House wired for two lines.. switching existing lin...

Hello,
My home is wired for multiple phone lines with the current phone line having an outlet in the downstairs bedroom.  This outlet works and is currently used for my phone and broadband connection.
The remainder of the outlets are upstairs and there is no dial tone, but I was told by the previous owner they were hooked up to a second phone line. 
I now have reason to need to move the phone line / broadband connection upstairs and as such would like to switch my existing phone line to the other outlet.  
A longwinded way to do this would be to order a second phone line and wait untill that is installed and working in the upstairs outlets and then cancel the first phone line.  However, surely there must be an easier way; however, the problem is difficult to explain and I am not eager to have a engineer come to the house if the answer is that a second phone line must be "activated"  .. so what I really want is  BT to act as I'm moving house, but really just move it within my house !  if that makes any sense
Any help appreciated. 
Solved!
Go to Solution.

plainview wrote:
Yeah, call the Home Movers Department, or contact the MOD's on here and they can arrange an Internal Home Move.
Never heard of that service at all. But if it does exist, then they would have to contact BT, who will arrange for Openreach to arrange the shift of the pairs, to the other master socket position. There would be a charge for that service.
Contact will need to be made the normal way by calling BT on 0800 800 150, and not via the forum moderators, who are there to deal with escalations only.
If the master sockets for both lines are adjacent, and they are like the picture below, then its simply an internal extension switch which can be done by the home owner.
There are some useful help pages here, for BT Broadband customers only, on my personal website.
BT Broadband customers - help with broadband, WiFi, networking, e-mail and phones.

Similar Messages

  • Different Pricing date for two line items

    Hi guru's
    How to give different pricing dates for two line items
    in a sales order
    To elaborate
    I have two line items one i need pricing date order date
    second one i need pricing date should be delivery date
    Thanks in advance
    Srinivas

    Dear Srinivas,
             While creating sales order select the item which you want to change the pricing date then go to menu>GOTO>Item -->Click on Sales A here you can able to change the pricing date as you like.
    You can change the pricing date of the item in the sales order through sales order change mode but that sales order should be open.
    I hope it will help you,
    Regards,
    Murali.

  • Is there a way to allow for two lines in "running header (character style)" text variable?

    In my "running header (character style)" text variables, some of the items are quite long and take up more space in my header than I have room for - because I have another "running header (character style)" text variable beside it - and I am trying to figure out if there is a way to force that text variable to go into two lines when it runs out of space.
    Does anyone know if this is possible?

    Sadly, only by adding a forced line break in the variable. Adobe’s engineers are unable to allow long variables to break at the end of a line. Sad, since this is a feature I remember from a Macintosh word processor I used in 1988.

  • Two lines in use, one master socket that is bypass...

    I work at an organisation that has a subscription for two lines. One line is used for the main phone system of the business and the other is used for two purposes: 1. There is a payphone for guests on it; 2. The business internet connection comes through it (DSL). The internet connection is noticably slower than it should be and often drops out, so I've had a look at the wiring of the phone lines.
    Both lines come into the building from the pole through a single 4-core black drop-cable, as is quite normal I think. This cable comes into the back of an NTE5 master socket. The wire colours are Green, White, Orange and Black. None of these connect to any part of the master socket - neither the main panel, nor the removable front plate. Instead, they are all connected with the little translucent crimp-type things to the wires of the internal "extension" cables. My first quesion is, is this correct? I think it's incorrect, especially as one pair of wires immediately gets split off to 2 extensions, as I'll now describe...
    From the master socket there are two "extension" cables. One goes directly to what I think is a normal extension socket (smaller than an NTE5, but it does have some kind of inductor or capacitor, and it looks modern). This socket's pins 2 and 5 are wired directly from the orange and white wires respectively in the drop wire. To this socket, the ADSL modem is connected and nothing else.
    The other extension cable goes off somewhere else. However, it must be carrying two phone lines - because the payphone must come off it (which shares the line with the modem), as must the main phone system. It is a 6-core round white cable. Its Orange and White/orange wires are connected to White and Orange in the drop cable (i.e. the same pair that goes to the modem extension) and its Green and White/green wires are connected to Green and Black in the drop-cable. I haven't been able to trace this cable yet, but all I know is that it must end up splitting off to the pay phone and the main phone system, because they are separate lines.
    So, is the incoming line not terminated correctly, in that it doesn't connect at all to the master socket and the one pair of wires immediately splits off to two extensions? Could this be causing the internet connection problems?
    Any help would be greatly appreciated - preferably from one of you former BT men ;-) I'm trained in electronics myself, so answer technically if you want.

