Hi,
We transported a new release strategy to production
The new POs created are catching the rel strat B if they meet criteria
But some of the existing POs also meet the criteria for B and they should also take up this new release strategy
We cannot change the POs in ME22N, busines refuses to make any change to POs
How can we apply our new rel strategy to these POs ? has the SAP provided any standard function module to report?
thank you
B
thankyou for the replies.
finally we got minor price change done manually in all the POs to get the new rel strategy on them
Open POs , no change done - Did not pick release strategy (then it was no problem at the first place)
Open POs , change done in price - picked the new release strategy
Open POs , no change done but click on 'check' button in change mode - Could not test this one bcoz all POs are now converted. But I put break point in save user exit (which also plays part in determining the new release strategy) it did not stop at the break point and I gave message 'No data changed' so I think this action will not redetermine release strategy. It was very useful if it did though.
thank you.
Similar Messages
-
How/where to look PR release strategy to a profile
How/where to look PR release strategy to a profile?
I am not sure what you mean by profile?
A release strategy contains different elements
Characteristics
Class
Release group
Release code
Release indicator
Rlelease prerequisite
The release strategy for PR is set up in customising
OLME->Purchase requisition->Release procedure->set up procedure
Kind regards
Lorraine -
How to check the PR release Strategy change date?
hi,
how to check when the PR Release Strategy chagned by someone ...?
Regs,
S J SolankiHi
You can directly go into the Purcahse order & check for the Heder changes which will give the Changed Date
If you need to use two table to find out the date when the Strategy was changed.
Use Table CDHDR & CDPOS. Object key is the POurcahse order number
Thanks & regards
Kishore -
How to activate a new release Strategy Of PR without deleting the previous one?
Dear All,
1=I have a release strategy in purchase requisition which is without classification and active in system.
2= Now i configured a New Release Strategy for Purchase requisition which is with classification
My question is i want to activate the New one with classification in System without deleting the previous one.
Should it possible? and How?
Ritesh.Dear Dev,
My old release strategy at item level.
But the New one is at header Level.
But the previous one showing the release Indicator.
But when i delete the old configuration the old release indicator vanishes.
But the thing is in Pr with out classification we have same Pr doc.Type
But in New Configuration We want to at header level and with same doc type.
so without deleting the old one if i activate the New Strategy whether the system allow me
to see the New Release Indicator?
As My testing when i deleted the old one the Old indicator in Line item Level vanishes. -
Release strategy affecting old POs
Hi Experts,
When we tried to cancel the material document by tcode MBST , we got the error message u201C Purchasing document not yet releasedu201D
This PO and related GRs were created before we implemented PO release functionality. Even then, the system looks for PO release while reversing the old GR documents.
If we release this PO now, it will go to top management level for further approval.
Please advice whether we can process OLD POs without effecting releasing procedure
Many thanks,thankyou for the replies.
finally we got minor price change done manually in all the POs to get the new rel strategy on them
Open POs , no change done - Did not pick release strategy (then it was no problem at the first place)
Open POs , change done in price - picked the new release strategy
Open POs , no change done but click on 'check' button in change mode - Could not test this one bcoz all POs are now converted. But I put break point in save user exit (which also plays part in determining the new release strategy) it did not stop at the break point and I gave message 'No data changed' so I think this action will not redetermine release strategy. It was very useful if it did though.
thank you. -
How generate transfer order for release strategy setting
hi expert,
I change the value for one release stragegy-> Classification -> Characteristic (GNETW) amount through t-code SPRO, but i can't get the transfer order for this change? Could you please suggest how to get a transfer order for this change?
thanksi also can update the characteristic through CL20N. My question here, are the two places have the same effert?
Cheers
Have a Merry X'mas! -
Transportation of release strategy
Hi guys,
We heard that in ECC 6.0, we can transport release strategy for PRs and POs along with characteristics and classes. I have the following doubts on this
1) Can we transport the values assigned in the strategies also with this functionality ?
2) From MM side can we configure the strategies in the normal way i.e. creating characteristics, creating classes, creating release groups, creating release indicators, configuring release strategies (or) we need to follow any other procedure for transporting the strategies
Any suggestions on thisHi
I dont think this functionality exits of transporting the charcterisitcs & classes.
