How BOM and routing is selected for Planned order and Production order?

Hi,
Can any1 plz tell me how BOM and routing is selected for a planned order and production order. ?

Hello Mathisuthan,
BOM and Routing selection for the planned order and production order through production version, If u have more than one BOM and more than one Routing then u can maintain this information as Production Version in the system.
Production version you maintained
MM01/MM02 -- MRP4--- Production version
Or you can create Production Versions in Mass also with Transaction Code "C223"
In the case no production version maintained/created  for the material, then system by default  will pick the first BOM and routing.
I hope this information helpful to you.
Regards
Umesh Mali

Similar Messages

  • How to get Operation wise Time for a list of Production Orders

    Dear Sir,
    We have a list of Production Orders numbers and need to know the operation wise time duration for these production orers (off course the desired time is same as mentioned in the routing for the relevant component)
    Kindly guide us as how can we get these timing details .
    Rgds
    Sonia agarwal

    Sonia,
    I hope your are refering to setup time, process time, teardown time in the production order.
    use report COOIS for it.
    In the 'List choose operation.
    Give input for the production orders in the slection scren. Execute.
    In the report select the columns as per your requirement.
    Hope this helps you.
    SmanS

  • How to round quantity with FMS for some items in Production order lines?

    Hello,
    How to round the quantity with FMS or SP for only some items in the composition of Production order (lines) and the bill of materials like a box or a stick that should not be with commas.
    Exemple  of Production Order
    P1
      M1 | 234,78
      M2 | 104,04 --> 104
      M3 | 60,7
      M4 | 512, 00
      M5 | 107,67 --> 108
    and others will not be rounded
    Thanks,
    Hafid

    Hi Gordon,
    you're always the first to respond, thank you.
    Its when adding the production order, before its creation or when entering the quantity of product in OWOR.
    Like :
    SELECT CASE WHEN ($[$37.4.0] = 'M2') OR ($[$37.4.0] = 'M5') THEN ROUND (T0.[PlannedQty],0)
    ELSE T0.[PlannedQty] END AS PlannedQty FROM WOR1 T0
    or
    SELECT ROUND (T0.[PlannedQty],0) FROM WOR1 T0 WHERE T0.[ItemCode] =$[$37.4.0] AND (T0.[ItemCode] = 'M2' OR  T0.[ItemCode] = 'M5)
    Thanks,
    Hafid

  • How to select another BOM in Planned Order Based Production Order

    Dear PP GURUS / EXPERTS,
    I am using following Scenario: I have alternate BOM for FG and Maintaining Finished Material with Production Version in MRP4.
    Now, When I run the Forecast based Planning (MP30) and go for Single Item  Multi-Level MRP Run  (MD02 & MD04)  it takes 1st Alternate BOM.
    Now, I create the Planned Order Based Production Order (CO40), but due to some reason - WE WANT TO CHANGE THE BOM. instead of 1st BOM We want to use another BOM For Production.
    How can we achieve this.
    Please Help. THANKS IN ADVANCE.
    DSC

    WE WANT TO CHANGE THE BOM. instead of 1st BOM We want to use another BOM For Production
    create  two production version ( PV)and assign the 1PV 1st  BOm and 2 PV 2nd BOM
    System will create a Plan order for PV 1
    IF you want you can change the Production version 1 to Production version 2  in Planned order itself ( in MD11)
    Or reread the master data for production order by selecting PV 2

  • I've an apple ID used to buy off iTunes and a mobileme account for the calendars and contacts. How can I move the calendars and contacts to the older apple ID and use it for iCloud?

    I've an apple ID used to buy off iTunes and a mobileme account for the calendars and contacts. How can I move the calendars and contacts to the older apple ID and use it for iCloud?

    If you remeber the password to that Apple ID then follow these steps
    1 - Make sure you have an email address that is NOT an Apple ID
    2 - Go to AppleID.Apple.com
    3 - Where it reads Manage Apple ID - Sign in
    Once you are signed in want to make sure the email address you are wanting to use is NOT set up as a "Recovery/Rescue" email for this account.
    [To check this - Main page where you see Primary ID - below do you see the email address you want to use listed towards the bottom? Yes - Delete / No - Good ./. If made any adjustments "Save" Next on the left select "Password & Security" - Answer your security questions you set up "if you have any" then scroll towards the bottom and check to see if you see the email address you want to use. Yes - Delete / No - Good] <-> Also you can change your password on this page as well. Any adjustments made "Save"
    Once this is done go back to the main page where you should read "Primary ID" and change the email address that is showing to the new email address youo want. "Save" Done
    I learned this not to long ago and worked for me. Hope this helps you!