    Yes, the payphone has a filter.
    Yes I agree that the line the main phone system comes off may not need a master socket for whatever reason (i.e. it may have its own circuitry).
    But as for the broadband line - it splits off to the payphone extension and to the modem extension as soon as it leaves the drop wire, which seems wrong to me. As far as I understand, one of the purposes of the master socket is to be able to detach the front plate in order to isolate the consumer's extensions from BT's line; but with the extensions being hard-wired in, that's imposisble. And with no master socket, I assume that whatever circuitry is normally in a master socket isn't present on the line. Does this matter? Is it just surge protection, or is there some kind of filtering as well? We will of course contact BT about this, but I'd like to know first whether there really is something wrong.

  • Vendor assignment for multiple line tiems

    All,
    We are with SRM 5.0, Classic Scenario.
    I have created SC with 2 line items and given different vendors for two line items of the same SC.
    It should generate two POs for this, right ?
    Bt, only one Purchase Req. and PO is created and showing in R/3.
    Any inputs please ?
    Thanks
    Maron

    >
    Maron, Swiss wrote:
    > All,
    >
    > We are with SRM 5.0, Classic Scenario.
    > I have created SC with 2 line items and given different vendors for two line items of the same SC.
    > It should generate two POs for this, right ?
    >
    > Bt, only one Purchase Req. and PO is created and showing in R/3.
    >
    > Any inputs please ?
    >
    > Thanks
    > Maron
    what about the vendor for the purchase request item? is it fixed vendor ? any data incomplete ?

  • Purchase order for a line item

    Hi Guys,
                 I have got the following business sceanrio.
    I have got a material "A" which can get from locally or can get from 3rd party also.
    In the sales order i have entered like following.
    Line item no.  Material     Qunatity     Item category
            10             A              100            
            20             A              500
    As only 100 quantity is available in my stock i want to go with 3rd party for line item 20.
    How can i go ahead in this scenario.
    What would be the item categories for two line items?
    If i go with Purchase order for line item 20. Where in sales order i can track that, Line item 20 is getting thru Purchase order, My requirement is to store the corresponding purchase order no for each line item getting from 3rd party (STO also).
    Thank you
    Anil

    Hi Anil,
    For delivery from stock use the item category TAN
    For procuring it from Vendor use the item category - TAS/TAB
    Check whether the ITEM CATEGORY GROUP & GENERAL ITEM CATEGORY GROUP for Material B is BANS/BANC & the Material type is HAWA.
    Once you get the item category TAS/TAB, in sales order save it and go to Change to mode of the Sales Order then you can see the purchase requisition no in the Schedule line tab. Based on this Purchase Requisition a PO is created.
    After you save the PO note down the PO number and then raise Goods Receipt (MIGO) with reference to the PO number.
    Now you can goto MMBE and check the Stock for Material B.
    Reward if helpful.
    Regards
    PAVAN

  • Font size in writing mail is too small for first two lines and then switches to 12. How do I change this to start and stay in 12.

    When I want to reply to a message or just compose one, the font size is Times Roman 10 which is too small. After two lines it becomes 12. How can I change the font to start and remain Times Roman 12?

    VikingOSX wrote:
    Mail > Preferences > Fonts & Colors > Message font: > Select ... 14
    This survives closing and reopening Mail. When you open a New Message window, the body text will now be 14 point.
    That's how it works on my iMac with OS X 10.8.1 but it refuses to change when selected on our new MacBook Air with the same OS and Apple Mail version.  Is there something about the track pad that it doesn't recognize the click?