In ECC 6.0 also this functionality does not exist as per my knowledge.
Jurgen Thank you for the SAP note
Thanks & Regards
Kishore -
Transport of Release Strategy Classification
Hi Experts,
Is there any way to transport Release Strategy Classifications.
Regards,
AKSYou cannot transport them (Class and characteristics) . But There is a way to send them accross systems by ALE . ref SAP link http://help.sap.com/erp2005_ehp_04/helpdata/EN/24/903b39878f4205e10000000a114084/frameset.htm . You will need help of an Abaper who has worked on ALE .
If the data isnt large, its safest to manually create class and chars and assign in CL24N . -
Release strategy and code authorizations
Hi,
We need to create a new release strategy for PO. After setting strategy, we are assigning existing release codes A1 and A2 to strategy. The same release code is also used in existing release strategy.
Now, will this create any authorization issue if we assign same release codes to different strategies, and different users in user roles.
Thanks
AlexHi,
I am confused with your requirement. When you have a business requirement to control the release, may be a new department created or new character value requires for adding to release process.
Option-1:--- >When you decided to create new release strategy, you should have gone for creating new release codes & design your release process with new release strategy with new release codes. Do not use same release codes, use different release codes for new release strategy which will be easy to control for authorization based on respective users.
Option-2:--- > When you added a new release characteristic to release class based on requirement, then check assignment of release group to release class ( just make change & TR need to be transported),release strategy design which trigger on how release is to be affected & which manner with a logic. Also check the new value you are entering with your release class, release group & release strategy in Cl20N/CL24N t.codes. Also check during creation of new release characteristic, you have values with correct field name.
Regards,
Biju K -
Contract & PO Release Strategy
Hi All,
We are in the process of designing the release strategy for contract and PO. I would like to know whether we can have the different release conditions for contract and different release conditions for PO. For example.
The release conditions for Contract required are
1)Porg
2)Pgroup
3) Value
Also, for quantity contract how can we make the release strategy trigger based on value.
The release conditions for PO required are
1)Porg
2)Pgroup
3)Material Group
4)Value
The release strategy is not getting determined if we create po with two line items which belongs to two different material group. Is there any way out to solve this issue?
Request your help.
Regards,
KannanHi Kannan
Yes your requirement is possible...
While creating Charectristics in CT04 for External Purchase Documents...Create one more Value for your Document Category...ie) Table as :CEKKO and Field as BSTYP and choose the Purchase Doc. Category values K and F.
Then create Charecteris for CEKKO - EKORG, CEKKO - EKGRP and CEKKO - GNETW, CEKKO- MATKL... and assign these all 4 Chareteristices in your release class.
And Configure your release statergy according to your requirement...
Reward if useful
Regards
S.Baskaran -
Release strategy for Release POs
Hi Every one,
We have a requirement.
A contract is created and approved as per the regular strategy.
The releases (POs) are created against it and sent directly to the vendor.
As the Contract is already approved, standard SAP does not apply the release strategy for the POs created for the contract.
But the business wants the PO releases too to follow the release strategy.
Can you please look in to this and let me what changes we need to make this happen.
Regards
PavanAs the Contract is already approved, standard SAP does not apply the release strategy for the POs created for the contract
This statement is not correct, it's upto you to use or Not to use Release Process for release Orders (PO) created w.r.to Contract.
As the table & fields are Common for both Contract & PO release ..you need to choose the PO relevant fields & values in the Release Strategy..
So that the Release Process is applicable to PO's created w.r.to Contract also..
For ex: if you use the field purchase Doc category as a Character in the Release , it differentiates whether it is PO or Contract..
So that you can define different Release Strategy for PO & Contract
Or if you maintain the Doc type of PO in the Contract Release Strategy in CL20N / CL24N trxn code..
then the release strategy applies to PO also.. -
Wrong Release strategy in purchase order
Hi,
I have a specific purchase order with wrong release strategy.
I had been creating others documents with the same total value and the release strategy work correctly.
