How can we change the Reports scheduled Time in OBIEE 11.1.1.5

Hello Friends,
I have scheduled BI Publisher reports for FTP, but now I want to change the scheduling time or cancel the scheduled reports.
But I didn't get any option for that. If any body know, please let me know.
Thanks & regards,
Pradip

Hi Pradip,
Go to the report location. You will find options open, Edit, schedule etc based on previliges. Click on schedule.
then you will find options, General, Output, schedule Notification. Under Scgedule tab you can change the scheduled time of the report.
Thanks,

Similar Messages

  • How can I change the file download time using Adobe Send? Adobe SendNow had a lot more options.

    How can I change the file download time using Adobe Send? Adobe SendNow had a lot more options.I don't see nay with Adobe Send.

    There isn't a feature in Adobe Send for setting and end-date for a file's availability. At any time, you can Unshare the file, however.

  • How can I change the report query source on the fly

    I am new to Bi Publisher,
    I have a user that wants to select certain columns in the table then have bi publisher make a pdf on just those columns
    without making different reports for each of there choices, how can i make the report variable?
    Thanks,
    Doug

    Hi Doug,
    You can also use lexical parameters to determine the columns in a Data Template (or Oracle Report)... taking it to the extreme the major components of a BI Publisher data template could be dynamic.... something like:
    select &select_clause
    from &from_clause
    where &where_clause
    Regards,
    Gareth
    http://garethroberts.blogspot.com
    http://www.virtuate.com

  • How can I change the report file name depending on which seq file is run in the main seq?

    I'm using TestStand 3.0.
    I have a main sequence file with a menu option to select one of several sequence files to run.
    How can I get TestStand to change report file name to the selected sequence file rather than the main sequence file name?
    Thanks
    Harminder

    Hi Harminder
    Try RunState.Root.Locals.ReportFilePath = "PathToMyFile.xxx"
    regards
    Juergen
    =s=i=g=n=a=t=u=r=e= Click on the Star and see what happens :-) =s=i=g=n=a=t=u=r=e=

  • How can I change the snooze alert time for my calendar?

    I have no idea what the default snooze time is as I have never seen where this is an option. It is annoying to get five snooze alerts for five different events with no way to modify when I want them. Is anyone looking at this?

    No. You can't change it.

  • How can I change the default start time of an activity in iCal (Mavericks)?

    My current default time in iCal is 9.00 AM. Don't know why. In iCal on my MBP it is 10.00 AM. Can I change that to 11.00 AM? I am not an early riser...
    Gr. K.M.

    If the program does not open the last folder you visited you most likely have the option enabled to autoload Bridge on Startup.  Either disable that option  in PS or shut Bridge down before you shut off the computer.
    Message was edited by: curt y
    If you always want it to start on a specific folder you can leave it on autoload, go to folder you want it to start on then exit Bridge.  It should load this each time in future.  Many of us discourage the autoload option as it can lead to other problems as well.

  • How can I change the "next backup time" in Time Machine

    I have multiple Macs all of which are running Snow Leopard and all of which back up to the same Time Capsule. Lately they seem to all have synchronized to back up at exactly the same start time which really slows down the individual backup times since the Time Capsule is slow to begin with. I would like to force Time Machine on each Mac to start at a different time so that only one Mac at a time would be backing up to the Time Capsule. Is there a way to do this?

    I don't think you can actually specify a time but the previous and next back up time is offered.
    You could turn off Time machine for a couple of hours on one, just to test, then restart it.   It should then be two hours later than the rest.   If the theory works it's just a question of patiently organising things.

  • How can I run the report for different input values at the same time?

    Reports version: Report Builder 6.0.8.13.1
    Oracle version: Oracle8i Enterprise Edition Release 8.1.7.0.0
    I want to run the same report for different input parameter values and spool each o/p to different file and ftp to a server. For this, as a first step, I am spooling different input values in to a file, reading those values through a loop and calling the report for that input values. Each report run/execution is taking 15 minutes. Total report execution is taking approximately 4 hours (assuming 16 different input values) to complete. So I have to wait 4 hours to see ALL outputs.
    I would like to run the report parallel for ALL the input values and I should be able to see the ALL outputs with in 15 or 16 minutes.
    In my shell script, I added & symbol at the end of the report call to start/run the job in the background. Due to this the control passed to the next step after the report call. At this place I have an ftp command to send the output file to a different server and it is giving error some thing like “o/p file is not available/created yet". This is due to the fact that report writer is NOT yet completely started/initiated or it is NOT completed the spooling.
    How can I run the report at the same time for all the input values and save the time?
    Thanks in advance.
    Kishore.

    Increase the number of server engines running right now it seems there is only one engine running ,increase it to 4 or 6
    and then atleast 4 or 6 reports will run simultaneously.
    For FTPing the output add to your sript to check whether it is locked and if not then only try to ftp .
    Also for more better functionality read the document (chapter 15 ) for 10g reports for its new fuinctionality.
    http://download.oracle.com/docs/cd/B14099_17/bi.1012/b14048/toc.htm
    Thanks
    Subodh

  • Mail -- How can I change the default email account from which my messages go, without having to change it each time I draft a message?  It currently assumes an email account that I rarely use. Thanks.