  • Can I switch my phone number between two lines(not just between phones)?

    I have 4 months left on my current plan. I would like to take advantage of current holiday sales to get the droid razr for cheap. I am considering adding an additional line to my plan to get the upgrade. The problem with this is that I either have to use the new number and let my other contract end or continue on with my current number and pay for 2 lines for the next 2 years. I noticed that verizon lets you switch the phone number that is associated with your line. Would I be able to add an additional line to my plan and then switch the numbers between these two lines? Essential line A has number A and ends in 4 months, line B has number B and ends in 20 months, and I want to make it so that line B has number A and then only pay for line A for the next 4 months. Is this possible?

    Verizon does not allow you to switch numbers since they are tied to your contact. However, there's a work around, because Verizon does allow you to port a number from another carrier to overwrite the existing number without changing your contract. So here's what you need to do:
    1. Get the Razr cheap like you wanted on a secondary line;
    2. Wait for 4 months so your main line contract is up;
    3. Port out your main line number to another carrier, for example, Pageplus;
    4. Wait till your bill cycle is passed and port that number from Pageplus to Verizon, overwrite the number on secondary line.
    After step 4 you will have your main number back on the line with the Razr.

  • U-Verse VOIP into house wiring: "Line-in-Use"

    All,       ATT converted our DSL to U-Verse high-speed Internet + VOIP 5 months ago. This included VOIP connection to original phone-wiring in the house (built in 1989), supporting 3 extensions.  All worked fine until last week, when all extensions show "Line-in-Use" and are inoperable. VOIP constantly trying to "Connect" == flashing green light on Modem/VOIP.  Disconnecting all phones has no effect.  Disconnecting line from Modem/VOIP to house wiring immediately enables VOIP connection.  Plugging phone directly into Modem/VOIP provides excellent phone service.       Obvious conclusion is that there is now a problem with house wiring.  Odd since the wires haven't been touched in months, and we have had no rain.  Any suggestions on where to start looking at the house wiring?Appreciate any advice.-Joe in San Diego

    A couple of examples of house wiring problems out of the blue -
    The wireis behind kitchen cabinets. Every time the spoon drawer is closed it beats up the wire til it breaks or shorts.
    The wire gets crimped in the jack mounting plate & eventually shorts out.
    Obviously, it is difficult to troubleshoot hidde wires. First determine if you are daisy chained from jack to jack or star connected to a bunching block.
    The daisy chain - work out from the RG to open the next segment til you bracket the segment.
    The star - check the feed leg. Remove all legs & add them back one at atime til it fails.
    Note that the tel connection is on thetwo center prongs of the RJ-11 jack. IT is standard to connect these to the red/green wires. With one phone the yellow/black are not used. If you find a problem with the red-green that you cannot fix because you cannot get to it, you could use the yellow -black for that segment.
    When you had DSL the tel house wiring was fed from outside. When you switched to u-verse feed on the RG the connecton to the outside should have been opened up. If it was not it may  still have worked. But, now the short is outside. Make sure you are not still connected to the outside.

  • BAPI_REQUISITION_CREATE: Err-No account assignment exists for service line

    Hi Frnds,
    I am using bapi BAPI_REQUISITION_CREATE to create PR with mutiple Service line.
    I am getting an error message SE518 - No account assignment exists for service line 0000000000.
    Can anyone of you help me out to solve this issue?
    Thanks in advance
    Suganya

