Help required -for MRP Run at storage location level

Hi ,
we need to have separate MRP fro two storage locations with direct procurement from Storage locations. Right now we have MRP run at Plant level for all the storage locations. we donot want the materials in these two storage locations to be planned at Plant level only with Separate storage locations. Plant level MRP will run for the other storage locations .
I have created separate MRP areas for the storage locations & activated MRP for MRP Areas client level. material masters for the two storage locations have been asigned the MRP areas & maintained the MRP area data in material master .
When we run the MD01, the Planned orders are getting created at both MRP areas plus at the Plant level.we donot want the planned orders creation at Plant MRP area level-only at the storage location level for those two storage locations MRP areas.
Can anybody guide me -how to achieve that ? Did we miss any configuration?
  I tried to maintain scope of planning & getting error for parallel processing .
Do i need to maintain parallel procesing with servers ?
  Pls need your input on this. Any help will be highly appreciated .
   Thank you in advance.
    Regards,
    Krish.

Hi,
     Go to IMG settings 'Materials Management + Consumption-Based Planning + Planning + Define Storage Location MRP per Plant' Enter your Plant, It will show list of storage location in that Plant, then select 2 in 'MRP Indicator' field for storage location for which u want to plan seperately.
Hope It will clear Your Problem
Regards
Sunil Kumar

Similar Messages

  • How to run MRP on different storage location level ?

    Dear Experts,
    Need your valuable guidance to solve the below requirement form the client-
    1) My client want to enter a "safety stock level" for one spare part/ Material on the basis of individual storage locations.
               For sake of example: in SL01 he wants the safety stock for particular material set to 5
                                  In FS18 he wants the safety stock set to 2
                                  In FS15 he wants the safety stock set to 1
    Kindly tell me whether it is possible? & guide me how to do it.
    2) Also tell me how to run MRP on a storage location level?
               This is because after maintaining different safety stocks for one material in different storage locations,  is it possible to appear each storage location with their differing safety stock levels?
    I checked the MRP type maintained & its-1 (plant) & not as- 2 (storage location).
    Kindly guide me for the above issue
    Thanks in advance for your support.
    Regards,
    Mehul

    Hi Umashanker,
    Thanks for your suggession . Accordingly I have resolved the issue.
    Regards,
    Mehul

  • Open Purchase Orders not considered as requirement for MRP Run

    Hi ,
    We are facing a issue of Open Purchase orders not appeared in Stock requirements list and also it is not considered as requirement for MRP Run against reservation.
    As aresult for a reservation demand of 10 units we are ending with Open POs 10 units and a additional planned order 10 units.
    Material Type : ERSA
    MRP Type : PD (or VB)
    Lot size : EX (  HB if MRP Type is VB)
    Could you please throw some light to correct our settings to MRP to consider Open POs?
    Saravanan

    Can you check to see if there is a re-order point set up for this materia? That could be causing the problem too.

  • Can PIR created at wbs element and MRP area of storage location level

    Hi,
    I tried to create an planned independent requirement at MRP area and WBS element level, but failed. The MRP area is not plant level, but storage location level.
    *When trying to create account assignment category Q for it, then there is an error message saying:*
    **only stock requirements are allowed when planning at MRP area level.**
    Does it mean it is not possible to create planned independent requirement for this case?
    Thanks!

    Select the "Issue storage location" as '2' here:
    spro -> production -> material requirement planning -> mrp groups -> overall maintenance of mrp groups -> overview -> mrp control parameters at material level -> (field) Issue storage location selection
    & make sure:
    1. In the BOM  issue storage location is blank for the components
    2. For the FG products , in mrp area prod.storage loc is maintained
    3. Components are extended to the mrp area.
    Pl. revert with the results

  • Material block for sale in plant-storage location level

    Dear experts,
    Please help me how to block a material to sale in plant-storage location level.
    Thank you.
    Regards,
    Badruddoza

    The standard sales block (MVKE-VMSTA) in material master is valid for sales organisation / distribution channel combination (VKORG, VTWEG) - this means you cannot do it for Plant / SLoc combination,
    What does it mean to block it at plant / sloc level? Generally in SO you do not specify the storage location. Or you are speaking about MRP also? In this case you could use SLoc-MRP (with proper availability check in delivery) for your material but the problem is that a plant might be assigned to several sales area and this SLoc would be hidden for them also.
    Could you please specify what would you like to achieve, what sales block means according to you?
    Regards,
    Csaba

