Hide button in bid invitation on condition basis

Hello All,
There few push buttons in the bid invitation screen.i want to hide the buttons based on the bid invitation status.
The configuration id hides the push button permanent.
For Example : if the technical bit is not opened then when the purchaser opens the invitation he should not be able to see the "Awards and Rewards" buttion even when the bid dead line date crossed.

Masa
Can you elaborate?
How do I disable buttons on RFx- All Queries page ....Buttons like Create RFx and Copy
Thank You
Nikhil

Similar Messages

  • Add a new button to BID Invitation screen

    Hi,
    How to Add a new button to Bid Invitation Screen in SRM?
    Thanks,
    Raveendra

    Hi
    Which SAP Version you are currently on ? What is the exact requirement ?
    If i understand you right, Incase you want to add a button to the existing screen template then it will require standard code change and also you need to plan out how will you will code the logic to activate the button.
    There is no BADI which can do this as this is not a SAP funtionality. You need to do a little bit of research on this to get the job done.
    Regards
    - Atul

  • Create bid invit. from template in two different ways has different consequ

    Hi everybody
    "Create bid invit. from template in two different ways has different consequuences"
    When I create a bid invitation from a previous template, from the template search results (Icon_create SAPLBBP_BID_INV 1010) my bid is published but then stay in the model search and the status is wating for approval. But no workflow started in BBP_PD.
    If I use the same template for creating a new bid from the detail using the create bid invitation button, the bid invitation is created correctly.
    I have configured the two events for the BUS2200 object and both of them have an initial condition.
    It seems that the two actions trigger different events or something like that
    Does anybody why it is occurring this and how I could link the workflow without approval for this case.
    Thanks

    Hi
    What SRM version are you using ?
    <b>Please see these SAP OSS notes / links, which might help -></b>
    <u>Note 976752 - Bidding Worklfows are not triggered correctly
    Note 941417 - Creating a bid invitation from template in the background
    Note 971752 - Incorrect approval preview in bid approval
    Note 741372 - Separating template search from bid invitation search
    Note 764028 - New bid invitation items not visible in bid
    Note 996907 No approval preview for bid after note 976752
    Note 765771 Workflow error when creating a purchase order from bid
    Note 790930 No warning message in case of jump from bid</u>
    Regards
    - Atul

  • How to hide document fields in Bid Invitation

    While creating Bid invitation I need to hide some fields e.g. Attachements, upload a document, description, button Search & Add. These fields are available under tab  Header data -> Documents.
    BADI 'BBP_UI_CONTROL_BADI' works to hide Bid Invitation Basic data, but not for above.
    Can anybody let me know how to hide above fields.
    Nilesh Kumar

    Hi,
       I dont think there  is any BADI/screen variant for this requirement.But yes,if any of the 2 are available in the std,ITS template changes should be avoided.
       The foll are the screen variants available in SRM 5.0:
    Item data overview in the invoice without purchase order reference: Screen variant BBP_IV_NON_PO; Method GET_SCREENVARIANT_INV
    Item data overview in the invoice with purchase order reference: Screen variant BBP_IV, Method GET_SCREENVARIANT_INV
    Item data overview in the confirmation: Screen variant BBP_CF; Method GET_SCREENVARIANT_CONF
    Item data overview in the confirmation for time recording: Screen variant BBP_CF_TIMEREC; Method GET_SCREENVARIANT_CONF
    Item data overview in the purchase order: Screen variant BBP_PO; Method GET_SCREENVARIANT_PO
    Item data overview for contracts: Screen variant BBP_CTR_ITEMLIST; Method GET_SCREENVARIANT_CTR
    Item data overview for selection of contracts: Screen variant BBP_CTR_ITEM_SELLIST; Method GET_SCREENVARIANT_CTR
    Search results for changing/processing a purchase order: Screen variant BBP_SEARCH_PO_IN_PO; Method GET_SCREENVARIANT_SEARCH
    Search results for entering an invoice and/or confirmation: Screen variant BBP_SEARCH_PO; Method GET_SCREENVARIANT_SEARCH
    Search results for entering a purchase order: Screen variant BBP_SEARCH_SC; Method GET_SCREENVARIANT_SEARCH
    Search results for displaying/processing a bid invitation: Screen variant BBP_SEARCH_BID; Method GET_SCREENVARIANT_SEARCH
    Search  results for displaying/processing a bid: Screen variant BBP_SEARCH_QUOT; Method GET_SCREENVARIANT_SEARCH
    Search results for displaying/processing an auction: Screen variant BBP_SEARCH_AUC; Method GET_SCREENVARIANT_SEARCH
    Search results for displaying/processing an invoice: Screen variant BBP_CHANGE_IV; Method GET_SCREENVARIANT_SEARCH
    Search results for displaying/processing a confirmation: Screen variant BBP_CHANGE_CF; Method GET_SCREENVARIANT_SEARCH
    Search results for entering/displaying/processing/status of a shopping cart: Screen variant BBP_SC; Method GET_SCREENVARIANT_SC
    Worklist for Sourcing: Screen variant BBP_SOCO_WL; Method GET_SCREENVARIANT_SOCO
    Work area in Sourcing: Screen variant BBP_SOCO_GA; Method GET_SCREENVARIANT_SOCO
    Overview for the budget display: Screen variant BBP_BUDGET; Method GET_SCREENVARIANT_BUDGET
    BR,
    Disha.