    HI
    I need to create pucharse-requisition for services with account assignment K.
    execute BAPI_REQUISITION_CREATE with an item with a service and work well.
    When I prove with two items each one with its service gives east error me
    "E518, No account assignment exists for service line 0000000010"
    my source is:
    REPORT Z_WGS_BAPI_REQUISIT_CREATE_002
                                      NO STANDARD PAGE HEADING LINE-SIZE 180
                          START-OF-SLECTION                              *
    DATA:
    W_NUMBER             LIKE  BAPIEBANC-PREQ_NO,
    W_REQUISITION_ITEMS LIKE BAPIEBANC           OCCURS 0 WITH HEADER LINE,
    W_REQUISITION_ACCOUNT LIKE BAPIEBKN          OCCURS 0 WITH HEADER LINE,
    W_REQUISITION_SERVICES LIKE BAPIESLLC        OCCURS 0 WITH HEADER LINE,
    W_REQUISITION_SRV_VALUES LIKE BAPIESKLC      OCCURS 0 WITH HEADER LINE,
    W_RETURN             LIKE BAPIRETURN         OCCURS 0 WITH HEADER LINE,
    W_RETURN1            LIKE  BAPIRET2          OCCURS 0 WITH HEADER LINE.
    START-OF-SELECTION.
    perform item_10.
    perform item_20.
    perform bapi.
    form item_10.
    **Item 10
    W_REQUISITION_ITEMS-DOC_TYPE = 'NB'.
    W_REQUISITION_ITEMS-PREQ_ITEM = '00010'.
    W_REQUISITION_ITEMS-ACCTASSCAT = 'K'.
    W_REQUISITION_ITEMS-ITEM_CAT = '9'.
    W_REQUISITION_ITEMS-PUR_GROUP = 306.
    W_REQUISITION_ITEMS-PURCH_ORG = '9000'.
    W_REQUISITION_ITEMS-PLANT    = 'CO95'.
    W_REQUISITION_ITEMS-PREQ_NAME = 'EORTIZ'.
    W_REQUISITION_ITEMS-DELIV_DATE = SY-DATUM.
    W_REQUISITION_ITEMS-SHORT_TEXT = 'Servicio 1'.
    W_REQUISITION_ITEMS-MAT_GRP = 'SER-0005'.
    W_REQUISITION_ITEMS-QUANTITY = '1.000'.
    W_REQUISITION_ITEMS-PCKG_NO = '0000000001'.
    W_REQUISITION_ITEMS-GR_IND = 'X'.
    W_REQUISITION_ITEMS-IR_IND = 'X'.
    W_REQUISITION_ITEMS-FIXED_VEND = space.
    W_REQUISITION_ITEMS-INFO_REC = space.
    APPEND W_REQUISITION_ITEMS. CLEAR W_REQUISITION_ITEMS.
    W_REQUISITION_ACCOUNT-PREQ_ITEM = '00010'.
    W_REQUISITION_ACCOUNT-SERIAL_NO = '01'.
    W_REQUISITION_ACCOUNT-COST_CTR = '0001010106'.
    W_REQUISITION_ACCOUNT-G_L_ACCT = '0063010001'.
    APPEND W_REQUISITION_ACCOUNT. CLEAR W_REQUISITION_ACCOUNT.
    W_REQUISITION_SERVICES-PCKG_NO     =  '0000000001'.
    W_REQUISITION_SERVICES-LINE_NO     =  '0000000001'.
    W_REQUISITION_SERVICES-EXT_LINE    =  '0000000000'.
    W_REQUISITION_SERVICES-SUBPCKG_NO  =  '0000000002'.
