How not to see values of a serie in a 2D line chart

Hello,
I have 3 series in a 2d line chart. There are two series which are the thresholds and one serie for the averages. Thresholds are fix/stable numbers which correspond to straight lines, however the averages as you can image dynamic and changing. What I want is to see the values of averages but not the values of the straight lines. I cannot find a spesific option for the series, I can always show/hide values which does not work for me.
Thank you from now.

Hi mertov,
You can find anychart's documentation in their website. The document that shows and explains all the XML tags anychart uses is the XML reference.
Best regards,
Sergio

Similar Messages

  • Display column values as a series/legend on a line chart where one column value can be more than one category

    Hi Everyone
    I don't know if this is possible or not, so I will describe it. I have a column in a table called Filing. There are currently three values in it ("Abuse", "Neglect", "Voluntary") and each record has this populated. I also have
    the below slicer for the column also.
    I would like to add a fourth value called "Abuse/Neglect" that would identify instances where both an Abuse and Neglect petition was filed, which is a subset of the Abuse and Neglect records in the Filing column.
    My question is, is it possible to create a line chart that has the 4 Filing possibilities: "Abuse", "Neglect", "Voluntary", "Abuse/Neglect" as the Series/Legend in the line chart?
    The problem is that there are records that are more than one category: Abuse or Neglect records can also be Abuse/Neglect.
    Paul

    Hi Paul,
    According to your description, there is a column with the values ("Abuse", "Neglect", "Voluntary") in your table, now what you need to is that add another value "Abuse/Neglect" in this column, and then use it
    as Series/Legend in the line chart, right?
    In this case, you can add calculated column to your table based on your logic. A calculated column is a column that you add to an existing PowerPivot table. Instead of pasting or importing values in the column, you create a DAX formula that defines
    the column values. The calculated column can be used in a PivotTable, PivotChart, or Power View report as you would any other data column. Please refer to the link below to see the details.
    https://msdn.microsoft.com/en-us/library/gg413492%28v=sql.110%29.aspx?f=255&MSPPError=-2147217396
    Regards,
    Charlie Liao
    TechNet Community Support

  • How not to see password in the script?

    Hi all,
    11.2.0.1
    Aix 6.1 5L
    I have a script expdp01.sh
    Which contains:
    expdp system/$1 schemas=HR
    Then I can run the script at  $ expdp01.sh  hrpass
    This is done so that the password will not be hard-coded in the script. Is this a good idea?
    Is there a way to hide the input parameter?
    Thanks a lot,
    zxy

    yxes2013 wrote:
    Hi all,
    11.2.0.1
    Aix 6.1 5L
    I have a script expdp01.sh
    Which contains:
    expdp system/$1 schemas=HR
    Then I can run the script at  $ expdp01.sh  hrpass
    This is done so that the password will not be hard-coded in the script. Is this a good idea?
    Is there a way to hide the input parameter?
    Thanks a lot,
    zxy
    How is this question different from the one you asked two weeks ago?  ==> How not to see database password?

  • How to add line series dynamically to a line chart in flex?

    hi..i need to add line series dynamically to a line chart..depending on an array..the application is this..i have an array which stores the details of the users connected to an fmi server..the chart should display the bandwidth of each client..so the users should be added and removed from the chart dynamically...

    Hi
    1.I am giving you solution for dynamically adding values to the dropdown
    public void addValue( )  //Method Name in Component controller
        //@@begin addValue()
              IWDNodeInfo nodeinfo = wdContext.nodeNodeTestData().getNodeInfo();// Node should be map to the view's Node
              IWDAttributeInfo att = nodeinfo.getAttribute("VechileTypes");// Attribute by which dropdown in bound//
              IModifiableSimpleValueSet svSet = att.getModifiableSimpleType().getSVServices().getModifiableSimpleValueSet();
              svSet.put(wdContext.currentNodeTestDataElement().getInpAtt(),wdContext.currentNodeTestDataElement().getInpAtt());
        //@@end
    2.   wdThis.wdGetLangCompController().addValue(); // call this method in the point where u want to add values to the dropdown.

