Help reqd on Changing the Valid from "date"  for both BOM & Routing

Hi all...
Pls advise me how to do the changing of Valid from "date"....
Is there any process in CC01 or ECM???....
pls reply me in detail step format (step by step analysis)....
I wrongly created in CS01 and CA01 as 05.10.2007 as my valid from date instead of 01.10.2007.....
How to change to my actual one......
I dont know how to change it exactly.....as im beginner in SAP...pls take this into consideration...and post ur replies imm.
Pls reply me in detail....will be rewarded at the end while closing this issue.
thanks & regards
sankar

Dear Sankarbabu,
IF there's no setting for Date Check in OS54 - Engineering Change Management
Control Data,then you can create a change number with past dates,and also to
use the same one for changing BOM.
Tell me one thing you are saying you want to use ECM.Was the earlier one
created without BOM was created without an ECN?
See already if you have created your BOM with an ECN,then remove the date
check setting which I have mentioned in OS54.
Now goto T code CC02 ,enter the Change number and give the valid from date as
01.10.2007.
After that check in CS03 whether this date(01.10.2007)is getting reflected or not.
I'm sure this will solve your problem.
Regards
Mangal

Similar Messages

  • How to change the valid from date of the bom header?

    ECM is active in the system.
    I want to change the valid from date of the BOM header with the help of a change number.
    How can I change it?

    Hello
    Lets assume that, we are going to change Management for controlling Valid From date
    Steps to be followed for creation of Change No
    Tcode CC01 for Change No
    Click on Change Master
    Once you enter into Change master, maintain the description
    In the Valid from Date, maintain the date from which you BOM should be current
    Maintain the Status (01)
    Click on Ojbect Type, maintain for which Object types is the Change no needs to be active i.e. for BOM, Rtg, etc
    save the Change No
    After the change no is created
    Enter the Change No during the creation mode of BOM
    THe system copies the Valid from date from Change No

  • Wants to change the validity from date in BOM

    Hi,
    We have created BOM by mentioning valid from date 21.08.2018.
    Now we need to change that valid from date 21.08.2018 to 21.08.2008.
    How can we do that?
    thanks/regards
    vish

    Hello,
    If you are creating the BOM wr.to change number & if the change number date is lying in future. System allows you to change the effective from date for the ECN, which in turn BOM effective date also get change automatiocally. T code CC 02 for changing the date through ECN
    Maruti

  • 'Valid to' dates for both the Header & the components in the BOM report.

    Hi Experts,
    My Requirement:
    Need to display the 'Valid to' dates for both the Header & the components in the BOM report.
    Right now we are using the Functional modules 'GET_STKO' & 'GET_STPO' for the header
    & the components respectively. The report gives the correct output for the all the BOM alternatives
    which exist. But for the BOM alternatives which have been deleted(updated in STKO-LKENZ)
    'Valid to' dates are displayed as'00/00/0000'.
    (Note:ECM is used for BOMs)
    Is there any Logical Database that I can fetch the 'Valid to' dates of both BOM Header & components
    which are deleted?
    Regards,
    Mahesh

    Dear Mahesh,
    In my understanding I dont think you cannot get the valid to date for BOM header,unless a ECN,(engineering change number) is
    used to set the deletion flag.In otherwords none of the business sets for all these BOM's the valid to date(which means the
    default valid to date 31.12.9999 is taken).
    Check with this FM, CS_BOM_EXPL_MAT_V2 whether can you get the valid to date for the components(infact here also the
    valid from date given in the input screen impacts the report output).
    Check and revert back.
    Regards
    Mangalraj.S

  • Please help me to change the language from Danish to swedish i PS CS5

    please help me to change the language from Danish to swedish i PS CS5
    In the program (interfaces) i can only choose Danish

    There is nothing to choose. The language is determined by your serial number and the choice of language during installation. You need to reinstall in that language.
    Mylenium

  • IDOC BOMMAT: Wrong validity-from dates for components

    Hi all,
    I am currently loading BOMs via IDOC BOMMAT for a data migration project. Unfortunately I am having problems to load the BOMs with the correct validity-from date for components. The data is correct when I check in LSMW, but after the load of the IDOCs the validity-from date of each component is the same as the validity date of the BOM header!
    System Version is SAP 4.7.
    Thanks for your help and Best Regards
    H.

