How to assign operation in Receipe

Hai gurus,
I had created a Material/BOM and a Resource.
when I assigned the Resource in the Recipe using T.C = C201 , operations and activities could not be
assigned .
what could be the reason , waiting for the positive reply.
Regards,
sekar chand

Hi Sekar,
Eg opn 10 will be predecessor and the opn 20 for which the phase key is active ,
which become the super ordinate operation .
Dear such predecessor and successor relation can be maintain at phase levels only and not at
operation level.In Master Recipe Operation are nothing but just a title of some work which is going to
carried out on certain resource.So it is just a number only.Key role is carried by phases which you have
to confirm later during process order processing.
Regards,
Dhaval

Similar Messages

  • How to integrate operating charts of account to country and group coa

    Hi Sap gurus,
    How to integrate operating chart of account to country and group chart of account
    Regards,
    Rajesh

    First create the country chart in OB13 and assign the same to OB62.
    Then for each operational chart of account, enter the country chart of account in FS00 and this will be captured in field Alternate account number.
    The relationship between operational to country chart of a/c is 1:1.

  • How to map operation subcontracting in a process order.

    Dear Gurus,
    How to map operation subcontracting in a process order.
    there are five operations in a process after three operations the material is send to a subcontract for further processing(i.e the fourth) then it comes to the plant and the fifth operations completed
    How can i map this process .
    Thanking you in advance
    Regards
    Ram

    Hi,
    have you tried external operations in  receipe.  There you need to maintain all the procurement realted data for that particular operations that is done outside,  and system creates PR for every process order that you release.  However the material goes and comes in without any material number  (as WIP).
    If you want to have more control,  create a part number before SC operations  and afer SCoperations   and then use subcontracting process in procurement. 
    The need determines which option you can go with.
    cheers
    Rav

  • How to assign  PRT in routing

    hi,
       please tell me how to assign  PRT in routing.
            Thanks
             Parag

    hi friend,
      for assigning the PRTs in routing go through following ways:-
    1. go in TC  CF01
    2. enter PRT (spanner.hammer,document,etc (only one)
    3.enter
    4.save the settings
    5.go in routing CA01.
    6. click on PRT ( first select the operation to which the PRT is to be assign)
    7. click on OTHER
    8. fill the requirements
    9.enter and save.
    hope this solution will solved your problem,
    thanks and regards,
    sachin.

  • How to lock Operational budget

    Dear all,
    I want to know how to lock operational budget in Project System?
    Thanks,
    Nelmaz

    Hi Nelmaz,
    You must have created at least one overall budget, or carried forward an existing budget for locking it. This overall budget is automatically assigned the budget status Proposed.
    You can create and change the budget hierarchy, and assign budgets to budget structure elements only if the budget status is Proposed. For this reason, always remember that, once you change the status, you will not be able to make any further changes to the budget hierarchy or the budgets of the budget structure elements.
    Your overall budget must be consistent - otherwise, you will not be able to change the budget status. This is because the SAP System performs a consistency check before the budget status is changed.
    Procedure
    Choose Human resources->Personnel management->HR funds and position management->Overall budget->Change budget status.
    The Change Budget Status screen appears.
    Select the tab page with the budget structure element type that you require.
    Select a budget structure element, and specify the appropriate financial year.
    To display the name of the budget structure element, choose .
    Enter the new budget status in the Change budget status box.
    The system proposes the next logical budget status.
    To have the system check the overall budget to make sure that it does not contain any inconsistencies. If the system detects any inconsistencies, these are displayed in an error log.
    You will not be able to change the budget status until you have rectified all the inconsistencies contained in the error log.If the system does not detect any inconsistencies, choose  Change status.This changes the budget status.Choose the appropriate stsus for locking it.
    Hope this helps. Please assign points.
    Rgds
    Manish

  • Compound assignment operator

    i've searched previous posts about assignments but did not find answer for my question...
    this is taken from JLS...
    on Compound Assignment Operator
    ========
    First, the left-hand operand is evaluated to produce a variable. If this evaluation completes abruptly, then the assignment expression completes abruptly for the same reason; the right-hand operand is not evaluated and no assignment occurs
    ========
    could anyone kindly show an example of this one?
    thanks..

    double[] vector = new double[3];
    // evaluating vector[-1] completes abruptly so method won't get called
    vector[-1] *= method(); thanks. got it.
    how about if the left-hand operand is not an array?

