How do I fade one frame into another?
In Flash pro 4 how do I fade out of one keyframe and fade into the next one with a slow transition? thanks.
Try this set alpha to 0. Move ahead 20 frames or how fast or slow you want it.Change the alpha to 100%.Then create motion tween in the button symbol and place the movie clip in the over state.
Then it should fade as the movie plays.You can implement it the way you want it.
Hope this helps
Good Luck!
Similar Messages
-
How can I copy one sheet into another spreadsheet or another file?
I am trying to copy a sheet from one file into another. Is that possible in Numbers?
Open both documents.
Click on the sheet icon of the sheet you want to Copy fom the Source document. Copy
Switch to the second document.
Click on the icon of one of the Sheets on that document. Paste.
The copied sheet (and its contents) will be pasted into the list immediately below the selected sheet.
Regards,
Barry -
How do I insert one file into another with track changes intact?
I gather that Pages does not have a way to insert a file into a document in the way that Word has insert file. So all we can do is copy an entire document and then paste it into the second document. But when I do that I lose the track changes, except for the odd comment. What is the way around this?
I'm assuming you're wanting to insert the contents of one Pages document into another. I don't have a need to use tracking, so I'm not sure if this applies but I think it should.
You can insert sections from one Pages document into another. Open your files & show thumbnails. Sections have a yellow border around all of the pages in that section. Now click on the page in the thumbnail pane & copy. If the file is more than one page & you only want one, you'll need to insert a section break to separate the pages. Then go to your other file, click in the thumbnail pane & paste. If you want to insert the other content into the middle of a section in the receiving document, you will need to insert section breaks at the point you want to insert. The whole copied page will be pasted in. Repeat with another section. Styles will copy over with the sections but headers & footers will not. -
How do you copy one page into another pages 5.2 doc
Working in version 5.2 and want to add (copy) one page from one pages document into another pages document. (both documents are made w 5.2)
Thanks!You could copy and paste pages from one document to another in Pages '09, but Apple removed this from Pages 5.
Best you can do is copy the content.
Peter -
How do I feather one image into another?
I want to make the black area look as though it does not have a hard edge but actually fades into the lighter grey behind it, but in a way so that the fade still describes the shape of the black area. I also don't want any of the darker colour to bleed into white space - I want all the fading to be contained in the light grey.
For context, this image is a river in its current state (the black) and the light grey is the floodplain of the river. The effect I want is for the river to appear as though it moves within the floodplain rather than look like a fixed line on a map.
Does anyone know if this is possible?I ended up selecting the black river area, and making a new layer, and expanding the selection by 100pixels - filling that with a slightly lighter black, and then using the eraser with transparency to create the fading effect around the river.
-
How do I make one song into two separate songs?
I have a song on my iTunes that I want to to split into two different songs, each with different names, and that can be played right after each other in the album. Is there an easy way to split up this song into two different parts, and if so, how? Thanks!
ccreatvwhit wrote:
How do I fade one song into another after only 1 minute or so of playing?
That is a common capability of DJ programs, but cannot be done with iTunes. -
Object Creation Of One class into another and vice versa
Hello Everyone,
My name is Prashant Sharma from Jaipur [Rajasthan]
Can u people help me
How to create of one class into another and vice versa
Eg,
I am having class A and class B
I want to create object of class A into class B and vice versa
Plz help me out of this problem as soon as possible....Read this: [Creating Objects|http://java.sun.com/docs/books/tutorial/java/javaOO/objectcreation.html]
Then, do one of these three:
1. Create an instance of the class
2. Extend the class
3. Access methods within the class
Try it out. Post the problem code if you're having trouble. -
How can I move part of one photo into another photo?
In older versions of Photoshop you could see two or more frames in the work area and cut an paste parts of one photo into another photo by using the "move" tool after the area to be moved was selected. I am having trouble discerning how to achieve this action in CC. Could someone in the forum with this experience give me some steps to take to complete this process? Thanks.
Thanks Trevor!
Bill Coan (BillCoan Photographs)
Moravian Falls, North Carolina
336-928-0498 (c)
336-903-8674 (h)
On Mon, Jun 16, 2014 at 6:48 PM, Trevor Dennis <[email protected]> -
When I put a burned cd from one Mac into another Mac, song titles do not show up! I have to enter them manually! My CD player reads the titles that i on the cd; how can I get my Mac to do so?
The problem is that I burned these CD's myself from music that I added from my personal collection to iTunes. The INFO is ON the CD's (it appears perfectly when I put the CD in my Numark mixer...so I know the info is on the CD), but for some reason, my MAC PRO will NOT read the info on the burned CD when I place the CD into the MAC PRO. The CD was burned on a MAC that I no longer own. But there HAS to be a way to transfer songs from a burned CD with the INFO that is on the CD burned with iTunes.
