Heuristic run @ destination location is creating the purchase requisition without source plant

Hello All,
Trust you are doing well.
Believe this is the good time to connect with you all get some advice on the below mentioned scenario:
Material (XXXXXX) is discontinued at source location (Plant specific material status: 90) but the same material
(XXXXXX) is still used in destination location (plant specific material status: 60). Here heuristic run @ destination location is creating the purchase requisition without source plant.
Here the customer expectation is that “SNP should not create the order, since the material is discontinued in source plant”
Could you please advise?
Regards,
Prabin

Hi Prabin,
You can change the SNP profile to NO PLANNING automatically and exclude the target location from the SNP run. Maybe you can try using Badi: SMOD_APOCF005.
This is what I would do:
1- Do not exclude the status 90 in the iModel.
2- Then when you change the status in order to discontinue a material at the source location you will be changing the status from 60 to 90 and you will CIF this modification to APO. At this time, I would use the BAdI: SMOD_APOCF005 to identify this situation. You will need to add a code in order to identify what are the possible target plants of your source plant and you will need to change the SNP Profile at the target location.. look for a BAPI for this...
Take a look of this document to see an example code of SMOD_APOCF005:
APO SNP - Master Data Automation
Kind Regards,
Mariano

Similar Messages

  • Not able to create the purchase requisition for the subcontracting process

    Dear Gurus,
    There is a process order with the component which is to be handled in the subcontracting .Earlier we are able to create the purchase requsition with the creation of the process order .But recently I am not able to do so .I am getting the "The value of the field Reservation/Purchase requsition as Never" .I have checked with the settings in the procurement type in the MRP2 view of the material master  which is "X" ,the validity of the outline agreement and contract  which is OK.Can you please help on this.

    Hi Venkata,
    Check this links:
    http://help.sap.com/saphelp_nw70/helpdata/EN/84/0cb892edfbc34290c1685132006662/content.htm
    http://help.sap.com/saphelp_nw70/helpdata/EN/58/54f9c1562d104c9465dabd816f3f24/frameset.htm
    http://help.sap.com/saphelp_nw70/helpdata/EN/f3/914f3445194d468f652d45494230b1/content.htm
    Which database and OS is your BW server on? Not all of them are supported for SQL server
    Hope this helps.
    Regards,
    Diego

  • Is there any way to create a Purchase Requisition without Purchase Inf Rec?

    Hi,
    i am dealing with the Preq creation for services when there is not any previous contract and i have noticed that the vendor and the net price are posible to populate them directly in the Purchase Requisition. if then i try to run the ME59 it is not possible to automatically convert it to a Purchase order because there is no PIR (when i assign the source of supply in the Preq then the PO is correctly created using ME59).
    I have been reviewing customizing but there is not any point related to that.
    Someone knows if it is possible to create a Preq for services without PIR?
    thanks
    ivan

    Hi,
    For Service auto- PO from PR, you need to activate Automatic Purchase order creation for Service requisitions in ML91 t.code.
    Note:
    For material :automatic PO creation from PR, follow the steps.
    1) Material Master purchasing view tick automatic PO check box
    2) Vendor Master purchasing view tick automatic PO check box.
    3) Maintain Source list for Vendor & Material.(ME01)
    4) Maintain Purchase Info Record.(ME11)
    5) Create a Purchase Requisition.(ME51)
    6) Use T.Code: ME59 & execute for PR for vendor, you will be able to create automatic PO.
    During creation of PR , select check box of Source Determination in the 1st screen of ME51
    Ensure that Purchase Info Record should be there.
    If you have more than one vendor then fixes only one vendor in source list.
    Regards,
    Biju K

  • MRP creating additional purchase requisitions for the existing sales order

    Hi,
    We have scenario where we switch materials from POD material to ARP material. POD material is just like make to procurement which creates purchase requisition and purchase order upon saving the sales order. ARP (Auto replenishment) material creates purchase requisition based on sales order and re-order point while running MRP.
    When the material is POD title, it created purchase requisition and purchase order (example: 4500000110) while saving the sales order (example: 1000000010) for the quantity 10. After some time this material is switched to ARP and it has open sales order (1000000010) and purchase order (4500000110).
    We have special MRP run for ARP materials based on MRP type, which creates purchase requisition.. What is happening is when we run MRP; it is creating new purchase requisition for the old sales order (1000000010) for the quantity 10. But old sales order (1000000010) is already having purchase order (4500000110) to fulfill. So we donu2019t want to create new purchase requisition for the old sales orders. It should create purchase requisition only for new sales orders.
    Please advise
    Thanks in advance
    Srinivas

    Mangesh,
    If the components are Inhouse production then you can think of using collective orders by assigning special procurement key 52. If raw material exists then your requirement cannot be met..as i think your scenario is of assembly processing. The idea of assembly processing is that component materials will always be available and only assembly will be done based on Sale Order.
    Regards,
    Prasobh

  • Can u tell me any bapi to create the purchase req with sales order as refer

    can u tell me any bapi to create the purchase req with sales order as reference?