  • How to link operative chart of a/c, group chart of a/c to country specific

    how we link operative chart of accounts,group chart of accounts to country specific chart of accounts.
    how to maintain account groups and accounts to get consolidated report.

    Group chart of account is used for reporting purpose only.
    business senario
    your organization is spread into different countries where by they are legally bound to submitt account at a very detailed level but in other country it may be at a different pattern. what you can do is assign different operational chart of account to each company code (legal requirement) and assign all of those operational chart of accounts to a group chart of account i.e how your organization wants to see the accounts. by doing this you can have the report the way you want them to be regardless what operational chart of account the company code is using
    example
    your group company want to see salary at   A01101 Employee related expenses
    in Asian specific breakup is to be made at 11000 salary
                                                                  12000 allowances
    in other countries detail is to be given at 11001 Salary officeres
                                                               11002 Salary Staff
    in this case you can create 2 different operational chart of accounts for asia and other countries and than assign the same operational chart of account to your main chart of account
    remember the group chart of account has to be created as normal chart of accounts
    than assign each GL code to group account no
    as far as the alternative no is concerned they can only be used for reporting purpose and alternate no helps the user to find the new GL code

  • How to confirm operation wise confirmation.

    Hi,
       please tell me how to confirm operation wise confirmation in details.
           Thanks
            parag

    Hi Parag,
    Confirmation against a production order can be done in 2 ways :
    1. Confirmation against each operation of an Order can be done  in Tcode : CO11 /CO11N
    2. Order Confirmation can be done in Tcode : CO15.
    My understanding about your problem is you want to confirm operation wise and the procedure for the same is goto Tcode : CO11N and enter the production order number and Operation number say 0010 and enter the Yield/ Scrap qty and save it. If there are any components assigned to operation 0010 as back flush in routing / order, then system will consume those bom items with movement type 261. You can check the components which are assigned to this operation with backflush in teh goods movement Tab screen in Tcode : CO11N itself.
    Next Enter the Prod order number and the next operation number say 0020 and enter the same yield qty as operation 0010  or different qty and save it. If any back flush items are assigned to this operation then on saving system does goods issue (with movt type 261) for those items.
    After saving you can check the goods movement in the prodution order Tcode : CO03. Goto document goods movement s and chk the same. For showing this the order type dependent parameters should be configured for the same.

  • Left side of assignment operator must be variable or property

    I Need Help!!!
    How do I prevent getting the message "Left side of assignment
    operator must be variable or property."
    Im trying to use 'onRelease' on the instance named "Item1"
    I have a variable named "sRange"
    sRange+Item1.onRelease=function(){

    Sry I didnt mean to send it through
    I meant to have it like this
    var sRange:String = "Zodiac";
    this.attachMovie("mcProducts","Zodiac",1);
    this.attachMovie("mcProducts","GTop",2);
    this.attachMovie("mcProducts","Triple",3);
    this.attachMovie("mcProducts","Custom",4);
    this.attachMovie("mcProducts","Special",5);
    sRange+ ".Item1".onRelease=function(){
    trace(sRange + "Item1 Selected");
    // I get this error:
    //**Error** Scene=Scene 1, layer=Item12, frame=1:Line 23:
    Left side of assignment operator must be variable or property.
    // sRange+ ".Item1".onRelease=function(){

  • How to assign numbers in external number range?