PLEASE HELP!
-Old Appel -
How to get a value from one item into another
How can i get value from one item into another item.
Ex: I have a report, in there i have check boxes, and when i have checked some rows, and press submitt, a prosses computates it into a item on another page, and a branche redirects to page 3. Then i'm going to use the value in the item into a PL/SQL script in an report to show the submittet items.
How can i do this?
Computation script, pages and all that is fixed. But i dont know which PL/SQL statement to use to get th value from the item.Hi Fredr1k,
Use the V() function from pl/sql.
e.g. V('P3_MY_ITEM')
will return the value of that page item.
As long as the pl/sql is called from within the Apex environment.
Regards
Michael -
How do I go directly from one frame to another particular frame which is far away in the time line? (e.g the two frames are separated by 100 frames). I mean, is it possible to take the playhead from one frame to another frame directly which is 100 frames away in the time line? Thanks for any reply.
In the Timeline, go to the first frame and press M to put a marker on it. Go to the other frame you want to jump to and put a marker on that one too.
Now press Ctrl+Semicolon to go to the previous marker - or Ctrl+Comma to go to the next marker.
Andy -
How to include one view into another view
Hi SDN's,
Could any please tell me,How to include one view into another view.
In my requirment.I want to create a 'Z' view for an interface .In that view i have to take,
1) Ship-to-email adrr by
LIKP-KUNNR -> KNA1-ADRNR
KNA1-ADRNR -> ADR6-ADDRESNUMBER.
2) E-mail addr of person who created the document.i.e
LIKP-ERNAM -> USR21-BNAME.
USR21-ADDRESNUMBER -> ADR6-ADDRESNUMBER
USR21-PERSNUMBER -> ADR6-PERSNUMBER.
In both the case we have to pass ADDRESSNUMBER to ADR6 table.
If we pass these condition it fails,B'Coz at a time it passes Two ADDRESSNUMBER and a PERSNUMBER.
So i created two which fetches only the email addr of person who created the document.and another view fetches Ship-to-email addr.
Now i want to include the second view into first view . Is it possible?or please
tell me someother way to get these email addresses in a single view.hi
as per my knowledge, nested views are not possible. However, while creating a new view, selection method will not giv u option to select the already created view(S) except the tables..i think so.
regards,
shamim -
How to put a string from one Frame to another Frame?
Dear all,
How can I put a String from one Frame to another Frame?
When the application started, the Frame 'WindowX' will be displayed. After you press the 'openButton', a whole new Frame (inputFrame) will be shown. In this Frame )(inputFrame) you can write a String in a TextField. After pressing the okButton, this String will be sent to the first Frame 'WindowX'.
But does anyone know how to realize the sending part?
I've tested this code on Win98 SE and JDK1.2.2.
Hope someone can help me. Thanks in advance.
import java.awt.*;
import java.awt.event.*;
public class WindowX extends Frame implements ActionListener, WindowListener
private Button openButton;
private TextField resultField;
public static void main(String [] args)
WindowX wx = new WindowX();
wx.setSize(300,100);
wx.setVisible(true);
public WindowX()
setLayout(new FlowLayout());
openButton=new Button("open");
add(openButton);
openButton.addActionListener(this);
resultField=new TextField(10);
add(resultField);
resultField.addActionListener(this);
addWindowListener(this);
public void actionPerformed(ActionEvent evt)
if (evt.getSource()==openButton)
inputFrame ip=new inputFrame();
ip.setSize(200,80);
ip.show();
public void place(String theString) //this doesn't work
resultField.setText(theString);
public void windowClosing(WindowEvent event)
System.exit(0);
public void windowIconi......
class inputFrame extends Frame implements ActionListener,WindowListener
String theString = "";
Button okButton;
TextField inputField;
WindowX myWX=new WindowX(); //??
public inputFrame()
setLayout(new FlowLayout());
inputField=new TextField(10);
add(inputField);
inputField.addActionListener(this);
okButton=new Button("OK");
add(okButton);
okButton.addActionListener(this);
addWindowListener(this);
public static void main(String[] args)
Frame f = new Frame();
f.show();
public void actionPerformed(ActionEvent evt)
if (evt.getSource()==okButton)
theString=inputField.getText();
myWX.place(theString); //??
dispose();
public void windowClosing(WindowEvent e) {
dispose();
public void windowIconi......
}Thanks for your reply!
But I got an other problem:
I can't refer to the object (wx) made from the main Frame 'WindowX', because it's initialized in 'public static void main(String [] args)'...
