How is the scarp portion of MO variance calculated?

How is the scarp portion of Manufacturing Order variance calculated?

First check Settings > General > Usage > see what apps is taking all the space.
Delete those unwanted data, and sync with computer iTunes.
If no joy, restore as new and sync back your content manually.

Similar Messages

  • In the Suite, how does the email portion handle spam?

    In the Suite, how does the email portion handle spam?

    Every email message you mark as spam (and also mark the ones that aren't spam that went in to your junk folder) helps it learn over time.
    If you want more (extremely) technical information about it: http://en.wikipedia.org/wiki/Bayesian_spam_filtering

  • Product costing - Variance calculation, Information system,

    Hi,
    I have an issue reconciling variances in product costing when I run S_ALR_87013139 - Cumulative. For instance I am getting results like below
    Tgt (Dts)     Actual (Dbts)     Scrap     Variance     WIP     Control Costs
    33946      183020     0     27248     -95034     0
    I was expecting
    Variance = (Actual Debits - WIP credited) - Target Debits.
    But it is not so. Am I missing something here
    Would also appreciate if someone could tell
    1. What does the target cost mean/how is it different from planned costs.
    2. When is the target cost calculated? Is it only after the order is complete and variance calculation in KKS2. I also fing that whenever a production order is created I dont get target costs. Only planned costs are there.
    Thanks for your help.
    Ram

    Hi Ram
    Following are explanations for clarifications u asked for
    1)  Target costs = Actual qty delivered X standard costs ( as per standard cost estimate for the material).  This means standard costs for actual goods delivered to stock.  Planned costs means standard cost for planned qty of production order
    2)  Variances are calculated if the status of the order is either DLV or Teco and if material is issued and activities are confirmed.  WIP is cancelled and variances are calculated
    3)  When u create production order - system only calculated planned costs of the order for planned quantities.  Target costs are calculated only when goods are delivered to stock for the order either partially or full.  Even if one qty is delivered to stock target costs gets calculated
    Hope the above clarifies and do your checks with above
    Pls assign points for the above clarifications provided

  • Product Variance Calculation

    Gurus,
    How do we calculate Product variance?
    What is the procedure / process?
    Where can the effect be seen?
    Edited by: Bhatia on Oct 15, 2008 6:44 PM

