How do I hide the duration on the TOC in an Aggregator project.

Hi I installed the widget to hide the duration on the TOC in my Adobe Captivate 5 project and it worked great.  However when I combine the Flash files in an Aggregator project it no longer works and the duration is showing at the bottom of the Aggregator TOC.  I have the TOC set to be the same as my first Flash in the project which doesn't show the duration because of the widget.

I think you'll find this widget was not originally designed to work with the Aggregator.  Go back to the widget developer and ask if he has a version that does work with Aggregator.

Similar Messages

  • How can I hide or make visible the fields at the order and at the delivery?

    How can I hide or make visible the fields at the order and at the delivery?
    Thanks in advance.

    Hi,
    For sales order, use user exit :
    MV45AFZZ and FORM userexit_field_modification.
    For deliveries, use BADI :
    LE_SHP_DELIVERY_PROC (see with Tcode SE18) and method CHANGE_FIELD_ATTRIBUTES.
    Create implementation in ref to this badi with Tcode SE19.
    Regards,
    Lionel

  • How to find the duration of the media?

    Hi
    For an application(video streaming) how to find the the duration of the video.
    I tried using the getDuration method but i get the result as -1.
    How to get the time duration of the video file?
    Message was edited by:
    thelastdon

    Hi
    not exactly streaming.My project is transfer of a video taken in a mobile to another mobile.
    I am taking the video,dividing it into frames and sending these frames to another mobile and rendering it to get a video streaming.
    My problem is since i have to take a video from a camera i need to find the number of frames each video will produce(for each video it may change).
    how to find the number of frames??
    I thought of trying to get the duration of the video and then try to get a link betweeen the duration and number of frames .Will it work?

  • How do I hide a clip in the timeline?

    How do I hide a clip in the timeline?  In the old version, at the far left of the timeline, there was a green button with a filmstrip icon. Clicking that toggled the clip on and off to let me see the clip below it.  Where is that button now?
    FCP X 10.1.1
    Mac OS 10.9.1
    iMac 3.2 Ghz Intel Core i5
    shoe size 10.5

    I have the full version of FCP-X on a new Mac.  I still have my old FCP-6 on my old Mac.
    I have something in FCP-X that looks like rows (tracks) in the timeline.  I have several clips that form a horizontal line and directly under that is another horizontal row of clips.  I call them rows or tracks.  Maybe that is not the correct term.  I just tried to create additional rows, and created six tracks (horizontal rows) each containing multiple clips.  FCP plays only the top clip, which is the same as the old version.
    I have found a way to disable a single clip, but what I want to do, and it was as easy as pressing the green button in FCP-6, is to temporarily disable the entire row of clips.
    Often I have multiple cameras shooting the same event.  I want to quickly disable one camera view and see the one below it.  If the video is chopped up into small segments, then It would take too long to disable each clip individually. 
    I wish they would have kept the old features when they upgrade the software.

  • Why i cannot know how much is the duration of the call WHILE calling someone?

    Why i cannot know how much is the duration of the call WHILE calling someone?

    You can. Look at the screen.

  • IMovie 08 transitions length...How do I change the duration of the transit

    Believe me, I've tried Edit, set duration, apply to all transitions.. it won't stay at the time that I set it. Can I get some help out there?

    I do have the same problems. I want to show some 10 pictures as a movie. Therefore I set the duration of all pictures to 0.4 sec and the transitions between to 0.1 sec. First I observe that not all photos have the same duration (some are 0.36 sec some are 0.5 sec ?!?). When I set the duration of all transitions to 0.1 sec then I get an error "Fell short of minimum" (which is not explained in Help) and the durations of the transitions are between 0.2 and 0.4 sec (regardless whether I choose to ignore ore cancel the request)
    Help just says that the duration of the transitions need to be shorter than half the length of the shorter clip which I intend to have.
    So to me this is a bug. Maybe you can report it to http://www.apple.com/feedback/imovie.html
    --kurt

  • Is it possible to change the duration of the timeline in Premiere Pro CS5.5?

    I'm used to working on Avid systems where the length of the timeline is determined by the last asset in the timeline, where it ends. I'm editing commercials and don't need or want a 10 minute timeline. Does anyone know how to change the duration of the timeline, like you can in After Effects? I've tried everything I can think of and It seems like it is not possible.... Thanks!

    Now, if you are seeing a Duration for your Timeline, that is longer than what you "anticipate" with your Assets on it, then you could well have an "Orphan," out beyond the anticipated end. This ARTICLE goes into more detail.
    Good luck,
    Hunt

  • Does the duration of the video change after putting a slow motion effect?

