How do I change the visible number range for the y-axis in numbers?

I have a chart that has a lot of white space because the y-axis starts at zero.I would like the graph to show the range 20-35. How may I omit the range for which I have no data?

agood,
You can control Max, Min, number of grid lines, etc. for X and Y axes.
Here's an example from the Chart template:
I've boxed the relevant areas.
Jerry

Similar Messages

  • How can I change the order of phone numbers in a contact?

    I have contacts that have more than one phone number (I am sure we all have those in this day and age). The importance of the phone numbers varies over time and I want to have the most important one as first on the list. How can I change the order that phone numbers are displayed within a contact?
    Thanks for any help.

    Currently, the order in which the phone numbers appear (in a contact) is dependent on the sequence to which you enter them. There is no way to change that order other than re-entering them in the desired order.

  • How do you change the paper size in numbers?

    somehow the default paper size in numbers is A4, i want to make it legal, how do i do it, numbers doesnt have "page set up" like pages. and i tried to change the default print size in the print center, still nothing happened. im really getting frustrated. help please.

  • How do you change the y axis value in numbers

    Hi
    relatively new to numbers. How do you alter axis value and set minimum, maximum values an step values in numbers
    Cheers

    Hi CA,
    Did you really intend to post this Numbers question in the Pages forum?
    Axis values are set in the Axis section of the Chart Inspector:
    Select the chart.
    Default values are 4 steps and auto settings from data for the min and max values for each axis. The x axis is a Value axis only for a scatter chart. Otherwise it is a Category axis.
    To set Min, Max values and number of steps for either axis, click in the appropriate box, then either type the value or use the stepper (which apears) to step to your chosen value.
    The maximum number of steps is 10.
    Regards,
    Barry

  • How do I change the page order in Numbers

    I have a simple three page document/ In the top left it says "sheet 1, 3 pages". I want to change the order of page I and 2. Simple, one would think, but I cannot figure out how to do it without a tricky cut/paste operation. Surely one would think you could see the pages in the left column and just drag and drop them to re-order?
    Anyone help me - perhaps I am overlooking something that is supposedly intuitive. Or maybe this part of the software was written by the page break department?
    Thanks

    Richard,
    The answer depends on whether on not you have a table that spans two or more pages. I'm guessing not.
    In Print View, do a click-drag to select all the content on page 1. Click on any part of the selection and drag the entire page 1 content to a blank page - one of the dimmed-out ones. Similarly, select and move the content of page 2 to page 1. Retrieve the former page 1 and drag it to page 2.
    It's very manual and very WYSIWYG.
    Jerry

  • How can I change the X-axis increment in a waveformgraph

    The X-axis always increments by 1, but I am acquiring one point of data every 100 ms. So my chart moves 10 times fater that the real time. How can I set my x-axis to increment 0.1 every time I add data to my Waveformgraph in VB net?
    The X-axis collection is not showing any property to change that.
    I have a continuous data acquisition giving me timed data at 100 ms rate.

    Thank you for posting to the NI forums.  You can set the update increment of the WaveformGraph plot function by using the overloaded function as follows:
    PlotYAppendMultiple( ByVal yData As Double(,),
       ByVal orientation As DataOrientation,  
       ByVal increment As Double )
    I did this in the VB.NET example program, "ContAcqVoltageSamples_IntClk", by adding the following line to the dataToDataTable function.
    WaveformGraph1.PlotYAppendMultiple(sourceArray, NationalInstruments.UI.DataOrientation.DataInRows, 0.1)
    The increment will be set to 1 / (sampling frequency), so in your case, it will be set to 0.1.  This function is documented in the NI-DAQmx .NET Framework 2.0 Help.
    I hope this helps.  Post back if you have any further questions.
    Ed W.
    Applications Engineer
    National Instruments
    Message Edited by Ed W on 05-04-2007 10:36 AM

  • How do I change the order of phone numbers in a contact?

    When I enter phone numbers for a contact on the iPhone, they seem to be stuck in the order they were entered. Is there any way to change the order using the phone interface? I sync with Yahoo Address Book. Will the order be preserved if I change the order there?