  • New condition in Bid invitation

    Hello,
    I would like to add a new condition a header level in bid invitation (BBP_BID_INV).
    What I have is the standard condition 01RH (table SP019) that is Discount. I would like to add a surcharge condition.
    How can I do that.
    Thank you,
    Joseph

    Hi,
    Please follwo the below steps.
    1. Add a new condition type for surcharge using 'process  condition type' in IMG
    2. Add the newly created condition type to condition group '01HQ' using 'process condition group' transaction in IMG
    I assume your bid invitation profile has 'det of pricing info' set to pricing with conditions. If not you have to do this using defing transaction types and process control.
    I am sure with you will be abe see your new condition type in bid invitation conditions.
    Regards,
    RRK
    Do reward points for useful responses
    Edited by: Ramakrishna Rallapalli on Jun 12, 2008 2:46 PM

  • Bid Invitation - Change Approver Button

    Hi,
    Is it possible to change the approver in the bid invitation? or does it have something to do with authorization? because currently I can't see the change button, while I can see it in the shopping cart transaction.
    Thanks

    Please ignore my question, I just found sap note 976555 that will solve my problem. thanks

  • Approval WF for Bid Invitations

    Hi,
    Is it possible to setup approvals for publishing Bid Invitations? We only see one WF (79000006 - One-Step Approval of Bid Invitation). We tried and it did not trigger a approval step. Appreciate any suggestions on how to setup approvals for Bid Invitations.
    We are using SRM 4 with Classic Scenario.
    Regards,
    Ashwani

    have you activated the workflow?
    (indicated by green button.)
    in the beginning try using simple start condition
    e.g.
    &_EVT_CREATION_DATE& >= 01.01.2008
    also remove any currency if it is there in SWB_COND for sub WF
    BR
    Dinesh

  • Grouping functionality for Bid Invitations.

    Is there any way to group external requirements to Bid invitations.