    How can I change the default email account from which my messages go, without having to change it each time I draft a message?  It currently assumes an email account that I rarely use. Thanks.

    sorry, but I can't find the mail preference in the latest Yosemite OS. Do you know where I can find it?
    Thank you
    Don

  • My mother used to be the bill payer on my iTunes account so now every time I send an email from my iCloud account it sent with her name, how can I change the settings so emails are sent from myself?

    My mother used to be the bill payer on my iTunes account so now every time I send an email from my iCloud account it sent with her name, how can I change the settings so emails are sent from myself?
    I've changed the bill payer to myself but it stills says on emails that I sent that its from my mother.

    In order for the "From" field to show you options on the "from" addresses available, you must set them up in the Preferences > Accounts first.
    I can't show you a screen shot of the from field because I currently only have one account, so the from address used is the default. However, when I had more than one, then options will show up in your compose/reply window.
    You'd need to add an account here:

  • How Can I change a report with base in another in the same dashboard?

    Hi,
    I need to publish two reports in a dashboard, the first report is a list of values and the second report is a chart. When I click in a value of the first report, the second report must change with the value selected from the first report.
    I first created the first report, and I changed the column properties in the data format, I selected treat text as: "Custom Text Format", the Custom Text Format is:
    @[html]"<f ont class=Nav oncl ick=\"Ja vaScr ipt:GoNav(event, '/path/reporte2','TABLE','FIELD','"@"');\">"@"< /fo nt>";;@
    The second Report has the next filter: FIELD is equal to / is in @{NQ_SESSION.@}
    With this the first and second reports works well, however, when I include the two reports in dashboard, the second report is updated in another window not in the same section.
    How Can I change the second report in the same page or section where this the first report?
    Thanks
    Edwin Guerrero

    I am not sure whether this would work but worth a try. Create a third report which would call the 2nd report using iframe and GO URL. Name the iframe of the narrative view. And use the java script to update the iframe using objWin = window.open(<ur go url>, “biee”,”height=480,width=240,scrollbars=yes,resizeable=yes”);. I had used a similar method to integrate biee with mapviewer. You can check it out here http://oraclebizint.wordpress.com/2007/09/26/oracle-bi-ee-10133-and-mapviewer-step-by-step-integration-phase2-and-phase3/
    Thanks,
    Venkat
    http://oraclebizint.wordpress.com

  • Facetime is using my husband's cell phone number instead of mine? How can I change the number in face time?

    Facetime is using my husband's cell phone number instead of mine. How can I change the number to mine in face time?

    You need to set up the accounts in System Preferences/Accounts, then activate Fast User Switching.
    That way you can quickly log in to your own account - then back to his.
    You should obviously have different passwords.

  • How can I change the space between a checkbox and text all at one time? I have a lot of checkboxes in my form.

    How can I change the space between a checkbox and text all at one time? I have a lot of checkboxes in my form.

    Okay, I haven't found a way to add an extra space using Find/replace, but you might be able to add some text wrap to the check boxes that will push the text away from them.
    Open Find/Replace and click the Object tab.
    Click the Specify attributes to find button to the right of the Find Object Format: field.
    Under Basic Attributes, choose Stroke and then the Black swatch (assuming the black swatch is applied to the strokes of your check boxes). If there are no other stand-alone objects in your form with a Black stroke, this should be all you need. (If there are Black strokes on your table cells, they will be ignored.)
    Click OK
    Click the Specify attributes to change button to the right of the Change Object Format: field.
    Under Basic Attributes, choose Text Wrap & Other > Text Wrap > Type: > Wrap around bounding box (2nd button from left)
    Under Offset, set a Right offset at the distance you'd like to add (I don't know what units you use, but the 3-5 points might work for your purposes...might take some trial-and-error to get it where you want)
    Click OK
    Click Change All

  • How can I get the date and time and display it on the report main page?

    Gurus,
    How can I get the date and time and display it on the report main page?
    Thanks!

    Hello,
    You can create a Formula Colum returning a date :
    function CF_1Formula return Date is
    begin
    RETURN(SYSDATE);
    end;
    Put a Field in the Layout having this formula column as source .
    Regards

  • HT204053 How can I change the time to central standard time so my calendar entries are correct?

    How can I change the time to central on my calendar

    Settings > General > Date & Time > 24-Hour Time > OFF.

Maybe you are looking for

  • New user with Droid Razr-

    Can not send text messages. What have I done wrong.

  • SYSTEM Tablespace issue (10.2.0.1 database)

    Hi , Oracle database 10.2.0.1 (upgraded from 8.1.7.0 via 8.1.7.4)...successfully upgraded Now when we open dbcontrol, we are getting alerts regarding the Tablespace. It shows two critical alert messages as below :- 1) Tablesapace SYSTEM (dictionary m

  • Deleted account recovery

    I accidentlly deleted the wrong account in Mail. Is there a way I can retrieve the old messages? I did not have the settings to keep a copy of the messages on the mail server, so setting up the account again wouldn't help.

  • CM installation on EP SP 2 Patch 28

    Hi all, I am using EP 6.0 SP 2 upgraded to patch 28 (the same PL to J2EE too) but with  no KM. I want to install CM& Collaboration. Is that possible for the installation (starting with the installation CD of CM& Collaboration) not to work because of

  • Collage screensaver missing in 10.8.

    I recently upgraded to 10.8 and now the collage screensaver is missing.  The new snapshot screensaver does not work near as well.  We used it in our sales room as peole were waiting and really miss it.  Is there any way to get the old one back?