    Ditto! I am having the same problem. Anyone?

  • How can I change the Y axis to show my values in a descending order in Numbers. eg zero at the top and the maximum value at bottom?

    Hi,
    I'm just about getting to grips with Numbers, but I'm stumped at the moment with this problem.
    I want to show zero at the top on the (y) axis, as zero is the goal and 100 is the starting point?
    can it be done? i would really appreicate some help on this.
    Kind regards
    Rob

    Is it so difficult to read given answers ?
    Barry described the correct scheme.
    In the table "to_chart", the cell A1 contains :
    =ROUNDUP(ABS(MIN(Tableau 1 :: B:E))/10,0)*10
    The cell B2 embed the formula :
    =$A$1+Tableau 1 :: B2
    Apply fill down and fill to the right.
    On the left edge, the colored rectangle is a text block in which I inserted the label values.
    Of course if you dislike this scheme, you are perfectly free to use an other application.
    Yvan KOENIG (VALLAURIS, France) lundi 4 juillet 2011 14:37:56 iMac 21”5, i7, 2.8 GHz, 4 Gbytes, 1 Tbytes, mac OS X 10.6.8
    Please : Search for questions similar to your own before submitting them to the community
    To be the AW6 successor, iWork MUST integrate a TRUE DB, not a list organizer !

  • How do i change the chart axis; x to y and y to x?

    i'm new to the numbers, please suggest me for the same
    thanks,
    Rajesh Ranadive

    Hey Rajesh Ranadive,
    Welcome to Apple Support Communities! Check out the Numbers Help document, specifically the section titled "Modify chart data references." I pasted the relevant steps below:
    Numbers Help: Modify chart data references
    http://help.apple.com/numbers/ipad/1.7/#tan72719392
    Switch rows and columns as data series:
    Tap a chart, and then tap Edit References.
    Tap in the top-right corner of the screen, and then tap your preference to plot table rows or columns as the data series in the chart.
    Tap Done.
    Cheers,
    David

  • How can I change the Y-axis (circular) grid spacing, in Polar Plot VI?

    When using Polar Plot VI, I need more control over the plotting parameters. This means tweaking the sub-VIs in various ways. What I need to do most is make the polar magnitude axis less busy, i.e. only draw circles every 10 instead of every 5 divisions, when using a range of 0 (outermost) to -80 (innermost).
    The magic 'magnitude axis subdivisions' variable seems to be generated in Calc Scale Specs sub-VI, and output as an array of clusters, but I can't quite see how it's created and from what.
    Please can anyone help me gain control over the number of magnitude division circles generated?
    Many thanks!

    I think if you go inside the Calc Increment.vi and modify the Increment output terminal it might change what you want to see. Try putting a multiply by 5 or ten into the case structure for when the log is false.
    Attachments:
    polar plot calc increment.jpg ‏90 KB
    modify calc increment.jpg ‏104 KB

  • How do I change the names associated with numbers on my bill

    I have multiple numbers on my bill that have the wrong names associated with them.  I have tried calling *611 only to wait and then be disconnected. I am the account owner  and am unable to locate where to correct the information.

    Online, in My Verizon / View Usage / Minutes / Breakdown of Recent Activity / Current Call Log for Line / Select a Line, a log of calls incoming and outgoing since the last billing date are shown. For years, I would be able to click on the blue telephone number and a popup box would show up to Add/Update Nick Name. I would type in a name, for example, Mom and then click on Add/Update and the name would then replace the number in the listing. As of two months ago, I can still do this EXCEPT the name will NOT replace the number! This is so irritating as I have been assning names to the numbers for years for ease of search and identifying the calls. I have call ed Customer Servcie at least htree times on this issue. I have tried to Add/Edit Nick Name in two odfferent browsers (Internet Explorer as well as Firefox) and I have tried it on two dofferent laptops in two diofferent wireless networks. So I know it is NOT an issue with my hardware or networks. The issue is on Verizon's end. I am puzzled that others have not complained. Maybe I am the only doofud that likes to assign names to the numbers? But I would be most grateful if someone within the Community or Verizon's Customer Servcie can resolve this issue once and for all!!!!!!!!!!!!