    Hi, I'm new with this After Effect software, and through researches and youtube videos, i learned how to make a slow motion clip, but i found a problem just after i was so happy to learn something new. Because I was so excited to try it out, i took a quick 3secs clip and edited it, after all the successful application of the slow motions, the clip suddenly stop without finishing the whole video, the duration of the clip remains 3 seconds after i applied the slow motion, i was hoping that the duration would go over 3 seconds because the slow motioned part was only at 5% the original speed.
    So my question is, is the duration really supposed to stay the same after the slow motion is applied or should it expand finishing the whole video.? Then what should I do if the duration doesn't expand?
    Pls give me a respond, thx.:))

    Nah, that's just not how it works. AE will only extend layers if you use the native time-stretch/ time-remapping. If you use the Timewarp, you will have to pre-compose the source clip to a comp with longer duration and then apply the slow motion.
    Mylenium

  • Is there any way to remove the duration from the course outline in Presenter 8?

    Is there any way to remove the duration from the course outline in Presenter 8? I would prefer to not have that listed if at all posible and can't find a solution.

    Are you talking about the Time Remaining display on the side bar? The text for that field is in the Modify Text Labels... tool in the Theme Editor of Presenter. You can change it to whatever you want, but you may want to keep a record of what the default text labels are, as there is no restore to default option. The Elapsed Time field is what you would want to change. I have seen this modified to show no text, copyright information or other general info.

  • OTL Error - Hrs - Element link does not exist for the duration of the entry

    Hi,
    We had a few new people start just before xmas however when the person entering their record did it, they didn't date-track the additional assignment time information record to the start of the week (they did however correctly date-track their employee and assignment record) so when the timecard was filled in errors were thrown up.
    Since then I have gone back into the employees assignment time record, purged it and then re-created it effective from the week beginning.
    However when we try to enter time for them now using delegated self service, the following error is shown for the two days which were originally excluded from the date-tracked record:
    Hrs - Element link does not exist for the duration of the entry Cause: The link has been purged or date effectively deleted. Action: Check the effective start and end dates on the link definitions for this element. The original record should have been created from the 19th dec 2009 however was done from the 23rd by accident. I have since been in and replaced it with a record effective from the 19th.
    I have re-run the security list generation (we are using static list).
    The only thing I can find on metalink is 372086.1 which doesn't really describe the problem or help!!
    The people don't appear in the timekeeper form though which is strange. I really can't see any reason why their record isn't valid - no data is missing. Do I need to run a job to update the information or something?
    We are using 11.5.10.2
    Thankss

    Well would you believe it!? After much late night meddling around, I noticed one employee worked! There was absolutely no difference in any settings between his record and a persons who did not work. So I went into another employees record, changed his name and saved (correcting). Tried again and he worked fine! So, just by changing the employee name it seems to have worked for self service! I still cannot see them in timekeeper which is worrying however at least we can get time in for them now!
    If anyone knows why I may not be able to see them in timekeeper (even using an un-secured responsibility) then that would be a great help! :)

  • I keep on adjusting the duration of the IMOVIE clips , and after I have hit DONE and check the clip, it reverts to the original number and not the new duration requested. Any suggestions???

    I keep on adjusting the duration of the IMOVIE clips, hit Done , and when I go check the clip, it reverts to the original duration. Any suggestions??

    Error -69 suggests a possible problem with the source files on your computer. Check the source disk for errors and backup if you don't already do so. See HT1210: iTunes displays a -69 error when syncing iPod for more details.
    The SyncToy backup program is also a good way to identify exactly which files cannot be read. Repeated runs may succed in copying files which won't copy over on the first attempt.
    See also Corrupt iPod classic.
    It may also help to disable any AV software while syncing or set exclusions on the media folder and the iPod's drive.
    tt2

  • Export Project and Change the Duration Cause the Finish date error

    I use VB.NET to create a MS Project Instance and use this Instance to add task, and set task's Name, Start and Finish, the Project file is created successfully, and the Duration value will be automatically generated by Project, but if I change the Duration
    value in Project, the Finish date isn't correct, for example, if I set the the Start is "10/21/2014" and Finish is "10/31/2014", the generated Project file has a Duration value is "9 days", and if I change the Duration value to
    "2 days", the Finish date will be changed to "10/21/2014", why this problem happen? I have no idea about this problem.

    when you set Start is "10/21/2014" and Finish is "10/31/2014", the generated Project file has a Duration value is "9
    days" because it is taking Saturday and sunday as non working days.
    By default in Project server calendar both Saturday
    and Sunday are non workng days. If you want to make these day as working day you have to configure the calendar once you will do it then it will display duration value as 11.
    When you change the value then after changing value click on Calculate button so that project server can calculate value correctly it is not required to click on Calculate
    all the time but some time project server takes time to reflect the chnages but if you will publish the project it will calculate correctly and display proper finish date ( I
    change the Duration value to "2 days", the Finish date will be changed to "10/21/2014 as 10/23/2014)
    kirtesh