    Hi,
    Variance Calculation
    As long the production order is not fully delivered or flagged Technical Complete the remaining order balance is treated as WIP. Otherwise the order balance shows up in variance calculation.
    If a lot-based product-controlling WIP, is valuated at actual costs. The WIP is calculated as the difference between the debit and credit of an order as long as the order does not have the status DLV (delivered).
    In lot-based product controlling the variances are not calculated until the order has the status DLV (finally delivered) or TECO (technically completed). This means that at the time the order has reached this status, the system no longer interprets the difference between the debit and the credit as work in process but as a variance. In lot-based product controlling orders never have work in process and variances at the same time.
    Variance calculation compares the actual costs incurred for the production/process order with the target costs according to the standard cost estimate for the finished material, and assigns the individual variances to variance categories. The target costs are calculated using the quantity delivered for the order.
    In this way you can find out which variances occurred between the value of the delivery and the actual costs and you can find the reason for the posting to the price difference account for materials with standard price control.
    Variances from production (target version 1)
    Variance calculation compares the actual costs incurred for the production order with the target costs for the production order and assigns the individual variances to variance categories. The target costs are calculated using the quantity delivered for the order.
    This enables variance calculation to find out which variances occurred between the time the production order was created and the end of the production process.
    Variances from planning (target version 2):
    Variance calculation compares the planned costs for the production order with the target costs according to the standard cost estimate for the finished material, and assigns the individual variances to variance categories. The target costs are calculated using the quantity delivered for the order.
    This enables variance calculation to find out which variance occurred between the time the standard cost estimate was created and the time the production order was created.
    Variance categories:
    The system assigns every variance to a variance category. The variance category indicates the cause of the variance (such as price change, lot-size variance). Variances are updated to the information system and passed on to Profitability Analysis according to variance category.
    You differentiate between variance categories on the input side and on the output side:
    u2022     Variances that occur because of goods issues, internal activity allocations, overhead and G/L account postings are displayed on the input side. Price variances, quantity variances, resource-usage variances and input variances are displayed on the input side.
    u2022     Variances that occur because too little or too much of the planned order quantity were delivered, or because the delivered quantity was valuated differently are displayed on the output side.
    Variances on the output side occur when you deliver using a price that differs from that found by dividing the target costs and the delivered quantity. If you deliver using the standard price, a variance can occur when the order lot size differs from the costing lot size. This is displayed as a lot-size variance.
    For config
    3.1.4.2     Variances & Settlement
    Variance Calculation determines differences between the actual costs incurred on a production order and the standard costs of the material produced. Variances are calculated not at once, but for different variance categories. The variances computed are then transferred to CO-PA.
    3.1.4.2.1     Define Default Variance Keys for Plants
    Use
    The Variance Key is part of the order header and controls variance calculation. The system selects the value set by this step as default value when a material master is created. From the material master the variance key then is transferred to the order when an order for the material is created.
    Procedure
    1.     Access the activity using one of the following navigation options:
    Transaction Code     OKVW
    IMG Menu     Controlling  Product Cost Controlling  Cost Object Controlling  Product Cost by Order  Period End Closing  Variance Calculation -> Define Default Variance Keys for Plants
    2.     Make the following entries:
    Plant     Variance Key
    BP01     000001
    BP02     000001
    BP03     000001
    BP0X     000001
    3.1.4.2.2     Define Target Cost Versions
    Use
    The target cost version controls various parameters related to calculation of target costs in variance calculation. In variance calculation, target costs are needed as a comparison to the actual costs incurred.
    Procedure
    1.     Access the activity using one of the following navigation options:
    Transaction Code     OKV6
    IMG Menu     Controlling  Product Cost Controlling  Cost Object Controlling  Product Cost by Order  Period End Closing  Variance Calculation  Define Target Cost Versions
    2.     Choose New entries and enter the following values or copy from default settings of CoArea 0001 to BP01:
    CoArea     TgtCostVsn     Text     Variance Variant     Control Cost     Target Cost
    BP01     0     Target Costs for Total Variances     001     Actual Costs     Current Std cost Est                                
    BP01     1     Target costs for production variances     001     Actual Costs     Plan Costs / Preliminary Cost Estimate
    BP01     2     Target costs for planning variances     001     Plan Costs     Current Std cost Est
    3.1.4.2.3     Create Settlement Profile
    Use
    The settlement profile controls various parameters related to settlement.
    Prerequisites
    Allocation Structure
    Procedure
    1.     Access the activity using one of the following navigation options:
    Transaction Code     SPRO
    IMG Menu     Controlling  Product Cost Controlling  Cost Object Controlling   Product Cost by  Order  Period-End Closing   Settlement  Create Settlement Profile
    2.     Choose New Entries and enter header data. Then for each new entry choose Details and enter remaining data.
    3.     Overview of data records:
    Profile     Text
    YGPI00      BP Process Order w/o CO-PA
    YGPP00     BP Production Order w/o CO-PA
    YGPI00     YGPP00
    Actual costs/costs of sales     
    To be settled in full     X     X
    Can be settled          
    Not for settlement          
    Default Values     
    Allocation Structure     A1     A1
    Source Structure          
    PA Transfer Struct.          
    Default object Type          
    Indicators     
    100% Validation     X     X
    %-Settlement     X     X
    Equivalence Nou2019s     X     X
    Amount Settlement          
    Var. to co. bsd. PA          
    Valid receivers     
    G/L account     N     N
    Cost center     O     O
    Order     O     O
    WBS Element     O     O
    Fixed asset     N     N
    Material     O     O
    Network     N     N
    Profit. Segment     N     N
    Sales order     O     O
    Cost objects     O     O
    Order item     O     O
    Business proc.     N     N
    Real est. object     N     N
    Other parameters     
    Document type      SA     SA
    Max.no.dist.rls     3     3
    Residence time     3     3
    You have to assign Variance Key in material master for semi-finished and Finished goods in costing 1 tab also.
    To Execute
    KKS1-Collective Variance calculation
    KKS2-Individual Variance calculation
    CO88-Collective settlement
    KO88-Individual settlement
    Thanks,
    Rau