    Hi Mukesh,
    You can use 'BAPI_REQUISITION_CREATE' for the purchase requisition creation if through transaction, you use transaction ME51N for creating the purchase requisition.
    Cheers,
    Sujay

  • MRP creating a Purchase Requisition

    All,
    I have a user that uses MD04 to create a planned order into a Purchase Requistion on a daily basis.  However, my ser is telling me that they sometimes go into MD04 and the system has automatically created the Purchase Requisition even though the user did not convert the pan order.  Can someone to explain to me what setting is allowing this to happen.  This is an area I am unfamiliar with.
    Thanks,
    Sean

    Dear
    There are following reason why MRP generetes PR rather than Planned Order :
    1.In MD03/MD02/MD01-You might have selected Create PR indicator as 1 along with other MRP parameters like NETCH .
    2.In material master MRP2 view , you must be assinged F-External Procurement for material  or X-both in-house /external
    3.If you have assinge MRP Group in MRP1 view for External item , then check in OPPR-Deifne MRP group whether you have marked Create Perchase Req .
    4.Basically , MRP processing parameter used by you for "Create Purchase Requisation" field in MRP run it may be   "2", what this means is that after MRP run, it creates purchase requisitions within the opening period and planned orders outside the opening period.If you always want PR to be created then use parameter "1"  but if you want Planned Order then keep 2 or 3
    Just check the re-scheudling horizon and planning horizon if any in OPPQ and test the same in same.I think when it is out side the opening period , it will generate Planned order .
    Regards
    JH

  • Error while creating a Purchase Requisition T Code ME52N

    Dear Freinds,
    The users are trying to create the Purchase Requisition, however the system gives the error message that the GL Account xxxxxx cannot be used, as the comparison of the field selection strings are not comparable with the Account Assignment Category E. Message no. is ME045. How could we resolve this?
    Thanks for the help.
    Regards

    Dear,
    check the FSG for the GL Account 200010 and go to TCcode OBC4 and check the status of field 'Asset number / subnumber' and then go to TCode OME9 and select A and check the field status for field 'Asset number / subnumber'. Status at both areas are different hence system is not accpting. Make status identical.
    Regards,
    Sandip

  • User Exit/BADI to change the Purchase Requisition date,creating threw MD02

    Hi,
    I've a requirement to change the Purchase Requisition creation date.
    I'm using MD02 to create Purchase Requisition.
    Based on the requirement if the available qty is less than the required quantity,we can change Purchase requisition date.
    Please let me know if any BADI's/User Exits we can use for this purpose.
    I've checked EXIT_SAPLMEREQ_010. I've kept debugging point nad i run MD02, but it is not stopping in the exit.
    we are using SAP 4.6c.
    Thanks,
    Adi.

    Hi Experts,
    Could you please give me a suggestion for the above problem???
    Thanks,
    Adi.

  • Update/create the purchase info records

    Hi All,
    i got a requirment for update/create the purchase info records for the transaction ME11.
    i came to know that the FM <b>ME_DIRECT_INPUT_INFORECORD</b> is suitable for this requirment.
    but when i am trying to test this by passing data to I_EINA and I_EINE.
    it is giving some error message like "<b>Please enter at least one vendor</b>, Number entered not within external number range and etc".
    can any one guid me in passing the data to this function module, i.e. what are the required fields that are to be passed to this FM.
    if i have to update/create the EINA & EINE table data.
    Thanks,
    Rama

    Hi,
    Better use report RM06IBI0 - read its documentation with
    Tcode SE38
    Greetings Andreas

  • Can we create the Purchase order that using P&L account or just using account do not use cost center.

    Dear Experts,
    Could you please advise :
    1) Can we create the purchase order that using profit and loss account ? ( if yes , which kind of account assignment category we should use ?)
    2) How to create a purchase order for service charge .( just using GL account )
    Thanks & Best Regards,
    Watson

    Hi,
       May I know why you do not use cost center for consumption?
       You may create a new account assignment category in OME9 by copying K and maintain the cost center as optional. Please note that you have to maintain the item category blank and the account assignment category combination in OMG0. Now, you can use a GL account in PO which doesnt require a cost center assignment (in OBC4 against the field status group of the GL)
       You may use the same account assignment category created in the previous step with item category D, after you maintain the combination of the account assignment with item category D in OMG0.
        Please test the scenario and revert back.
    Regards,
    AKPT

  • How to create a purchase requisition from the EP

    1. How to create a purchase requisition from the EP & What are the pre-requiste?

    Hi,
    You need to create a SAP transaction iview for purchase requisition transaction and link it to the role and to the user to view purchase requisition transaction.
    First you need to create a system in portal to link to the R/3 system. For creating system check this link.
    http://help.sap.com/bp_epv260/EP_EN/documentation/EP/N03_BB_InstallGuide_EN_US.doc
    For linking portal with R/3 and view the Purchase requisition check this link
    Configuring EP for connecting to SAP R/3
    Regards
    Arun