    W_REQUISITION_SERVICES-FROM_LINE   =  '1'.
    W_REQUISITION_SERVICES-PLN_LINE   =  '0000000001'.
    APPEND W_REQUISITION_SERVICES. CLEAR W_REQUISITION_SERVICES.
    W_REQUISITION_SERVICES-PCKG_NO     =  '0000000002'.
    W_REQUISITION_SERVICES-LINE_NO     =  '0000000002'.
    W_REQUISITION_SERVICES-EXT_LINE    =  '0000000010'.
    W_REQUISITION_SERVICES-SUBPCKG_NO  =  '0000000000'.
    W_REQUISITION_SERVICES-SERVICE    =  '000000000003000001'.
    W_REQUISITION_SERVICES-QUANTITY   =  '5.000'.
    W_REQUISITION_SERVICES-BASE_UOM   =  'UN'.
    W_REQUISITION_SERVICES-GR_PRICE   =  '150.0000'.
    APPEND W_REQUISITION_SERVICES. CLEAR W_REQUISITION_SERVICES.
    W_REQUISITION_SRV_VALUES-PCKG_NO    =  '0000000002'.
    W_REQUISITION_SRV_VALUES-LINE_NO    =  '0000000002'.
    W_REQUISITION_SRV_VALUES-SERNO_LINE = '01'.
    W_REQUISITION_SRV_VALUES-SERIAL_NO  =  '01'.
    W_REQUISITION_SRV_VALUES-PERCENTAGE  = '100.0'.
    APPEND W_REQUISITION_SRV_VALUES. CLEAR W_REQUISITION_SRV_VALUES.
    endform.
    form item_20.
    item 20
    W_REQUISITION_ITEMS-DOC_TYPE =   'NB'.
    W_REQUISITION_ITEMS-PREQ_ITEM = '00020'.
    W_REQUISITION_ITEMS-ACCTASSCAT = 'K'.
    W_REQUISITION_ITEMS-ITEM_CAT = '9'.
    W_REQUISITION_ITEMS-PUR_GROUP = '306'.
    W_REQUISITION_ITEMS-PURCH_ORG = '9000'.
    W_REQUISITION_ITEMS-PLANT    = 'CO95'.
    W_REQUISITION_ITEMS-PREQ_NAME = 'EORTIZ'.
    W_REQUISITION_ITEMS-DELIV_DATE = SY-DATUM.
    W_REQUISITION_ITEMS-SHORT_TEXT = 'Servicio 2'.
    W_REQUISITION_ITEMS-MAT_GRP = 'SER-0005'.
    W_REQUISITION_ITEMS-QUANTITY = '1.000'.
    W_REQUISITION_ITEMS-PCKG_NO = '0000000003'.
    W_REQUISITION_ITEMS-GR_IND = 'X'.
    W_REQUISITION_ITEMS-IR_IND = 'X'.
    W_REQUISITION_ITEMS-FIXED_VEND = space.
    W_REQUISITION_ITEMS-INFO_REC = space.
    APPEND W_REQUISITION_ITEMS. CLEAR W_REQUISITION_ITEMS.
    W_REQUISITION_ACCOUNT-PREQ_ITEM = '00020'.
    W_REQUISITION_ACCOUNT-SERIAL_NO = '01'.
    W_REQUISITION_ACCOUNT-COST_CTR = '0001010106'.
    W_REQUISITION_ACCOUNT-G_L_ACCT = '0063010001'.
    APPEND W_REQUISITION_ACCOUNT. CLEAR W_REQUISITION_ACCOUNT.
    W_REQUISITION_SERVICES-PCKG_NO     =  '0000000003'.
    W_REQUISITION_SERVICES-LINE_NO     =  '0000000003'.
    W_REQUISITION_SERVICES-EXT_LINE    =  '0000000000'.
    W_REQUISITION_SERVICES-SUBPCKG_NO  =  '0000000004'.
    W_REQUISITION_SERVICES-FROM_LINE   =  '1'.
    APPEND W_REQUISITION_SERVICES. CLEAR W_REQUISITION_SERVICES.