    Has anybody any ideas?
    Thanks a lot!

  • TS3999 How do you Change the sent from email for iCal invitations on my iPad. It uses the iCloud email but I want it to use my work email.

    How do you Change the sent from email for iCal invitations on my iPad. It uses the iCloud email but I want it to use my work email.
    It keeps sending from my bosses ICloud account, we are all synced at work but I want all my invitations to come from me, not my bosses iCloud account!
    Need to know how to do it on the iPad!!

    Hi garretktowne,
    Welcome to the Support Communities!
    The article below may be able to help you with this issue.
    Click on the link to see more details and screenshots. 
    Apple ID: Changing your Apple ID
    http://support.apple.com/kb/HT5621
    Cheers,
    - Judy

  • Change of valid from date in routing

    Dear All,
    How can i change the routing "valid from date".
    When i am creating a prod coder in co01 its throwing a message that routing is not found so when i wwent to co02 it is showing that valid from 09.01.2012 but i need production order from 01.01.2012.
    Plz help.
    Thanks.

    Hi,
    There is a work around to change the validity of routing without using ECM in this particular situation
    1) While creating routing in CA01 you can change the key date to some past date say 01.01.2012.
    2) If already routing exists (one GC available) for same material and group number you can create another GC with past date and use the new GC for Production order by changing the old GC status to 1
    Be sure of implications of creating master data in past and may not be a standard practice.
    you can try and hope useful.
    Regards,
    Brahmaji D

  • Extend the validity to date for planning calendar

    Hi gurus in md26, iam trying to change the validity dates as they are expired, can some one advise me the correct way to do this, when i am doing that i am getting runtime errors,
    Thanks in advance,
    Regards,
    Gopio

    Dear Gopio,
    Follow following steps;
    (1) Go to transaction code MD26
    (2) Enter your plant and and Planning Calendar
    (3) Select "Periods" (click Calculate Periods or Fn F8 Button)
    (4) Enter new dates (Valid From and Valid To)
    (5) Check and Save
    Hope this info will suffice your needs.
    Regards - Muralidhara

  • In Service contract, to change the valid form date on service code level.

    Hi.
    I want to change the price valid form date on service code level ( i.e. in condition)  in Service contract.
    I know i can  do that with ME32 transaction but i have lot of Service contract with more then 10,000 line items
    Is there any way that i can change in mass based on Service contract no. wise.???
    Thanks in advance..
    Edited by: VIKRANT HANDE on Sep 15, 2009 9:11 AM

    Please check in KON* series table in SE16N transaction. I guess KOHN table may help you out. You can see other similar tables.
    In any one of the table you will find validity data.

  • I need to change the storage hard drive for both lightroom and Photoshop from my C drive to F drive

    How do I change my storage drive from C to F in both lightroom and photoshop as I am running out of space on my C drive?

    Storage Drive ??  Photoshop.   What Platform and OS are you running.
    I use PC therefore Windows. When I thing about Application like Photoshop I know the are going to be files all over the place.  Windows like everything installed on the Boot disk.  I gave up the fight many years ago and let windows have it way when application are installed using an installer.  However besides the application files you have user files and I break user files down into to categories. Windows User files like applications settings, preferences, cashes, etc and user Data Files,  Images, text documents, PDF.   Applications like Photoshop also have add-ons an need swap space as well.  While all Windows default library reside on the C: drive you can add additional storage  to you document, music, picture and video libraries the are not on the c: Most of my user data file are actually on external ESATA drives or USB3 drives.  System files, Application Files, Paging, swapping and backup are on internal SSd and Fast Disk drive. Some of the folder that look like they are on C: are actually shortcut links to folders on other drives.