  • MRP run at storage location

    Dear All
    We have around 10 storage location and out of the 5 storage location i dont want to include in the MRP run.
    What should I do ?  can you please guide me.
    Regards,
    AMOL WAGH

    Dear ,
    In my understanding it's only possible to make stock in transfer,blocked stock and restricted use stock as available/not available
    for planning.So in my understanding it's not possible to exclude a particular storage location's quality stock to be excluded from
    MRP.
    kindly check this thread which gives a clear explanation regarding your requirement.
    Exclude QI stocks from MRP
    Correct me if I'm wrong.
    Regards
    Mangalraj.S

  • Location required for stock within a storage Location

    Dear All,
    Can we have location concept to identify different stock location within as Storage Location. We are only using MM module and not using WM Module.
    Is there a option to maintain location concept to identify stock located at different location in a storage location only in MM Module.
    Regards
    Vikas Sehra

    Hi,
       As you know, the same can be very well mapped using WM. If you are not using WM, you may check the following option.
       If you are using same location for a material within a storage location, you can maintain the location as "storage bin" in the material master - "plant data / stor. 1" view as shown below:
       The same will be shown in MMBE:
       Please note that this storage bin is not actual storage bin, its just a text field for tracking the storage area. It doesnt have any other control.
    Regards,
    AKPT

  • Change MRP type at storage location level

    Morning,
    i am having trouble with PD and ND reporting. Your you are aware ND should only have balances of 0 and PD should only have balances of >0. When i run a reportto show all PD stock and exclude the positive balances, i am getting MM numbers appearing that are 0 in 1 sLoc but have a positive stock balance in another sLoc. This becomes a problem when i change the PD to ND because it changes at plant level. i only want this to be changed at the sLoc with the 0 stock balance.
    I have tried MM06 to flag the MM for deletion at sLoc level however, when running the report again, the sLoc with 0 stock balance still shows.
    Also, i have about 800+ that need changing so a solution to do this in a batch would also be appreciated.
    Please help.
    Paul

    Hi,
         Go to IMG settings 'Materials Management + Consumption-Based Planning + Planning + Define Storage Location MRP per Plant' Enter your Plant, It will show list of storage location in that Plant, then select 2 in 'MRP Indicator' field for storage location for which u want to plan seperately.
    Hope It will clear Your Problem
    Regards
    Sunil Kumar

  • RLM MRP execution at storage location

    Hello Friends,
    Need help - I am configuring RLM with MRP - need help with below:
    Requirement: I need to run MRP at the main storage location first (requirement is from Plant Maint order), followed by another MRP run at secondary storage locations. I want to deplete stock in the main storage location before using up stock at secondary storage locations.
    This is not for re-order point planning (VB) for both storage locations, I know that I can plan MRP separately at storage location levels, but that only works with re-order point replenishment.
    Is MRP area configuration my only option?
    If possible I want to avoid MRP area configuration - I hear once it is configured we can revert back!

    Hi Joe,
    As per your client requirement, you need to run MRP at Main storage location, and want to avoid performing at storage location, here you can define the supply chain derivation via plant Mainteniance order by using using item category and transport requistion in RLM Configuration. you have option to select the order type order type item category  ( ), item category change rule ...( newer change item category) & direct prourement type ( SAP Std ).
    Yes MRP Area is the only option, the MRP first as plant level is the option, check in setting ie Step-3 Supply process derivation via plant ( supply type PD).
    The parameters for the RLM Supply Process are a combination of the following:
    · Material requirements planning (MRP) type at the requesting plant or storage location (the plant making the request for materials)
    · MRP type at the supplying plant or storage location (the plant or storage location supplying the material)
    · Special procurement type at the demanding plant or storage location.
    For more information pls check this link..
    http://help.sap.com/saphelp_47x200/helpdata/en/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm
    http://help.sap.com/saphelp_oil472/helpdata/en/83/496c3a411aab70e10000000a114084/frameset.htm
    BR
    Satish

  • Number range purchase requisitions at storage location level

    How can I define a number range for purchase requisitions at storage location level? I have one plant with several storage locations and I want a number range for purchase requisitions per storage location.

    what is the background to this request?
    I guess that the requestor can easily identify their own requisitions among many.
    I dont think that this is necessary with SAP, do not put to much importance in numbers, there are many other options to meet the users requirements.