    Hi,
    When you press the Submit to Grouping button in the Carry Out Sourcing option ,report BBP_SC_TRANSFER_GROUPED must be executed.
    Read the Documentation given in the report BBP_SC_TRANSFER_GROUPED .
    Short text
    Automatic Grouping of Requirements for POs and Bid Invitations
    Purpose
    This report groups together requirement items to which a valid source of supply has been assigned (for grouping into purchase orders) and whose product category has been enabled for grouping (sourcing option in Customizing).
    In cases where assignment is automatic, the system sets the requirement as Transferred to Grouping.
    In cases where a source of supply is assigned manually, the purchaser has to choose the function Transfer to Grouping in the sourcing application for the requirements.
    You should schedule this report periodically, and make sure that the report is run separately for each document type (purchase order, bid invitation).
    Prerequisites
    You have assigned each relevant product category to a sourcing option for grouping, for example, Automatic Grouping, Sourcing for Item Without Assigned Source of Supply.
    For more information, see the Implementation Guide (IMG) for Supplier Relationship Management: SRM Server -> Sourcing -> Define Sourcing for Product Categories.
    Features
    Report BBP_SC_TRANSFER_GROUPED provides the following functions:
    For automatically grouping requirements into purchase orders:
    It selects all requirements that have a unique valid source of supply, and have been set up for grouping. You can use selection criteria to further restrict the requirements that are selected.
    It groups requirements by vendor. In other words, it groups together all of the requirements that can be sent to the same vendor.
    You can use a Business Add-In (BAdI) to make additional groupings. If the standard system groups together certain requirements, but you want to create them in separate local purchase orders, use the BAdI BBP_GROUP_LOC_PO for this purpose.
    Note that there are some limitations to creating purchase orders this way. For example, it is not possible to group together requirements with different vendors in the same purchase order. This report uses the same differentiation criteria as the sourcing application (for example, business partner, company code, product type).
    It uses function module BBP_PD_PO_CHECK to check the assignment to a source of supply. The report passes on requirements to function module BBP_PD_SC_TRANS_MULTI_LOC_PO, where they are grouped, and converted into a purchase order.
    In a production run (that is, not a test run), the system issues error messages to the Application Monitor. Example: A contract item assigned during sourcing is no longer valid when grouping is about to occur. This error appears in the Application Monitor. The system moves the requirement item to the worklist of the sourcing application.
    The Application Monitor assigns errors to one of the following categories:
    Shopping Cart: Automatic Grouping
    Purchase Order: Automatic Grouping
    If necessary, you can copy this report, and change the selection criteria to suit your needs. You can start the report in test mode.
    Note: In the sourcing application, you can determine which requirements are planned for the next report run by choosing Find -> For Grouping.
    For automatically grouping requirements into bid invitations:
    It selects all requirements that have been set up for grouping. A source of supply is not required. You can use selection criteria to further restrict the requirements that are selected.
    You can use the BAdI BBP_TRANSFER_GROUP to take bid invitations that have been grouped by the system, and then split them up on the basis of your own customer-specific criteria. You can use the BAdI BBP_SAVE_BID_ON_HOLD to determine whether or not a bid invitation should be published automatically.
    The report passes on requirements to function module BBP_PD_SC_TRANSFER_MULTI_RFQ, where they are grouped, and converted into a bid invitation.
    In a production run (that is, not a test run), the system issues error messages to the Application Monitor.
    If necessary, you can copy this report, and change the selection criteria to suit your needs. You can start the report in test mode.
    Note: In the sourcing application, you can determine which requirements are planned for the next report run by choosing Find -> For Grouping.
    Output
    The report displays the purchase orders or bid invitations resulting from the grouping of the requirements. It also shows incorrect requirements that the system was unable to group into a purchase order or bid invitation.
    Related thread:
    SOCO Submit to Grouping functionality?
    Re: Bid invitation
    BR,
    Disha.
    <b>Pls reward points for useful answers.</b>

  • PO Creation error after processing bid invitation

    Hi Guys,
    I need small help from you. I have created one bid invitation with out shopping cart. I had processed the bid invitation. Few vendors have submitted their bids. Purchaser had accepted those bid and approver had approved those bids. Now I have the option to "Generate PO" and "Create contract". If I click on Generate PO button I am getting an error that “Purchase order has not been created”.
    I am unable to process further. Please help me. I have maintained PO number range in both the systems means in R/3 and SRM. Transaction types are also maintained in both the system. What else settings I need to configure?
    if i click on "Create contract" buttion then I am able to create Contract in SRM system in held state. When this Purchasing contract will be copy to Backend system?  once I chance the Contract status to release then this will be copied to backend?
    My requirement is to create Purchase Order ?
    Regards
    Apparao a

    Hi
    Please provide your system version details.
    In the bid invitation, the Follow-On Document field must contain the entry Purchase Order or Contract.
    · In the case of bid invitations that are created manually, purchase orders are local only (product category is not relevant). In the case of direct material purchase orders, a copy (that cannot be changed) is created in the backend. Whether or not it concerns direct material needs to be stated in the item details in the bid invitation. You must specify the goods recipient and purchasing group. Also:
    -> Outline levels can be displayed in a local purchase order
    -> Bid invitation texts, bid texts, and documents are transferred to the purchase order (however not internal notes).
    Also refer to this link for configuartion settings ->
    http://help.sap.com/saphelp_srm50/helpdata/en/d3/133dcd5641b244a60578baa996a597/frameset.htm
    http://help.sap.com/saphelp_srm50/helpdata/en/38/4cc5376848616ae10000009b38f889/frameset.htm
    Hope this will help.
    Please reward suitable points, incase it suits your requirements.
    Regards
    - Atul

  • Defaulting dynamic attributes and weightings for BID INVITATION

    Hi Friends
    I have a task at hand to default the dynamic attributes( some custom defined fields for the bidder) for bid invitation.
    Can anyone help me with this?
    Thanks in Advance
    Regards

    Hi Ankur,
    I assume you are looking for attributes automatically populated, when a user
    creates a bid invitation. Did you try to work with a template and define the
    bid invitation in the way required and create a bid invitation based on the template?
    Another option is to define the attributes for well defined categories and let the
    users use the "propose" button.
    Thanks,
    Claudia