The release strategy configuration are right.
How I can correct the release strategy in a specific document?
Thanks.
Best Regards.Hi,
The release strtegy is basically conssitss of Different type of characters.
What characters you are highlighting plays in release strategy.
First you comapre the characters you mentioned in two purchase orders,
eg: p.org, Pur Grp, Value,------
o to bith release strategies and compre the things or characters you mentioned Release strategy and found wher you missed to get the required Strategy.
SPRO>>MM>>Purchase order>>Release Procedure for Purchase Orders>>Define Release Procedure for Purchase Orders>>Click on release strategies
Select your release strategy and go to Classification , here you chck the parameters in both release strategies and compare with your purchase orders.
Regards,
Andra. -
Dear All,
Do you know how to use workflow in Release Strategy? I have used the standard workflow (1) in order when every document is released an e-mail to be sent to the next releaser. I maintained also the users at the "workflow". Can you please specify some settings??
thanxhi,
You shd check, it could be very usefull for you....check in the tree structure as per the document:
[WORKFLOW SETUP|http://help.sap.com/erp2005_ehp_04/helpdata/EN/6f/9eeb85cd6b11d1ad77080009d2232d/frameset.htm]
Regards
Priyanka.P -
BapiCreateFromData Release Strategy
How can I set the Release Strategy in the Purchase Requisition? I'm creating a Purchase Requisition using the Bapi BapiCreateFromData from the business object Purchase Requisition, but there's no such parameter to set the Release Strategy as far as I can see.
check there BAPI to set
BAPI_REQUISITION_RELEASE
BAPI_REQUISITION_RELEASE_GEN
for more info just go thru documentations of that BAPI.
It comes from Confirg , u cannt define ur own strategies while creating the PR .
check in SPRO----> MM---> Purchasing ---> PR---> release procedure.
Regards
Prabhu
Message was edited by: Prabhu Peram -
Redetermine release strategy for purchasing requisitions
Hi Guys,
How can I redetermine the release strategy for purchasing requisions when changes on the costcenter (EBKN-KOSTL) are done -
I know that it will be redermined when I add the costcenter as charateristics in customizing for release strategy but thats not an option
I also tried to add coding in userexit for changing the communication strategy (Include ZXM06U13) but this exit doesn't provide information of the document number and position (EBAN, EBKN ..) so I can't find out if changes have been made
I spend several hours trying to find solutions for this issue but no working results so far ..
I hope you can help me on that
TIA
ManuelHi,
Note that EBKN will have entries corresponding to a PR only when it is
saved or checked, so KOSTL will not have any values for a PR which is under
creation. You should always use fields from structure CEBAN while
creating characteristics for Requisition release procedure as it
contains most of the relevant data about a PR under creation/change.
I would advice you to check the note 365604.
Please also check the changeability indicator in the customizing:
transaction OLME -> Purchase Requisitions -> Release Procedure -> Procedure with Classification -> Set Up Procedure with Classification -> Release indicator -> check the detail screen for settings.
Please check additionally the possible values for your characteristic cost centre (transaction CT04).
Regards,
Edit
Maybe you are looking for
-
I did a force close on Safari and after rebooting my macbook pro, i no longer see the Safari icon on the dock. How do i get i back?
-
My serial number is not accepted when upgrading
Came into this late. I am trying install the CS6 upgrade we were offered when we bought CS 5.5. Now the 5.5 I am upgrading was on an upsell path from CS2. My problem is it will not accept the same serial I used to upgrade to 5.5 - do I have to uninst
-
Ios 7.1.1 update!!
I updated my iPhone 4s to IOS 7.1.1 at work and now I cannot turn my phone on unless it is connected to iTunes....but I can't!! Is there any way I can get access to my phone please?? I always do the updates with everything automatically backed up to
-
When firefox opens, it will not let me search, or check emails
When I start Mozilla Firefox, it will not let me check my emails, I cannot search, or any other items.
-
Hi, We are planning to use weblogic portal 8.1 beta version. We have various user groups exist in our system (physician ,caregiver....). We want to have different home page layout for these groups . For example for physician, the home page may be of