  • Variance calculation repport (KKS2) different to variance line items (KOB3)

    Hi, need your help.
    I´ve run variance calculation (KKS2) for one production order, one target cost version and it has calculated correctly all cost element variances. However, when I display variance line items (KOB3) for this order with the same target cost version used in KKS2, calculation is´t correct for all cost element and if I compare it with KKS2 repport, it displays different values. Does anyone know why?
    some details that may help:
    WIP is customize
    The company I´am working for had activated "write line Items" (OKV1) after the golive,
    Scrap check box is activate in variance key,
    All variance categories are activate,
    etcetera
    Thank you for your help.
    Regards,
    André

    Hi
    I would suggest raise an OSS msg then.. Because i dont see any possible reason why this could happen
    In my case, the only discrepancy I found was variance doc was posted to FI and not to COPA because the user did not execute variance calculation in update mode.. So, variance got posted in FI, but not in COPA...
    But the posted values always matched in my case,,,
    Do update us incase you find solution
    Regards
    Ajay M

  • Because I can no longer open Adobe files, and have tried all obvious solutions, I've been told to defrag the Intel portion of my MacBook Pro. How do I do this?

    Because I can no longer open Adobe files, and have tried all obvious solutions, I've been told to defrag the Intel portion of my MacBook Pro. How do I do this?
    I never use the Intel side, and have never partitioned the MacBook Pro.
    Message was edited by: MacGirl221b

    I never use the Intel side,
    Not understood, Intel make the processor that runs your Mac, there is no other 'side' to your Mac.
    What Adobe application are you trying to open files with?

  • How do I copy the string portion of an enum into the string portion of a cluster?

    I want to do this for the an entire array of clusters.  I'm trying to use a for loop.  Can't figure out how to parse the string portion of the enum into the string portion of the cluster.
    Alternatively, I'd be happy if I could figure out some way to tie the enum to the array of clusters, but I figure that gets problematic.
    DH
    Solved!
    Go to Solution.

    Dark Hollow wrote:
    OK, let's say that the enumerated type has N elements.  I want to initialize an N element array of strings.  How do I reference each string in the enumerated type to get to each string?
    Easy way to do this is to use GetNumericInfo.vi, part of the Variant library, found in vi.lib\utility\VariantDataType\GetNumericInfo.vi.  Wire your enumeration to the Variant input; one of the outputs is an array of the strings in the enumerated type.
    The more complicated way is a for loop, in which you typecast the iterator terminal value to the enumerated type, then use Format Value.  You can get the maximum value of the enumeration by casting 0 to the enumerated type, then decrementing; cast that back to a numeric and add one to get the right value to wire to the N terminal.
    EDIT: just thought I'd add, since RavensFan's reply popped up while I was writing mine - I don't like the Strings[] approach because it doesn't work on RT targets, and I lost a lot of time once due to this trying to figure out why my code wouldn't run properly on an RT system but worked great on my development computer.

  • Under the iCloud portion of settings on my iPhone, I have always gotten the message "account not verified". The email matches and is in fact the same for my accounts on iCloud and iTunes. Has anyone had this problem, and how have they resolved it?

    Under the iCloud portion of settings on my iPhone, I have always gotten the message "account not verified". The email matches and is in fact the same for my accounts on iCloud and iTunes. Has anyone had this problem, and how have they resolved it?

    Hello megalina23
    You need to verify the email address associated with the Apple ID. Check out the article below on how to do this.
    Associating and verifying email addresses with your Apple ID
    http://support.apple.com/kb/HE68
    Thanks for using Apple Support Communities.
    Regards,
    -Norm G.