  • Send e-mail to Vendors when Close Bid Invitation

    I have a issue with SRM.
    In Process BID Invitation, when the Bid is close by the button action "Close", Is possible to send an e-mail to the selected vendors, advising them about the closure of the BID invitation? Can I do this thru any BADI or another solution?
    I think that in Auction, when I CLOSE them, an email is send to the vendors. Am I correct about this?
    Can anyone please tell me how I can solve this problem?
    This problem can be the Configuration? Is a SRM Problem or ABAP Problem?
    Modaration Please, if this question is an incorrect forum, check and move to the appropriate.
    Regards and tks a lot!
    Edited by: Edgard Henrique Balam on Oct 29, 2008 8:21 PM

    Hi Henri,
    This blog may be useful for you.
    I think it is possible if you have event which you desired
    Bidder Alert Notifications
    You can try.
    Muthu
    Edited by: Muthuraman Govindasamy on Oct 31, 2008 5:55 AM

  • Buffer Table Not Up To Date Short Dump When Publishing Change Version of Bid Invitation

    Hi experts,
    We are running SRM 5.5 with Support Level 16.
    We have a bid invitation for which a user is trying to publish a Change Version. This bid contains two bid outlines, with one line item in each bid outline:
    ITEM 1: HIER (Bid Outline)
    ITEM 2: Line Item
    ITEM 3: HIER (Bid Outline)
    ITEM 4: Line Item
    However, upon clicking on the Check or Publish button, the system throws a CX_BBP_PD_ABORT exception short dump. The reason for the exception given in ST22 is "Buffer table not up to date".
    Due to organisational system security restrictions, I am unable to copy-paste the dump from ST22, so I will be typing out some of the details here.
    Transaction: BBP_BID_INV
    Program: SAPLBBP_PDH
    Screen: SAPLBBP_BID_INV_1000
    Termination occurred in the ABAP program "SAPLBBP_PDH" - in "BBP_PD_ABORT". The main program was "SAPLBBP_BID_INV".
    In the source code you have the termination point in line 73.
    Active Calls/Events
    (formatted below as "No: Type: Name")
    24: Function: BBP_PD_ABORT
    23: Form: ABORT
    22: Form: ITMADM_UPDATE
    21: Form: ITMADM_MAINTAIN_SINGLE
    20: Form: ITEM_F_CHECK_FROM_WTAB
    19: Form: ITEMLIST_F_CHECK
    18: Function: BBP_ITEMLIST_CHECK
    17: Form: PROCDOC_DB_CHECK
    16: Form: PROCDOC_CHECK
    15: Function: BBP_PROCDOC_CHECK
    14: Form: SSIS_DOCUMENT_CHECK_COMPLETE
    13: Form: STATUS_SET_AND_INTERNAL_SAVE
    12: Form: PROCDOC_UPDATE
    11: Function: BBP_PROCDOC_UPDATE
    10: Form: CHANGE_VERSION_UPDATES_ACTIVE
    9: Function: BBP_PDCV_UPDATE_ACTIVE
    8: Form: PROCDOC_CHECK
    7: Function: BBP_PROCDOC_CHECK
    6: Function: BBP_PD_BID_CHECK
    5: Form: FCODE_DOCUMENT_CHECK
    4: Form: FCODE
    3: Function: BBP_BID_PROCESS
    2: Form: PROCESS
    1: Module (PAI): PROCESS
    The ABORT subroutine is being called in Step 22 (ITMADM_UPDATE), at the following line:
    * parent guids have to be identical ...
    if gt_itmadm-parent <> w_itmadm-parent.
      perform abort.
    endif.
    Upon tracing the variable values in the ST22 dump, it appears the program terminates when processing line 3 (i.e. the second Bid Outline). It appears that the first Bid Outline processes fine.
    In the iteration for Line 3, the dump provides that gt_itmadm-parent contains the GUID to the Change Version document header, whereas w_itmadm-parent contains the GUID to the original Bid Invitation document header, resulting in a mismatch and subsequently program termination.
    We have tried to replicate this bid invitation in our Development environment, but when executing, both gt_itmadm-parent and w_itmadm-parent contain GUIDs to the Change Version document header, hence the program does not abort.
    Any suggestions would be greatly appreciated.
    Thanks!
    Best regards,
    Kwong How

    Hi Janu,
    For Note 1561750, I have looked at the Correction Details and observed that it makes changes to an IF-ELSE block, but will result in the same path of code execution as before. I.e., the Note changes the code from "IF a THEN b, ELSE c" to just "c", but according to my code trace, we are already executing the "ELSE c" block in its current state.
    We will look further into Note 1877600. The unfortunate situation here is that since we are unable to replicate this issue in our Development/QA environment, and the Note description does not explicitly fit the situation we are facing, we need to be very sure that the Note can address the issue before bringing it into Production.
    Otherwise, we will raise a message as suggested.
    Thank you so much for your help!
    Best regards,
    Kwong How

  • Process Bid Invitation attachments are not displaying

    hi
    In Process Bid Invitation, when i display the bid number and go to header data tab ->documents
    here i am not able to view my attachments.when i click on change button and add new document then i can see my old attachments along with the new one. please help me if any one have faces this earlier...