  • Table of Contents -- Removing the Duration at the bottom

    Hi
    I was wondering if it is possible to remove the duration at
    the bottom of the table of contents? I checked off the show
    duration box in the settings but that only removes the duration for
    each individual slide. Is it also possible to edit the height or
    adjust the y position?
    Thanks,

    Actually, there is a great article on customizing the TOC
    just recently added to the Captivate Blog.
    You can go to it directly from here:
    http://blogs.adobe.com/captivate/2009/02/changing_default_captions_in_t.html
    Hope that helps,
    Russ

  • API error: Element link does not exist for the duration of the entry

    I am trying to create an element using the API_PAY_ELEMENT_ENTRY.CREATE_ELEMENT_ENTRY API
    While I am able to create many elements for years this way, for one particular non-recurring element I get the following error
    ORA-20001: Element link does not exist for the duration of the entry
    Cause: The link has been purged or date effectively deleted.
    Action: Check the effective start and end dates on the link definitions for this element.
    I have checked evertything and the Link is defined far before my element entry starts and with no end date. The assignment I want to attach this element entry is perfectly eligible.
    The weirdest is that I am able to create this element entry with the values I want and the dates I want through standard User interface...
    Any idea?
    Message was edited by:
    briard

    Here are the parameters I use in my call.
    DECLARE
    L_EFFECTIVE_START_DATE DATE;
    L_EFFECTIVE_END_DATE DATE;
    L_ELEMENT_ENTRY_ID NUMBER;
    L_OBJECT_VERSION_NUMBER NUMBER;
    L_WARNING BOOLEAN;
    BEGIN
    APPS.PAY_ELEMENT_ENTRY_API.CREATE_ELEMENT_ENTRY(
    P_EFFECTIVE_DATE => TO_DATE('01-JUL-2008','DD-MON-YYYY'),
    P_BUSINESS_GROUP_ID => 1,
    P_ASSIGNMENT_ID => 122147
    P_ELEMENT_LINK_ID => 233,
    P_ENTRY_TYPE => 'E',
    P_INPUT_VALUE_ID1 => 313,
    P_ENTRY_VALUE1 => 'T',
    P_INPUT_VALUE_ID2 => 314,
    P_ENTRY_VALUE2 => '5',
    -- out params
    P_EFFECTIVE_START_DATE => L_EFFECTIVE_START_DATE,
    P_EFFECTIVE_END_DATE => L_EFFECTIVE_END_DATE,
    P_ELEMENT_ENTRY_ID => L_ELEMENT_ENTRY_ID,
    P_OBJECT_VERSION_NUMBER => L_OBJECT_VERSION_NUMBER,
    P_CREATE_WARNING => L_WARNING);
    END;
    François

  • How to hide the duration on the Aggregator TOC?

    I used the Aggregator to link multiple projects together as once course. I know that you can use a widget to hide the duration if you are using the Captivate TOC. I want to know if there is a way to hide the duration shown on the TOC created by the Aggregator.
    Thanks.
    Molly

    system->dock->Show Indicator lights for open applications

Maybe you are looking for

  • Automatic Sloc creation...........

    I am trying to establish automatic sloc creation for this, I have done the below configuration in IMG:- Material Management -> Inventory Management and physical Inventry -> Goods Recipt -> Create Storage Location Automatically then enable the plant a

  • Sales Report does not have the items in AR Reports

    Hi Team, We have got one query saying sales tax details and AR tax details is not matching. Sales documents are posting automatically at the time posting BSEG table and BSET table will get update and the issue is here now for few documents BSET table

  • Reducing maintenance time.

    Hey all, My colleagues and I have been experiencing more and more requests for BI publisher reports along with the standard apex reports. This way the user has something nice to present to upper management or someone outside of the company. Both of t

  • Programs won't allow login after installer of new Elements and Premiere.

    I've download both Photoshop Elements and Premiere new installs with alot of difficulty. Finally got through installer to launch then to login. But, login just sat there spinning. Yet, outside of these programs, I can login into my Adobe account. I'm

  • 8605 Unable to get the semaphore lock

    NM 2.2 on Windows 2008 Server 32 current users 39 peak 32 physical connections Recently added another context to utilize Novell Messenger 2.2.0 and have started seeing many "[0x8605]: cn=username,ou=Context,o=ETMC - Unable to get the semaphore lock"