  • How to make use of a different data model for a line chart?

    I have a datamodel which is a sql query. I have a line chart on my template which is using some "Start Time" field as X-Axis. There is a chance that "Start Time" is null. In such cases the plotted point doesn't appear with x-coordinate. But I can't change the X_Axis field to some other not-null attribute due to business requirement.
    I am thinking to create another datamodel which filters all "Start Time"s which are nulls and use that datamodel for the line chart that has "Start Time" as X-axis. But I don't know how to do this as whenever I try to insert a line chart from BIPublisher menu in MS_Word, I am not prompted to select the datamodel.
    Can anybody tell me what I am trying is possible? If so how? If not, how do I have "Start Time" as X-axis without hassles?
    Thanks,
    -Vijay-

    Are you able to extract the data based on the new data model in an XML file? If so, in BI publisher desktop, are you able to load the XML data via Add-Ins ->Data -> Load XML Data?
    If you have been able to load the data successfully, then you need to Select Chart from the Insert Menu. When you do that, you should be able to see the Data layout on the left side of the chart dialog box. Then you should be able to drag and drop fields as necessary to create the chart. Are you having issues doing this part?
    You will not be prompted to select the data model. Hope I haven't misunderstood your question.
    Thanks!

  • How can I connect dots across missing data points in a line chart?

    Hi all!
    I have a table in Numbers that I update every few days with a new value for the current date (in this case body metrics like weight, etc.), which looks something like this:
    Column 1              Column 2      Column 3
    Aug 16, 2011         87.1             15.4
    Aug 17, 2011         86.6
    Aug 18, 2011         86.1
    Aug 19, 2011              
    Aug 20, 2011         85.7             14.6
    Aug 21, 2011         85.3
    Every once in a while there will be a missing value for a given date (because I didn't take a reading on that day). When I plot each column against the date on a line chart, there is a gap where there are missing data points. The line does not connect "across" missing data points. Is there a way to make the line connect across missing data points?
    Thanks for any help. This thing has been driving me nuts!

    Leave your nuts in peace.
    Don't use line charts but scatter charts.
    These ones are able to do the trick.
    Of course to do that you must study a bit of Numbers User Guide.
    In column D of the Main table, the formula is :
    =IF(ISBLANK($B),99999,ROW())
    In column E of the Main table, the formula is :
    =IF(ISBLANK($C),99999,ROW())
    Now I describe the table charter.
    In column A, the formula is :
    =IFERROR(DAY(OFFSET(Main :: $A$1,SMALL(Main :: $D,ROW())-1,0)),"")
    In column B,the formula is :
    =IFERROR(OFFSET(Main :: $A$1,SMALL(Main :: $D,ROW())-1,1),"")
    In column C, the formula is :
    =IFERROR(DAY(OFFSET(Main :: $A$1,SMALL(Main :: $E,ROW())-1,0)),"")
    In column D, the formula is :
    =IFERROR(OFFSET(Main :: $A$1,SMALL(Main :: $E,ROW())-1,2),"")
    In this table, select the range A1 … D5
    and ask for a Scatter chart.
    You will get what you need.
    I asked that points are joined by curves
    I just edited the parameters of Xaxis and Yaxis to get a cleaner look.
    I repeat one more time that knowing what is written in the User Guides is useful to be able to solve problems with no obvious answer.
    Yvan KOENIG (VALLAURIS, France) samedi 27 août 2011 15:59:20
    iMac 21”5, i7, 2.8 GHz, 4 Gbytes, 1 Tbytes, mac OS X 10.6.8 and 10.7.0
    My iDisk is : <http://public.me.com/koenigyvan>
    Please : Search for questions similar to your own before submitting them to the community
    To be the AW6 successor, iWork MUST integrate a TRUE DB, not a list organizer !