  • How can I make the stage height shorter by "cropping out" the bottom portion of the stage?

    Right now my stage dimensions are 980 X 800 px.  I need to cut or "crop out" the bottom portion of the footer because its height is too long.  So I changed the stage dimensions to 980 X 600 px (and changed the corresponding dimensions in the embed tag in the index.html file to match).  Doing this seems to cut out the bottom but at the same time adds space to the top and seems to distort the overall spacing.  Is there a simple way to crop out the bottom of the stage (just like cropping out a section of a photo)?

    Forgetting about the html file and embed tag for now, I can't seem to get the .swf proportioned properly in the first place.  I just want the bottom portion of the stage cropped out.  How do I do that without distorting the spacing?  When I tried to reduce the stage height, it doesn't simply crop out the bottom - it reduces the stage's height but it also seems to add space to the top and "squeezes" lines together, distorting the vertical spacing.
    Is there a way to simply crop out the bottom, just like cropping an image?

  • How to lighten the front portion of a seashell?

    i would like to lighten the front portion of a seashell. how would i do this/ what selection tool etc.  Attached is a photo of a seashell floating on some clouds. Thanks for your help!

    I would suggest the dodge & burn tools which are traditional dark room techniques. Use the dodge tool on the lighter parts and the burn tool on the darker parts.

  • I have an image that I removed from its back ground and I would like to scale the bottom portion of the image because its to wide but not have that effect the top portion of the image which is the correct with. but also keep the aspect ratio correct? how

    I have an image that I removed from its back ground and I would like to scale the bottom portion of the image because its to wide but not have that effect the top portion of the image which is the correct width. but also keep the aspect ratio correct, keep it looking as natural as possible (its a piece of jewlery) ? how can I begin to do this.

    The area circled in red is to wide (the width) the necklace's width is as wide as the models entire chest. And also the length of the necklace it's to long it should come down to the clevage area on the model/woman.

  • How do I get the software to only recognize the edited portion?

    I uploaded a 17 minute video and edited it down to 2 minutes.  I am trying to post it to YouTube but the software still thinks that the video is 17 minutes long.  I have changed my YouTube setting to allow more than a 15 minute video but I am still stuck because it won't upload as it thinks it's too long.  How do I make it only recognize the edited portion?

    flifaflafa
    What version of Premiere Elements are you using and on what computer operating system is it running?
    Since you are specifically asking about doing this as an upload to YouTube from within the Premiere Elements YouTube feature, let me
    give you details as specific as possible for what you asked.
    Assuming Premiere Elements 13 on Windows 7, 8, or 8.1 64 bit as the model.
    Two requirements are required to export selectively a Timeline segment
    a. Setting the gray tabs of the Work Area Bar to span just the segment to be exported
    and
    b. Having a check mark next the option "Share Work Area Bar Only" in the YouTube export area.
    To set the gray tabs of the Work Area Bar in the Edit area, use the shortcuts.
    Move the Timeline Indicator to the start of the segment and, as you hold down the Alt key of the computer main keyboard, hit the left
    bracket key [
    Move the Timeline Indicator to the end of the segment and, as you hold down the Alt key of the computer main keyboard, hit the right
    bracket key ]
    Any questions or need details specific for another version, please let us know. Principles remain the same - features sometimes
    get moved around.
    ATR

  • How do I keep only the cropped portion of a clip and trash the rest?

    Before getting my new Macbook, I was using iMovie3. When I would crop a file, only the highlighted portion was kept and the rest of the clip was sent to the trash. With iMovie HD, it is my understanding when you crop a clip, the information outside the cropped area is stored somewhere - how do I send this unneeded portion of the clip to the trash? I have used up almost all the memory in my new computer and don't know how to free up space without deleting the entire clip.

