How capacity requirement calculated in RCCP in SOP

Hi,
I am executing RCCP (Rough cut capacity planning in SOP)  for a material through MC93... I am in the below situation as shown in the below screen shot... in the below screen shot if we consider April 2014 month I understood how available capacity 34819 (MIN) is calculated but not getting how capacity reqmt 397 (MIN) is calculated... can anybody guide me on this how capacity reqmt is calculated....
Thanks
Kumar

Hi,
Thanks for your reply....While creating the rough cut capacity planning profile where I need to mention the qty produced..I will give you my exact situation..
I have resource with  six days working. total working time per day is 1339.2 MIN. Total work days in a month are 26 so total available capacity becomes 26*1339.2 = 34819.2 MIN
Now in a month I have a requirement of product is 20,00,000 PC. Machine can produce i.e. capacity of the machine is 1,00,000 PC per day....now my capacity requirement will become like this
total to produce 20,00,000 PC no of days required are is  20,00,000/100000 =  20 days
Per day capacity is 1339.2 MIN so total capacity requirement is 20*1339.2 = 26784 MIN
So now capacity load is 26784*100/34819.2 = 76.92
Now question is where to give capacity of the machine is 1,00,000 PC per day. is it in the RCCP profile header in the base qty as shown below or some other place....  plz clarify....
Thanks
Kumar

Similar Messages

  • Rough -cut plan with capacity requirment calculation

    Hi all,
    We checking SOP with rough-cut plan
    We created Rough-cut profile in mc35 for our bottle neck work center with base quantity -1 and time span - 1
    then we selected new work center (there is no existing cap req). and assigned base unit measure:min.
    and we assigned 1min for each day and saved the profile.
    Now we went to mc88 and checked the material's active version production plan. (period split- DAY)
    in View -> capacity situation -> rough cut planning -> show.
    System calculates some capacity requirement for our production plan.
    Say for tomorrow's date i given 1000 qty - production plan.
    but system showing capacity req
    Work center:  TESTWC3                  Plant: 0001         Capacity:  001
    Info structur  Material          Plant   Order qty     Unit     From              To          Capacity reqmts      Unit
    S076            TESTFERT14    0001  1000.000       EA    29.01.2010  11.02.2010   9000.000              MIN
    with 9000min and cap load more than 652% ( Actuallly  it has to show 1000min as per rough cut plan profile)
    Our available capacity of work center per day - 1380 min
    We cant understand the capacity requirement calculation in MC88..
    Help us out...
    Thanks in advance

    Hi,
    Rough cut planning is genrally done for the group of material say product group, group of workcentre rather than individual material or workcentre.
    As standard, in resource table whatever the value you enter that corresponds to no. of days. Each column represents one day.
    Pl. refer this link for clear understanding of the same.
    http://help.sap.com/saphelp_47x200/helpdata/en/a5/63212e43a211d189410000e829fbbd/frameset.htm
    Madhava

  • Capacity requirement and scheduling process

    Hi Experts,
      please explain me how capacity requirement and scheduling (please explain with configuration  settings)    will help in SAP PP.
    Regards,
    Bhaskar.
    Edited by: basi123 on Nov 7, 2011 1:12 PM

    Dear
    Capacity Requirement Are those Which is used  For Operation And Calculate the Time with help of Dervied Formulas
    for instance i take an Example To Describe so that u get clear Picture
    Ex: Suppose i have machine Drilling u assume that Drilling machine as a one capacity under capacity catergory
    here to operate this i need to make my machine set up first then machine time i need to arrange a labour
    so total i required Setup Machine Labour so Here in sap we define a standard value key with all these combination and there we will assign formula for HOW Much to Produce so on...... and in turn it is assigned to control key to perform all the Actions.....
    Scheduling : Scheduling is Nothing but to sechedule Right time at Right job This helps in shop floor to over come overload on machines.scheduling used in
    scheduling for Production orders
    scheduling for Planned Orders
    scheduling for Plant maintainence Order
    Configuration :
    1. Capacity Requirenemnt ;
    SPRO>>>production >>> capacity requirement >>>> Define capacity catergory
    2.Capcity planner
    3.Define parameters OP7B
    4.Assign this to OPCM
    Scehduling
    1. go to OPU3
    With regards
    Pushpalas

  • MD02 - Capacity Requirement Plan for External Procurement Material

    Hi, I have the following requirements.
    MRP Scheduling is getting executed material level (material no, plant) with scheduling type 2 which means lead time scheduling using MD02 Transaction Code. This is works fine for the Inhouse Product. In order to achieve lead time the functional team has maintained the necessary routing/workcenter configs.
    The business needs the same functionality "Capacity requirements calculation" for the external procurement material. Business is willing to maintain routing/workcenter config.
    Currently standard program (MD02) is not considering the Capacity planning for the external Procurement material.
    Could you please suggest is it can be controlled through programming.
    Kindly suggest the function modules for Capacity Planning - materialwise, plantwise.
    Please suggest.
    Thanks
    Giri