  • How do I see values of global variables in a SAP system

    Hi Guys
    How do I get to see the values of global variables DIR_GLOBAL etc.
    Actually I wanted to run an archive for some IDOCs, and I configured a filepath for the same and gave it an address to my local system, now when I use SARA and after customising the logical path it gives me an error stating that "Logical file path is not completely maintained".
    So I resorted to one of the predefined paths ARCHIVE_DATA_FILE and it archived successfully but I am not able to figure out the exact path of the archived file can you please help??
    Best regards
    Sujoy

    Hello Sujoy,
    Execute transaction FILE, double click on Logical File Name Definition, then, scroll down to find ARCHIVE_DATA_FILE - double click on ARCHIVE_DATA_FILE.  Note what is entered in the Logical path field and then, go to Logical File Path Definition.  Look for the path name from previous step and highlight/select it and click on Assignment of Physical Paths to Logical Path.  From there, you can double click on the relevant Syntax group.  This will give you the path for where the archive file has been written to.
    I hope this explanation is not too confusing :-).
    Best Regards,
    Karin Tillotson

  • How to make the values of a combination graph (bar and line) visible always

    Hi ,
    I am using jdev 11.1.1.6
    i have created a combination graph which has a bar and line.
    The data with respect to bar and graph were only visible when i keep the mouse pointer on it.
    i need to set the values visible always.
    kindly let me know how to make it.
    In pie graph its by default showing the data always.
    regards
    Siva

    Hi Sameh Nassar,
    Thanks for the input, am using the combination graph and i dont have this property added till now.
    i tried adding them manually in source but it didn't work. so I assume that this property is good with pie chart alone.
    please correct me if am wrong.
    This is my combination graph structure.
        <dvt:comboGraph id="comboGraph1"
                          value="#{bindings.testVO1.graphModel}"
                          subType="COMBINATION_VERT_ABS_2Y" shortDesc="Graph 1">
            <dvt:background>
              <dvt:specialEffects/>
            </dvt:background>
            <dvt:graphPlotArea/>
            <dvt:seriesSet markerDisplayed="true">
              <dvt:series lineWidth="0"/>
            </dvt:seriesSet>
            <dvt:o1Axis/>
            <dvt:y1Axis/>
            <dvt:y2Axis/>
            <dvt:legendArea automaticPlacement="AP_NEVER"/>
            <dvt:graphTitle text="Combination graph"/>
            <dvt:o1Title text="x axis"/>
            <dvt:y1Title text="y1 axis"/>
             <dvt:y2Title text="y2 axis"/>
          </dvt:comboGraph>
    regards
    Siva

  • How can I reference value of a field from a diffrent line in formatted search

    I want to use a formatted search for this
    I want to set a field value based on a value from a previous row. ( is this possible at all ?)
    I have a udf called Test at Line Level on AR Order
    The user enters a value for test on line 1
    he will have a lot more lines then after that. all I want is to copy the value in test ( on row 1) to row2 as the user edits say the Item code on that row.

    Hi,
    Unfortunately formatted search is for current line only , you can't reference the previous or next line .
    You can do achieve this with SDK but with FMS not possible .
    Regards

  • Line chart with different "colors": Values not available are displayed as 0

    Hello,
    I defined a line chart with more than one lines (aka "colors" in the chart wizzard) - each line representing the (monthly) values of a year. x axis are the 12 months of the year; y axis are the values.
    When one defines such a line chart in BIP client there is a choice between sum, average and count for the data values.
    This is no problem for my template as there is only one value per month/year - so I used sum.
    The problem: for the actual year there are no values for future months . But bip nevertheless shows 0 for this month/year... Can one prevent this?
    Regards
    Peter

    Solved it finally - unavailable values must explicitly be passed to the report with nothing contained in the value tag.