    W_REQUISITION_SERVICES-PCKG_NO     =  '0000000004'.
    W_REQUISITION_SERVICES-LINE_NO     =  '0000000004'.
    W_REQUISITION_SERVICES-EXT_LINE    =  '0000000010'.
    W_REQUISITION_SERVICES-SUBPCKG_NO  =  '0000000000'.
    W_REQUISITION_SERVICES-SERVICE    =  '000000000003000002'.
    W_REQUISITION_SERVICES-QUANTITY   =  '10.000'.
    W_REQUISITION_SERVICES-BASE_UOM   =  'UN'.
    W_REQUISITION_SERVICES-GR_PRICE   =  '90.0000'.
    APPEND W_REQUISITION_SERVICES. CLEAR W_REQUISITION_SERVICES.
    W_REQUISITION_SRV_VALUES-PCKG_NO    =  '0000000004'.
    W_REQUISITION_SRV_VALUES-LINE_NO    =  '0000000004'.
    W_REQUISITION_SRV_VALUES-SERNO_LINE = '01'.
    W_REQUISITION_SRV_VALUES-SERIAL_NO  =  '01'.
    W_REQUISITION_SRV_VALUES-PERCENTAGE  = '100.0'.
    APPEND W_REQUISITION_SRV_VALUES. CLEAR W_REQUISITION_SRV_VALUES.
    endform.
    form bapi.
    BAPI
      CALL FUNCTION 'BAPI_REQUISITION_CREATE'
      EXPORTING
        SKIP_ITEMS_WITH_ERROR          =
       AUTOMATIC_SOURCE                = 'X'
        IMPORTING
          NUMBER                         = W_NUMBER
        TABLES
          REQUISITION_ITEMS              = W_REQUISITION_ITEMS
          REQUISITION_ACCOUNT_ASSIGNMENT = W_REQUISITION_ACCOUNT
        REQUISITION_ITEM_TEXT          =
        REQUISITION_LIMITS             =
        REQUISITION_CONTRACT_LIMITS    =
          REQUISITION_SERVICES           = W_REQUISITION_SERVICES
          REQUISITION_SRV_ACCASS_VALUES  = W_REQUISITION_SRV_VALUES
          RETURN                         = W_RETURN.
        REQUISITION_SERVICES_TEXT      =
        REQUISITION_ADDRDELIVERY       =
        EXTENSIONIN                    =
    ejecuta commit
      CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'
        EXPORTING
          WAIT   = 'X'
        IMPORTING
          RETURN = W_RETURN1.
      LOOP AT  W_RETURN.          .
        WRITE: / SY-TABIX,
        / 'W_RETURN-TYPE:', W_RETURN-TYPE,
        / 'W_RETURN-CODE:', W_RETURN-CODE,
        / 'W_RETURN-MESSAGE:', W_RETURN-MESSAGE,
        / 'W_RETURN-LOG_NO:', W_RETURN-LOG_NO,
        / 'W_RETURN-LOG_MSG_NO:', W_RETURN-LOG_MSG_NO,
        / 'W_RETURN-MESSAGE_V1:', W_RETURN-MESSAGE_V1,
        / 'W_RETURN-MESSAGE_V2:', W_RETURN-MESSAGE_V2,
        / 'W_RETURN-MESSAGE_V3:', W_RETURN-MESSAGE_V3,
        / 'W_RETURN-MESSAGE_V4:', W_RETURN-MESSAGE_V4.
        ULINE.
      ENDLOOP.
    endform.