  • How can I reduce the selection for the characteristics value in a BW query

    Good morning,
    I need to find out how I can reduce the selection for the characteristics values in a BW query.
    In a BW query I have a characteristic "Due month".
    The characteristic values shown in the query are from 01.2001->03.2007. I would like to reduce it to the last 2 years,in the query view,  without deleting the data for the other years in the cube.
    Do you know how this can be done?
    Thank you in advance for your feedback.
    Kind regards,
    Linda Verding
    Staff Consultant - CSC

    hi,
    First thing you have to do is check the report how the data is being restricted only to those months.
    1) one it can be variable in which the code is written for that to populate for last few years.
    or else it must have been hardcoded for these months.
    Go into your report and underneath the characteristicsCALMONTH there must be an variable or hardcoding.
    You need to change this here in the report.
    You dont have to delete anything there.
    Regards, Siva

  • Setting # for 0CALYEAR in selection for planning level in BPS

    hi all!
    when i try to set # for 0CALYEAR (and other time variables) in selection for planning level in BPS, i recieve the following error message: 'Value # is not permitted for characteristic Calendar Year' (UPC003). As i understand, this problem began to occur after upgrading to SPS12.
    we have BI 7.0 installed
    can anyone help me solve this problem please?

    <FONT FACE = "Tahoma", Font Color = "Blue">
    Hi<br>
    Check in year master data if value BLANK (#) exists. System should permit only those values for characteristics which are available in master data tables.<br><br>
    Secondly, does system allow you to select value # for calendar year using the F4 drilldown?
    <br><br>
    Hope it helps.<br>
    Cheers Abhijit</FONT><FONT FACE = "Verdana", Font Color = "Red">
    Please assign Reward Points if I above information was useful
    </FONT>

  • Error: Common entries are not permitted for plan queries and input queries

    Hi,
    I have a 2 selections in the column struct:
    1. year = 2005, version = actual
    2. year = 2006, version = plan, marked as data can be changed using user entry or planning function
    row has posting periods from 1-12
    in the workbook I have inserted this query in the workbook in analysis grid. it runs good.
    now i added a button and assigned planning function to it. this planning function copies 2005, actuals to 2006, plan.
    when i execute the workbook and hit this button, it gives me following error:
    "Common entries are not permitted for plan queries and input queries"
    please can anyone provide me assistance with this issue.
    thanks,
    sam

    when i go to diagnosis it displays following:
    Diagnosis
    InfoProvider ZIP_PLAN2 must be described in this application by both a plan query and by a input-ready query, which is directly defined on the InfoProvider ZIP_PLAN2.
    System Response
    This is not permitted.

  • Pros and  cons  of  select  for  update  clause

    hi,
    Can anybody explain what are the
    pros and cons of select for update clause
    11.2.0.1

    As commented, there are no pros versus cons in this case.
    What is important is to understand conceptually what this do and why it would be use.
    Conceptually, a select for update reads and locks row(s). It is known as pessimistic locking.
    Why would you want to do that? Well, you have a fat client (Delphi for example) and multiple users. When userA updates an invoice, you want that invoice row(s) locked and prevent others from making updates at the same time. Without locking, multiple users updating the same invoice will result in existing updated data being overwritten by old data that also has been updated. A situation called lost updates.
    For web based clients that are stateless, pessimistic locking does not work - as the clients do not have state and pessimistic locking requires state. Which means an alternative method to select for update needs to be used to prevent lost updates. This method is called optimistic locking.
    So it is not about pros versus cons. It is about understanding how the feature/technique/approach works and when to use it.. and when it is not suited to use it. All problems are not nails. All solutions are not the large hammer for driving in nails.