  • Plot empty point in line chart with previous non empty value

    Hello,
    I have a problem to plot series data in SSRS line chart, with the empty point, I don't want use average and zero provided by the report builder, I want use the last non empty data to fill the empty point, tried to use expression =Previous(Field!Value), no
    luck, any one have some good idea?
    P.S. do not want to use query to fill the null with previous non null value, just from the performance point view. at last , the chart should have some line as square wave with different height, if I use average for empty point, it shows slop wave line which
    is not reflect the real production.
    Thanks
    Richard 

    Hi Richard,
    In Reporting Services, if the chart type is a linear chart type (bar, column, scatter, line, area, range), null values are shown on the chart as empty spaces or gaps between data points in a series. By default, empty points are calculated by taking the average
    of the previous and next data points that are not null.
    If we want to use previous value to replace the empty value, please refer to the following steps:
    Right-click the field which displayed in Y axis (Height) to open the Series Properties.
    In the Value field to modify the expression to look like this:
    =iif(isnothing(Sum(Fields!Height.Value)),previous(sum(Fields!Height.Value)),sum(Fields!Height.Value))
    The following screenshot is for your reference:
    If there are any other questions, please feel free to ask.
    Thanks,
    Katherine Xiong
    Katherine Xiong
    TechNet Community Support

  • How can i make x-axis even distribution in line chart?

    can i change the min value, max value of x-axis?

    For a line chart, the answer is : NO
    In this charts, the X axis isn't a numeric one. It's just one with labels.
    On the screenshot, compare the chart 2 (line one) and the chart 4 which is a scatter chart.
    This late one behave as a true numeric one and it allow us to set min and max values.
    Yvan KOENIG (VALLAURIS, France) lundi 11 juillet 2011 15:18:51 iMac 21”5, i7, 2.8 GHz, 4 Gbytes, 1 Tbytes, mac OS X 10.6.8
    Please : Search for questions similar to your own before submitting them to the community
    To be the AW6 successor, iWork MUST integrate a TRUE DB, not a list organizer !

  • How do remove commitment value in the PO ? any SAP note avl?

    Hi,
    Project (WBS)releated service PO (Account assignment category P and Item category D), in which SES,GR,IR have been completed for entire Project services for the year 2005,PO history also updatd for SES, GR,IR in the 2005 only.But Now system is showing still commitment value in the PO for the year 2009?.
    Henece how do remove the inconsistency of the  commitment value in the PO for the year 2009?. (i.e value is comming from COOI table entry).Is there any SAP NOTEs are available for this case?
    Note:
    But this case no PR has been refered in the PO. PO has been directly created, and PO  QTY,Value changes have not been done after SES,GR,IR completion.
    But still system  commitment value is showing in the PO for the year 2009, so HOW do remove the value?
    i am looking suitable answers.
    Regards,
    kumar

    Hi,
    Pre-requisites for a commitment update are:                                                                               
    o  In transaction OKKP, the commitment management indicator must be              
           active for the given controlling area in the current fiscal year.                                                                               
    The controlling area is the highest organizational unit in Controlling,              
    however this area is missing from the accounting data of the PO.                                                                               
    o  The accounting objects must be active for commitments:                                                                               
    -  Work orders: The commitment management indicator must be set               
              in transaction KOT2 for the given order type.                                                                               
    -  Cost centers: In transaction KS02, in register "Control", the              
              commitment update indicator must NOT be set.                                                                               
    -  Projects: see note 47992                                                                               
    o  In transaction CUNI, the unit of measurements used at item level              
           must be set to value based commitment.                                                                               
    Please check the following notes 152571, 634298, 459509 and            
    772206 carefully and also 165823. 
    Please check also if the "delivery complete" indicator is set in the PO item (see note 735404).
    Usually for service POs the "Delivery completed" indicator will be   
    hidden and this indicator is fully controlled by the "final entry    
    sheet" indicator in ML81N. You must allow to set this indicator trough a field selection customizing for your PO item.
    Regards,
    Edit

  • My DSO does not activate.how do i see contents os data package?