  • BAPI Error: No account assignment exists for service line 0000000000

    I am using BAPI : BAPI_PO_CREATE1 to create a PO.
    I am getting this error while creating PO  "No account assignment exists for service line 0000000000"
    Please help.

    Yes...
    for each item i am creating one parent service record and one child service record with REQUISITION_SERVICES.
    the Package no for parent is the subpackage no for child.
    also for each item, I fill REQUISITION_ACCOUNT_ASSIGNMENT and REQUISITION_SRV_ACCASS_VALUES
    Still I get the Error.
    Thanks to help me resolve.

  • How to configure Two Tax Codes for single line item in work order

    Hi All,
    Please do Review the below scenario and tell me how to solve it.
    A) Certified Work Done Gross Bill Amt      100,000      
    Total Work Done Value      100,000      
    Less : Labour & Like Charges @ 30 % on Rs 100,000 =  30,000      
    Vat applicable Amount =      70,000      
    Add VAT @12.5%  Chargeable on Taxable Turnover of Rs. 70,000.00     = 8750
    Total Bill Value = 108750
    Service Tax @ 12.36% on 33% Value of Rs. 100000     = 4079
    G.Bill Amt = 112829
    Total Amt Due for Payment = 112829

    HI,  There is a possible solution for this scenario.
    1. Create 2 tax codes for VAT and SERVICE Tax at 12.5% and 12.36% respectively
    2. While posting the Invoice (TRX - FB60) following steps need to be followed.
    3. Amount has to be split into two line items
    4. Ist Line Item should have the Vat amount + 70000/- and select relevant tax code that was
        created for 12.5%
    5. Similarly 2nd Line Item should have Service Tax amount + 30000/- and select relevant tax code that    
        was created for 12.36%.
    Hope this would meet your requirement. If the solution is okay, kindly indicate the points.
    Regards
    K.Sanjai Babu

  • No account assignment exist for service line.

    Good Morning
    When I try to create a Purchase Order by Shopping Cart created directly in SRM it works normally but when I try to create a Purchase Order by Shopping Cart created based on Purchase Requisition from R/3 it gives me the follow message: "No account assignment exist for service line 10".
    I´m in SRM Server 5.5 SP 11 and the R/3 version 4.7.
    Someone could help me?
    Thanks
    Edited by: Victor Hugo Santos Sousa on Jul 4, 2008 3:00 PM

    try to use existing  package number + 1.
    select MAX( packno ) from eban into w_packno where packno NE ' ' .
    v_packno = w_packno + '0000000001'.
    W_REQUISITION_ITEMS-PCKG_NO = v_packno.
    and also ref. link.,
    http://wiki.sdn.sap.com/wiki/display/ERPSCM/MM-SRV-ACC+Account+Assignment

  • Bapi_po_create1 ,No account assignment exist for service line 0000000000'. for po limits,how to create multiple service items in service po

    hi,
    Hello all, please help!! I used function BAPI_PO_CREATE1 to create PO with limit item but function returned message error '518 No account assignment exist for service line 0000000000'. Can anyone give me an idea to slove this problem?
    i am passing po header, po headerx, po item , po itemx, po account, po accountx, po limits, po services, po service values, to bapi. if i comment package number in po limits structure , po was creating but limits data not updating in po., if i pass package number i am getting above error.
    Thanks In Advance,
    regards

    hi Dinesh,
    am also having same error for bap po create1 . did it get resolved for you? please help its urgently needed for me here

  • 'No account assignment exists for service line' - BAPI_REQUISTION_CREATE

    Hello,
    Getting straight to the point.
    I am creatin a PR from one system to another system(SAP to SAP) thru BAPI_REQUISITION_CREATE by getting its detail from the former system thru BAPI_REQUISITION_GETDETAIL.
    PR for materials is working fine but when i create PR with service items it gives me error that, 'No account assignment exists for service line 0000000010'.
    Can anyone help me on this one or tell me why is it happendin and how to overcome it..
    Bundle of thanks..
    Shehryar Dahar

    Hello...anybody ?

Maybe you are looking for

  • PDF displaying bit-mapped or "crunchy" on Retina MacBook Pro

    I have a new Retina MacBook Pro and when I opened a PDF, it is displaying bit-mapped or "crunchy" looking. Do I need to change settings in Acrobat (CC) ?... or in my Mac System Preferences somewhere?

  • Iphoto won't run after upgrade

    I have just upgraded my PB G4 to MAC OS X TIGER 10.4.3 and also installed the iLife '05 in the computer. Unfortunatelly when i try to start iphoto nothing happens! The open window blinks and that's all. I have already upgraded software at apple.com,

  • Inspoke data logic

    Hi all, I have created an Ispoke which is getting the data from an infocube and feeding the data to a flat file. The number of records transferred from infocube to Ispoke are not same. For example, infocube is getting 16 records and Ispoke is getting

  • How do I download Adobe Shockwave Player for separate system?

    Seems that the install page on the Adobe site is only configured to install the package on the system accessing the download page on the Adobe site. I need access to the installer file so that I can update the version of Shockwave Player that is inst

  • Why does computer freeze when checking yahoo email?

    I get that little spinning rainbow when trying to open emails in yahoo.