  • Updating the VETVG table while creating the purchase order

    hi all,
       I have one requirement to calculated the delivery creation date while creating the Purchase Order. It is calculated based on the delivery date of PO. I have calculated that one but how to update it after calculation. Can any body give a user exit or BADI with implementation which will update the VETVG table while creating the PO.
    Thanks
    rajkumar

    hi sanjay,
    thanks for reply, I am using same BADI(ME_PROCESS_PO_CUST) and implementation(FIELDSELECTION_ITEM_REFKEYS). In this implementation i am setting the shipping data with SET_SHIPPINGDATA method . but after that the values are not updating the EKPV and VETVG tables but it is only showing in the screen. Can you give a idea where to pass these values so it will update the tables.
    thanks
    rajkumar

  • While creating  the purchase order

    Hi all,
    While creating the purchase order I am getting error like No account assignment to customer order (Not Active in co area 1100, Year 2007)
    please help me out from this problem
    Thanks and regards,
    Sreekanth Lokaray

    Hi Nazim,
    I got the solution by doing the maintain controlling area I activate the sales order.
    and In t.code vkoa I have given the condition type for sales organization.
    Thanks and regards,
    Sreekanth.L

  • How to create a Purchase Requisition for a material component in WBS or NW?

    Hello All,
    I have created a project with the following structure:
    Project Defination (Construction of Sub station)
          Main WBS
                   Level 1 WBS
                             Level 2 WBS
                                       Network for level 2 WBS
                                                      Activity  (Procuring Material)
                                                                 Material Component - MATXXX (Stock Item)
    Now in the above structure i have a activity where in i am procuring all the materails required to construct a Substation.
    So under this activity i have assigned all the materials which are needed to build Substaion.
    After i change the status of the project to release, there  a reservation created for the quantity of the material which i have mentioned in the material component under the activity.
    Now my querey is, how should i create a Purchase requisition for the reserved materail quantity in order to bring in the stock against the WBS / network / Project ?
    Awaiting your reply.
    Thanks and Regards,
    Sudarshan.

    Hi Sudarshan,
    In your case you can run Me5J to check the list of PR created against your project.
    Then Create PO and similarly you can check list of PO in Me2J.
    Then followed by GR and check if any GR release exist in MIGO. Then once after doing GR you can check the Material in Stock which will move material from Unrestricted stock to Project Stock which you can check it in MMBE.
    Then you can do the Good Issue in MIGO itself and run MIRO to complete the cycle.
    Regards'
    syed

  • Error when creating a purchase requisition in reference to a contract.

    Hello All,
    My client have a requirement that , He wants to create a purchase requissition with Item catogery-B and account assignment-K
    with reference to a contract.
    when we are trying to create a purchase requisition with Item catogery-B and account assignment-K
    with reference to a contract the system is throwing an error: "Item categories in agreement and requisition incompatible".
    I had searched for the relating documents and tried all the conbinations but could not find the solution.
    Could any body help in this regard.
    thanks in advance.

    Hi Gayathri
    I thought so. So that means you are unable to create a contract with the combination of K and B which is why you are not able to adopt it in the PR with the same results.
    As far as entering the limit goes, you would be making a value contract in which you would have to enter the value of contract that you need to create for vendor. Also, for the second error, once you have created a contract with the particular account assignment, u cannot change it. You would have to create a new contract with the desired account assignment category and then try creating a PR. Hope this helps!

Maybe you are looking for

  • Mac 10.6.4 and CS5 - known problems? VERY slow, long freezes

    I am on a brand new 12-core (dual 6-core 2.66GHz) Mac Pro with 16GB of RAM (and of course running 10.6.4). I have a new install of CS5 Master Suite (trial version, our box has not arrived yet), and primarily in my explorations with After Effects, it

  • Can you install some CC apps on one drive and others on a secondary drive?

    Hi, I am running Win 7 and Adobe CC. I have a 125 Gg SSD HD and it is now full, but i have only installed a few CC apps on it. Can I install others on a secondary drive? In other words, some CC apps on C: and others on D:?? or must they all be on the

  • SEE BURGER FTP & AS2 configurations

    Hi, Can anyone please send me hte configuration parameters of the SEE BURGER FTP & AS2 adapters both for sender and receiver communication channels. I already have the config details of the Module processor. Thanks in Advance

  • Get current SQL instance name with PowerShell

    Hi all, I'm preparing SQL agent job that will backup all jobs on SQL server. Main step is PoswerShell script. I want that job to be universal for all servers. The first parameter that I need to send to script is instancename. I want to use variable a

  • Firefox lags and freezes several times in an hour - How to fix?

    I've read up on the forums and nothing seems to be describing what I'm experiencing with Firefox. The last 3-4 days I've had several instances where Firefox lags or completely freezes up when switching between tabs. It will still somewhat work but it