Hope you can help me again... Thanks!
import java.awt.*;
import java.awt.event.*;
public class WindowX extends Frame implements ActionListener, WindowListener
private Button openButton;
private TextField resultField;
public static void main(String [] args)
WindowX wx = new WindowX(); //!!
wx.setSize(300,100);
wx.setVisible(true);
public WindowX()
setLayout(new FlowLayout());
openButton=new Button("open");
add(openButton);
openButton.addActionListener(this);
resultField=new TextField(10);
add(resultField);
resultField.addActionListener(this);
addWindowListener(this);
public void actionPerformed(ActionEvent evt)
if (evt.getSource()==openButton)
inputFrame ip=new inputFrame(wx);
ip.setSize(200,80);
ip.show();
public void place(String theString)
resultField.setText(theString);
public void windowClosing(WindowEvent event)
System.exit(0);
public void windowIconi....
class inputFrame extends Frame implements ActionListener,WindowListener
String theString = "";
Button okButton;
TextField inputField;
WindowX parent;
public inputFrame(WindowX parent)
setLayout(new FlowLayout());
this.parent=parent;
inputField=new TextField(10);
add(inputField);
inputField.addActionListener(this);
okButton=new Button("OK");
add(okButton);
okButton.addActionListener(this);
addWindowListener(this);
public static void main(String[] args)
Frame f = new Frame();
f.show();
public void actionPerformed(ActionEvent evt)
if (evt.getSource()==okButton)
theString=inputField.getText();
parent.place(theString);
dispose();
public void windowClosing(WindowEvent e) {
dispose();
public void windowIconi..........
} -
I have multiple libraries. I would like to import one project into another library. How?
Select the project in the Library Inspector and export the project as library. Then import this library into your other Aperture library.
File > Export > Project as New Library
File > Import > Library
Regards
Léonie -
How to copy one schema into another
I need to copy one schema into another. That means, all the tables, views, constraints, etc, and all the data as well.
I have a dmp file of source-schema (created daily with expdp by our backup schedule).
Can I use impdp to import this dmp file into dest-schema? I'm thinking about something like this:
The dmp file was created with:
expdp source-schema/pwd DIRECTORY=dmpdir DUMPFILE=myproject.dmp
Create the copy on dest-schema with:
impdp dest-schema/pwd DIRECTORY=dmpdir DUMPFILE=myproject.dmp
(dest-schema is an existing schema on the same machine. I'll drop all the tables before executing the command. Is there anything else I should do first?)
If this approach is not feasible, kindly suggest me an alternative.
Thank you.
Edited by: mgro on Apr 16, 2010 3:22 AM (changed 2nd command: expdp to impdp)Thank you both. Dean, I've made a note of your proposed command. May use it next time.
In the end I used the following command and it worked for me. I added TABLE_EXISTS_ACTION=REPLACE since the destination was not empty.
First I ran these command logged in as SYS
GRANT Import Full Database TO dest-schema;
GRANT Create Any Directory TO dest-schema;
GRANT Unlimited Tablespace TO dest-schema;
impdp
dest-schema/pwd
DIRECTORY=dmpdir
DUMPFILE=myproject.dmp
REMAP_SCHEMA=source-schema:dest-schema
TABLE_EXISTS_ACTION=REPLACE
LOGFILE=implog.log
There were some errors though. The import process complained about constraints referencing non-existent primary keys.
It turns out that the source schema has some constraints that are marked with status DISABLED. These constraints either:
- are not part of the DUMP file
or
- are in the DUMP file but skipped during import
Don't know if this is a bug or by design behavior.
Maybe you are looking for
-
Delete AppStore via iTunes Works Fine, but the footprints are still visible. In the iPad Local app Store Looping at tab 'Not on iPad'. How can these footprints are Delegat too, so they aren' synchronised any more?
-
Adobe flash cs5 getting error.
Hi, I am facing the problem "Adobe Flash CS5 has stopped working " Installation of CS5 is done. But when I open a flash file the above error occures. Could you please help me? windows 7p 32 bit
-
MS Usb Mouse Scroll Wheel Problems
Im having this problem on my laptop running arch. I have the USB module loaded. My XF86Config file looks as follows. Section "ServerLayout" Identifier "XFree86 Configured" Screen 0 "Screen0" 0 0 InputDevice "Mouse0" "CorePointer" InputDevice "Mouse
-
Hi, When we try to upload any document to KM we get the following error, com.sapportals.wcm.repository.ResourceException: Webservice returned with exception in method 'getBOInstance'"",""n/a"",""com.sapportals.wcm.control.navigation.ResourceTreeContr
-
Photobooth and Isight Video camera with slash through it. Need help. Thx
I have a slash through my video camera and cannot use photobooth for either video or still photos. How can I correct this? Thanks.