  • Business partner change Valid From Date field

    How can I change the Valid From Date field in tables:
    BUT000
    BUT020
    BUT0BK
    BUT100
    Currently the of date of creation of the business partner is in this tables' Valid From field.
    In transaction BP the Address of the Business Partner is  valid from 01.01.1990 but still I get a warning that the business partner is not valid for date 01.11.2011.

    Sounds like the problem is the valid to date.  What is that date set to?

  • Component - Change valid from date

    Hi Experts,
    I am using function module CRM_IBASE_COMP_CHANGE to change the component data. I am able to make all the required changes in the component except valid from date. Even though I am specifying it in VALFR of the structure IBAP_COMP3
    Can you suggest me how do I change the valid from date of the component.
    Regards,
    Abdullah

    Hi Abdullah,
    Valid-from date cannot be modified. If you go to IBase Display or if you create a new IBase with one Component, then you can observe there, that Valid-from date is only a Display field which takes current date by default (during creation) and not an input field. Hence i think you cannot modify.
    Thanks,
    sksingh

  • How to set the Valid-to-date (datub) of a BOM item

    Is there a way I can set the "Valid-to-date" of a BOM item?
    According to SAP documentation...
    Quote
    <i>"If you change a BOM using a change number, the system determines the valid-to date dynamically."</i>
    Unquote
    I want to "expire" a BOM item. Meaning I want to set the valid-to-date to a date in the past.
    Is this possible at all?
    Thanks for any input.
    Fred

    Ferry,
    Thanks for you reply.
    I do not see a field for the "Valid-to" date in the function module - CS_BOM_EXPL_MAT_V2. There is one for the "Valid-From" date called DATUV. But I would like to change the "Valid-from" date of the BOM item.
    Or is there another way to set the BOM item's valid-to date using this function module which I am missing?
    Fred

  • Changing valid from Date in MDG Finance

    Hi,
    We have a valid edition say E1 that has the validity of 08.08.2014 to 31.12.9999. We have assigned few master data objects (Cost centers, profit centers etc) into this edition. Now we have to change only the Valid from date (say to 10.10.2014) of few cost centers that are part of the edition E1. How do we achieve this? I tried creating a new edition say E2 that has the validity of 10.10.2014 and tried including into it. However I see even after including the cost centre into the new Edition E2 the cost centre still shows as having validitity E1.
    Please help.
    Regards,
    Ponraj M

    Hi ponraj
    You can change here as per sceeen snap ( Available in MDG 7.0 and future versions)

Maybe you are looking for

  • How do I reinstall HP SImplepas and Validiy sensor on Win 8.1

    Hi  I reinstalled HP SImplepass and validity sensor driver once before by doing it in a particular order i can no longer remember and running it under compatibility settings. I had to refresh my machine and I cant get the snesor to work Can anyone ad

  • Pixelated images in RSS screensaver

    I added two RSS photo feeds to my RSS screensaver, one from flickr, one from Picasa online. The photos on both those sites are large, high-resolution photos. Yet 9 in 10 of those photos that cycle through the screensaver have incredibly poor image qu

  • IPhone SDK b3: How I fixed broken (blank) Research Assistant

    Hello, I wanted to give this thread a new title as the original thread didn't indicate "iPhone SDK" in the title, and was in reference specifically to b2. The original thread: http://discussions.apple.com/message.jspa?messageID=6935634#6935634 Here a

  • Indesign and Flex connection - WYSIWYG!

    Guys, My client has requested for one application. He says that he shall create some files in indesign and those should be rendered in Flex when requested by the end user. I am completelu clueless about this requirement. Seems like Indesign can expor

  • Request: Support DNG as Option to Pass Images to Photoshop

    I see you've added the option to Export to disk in DNG format. Love it. But I'd also like to see the option of passing an image with Develop module adjustments to Photoshop and other external editors in DNG format. At the moment, only JPEG and TIFF a