    Hi m
    You can't: As standard. iMovie is a "*non destructive editor*" - means it stores
    the Capture/Imported material in one place and Your cutting, editing etc. is just
    a text document refering onto how this material is to be viewed.
    Even if You only usesed one frame from an hour long import - all of it will be
    saved for futhure changes. (1 hour = about 13Gb of space)
    You can: Send movie back to Camera and a new miniDV tape. Then start a new
    project from this - and delete Your old project.
    This will free up space - but You lose the ability to adjust the prior editings,
    texts and so on.
    Alt is to save as full quality QT.mov and start a new project from this. Still
    what's done is done - but You jump the Camera step. (I have the feeling of that
    I get a quality loss this way - but several in this forum disagrees)
    Advice:
    1. Try to Capture/Import about what You need and not just dump in several hours of
    material for a few minutes movie.
    2. I use a hugh external FireWire hard disk (Mac OS Extended formatted) to store
    my movie projects and a minimum of 25Gb free space on my internal (start-up) one.
    Yours Bengt W

  • I recently bought an Epson Artisan 837 printer. I installed the driver and now Photoshop from CS3 will not open. It quits when the Twain portion of the program starts loading. Does anyone know how to fix this so my printer will work with Photoshop??

    I recently bought an Epson Artisan 837 printer. I installed the driver and now Photoshop from CS3 will not open. It closes every time it gets to the point where it is loading the Twain portion. Does anyone know how to fix this so my printer and Photoshop will work together? Thanks for any help I can get!

    You're welcome. 
    But, no, don't look to  Epson for fixes to their  driver in newer versions, and Adobe has deprecated the TWAIN plug-in.  Hoping for a solution there is futile.  That has not happened and it's never going to happen.  The consensus is that it's pretty foolish to tie up Photoshop to scan.  Honestly.
    Any improvement in the behavior of newer versions of the Epson drivers in that regard would be pure coincidence.
    You need to understand that you never, ever scan "within" Photoshop, as Photoshop has no scanning capabilities whatsoever.  When you use the Import > Twain plug-in all you are doing is blocking Photoshop while you call up the stand-alone Epson scanning software.  If you think about it, its most inefficient.
    VueScan has a pretty powerful scanning plug-in that can be called from the Impost menu—if you insist.  VueScan is not free, but it's a pretty good value, IMO.
    As for the Epson CD printing software, I have no clue.  Sorry. 

  • How to find the decimal portion of a FLOAT

    Hi,
    I have a columnX with datetype of FLOAT with a value of 61827.52, 60428.99, and etc.
    The number portion represent a date.
    How to convert it from 61827.52 to 61827 without round off issue
    and use 61827 to convert to date?
    thanks.

    Buga wrote:
    Prazy did show you the first half, howvever the second part was only a joke right?hehe.. Great spot..
    Just a wild guess, it may be 27-08-1961. *{:-)                                                                                                                                                                                                                                                                                                                                                                                                   

Maybe you are looking for

  • TV and CinemaDisplay on a PM G5 1,8?

    Hi, I have to connect a tv and a cinemadisplay (DVI) to my Powermac dual 1,8 Ghz (Nvidia FX5200 DVI/ADC).The cinemadisplay goes to the dvi port. I found adapters to get a component video from a dvi signal, but I found nothing to get a adc signal conv

  • Can´t configure Open Directory Master

    After a reinstall I can´t config Open Directory Master. I have this logs: Mar  4 12:22:28 servidor slapd[14293]: @(#) $OpenLDAP: slapd 2.4.23 (Oct 19 2011 00:16:13) $                     [email protected]:/private/var/tmp/OpenLDAP/OpenLDAP-186.2~3

  • Roles for vendor's creation

    Hi experts i'd like to know what are the Roles for vendor's creation needed in SRM 5.0 Thanks Andrea

  • Wrt54gs V4 FWv1.06.1 - Port Redirection not supported? Any workarounds?

    My office does not allow any outbound traffic except for port 80 and 443. On my home network I have VNCServer listening on port 5900. I'd like to have the incoming port 443 to go 192.168.1.102 port 5900. I'm able to successfully 'port range forward'

  • Can time machine use iCloud as it's backup destination?

    I read how photos , music, contacts, etc. get automatically backed up by using icloud, but can I use it for a complete backup of everything via Time Machine?