  • How can I change the border size in Numbers?  The border when I print is Way big.

    Just updated numbers and now when I print it has a 2" border around my spreadsheet. Basically shrinking it on the page by 50% !!  Can't seem to find a way to change it so I can print on the whole piece of paper.  HELP?!

    Jeff,
    Printing has definitely gotten worse with Numbers 3.0.  Apple published a list of items they are addressing here:
    http://support.apple.com/kb/HT6049
    You can continue to use the previous version which is located in the folder "/Applications/iWork '09"
    The only way I know to "fix" this problem is to print to PDF directly to Preview, then crop (using the rectangular selection tool and the menu item "Tools > Crop") and print again.

  • Alphanumeric Number Range For Serial Number

    Hi Friends
    How can i use alpha-numeric number range for serial numbers.I am using serial number profile For  GR Process
    Regards
    Vivek

    Hi,
    You may check link
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/3c/abc157413911d1893d0000e8323c4f/frameset.htm
    Ramesh

  • How to change number range for document type ?

    Dear All
    Experts
    How to change the number range for document types for entry view? I am trying to change the number range for all document type as per defined ranges in FBN1, but at the time of saving document type and number range the system is throwing error message as 
    Doc. type C1: Number range 07 is used for ledger L6 with doc. type AE
    Message no. FAGL_LEDGER_CUST093
    I have defined a leading ledger in system too with these settings
    1)     Define ledger for accounting.
    2)     Defining currencies for it.
    3)     Defining ledger group for the same.
    4)     Defining accounting principles
    5)     Assignment of principles to leading ledger.  
    Are there any extra settings required for leading ledger settings?
    I have some doubts those are :-
    How document types defined at ledger level?
    How to define them at leading ledger level?  (Like my case)
    Focus on this will be appreciable.
    Regards,
    Sharvari Joshi.

    hi ,
    The document numbers in the leading ledger and the non leading ledgers should be in sync, they should not have any differences, so incase you are trying to change the number range for C1, the  number range 07 is already been assigned to doc type AE. i guess you have cant use 07 for C1. may be you can try out with an other number range. check this and let me know if you are able to do this.
    coming to
    1.How document types defined at ledger level?
    2.How to define them at leading ledger level? (Like my case)
    Ans 1. please try defining document types for entry view in a ledger.
    path : SPRO- financial accounting new -financial accounting global settings new - document -document types -define document types for entry view in ledger.
    upon prompt enter the ledger and go ahead creating the number ranges for the document types.
    Hope this helps.
    Regards
    amrutha

  • My iPad has connect to the wrong number for imessage and facetime. How do I change the number on my iPad for imessage and faceting?

    When setting up my new iPad and entering my own Apple ID my sisters number appeared on the imessage and facetiming; however her number is not associated with my Apple ID. How do I change the number to my own?

    Turn iMessage and FaceTime off, reset the device by holding both buttons until the apple logo appear then let go and wait for it to restart. Then turn iMessage and FaceTime back on and enter the settings again

Maybe you are looking for

  • Can someone please identify my problem by reading this crash report

    Okay hi guys. So I spend a lot of my time playing pc games and ive recently run into a problem with one. Not many of you will know this game but it is called League of Legends. After having played this game on my mac for months i suddenly started enc

  • Opened PDF by Adobe Reader X and IE 9

    Please help to solve this issue. I have no idea for this. I have a problem with Adobe Acrobat Reader and the way it is displaying text on screen, both opening a file directly or displaying within Internet Explorer.  Documents print correctly but do n

  • Problem w/ portion of SQL statement in servlet

    Hi folks, Don't know if this was one that should go under JDBC, but it's not so much of a connection problem as it is returning -- or not in this case -- a small result set I'm trying to make. I've got an INSERT statement up above this code that hand

  • Workbook Error

    We use a Structure in many of our BW reports. Recently we have changed the structure a little bit. Due to this change many workbooks are giving authorization errors when loading them. When I run the used query in the workbook w/o workbook the report

  • Line ends

    How do I switch the start and end point of a line?