    Hi,
    I think landscape of your Dev system is different than your Quality system. You need to put an entry of fully qualified domain name in the table I have mentioned.
    The entry in the table should look like :-
    MANDT         <client name>
    SORT KEY      010
    PROTOCOL      HTTP
    APPLICATN     *
    FOR DOMAIN
    HOST          <fully qualified domain name>
    PORT          80
    If you are using a web dispatcher or reverse proxy server in your landscape, then there should also be an entry for http header.
    Thanks
    HARSHB

  • Stoping notification: A new Bid for a Bid Invitation has been Received, once a response is submitted

    Dear SRM experts,
    I need your help in stopping one notification completely.
    Once a Rfx response is submitted by bidde against a Rfxr, automatically system is sending a below notification to purchaser:
    A new Bid for a Bid Invitation has been Received
    But as per the bid secracy we dont want this notig=fication to be triggere by the system. We need to stop is completly.
    Notification also contain a link to response. We have also made some validations on response and awards button of Rfx. But because of this link, those validation are bypassed.
    Can anyone please let me know how to stop these notification for trigerring?
    I will be greate help.
    Thanking you in advance.
    Thanks,
    Manil

    Hi Jinesh,
    If you want to stop the BID email notification completely, you can do that by deleting the entry in the configuration setting "Define Recipient of the notification"
    SPRO--> SAP SRM--> SRM Server --> C.A.B.S-->Business Workflow--> Process Controlled Workflow-->Business Process Configuration --" Define Recipient of the Notification"
    Reward me the points if it helps you...

  • Stopping notification: A new Bid for a Bid Invitation has been Received

    Dear SRM experts,
    I need your help in stopping one notification completely.
    Once a Rfx response is submitted by bidde against a Rfxr, automatically system is sending a below notification to purchaser:
    A new Bid for a Bid Invitation has been Received
    But as per the bid secracy we dont want this notig=fication to be triggere by the system. We need to stop is completly.
    Notification also contain a link to response. We have also made some validations on response and awards button of Rfx. But because of this link, those validation are bypassed.
    Can anyone please let me know how to stop these notification for trigerring?
    I will be greate help.
    Thanking you in advance.
    Thanks,
    Manil

    Hello Manil,
    this is because for transaction type concerned (linked to transaction category BUS2202 - Supplier Quote), an event schema is customized (IMG: SAP Implementation Guide > SAP Supplier Relationship Management > SRM Server > Cross-Application Basic Settings > Define Transaction Types)
    This event schema (IMG: SAP Implementation Guide > SAP Supplier Relationship Management > SRM Server > Cross-Application Basic Settings > Event and Event Schema for Alert Management > Define Event Schema) has the event SUBMITTED.
    If you do not want any longer this event to be triggered, create a new specific event schema (based on the standard one), but without this event.
    Then, assign this new schema to the concerned transaction type instead of the standard one.
    For notification (event category "Message"), mail layout is managed in standard by smartforms BBP_OUT_EXCEPTION.
    Regards.
    Laurent.

Maybe you are looking for

  • Photoshop Elements 8 - Organizer - File size too large

    I have a new computer running Windows 7 with gobs of RAM and hard drive space.  I’ve recently installed Photoshop Elements 8. I am having the following problem in the Organizer for some 35MM slides that I’ve scanned at 1600DPI.  It looks like the pix

  • How to play sound from a proprietary format

    I would like to convert a small java applet to flex as3 The current applet connects  to a remote server to receive audio in a proprietry compressed and encrypted format using a tcp connection (the data is encoded as text) It then decrypts, decompress

  • HOW TO CHANGE DATA IN STANDARD TABLE

    PLEASE HELP AS PER ABOVE. THANKS, LALIT

  • Import Tiff to Freehand problem

    HI all, Im so worry just got this problem. Im doing a school book design, it contains around 100pcs of Photoshop Tiff import in Freehand 11 file. Now just found that the Freehand 11 change all my Photoshop Tiff file name to other code when the name m

  • Storage Issue- MacBook Air 64GB

    Is it possible to upgrade an 11" MacBook Air 64GB to 128GB SSD?