    Hi Giri
        I think the requirement is not mentioned clearly. Capacity is required only if the material is assembled/produced in house.
    Anyway try this. Set the Procurement type to X in the MRP views in material master. You might have to define your custom material type so that it does not force the procurement type to F. Try the feature called "Quota arrangement". The idea is to define the material in such a way that it can be procured externally or produced in house. With quota arrangement you can say what % has to be bought and what % to be produced in house. If it is produced in house then you can have capacity requirements.
    Regards
    Pragnesh

  • How is Reqmts calculated in CM01( capacity Planning: Detailed Capacity List.

    I believe Reqmts is the difference between the 'To be confirmed' and 'confirmed hours'.
    If let suppose standard hours for a part to be manufacture is 100hrs and we have already work 52 hrs off 100hrs then if i go and look up this order in CM01 then the Reqmts should say 48hr (100-52).
    But when I am going to CM01 it still saying 100 hours which is not correct. Can some one help me solve this issue

    Hi Pankaj,
    Once confirmation is done, hours must be deducted and it should show the remaining hours in CM01 based on the below settings in work center/resource in Capacity tab.
    Control: Calc. of Remaining Req./Duration After Confirmation
    Controls how, after partial confirmations the
    Remaining capacity requirement and
    Remaining duration in a rescheduling is calculated.
    The following are possible:
         Formula-Related: The remaining requirement / remaining duration of a
         partially confirmed operation is determined when the formula defined in the work
         center is evaluated. It is the remaining quantity and not the operation quantity
         that is taken into account after the confirmation.
         Completely for Partial Confirmation: The remaining requirement /
         remaining duration is reduced completely when there is a partial
         confirmation.
         Completely for Final Confirmation: The remaining requirement /
         remaining duration is reduced completely when there is a final confirmation.
         There is no adjustment through partial confirmations.
         Proportional to Service: The remaining requirement / remaining
         duration of a partially-confirmed operation is reduced proportional to the
         service that is assigned to the relevant capacity segment in the work center in
         your record type group.
    Dependencies
    When there is a final confirmation the remaining capacity requirement of the
    operation is always completely reduced.
    Please check your settings accordingly.
    Thanks.

  • Capacity requirement showing up in previous month in RCCP

    Hi Experts,
                     I am doing RCCP through MC88. But when i am giving the sales quantity in January and generating a synchronous production quantity, the capacity requirement and load are shown in the month of December instead of in January.
                     How can i get the requirement and load in January, please suggest.
    Regards
    Sm.

    Hi Jiaul,
                I cannot find a provision to change the profile dynamically from MC88 screen. This is possible in my understanding in capacity levelling/planning screens like CM38/CM01, etc.
                But even in such screens the same problem remains. For example when i did LTP for this material with PIRs in Feb 2011, the capacity requirements in CM38 appeared from current period that is from 09.12.10, though my planning scenario was valid from 01.01.2011. I changed the period and evaluation period dynamically from  the CM 38 screen, but that did not solve the problem as the requirement and load which was wronly showing up in Jan instead of Feb 2011 ( just as it happened in RCCP) merely vanished from the output and now i have the available capacity in Feb 2011 showing up but without any capacity requirement or load in the month.
    Regards
    Sm.
    Edited by: Sm on Dec 9, 2010 1:02 PM

  • How to Split Capacity Requirement

    Dear PP Guru's,
    We are in discrete manufacturing, there are several operations having capacity requirements say 24 hours .
    But in actual we do not perform such operations at a go. We carry out operation in partial lots of operation qty. say each lot requires 4 hrs & there are 6 lots. Say for each lot operation is perforemed on alternate day.
    My query is how we can split the capacity requirement of (single) operation in to six (lots) so that we can schedule each lots on alternate day. Currently we schedule capacity in CM31 where the order is shown in single block of 24 hrs.
    Please suggest how to split the operation qty. Any configuration required to do so?.
    Regards,
    Srinathan.

    Perhaps this documentation can help you:
    http://help.sap.com/saphelp_47x200/helpdata/en/8a/a593554adc11d189740000e8322d00/frameset.htm
    Sincerely
    Luciano Nobrega

  • How to calculate the Remaining capacity requirement in SAP Production Planning?