  • Help required !! For MRP at Storage location level

    Hi ,
    we need to have separate MRP fro two storage locations with direct procurement from Storage locations. Right now we have MRP run at Plant level for all the storage locations. we donot want the materials in these two storage locations to be planned at Plant level only with Separate storage locations. Plant level MRP will run for the other storage locations .
    I have created separate MRP areas for the storage locations & activated MRP for MRP Areas client level. material masters for the two storage locations have been asigned the MRP areas & maintained the MRP area data in material master .
    When we run the MD01, the Planned orders are getting created at both MRP areas plus at the Plant level.we donot want the planned orders creation at Plant MRP area level-only at the storage location level for those two storage locations MRP areas.
    Can anybody guide me -how to achieve that ? Did we miss any configuration?
    I tried to maintain scope of planning & getting error for parallel processing .
    Do i need to maintain parallel procesing with servers ?
    Pls need your input on this. Any help will be highly appreciated .
    Thank you in advance.
    Regards,
    Krish.

    Hi Krish,
    Go to following IMG path and check out your settings -
    IMG>>>Production>>>MRP>>>Master Data>>>>MRP Areas>>>
    (1) Activate MRP for MRP Areas    -
      Is that activated?
    (2)Define MRP areas>>>> Do setting s as per Storage Location
    Then run MRP.
    MRP Areas
    In this IMG activity you define whether MRP is to be carried out with MRP areas. In addition, you define the MRP areas for each plant in which you would like to carry out this type of materials requirements planning.
    The MRP area represents an organizational unit which carries out materials requirements planning independently. The results of the planning run are displayed specifically for each MRP area. An MRP area can include one or several storage locations of a plant or stock with a subcontractor.
    You can assign a material to various MRP areas.
    Basically, there are three types of MRP areas:
    Plant MRP Area
    Initially, the plant MRP area includes the plant with all its storage locations and stock with subcontractors. When you have defined MRP areas for storage locations and for subcontractors and you have assigned the materials, the plant MRP area is reduced by exactly this number of subcontractors and storage locations, as they are now to be planned separately.
    MRP Areas for Storage Locations
    You can define an MRP area that consists of a particular storage location by creating an MRP area and assigning the storage location to it. Material requirements for this storage location are then planned separately from the rest of the plant. You can also group several storage locations into one MRP area by creating an MRP area and assigning the storage locations. These storage locations are then planned together.
    MRP Areas for Subcontractors
    You can also define an MRP area for each subcontractor. Using an MRP area, it is possible to plan the components to be provided in subcontracting, by defining an MRP area for each subcontractor and assigning the components to be provided. You can therefore plan the requirements to be provided for these components for one subcontractor separately from the usual requirements.
    Up to now, MRP at plant level had been carried out. The various requirements were combined in the planning run and procurement elements were created for these pegged requirements with unknown sources.
    The introduction of MRP areas enables you to carry out material requirements planning and know the source of the pegged requirements and to be able to distinguish between them. The source of the pegged requirements can be, for example, production on a particular assembly line or a subcontract order.
    Material requirements planning for each MRP area allows you to have specific control over the staging and procurement of important in-house production parts and purchased parts for each shop floor and assembly area.
    Hope this will give you more idea about the same.
    Satish

  • MRP at storage location level with external requirements

    HI,
    We have to have reorder point planning at storage location level. Also we need to consider external requirements.
    When I am setting storage location MRP indicator as 2 and putting Reorder point and replenishment quantity, then after running MRP it only considers the replenishment quantity but it doesnot consideer any external requirements.
    Help me out how to configure the requirement?
    Regards
    Sukant

    Hi,
    I think your question is answered by Sarita Doddi.
    If you have several storage location for your plant, you cannot plan for them separately unless you assign them to a separate MRP area.
    If a storage location (alone) is assigned to an MRP area, it means you wan to plan for it separately. If several storage locations are assigned to an MRP area (or let's say to a plant), it means you want to plan using all of them - and you cannot choose only one and plan for it (you can exclude a SLoc from planning w/o assigning it to MRP area).
    So, planning is not SLoc wise, it goes MRP area wise.
    BR
    Csaba

  • How to run MRP at storage location level?

    i know to run the MRP at plant level. i want to know to run the MRP at storage location level. what are the setting have to do for that? please can help any one....

