Hi guys! movie doesn't work -- stops in the middle...

i downloaded a movie that actually stopped at minute 32 --> movie frozen.. what can i do to get my money back? anyone had a similar experience? thank you!

Cost component structure 01 is not active
Diagnosis
You are costing with cost component structure 01. This cost component structure is not active.
System response
The costing results can be saved for analysis together with the log. The cost estimate receives the status costed with errors and cannotbe released.
Procedure
If you want to release the cost estimate, you must use an active cost component structure, or activate cost component structure 01.
How should i activate cost component structure 01?
OKTZ?

Similar Messages

Maybe you are looking for

  • I am using Acrobat Pro 9.5.5 on Windows 8.1. I cannnot print an oversize document.

    I am trying to print an oversize document 950mm x 2300mm.  With the printer set to "fit to printed area" and "oversized pages" and size "backdrop 950x2300" I get a print preview image in the printer window.  When I click OK the save window appears. 

  • Function module called for order report in pegging screen

    From MD04 when we try to find out the higher level production order it takes us to the planned ind req(PIR). In that screen, we have an "order report" button which takes us to the production order linked to the PIR. Can anyone please let me know the

  • Error information when starting Terminal

    Hi When I start Terminal, it shows the following: Last login: Tue Feb 26 15:25:02 on ttys000 -bash: ulimit: open files: cannot modify limit: Invalid argument nbmedia:~ levpw$ Can anyone tell me what is the second line about and how to remove it? Than

  • My iTunes won't load on my computer; just the store part

    The iTunes will open for my library but then the iTunes store will start loading and never finish

  • Converting Number to Date in Oracle sql

    I have some values in field1 like 20110820, 20110821, 20110822 which is a number datatype and which is something like yyyymmdd. I want to convert it to date format as 'dd/mm/yyyy'. I have to use in select query something like if (A.field1=0, 01/01/20