    Hi SAP Guru's,
    I would like to make report on Work center capacity with Remaining capacity requirement, available Capacity and Remaining available capacity requirements.
    Can please let me know the Transparent tables for below Fields?
    BEDAKT: Capacity Consumption Rest
    OUTPUTLEN: Capacity Consumption Offer
    SLIBELAS: Capacity load and
    SLIDELTA: Capacity Unused.
    Could you please help me accordingly
    Regards
    Bhupal

    Wrong space. Please move this to BW area.

  • Capacity requirement in workcenter.

    Hi all
    Please explain about  setting for determining actual capacity requirements in workcenter.
    Also explain how it is useful?

    Hi,
    Capacity planning is divided into two components in SAP
    1. capacity leveling
    2.capacity Evaluation
    Capacity Leveling
      Following elements will create Capacity requirements,
      1. Planned order with Lead time scheduling
      2. production orders
    Following elements will be used to calculate  required capacity  and Capacity Percentage:( Actual capacity calculation)
    1. Work center formula
    2. Routing Base qty.,activity times
    3. Number of Individual capacity
    4. production order/ Planned order Order Qty
    Capacity Evaluation
    Capacity evaluation is fully controlled by setting maintained in IMG 'Overall profile'
    This is Just an overview about CRP.
    Regards,
    Velmurugan S

  • REM Planning table - Capacity requirements and Levelling.

    Hi i have few queries in REM planning table.
    In REM planning table MF50 my selection is based on entire plant. Here in total capacity data tab for any particular plant it will show the list of work centers which are maintained in particular plant to know the capacity details as per our requirement.
    1.When i select any WC line and click on change capacity display from CRP it is giving break up with required and available capacity hours for any particular WC available time is assume 22.5 hrs per day which is given in operating time in capacity header in WC but in MF50 it is showing 23hrs.I have defined shift sequence in OP4A and assigned in capacity header grouping which have 3 shift with 30 mins break in each shift which results in 22.5 hrs working for a day so in shift sequence and operating time it is mentioned as 22.5 hrs is the time available for day but in MF50 it is showing 23 hrs available for day?
    2.What is due% in MF50 total capacity data for any work center and how required time would be calculated?
    Appreciate if any one has any example.
    Cheers
    KK

    Hi bump for any suggestions?
    i have noticed one thing the time available is a round up value actual time available as per capacity header is 22.5 but in MF50 it is showing as 23..if i change to 21.5 then it is showing 22hrs available per day is this the standard behaviour?
    can anyone tell me how the required time is calculated?
    Cheers
    KK

  • 2010 server role requirements calculator

    I'm sure there are other threads on this my terminology must be off on searching for them.
    I have a 2010 exchange environmnet, VMWare, max ____ 2TB.  I don't know if I need to say max disk, volume, lun or single storage device.  But if the role calc is going to help me I need to input this limit.  I have 2 mbx servers, no DAGs. 
    The calc returns lun sizes of 6+ TB but I can't have luns that large.
    How/where do I input the right number so the calc will help me with storage configuration?

    Hi,
    Found a useful blog for your reference:
    Exchange 2010 Server Role Requirements Calculator
    http://blogs.technet.com/b/exchange/archive/2009/11/09/3408737.aspx
    Collected some information from the blog above: 
    1. The term LUN utilized in the calculator refers only the representation of the disk that is exposed to the host operating system. It does not define the disk configuration.
    2. The LUN Design highlights the LUN architecture chosen for this server solution. The architecture is derived from the backup type, backup frequency, and high availability architecture that were chosen.
    3. Most operations management programs have capacity thresholds that alert when a LUN is more than 80% utilized. This value allows you to ensure that each LUN has a certain percentage of disk space available so that the LUN is not designed and
    implemented at maximum capacity.
    Hope it is helpful
    Thanks
    Mavis
    Mavis Huang
    TechNet Community Support

  • Pricing - Requirment / calculation type / base value

    Dear Friends,
    Thnaks for the support and guidance provided by you for my previous posts
    In Pricing Procedure we give Requirment, Calculation type and Alternative formula for condition base value, I would like to know where do we exctly define all this?
    Or are they standard? If standards where we can see how they works?
    Regards
    Vishal