    Hi,
    I think your question is answered by Sarita Doddi.
    If you have several storage location for your plant, you cannot plan for them separately unless you assign them to a separate MRP area.
    If a storage location (alone) is assigned to an MRP area, it means you wan to plan for it separately. If several storage locations are assigned to an MRP area (or let's say to a plant), it means you want to plan using all of them - and you cannot choose only one and plan for it (you can exclude a SLoc from planning w/o assigning it to MRP area).
    So, planning is not SLoc wise, it goes MRP area wise.
    BR
    Csaba

  • MRP - Create STO for Stockk Transfer between Storage Locations

    Hi Everyone,
    I have a scenario where MRP run should create Planned Order as well as STO for a VSF Requirement. The reason is our Plant has got 2 Storage Locations. One is the Production Storage Location and the other is Warehouse Storage Location. The Planned Order should be for Production SLoc and STO should for Stock Transfer from Production to Warehouse Storage Location. Your suggestions are much appreciated to resolve this issue.
    Thanks,
    Jay.

    new releaes bring new features........
    not all new features can run in old environments.
    I know that companies did already Storage location to storage location STOs in 4.6c but they had z-tables to assign customer numbers at storage location level, and they had changed some  coding to make it happen.
    I am not sure if there is an OSS note that explains the steps and modifications needed......but try to search OSS.

  • Release strategy in sales order is required before MRP run

    Hi Experts,
    My requirement is Release strategy in sales order is required before MRP run. My client is doing the following process:
    1) Creation of Sale order (MTO).  Ex: User creates 10 sale orders per day.
    2) MD04- Stock Requirement List. All 10 Sale orders should be displayed. So no problem here.
    3) MD50-Make to order-Planning . Here when user gives the sale order number and sale order item and press enter, then only the released sale orders should be allowed and the rest sale orders it should throw a error message and it should not allow to process further.
    How this situation can be addressed in SAP.
    Kindly post some hints and comments.
    Regards,
    Kiran.

    Hi Kiran,
    Define and Assign status profile BS02 at sales order detail (line item) lets say with create and release status
    SD>Sales>Sales documents>Define and assign status profile
    Have create status as default while creating SO with item
    And do a user exit change for MD50 with ABAP consultant help and release it when user keys in SO and item.
    For other line item I believe it will give an error
    Pls try and update if it solves your requirment
    Regards,
    Siva

Maybe you are looking for

  • Issue Installing Adobe AIR

    Hi, I'm actually trying to install PhotoShop Element. I can't install it because Adobe AIR is not installed yet. But when I try to install AIR, nothing happened. I Have download the latest version on the adobe website, but when i start the exe, nothi

  • Regarding Performance It is Urgent.

    hi      I have one statement    move-corresponding gt_bkpf to post_tab. In gt_bkpf  Internal Table 10 fields are there. Post_tab is another Internal Table. In performance issue you need to use ASSIGN instead of move-corresponding. How can i do it. Pl

  • IPOD doesn't fully update!

    Hello, My ipod will not fully upload everything from my computer for some odd reason. When I was downloading songs those always updated no problem. Now I have a bunch of podcasts on my iTunes but they will not upload on my ipod. I have the setting se

  • Sync Photos from Apple TV to a Mac Pro - HELP

    Hello All, Let's say I lost my photos from iPhoto, but I synced them to my Apple TV. Can I tell the Apple TV to sync my photos back to iPhoto? I know you can sync music back from an iPod. Thank you.

  • Ultra 5 Solaris 8 Drivers

    Hi have downloaded and tried to install Solaris 8 on my Ultra 5 Series 3 and it would not allow me to install networked so I chose non networked and now want to install the correct drivers. Does anyone know where these might be (if not on the Solaris