for any material and plant combination,this will satisfy your
    requirement.
    Regards
    S Mangalraj

  • Mass change of routing

    Hi all,
    My question is mass changing of routing. Is there any transaction, mass changing of routing?
    Regards
    MSinan

    Hi,
    Try T code CA85, CA85N, CEWB.
    SmanS

  • Delete rate routing particular operation

    Dear all,
    In rate routing i need to need delete only operation 10 & 40 for this how handle this transaction in SAP.
    Example:
    10     Dummy
    20     Operation
    30     Operation
    40     Dummy
    Advance thanka
    By
    jack

    Dear
    There is no SAP Standrad Txn to mass delete operation in Rate rouning or any  type of routing .Even there is no FM or BAPI available for change routing. in mass but  you have BAPI for routing display and create
    The best option will be discuss with your  ABAPER  to develop a RFC enabled FM (called as RFC in Technical language)  and ask him to include BDC code for change operation/delete operation and all other thinghs which you want your BAPI should
    want you to perform .
    Hope this helps
    Regards
    JH

  • Contract Mass change enhancement in SRM 7.0

    Hi Experts,
    We are using SRM 7.0 & implementing new Contract mass change functionality for header P.Org. & P. Group data. I have created a Web Dynpro Component (with View similar to /SAPSRM/WDC_UI_AO_CT_MC_D), & implemeted a BADI /SAPSRM/CTR_MC_BADI & added an entry in Table BBPV_CTR_MASSOP.
    After selecting the change method i am getting the error "View O_V_PURCH does not exist in the component YWDC_UI_AO_CTR". Actually, O_V_PURCH is an outbound plug of the WEb Dynpro Component. I am not sure why this eror is coming.
    Could you please help me out in this. That will be a great help.
    FYI - I am using Operational Contract Configuration document as reference.
    Thanks & Best Regards,
    Vishnu

    Hi Azad,
    Thanks for the reply.
    I checked that the outbound plug is linked to the Window correctly. I do not understand why the plug is considered as a view.(as per the error message"
    Thanks & Best Regards,
    Vishnu Reddy

  • Copying and Mass Changing of Legal Controls on Material Masters

    I have just set up in our DEV system, the Legal controls on the Material Master . . . The Legal Regulation, the Export control class and the Grouping.  We do not have Foreign Trade turned on, but we wanted a place to store this information . . . to help when documents are generated.   My question(s) now are, when our users create Material Masters in most cases they create in reference to another material.  I tried this with what I set up, and it will not copy those fields . . . is there a way it can copy . . .something in configuration that will allow this?  And, also our users require a large amount of data to be changed sometimes and these fields possibly fall into that requirement, and I was looking for a way to Mass Change, but I am not able find those fields on the available Mass Change tables . . . I believe I need MAEX . . . Is there a way to Mass Change?

    Hello Diane,
    There are two things, which have to be done :
    -The first thing of course is, that for the fields involved the field :    
    "Propose Field Content from the Reference" must be set in transaction OMSR.
    - The second is, that the user have to enter this screen, because if she/he don't display this screen, then it is technically not possible to copy the reference values.                                                                               
    Hope this can help !!!                                                    
    Regards,
    Mauro

  • Mass Change in Material Master

    How to do mass Change of material group (say from 1HA TO 1HB) in material master in basic data 1 tab.
    Plz explain steps.

    Hi Rohit,
    Follow the Steps  SPRO - SAP Reference IMG - Production - Material
    Requirement Planning - Planning - Define Storage location MRP per plant - Enter
    the plant - Check for which Storage locations has got the indicator 1 - Storage
    Location stock excluded from MRP - Now remove that or choose the values.
    if you give me brief i can help you out more.
    Thank you .
    Regards
    Ram

Maybe you are looking for

  • ASDM 7.1 fails to start on MacOS

    Hi, I have an ASA-5505 which I have been managing using ASDM from a PC and a Mac. I just happens that the Mac has not been used in a little while and when I tried to use ASDM on it, it fails. I've had a trawl through various posts and release notes (

  • Cost of Sales Accounting

    Functional Area "0100" assigned in one General ledger Which one the requirement of 2 company, But Functiona Area should be derived from respective object ( Cost center/ Order etc)  for  one company which is located in another country. How it can be a

  • Convert 0-10 volt to 0-5 volt

    I apologize if this isn't the correct forum.  I need to convert a 0-10 volt analog square wave signal to 0-5 volt to use with the USB-634. Thanks in advance. LabVIEW 2012 - Windows 7 CLAD

  • Importing from iPhone _LOST_ pictures

    I imported photos from my iPhone, then chose to delete the original photos. At the same time I clicked this button, a text message came in to my phone and apparently triggered a concurrency bug. iPhoto completely beach-balled and didn't come back aft

  • Finding CPU patches on oracle support

    I could open a ticket and ask, but that would be a while for a response. Possibly days. So I am going to the patch screen. I am doing a search for CPUJUL2010 and nothing comes back. I need the July one on Solaris Sparc 64 bit. on the left there is a