    Hi,
    go through the below Examples for better understanding ..
    Example: 1
    Condition Type: PR00
    Requirement 2 Item with Pricing
    Purpose:
    This is an example of a pricing requirement.  This requirement is met if the document item category is relevant for pricing and no previous condition in the pricing procedure has set the condition exclusion flag. This requirement can be assigned to condition types in the pricing procedure to avoid unnecessary accesses to the database when an item is not relevant for pricing or a condition exclusion indicator has been set.
    Example: 2
    Condition Type:  Net value
    Calculation Type: 2 Net value
    Purpose:
    This is an example of a condition value formula.  This type of formula can be used to influence the value shown for the condition in pricing.  A condition value formula is assigned to a condition type or value line in the pricing procedure.
    Formula '2' sets the value equal to net value that has been calculated so far for the item in the pricing procedure.  It contains the amount excluding taxes.
    Example: 3
    Condition Type: R100
        Alt.Condition Base Value: 28 (100% Discount)
    Purpose:
    This is an example of a condition base value formula.  A condition base value formula can be used to influence the basis the system uses when computing a pricing value.  A condition base formula is assigned to a condition type in the pricing procedure.
    Formula '28' sets the rate of the condition to a 100% discount.  This formula was delivered with condition type R100 to support free goods functionality.
    Reward if it is useful,
    Chandramohan

  • How Achieve timedseries calculations with out using AGO And ToDate function

    Hi,,
    1)
    How Achieve timedseries calculations with out using AGO And ToDate functionion
    this question asking in interview ..is it possible..?
    if yes please response as soon as possible..
    2) i have 2 cloumns Product and value...
    client requirement is they need ranks based on Value ..in dashboard .using dashboard prompt..edit box...if user enter any number (ex :5 ) report should show top 5 ranks if he enter 20 should be top 20 ranks..
    how to achive this ?
    thanks,
    raj

    Consider yor first question:
    1. Yes, we can create timeseries measures without using AGO and TODATE
    1. Create ALIAS of fact tabe in the physical layer
    2. Join the Time id from the ALIAS fact table with the YAGO_MONTH_ID column from your time dimension table (For calculating Year Ago variants) similarly join with MAGO_MONTH_ID column for Month Ago measures.
    3.Pull the ALIAS tables as an additional Logical table source in the Lgical layer
    4.Keep the mapping of the columns from the ALIAS table as its is
    5. For e.g If you pick Revenue from the Year Ago Alias table it will give you the "Prior Year Revenue"
    See if this helps you

  • Error in SAP APO Inbound: capacity requirement is invalid

    Hi Experts
    I am getting an error in APO Inbound in APO queue manager. The error text reads " Capacity requirement is invalid".
    I checked for all the resources whether they have validity and also checked for mismatching control key. But these fields are allright in both ECC and APO system.
    I checked note # 924562, but i am still not able to solve this issue.
    Can you please suggest how should i debug this error?
    Many Thanks!!
    Regards
    Mansi

    Hi Mansi,
    Were you able to replicate the issue on which activity triggers this CIF error?
    I remember a similar error which happened when converting planned order to production order where it was giving error"“Bucket capacity requirement has an invalid value” .
    SAP had suggested to implement note 1381483 to fix this.
    Thanks
    Ajay

  • Remaining capacity requirements scheduled for operation in Planned Order

    Hi all,
    I'm workig with planned orders, and I need the "Remaining capacity requirements scheduled for operation" data to list it in a Z Report, but I don't know how to get it.
    You can see the info in the "Detail Scheduling" of the planned order in MD13.
    Anyone knows how to get the info? Any table or any FM to get it?
    Points will be given for helping
    Thanks in advance!

    Did you ever find out where the planned order capacity information lives?  I can find the production capacity information in table KBEZ, but it appears that there is no planned order info there.
    Thanks,
    Matthew Bruckner

Maybe you are looking for

  • Migrate a Local User Account to a Network Account Shell Script

    http://support.apple.com/kb/HT5338?viewlocale=en_US&locale=en_US If you are looking for an easy way to migrate local users to network users without losing data, then try this script. Follow steps 1-10 in the support link above before running this scr

  • Clean prompt field problem - OBIEE 11g

    Hello guys! We are facing this issue: we have a prompt with 3 fields: Name, Document Number, Account Number. Each of this three identifies a person. We have an "or" relation between these fields. So, if I put Name, I don't want put Doc Number, etc. S

  • Photo shop Element 6 failed to open catalog  The catalog could not be opened.  It is either corrupt

    Photo shop Element 6 failed to open catalog  The catalog could not be opened.  It is either corrupt, or the version is out of date and cannot ne updated

  • Placing resource bundle in UCM

    Hi, We are planing to put our resource bundle (.properties) files for all supported languages in Oracle UCM for our Webcenter Portal application. But i am not sure how to use it for labels/text on jsff pages. I can use ridc api for reading the file b

  • Where is the ID for iWork ?

    I have restored the OS on one computer and it did not transfer the iWork family pack to my OS . The other computer doesn't seem to have the ID for iWork in the plists , the get info , or application support . Does anyone know where I could find the n