  • Cross-Dock: No inbound docs have been selected for planning

    Hi everybody here,
    I am testing cross-docking function on our DEV environment. I set the warehouse 001 as one-step crossdocking and no opportunistic cross-docking allowed, not consider FIFO. The time ref. is delivery date & time, time window is set to 72H, release time is 2H and latest relase time is 1H.
    Then I set movement type 501 and 201 as cross-docking relevancy.
    I created 2 TRs with movement 501 and 201 with same material and same quantities. The 501 TR's planning time is 12:00, Aug 17 and The 201 TR is 23:00 Aug 17. However, when i run LXDCK to plan a cross docking with these 2 TRs, system prompts an error message "No inbound docs have been selected for planning".
    If you guys have implementation experience of cross-docking, please give me some advice, many thanks!
    Leon Xiao

    Hi,
    I am facing a similar problem, were you able to find out the reason for the problem?
    Any help is appreciated
    Thanks in advance,
    Mike

  • PS: BAPI For Planned Progress and Actual Progress

    Dear All,
                  Is there any BAPI available for Planned Progress and Actual Progress for PS Project.
    Regards,
    Sohail

    Hi,
    Try using this report s_alr_87013532.
    Also for planned and actual progress the table is rpsqt. Could not find any bapi for the progress
    Regards
    Hiren K.Chitalia

  • How to forbid any further changes for PO (QTY and price ) after it has been

    Hi,
    How to forbid any further changes for PO (QTY and price ) after it has been done GR and LIV? Thanks.

    Hi,
    Price anyway cannot be changed once GR is posted on the PO item, it can be changed only by cancelling the GR, the same applies to IR too.
    But quantity can be changed at any time.
    So if you are looking at blocking qty too, then a customized message through save exit is the option, I am not aware of any standard SAP messages that can be configured to achieve this..
    Ramesh

  • How to forbid any further changes for PO (QTY and price )?

    Hi,
       How to forbid any further changes for PO (QTY and price ) after it has been done GR and LIV? Thanks.

    Better to post this in logistic forum.
    THere will be some config option to do so but normal FI perosn would need to dig deep, a MM perosn should answer quickly.
    Reg
    Hein

  • Help - I have an apple id account, where is my iPod and iPad registered, but also the iPod of my daughter. How can I make an account for my daughter and keep all the apps she has on her iPod?

    Help - I have an apple id account, where is my iPod and iPad registered, but also the iPod of my daughter. How can I make an account for my daughter and keep all the apps she has on her iPod and in her own iTunes?

    Sorry, content bought with one Apple ID cannot be merged or transferred to another Apple ID.

  • How to use multiple VCI strings for lap 1300 and 1200 (option 60) in one pool?

    Hi All,
    Hope to you a very happy new year,
    I have two differnt LAP 1300 and 1200 in my network and I need to add theme to the WLC,
    I successed to add one of theme by the option 60 in the DHCP pool at the Core SW,
    So my quetion is below:
    How to use multiple VCI strings for lap 1300 and 1200 (option 60) in one pool?
    Thanks in Advanced,
    Ahmed,

    To add to Scott's post.  Option 60 would be useful if you needed to put certain types of AP on specific controllers.  Otherwise, no real need to use it for the most part.
    Though, I do recall an issue a few years ago that some windows machines had issues getting DHCP if option 43 is being returned.
    Now, on an IOS switch, you can only configure one option 60 per DHCP scope
    HTH,
    Steve
    Please remember to rate useful posts, and mark questions as answered

Maybe you are looking for

  • I need help trying to install 8.1.2 from 8.1.1? And update is for 8.1.2 only.Help please.

    Hello I hope some one will know what to do to help me out here!!! I have read most of the Post about 8.1.1 to try and download and upgrade to 8.1.2 and most of the ?'s don't have the answers the person needs to fix adobe on their computer befor they

  • Apps & Wifi

    I am having trouble with apps making an internet connection at home.  Apps like the app store, facebook, etc - need wifi connection to work.  Now I can connect to the internet through Safari, but apps will not work.  I am using a Belkin N300 wireless

  • Regarding servicetax on freight charges...............

    hi.... i need to calculate servvice tax on transportation.... for ex. if kf00 is 1000rs... the service tax should calculate on 20% of the freight charges...could anyone give me solution for this.......... Thank you

  • Which table stores the created work-flow event?

    Hello, When am executing FM of 'SWE_EVENT_CREATE' in my custom program, its executing with SY-SUBRC = 0, but, am not getting any email to my SAP inbox! 1) pls. let me know the reason? 2) Atleast how to know that (where to see, any table) an EVENT is

  • Problem after 30 login attempts on A390

    Hi,    I installed a program to control the rotation on my lenovo a390 (ultimate rotation control), the problem is that I locked the screen on landscape, and then I was unable to insert the pattern on the lock screen. (OK stupid, I know... but that w