    My Dso has data in new data table but it status turns RED when I am trying to activate. I used standard data source 0fi_gl_4 and standard DSO 0FIGL_O02 . pretty straight forward. no added fields or objects. I have deleted 2 requests from previous loads and executed DTP . i did full update.then new data table has new data now but i could not activate.
    pls help what should i check for
    REQUEST STATUS is 'Error occured during activation process'
    REQUEST FOR REPORT AVAILABLE - 'request available for reporting'
    In the LOG i can see RED on Data package 000039 when I click on it
    the error is
    -value electronic account statum of characteristic 0DOC_HD_TXT cont
      long text  looked like it is INVALID CHARACTER
    how do i see the contents in a particular data package (000039) ???
    thanks
    Edited by: Ramya27v on Dec 12, 2011 1:56 AM

    Hi,
    This can happen if the size of teh data package from R/3 to PSA is larger than the size of the data package from PSA to DSO. Assume till PSA the data package size is 50000 and you are receiving 9 data packages the total number of records equals to 50000 X 9. Now from PSA to DSO suppose the data package size is 10000 then number of data packages will increase from 9 to 45 that is 9 X 50000/10000.
    If you are having problem in data package 39 (in the above mentioned scenario) then you should move to data package 39 X 10000 /50000 that is data package 7 of the PSA and rectify the corresponding record in the PSA and load it to the DSO.
    Similarly you will have to calculate the data package number of the PSA in your scenario.
    Navesh

  • How can I see "Events" in a LIST - NOT in icons?

    Could someone please tell me (step by step, inch by inch) EXACTLY how I can see all of the "Events" in Iphoto '11 as a LIST...with no icons, no "Key Photos," no scrolling through 600 different pictures to try to find the EXACT event I want by DATE that I want on the event - NOT the date that the photo was taken...A LIST:
    2011-12 Go to Store (BLACK LINE WITH NOTHING ELSE IN IT)
    2010-08 In Thailand (BLACK LINE WITH NOTHING ELSE IN IT)
    2005-05 In Mexico (BLACK LINE WITH NOTHING ELSE IN IT)
    1983-01 Buy First Computer (BLACK LINE WITH NOTHINGELSE IN IT)
    600 MORE OF THESE LINES, BY DATE, AND MY DESCRIPTION, WITH NOTHING ELSE.  PERIOD.
    I USED to be able to do this in IPhoto, but since upgrading, it seems to be impossible.  It is EXTREMELY difficult to find the photos I want when dealing with Icons no matter WHAT their size. 
    Along with "faces" - which I neither need, nor want, nor seem to be able to get rid of, this is the most irritating aspect of Iphoto.  But of course, it's possible that, having spent a week reading the entire manual page by page, and searching every known corner of the Internet - I simply am not smart enough to find the correct answer to this question.  OKAY.  I can admit my limtiations.
    Thanks!

    Like the original poster, I'd like to view events as a simple list. A solution is given in this thread but it does not completely provide what I would like.
    I would additionally like to have the option to sort the collapsed list of events. Specifically, I would like options to choose sort alphabetically or by date, ascending or descending. The collapsed events list in the photos view seems to be hardwired to display events chronologically.
    I am aware that in events view, event tiles can be sorted in the way that I want. However, it is the simple, collapsed list of events that I would like to sort.
    Are there any 3rd party iPhoto companion apps that can read my iPhoto library and give me a more controllable view of my events list?

Maybe you are looking for

  • How to restrict issue the form through VOFM routine

    Hi Experts, I have  developed form using adobe form, I need to issue the output only one time, once the output issued again the output should not issue. I need to control this logic through VOFM routine...how to restrict ? Thanks in advance.

  • IMPORT DUTIES MIRO

    Dear All MM Gurus, I have created an import PO, changed the vendor in the item condition detail screen as Cutoms vendor. I have done that for all the duty conditions. Saved the PO release the PO. Now as per the procedure i am doing MIRO for the duty

  • Schema editor in windows 7 machine

    Hi i have CC&B 2.3.1 in windows 7 and i just installed Schema Editor in that. I am not able to open schema editor as i have to select Data source from the drop down which is a ODBC configuration in control panel. I couldn't add ODBC configuration in

  • /System/Library/Printers/Libraries/PrintJobMgr/Contents/MacOS/PrintJobMgr failed

    /System/Library/Printers/Libraries/PrintJobMgr/Contents/MacOS/PrintJobMgr failed HP printer problem after upgrade!  Any fix?

  • System Preferences Pops Up