    Dear experts,
    Since NUMBER_GET_NEXT can only be used to assign numbers in internal number range, how to assign numbers in external number range?
    So far, I only know the NUMBER_CHECK function module to deal with external number ranges and it only check a number whether it lies in any external number range or not, but it doesn't update any number range status. What I need is a function module like NUMBER_GET_NEXT that supports external number range.
    Thanks in advance.
    Regards,
    Haris
    Edited by: harissahlan on Oct 19, 2011 5:44 AM

    With external number range, there is no updating of the number range objectt. The only thing you need to know is whether the number you wish to assign is allowed according to the external number range. And also check if there isn't already an object/document with the same number in the database.

  • How to assign a task to Reuestor in OIM 11g

    How to assign a task to a requestor (who has raised a request for other user).
    I created a Task assignment adapter and mapped variable in Process definition as
    Map To: Request Info
    Qualifier: Requester User Login
    Still it returns null and default task is assigning to System adminstrator. I am pasting the Task Assignment code here. User key value coming as Null.
    Do you have any idea what is the exact mapping required in Process definition.?? Pls note: I am using OIM version 11.1.1.5.0
    public class TaskAssignmentToUserAdapter {
         Logger logger = Logger.getLogger("COM.IDM.PROV.COMMON.ADAPTERS");
         public String getTargetType(String targetType){
              return targetType;
         public String assignTaskToUser(String userKey,tcDataProvider dataProvider ){
              System.out.println("The user key value:" +userKey);
              return userKey;
         }

    Not sure what sample code I can give you, but you need to do a query in your adapter like:
    select REQUEST_KEY from OIU where ORC_KEY='?'
    Here ORC_KEY should be mapped to the process instance key.
    Once you have the Request key, you can use RequestServcie APIs to get the requester information. http://docs.oracle.com/cd/E14571_01/apirefs.1111/e17334/oracle/iam/request/api/RequestService.html#getBasicRequestData_java_lang_String_
    Or if you don't care then get the requester key from the request table. Thus you can have the final query as:
    select USR_LOGIN from USR where USR_KEY=(select REQUESTER_KEY from REQUEST where REQUEST_KEY = (select REQUEST_KEY from OIU where ORC_KEY='?'))
    HTH,
    BB

  • How to assign an order to a GL account

    Hi all,
    Can anybody please let me know how to assign an order to the GL account?
    Thanks,
    S.Sumana.

    Hi,
    There is no such an assignment. When you post a document, you define your G/L accounts and cost objects. If you want to make a default internal order for certain cost element, you can go to KA02 or OKB9 and define the defaults there.
    Regards,
    Eli

  • How to Assign a Constant Value to a Dim. Member when pulling Master Data?

    BPC Gurus:
    I am trying load Vendor and Customer Master data into BPC dimension.  My Dimesnion has memebrs: ID, EVDESCRIPTION, PARENTH1, TYPE.  I have successfully pulled the ID and the description from 0CUSTOMER and 0VENDOR.  However, I
    need to have a ttext value for 'PARENTH1' and 'TYPE'.  For Customers, I want to add a FIXED value "'CUSTOMER' for every
    Customer ID pulled in and also for "TYPE", I want a value of "CUSTOMER".  When I maintainthe Dimension, I want to see
    th followingvalues:
    ID                          EVDESCRIPTION                                   PARENTH1                         TYPE
    0000000001         WALMART                                            CUSTOMER                        CUSTOMER
    0000000002          TARGET                                               CUSTOMER                        CUSTOMER
    and so ON
    Since we have Vendor Numbers in the same Diemsnion, when I pull Vendors, I need to have similar values as:
    ID                          EVDESCRIPTION                                   PARENTH1                         TYPE
    0000005050         ABC Supply Inc.                                   VENDOR                            VENDOR
    0000005051         BASF                                                    VENDOR                            VEDOR
    and so ON
    How can assign a Fixed value to the member Propert?  Can I achieve it in Conversion file....? 
    ( My atempts failed...).
    Any suggestion recommendation would be gretaly appreciated.
    Munna.

    Hi,
    For adding fixed values to the properties, you can use the transformation file. In the mapping section, you can specify a constant value. This value will be written to properties of all the members while importing master data. However, for parenth, its a bit different. First thing is that, you need to have a member called CUSTOMER, then only you can have CUSTOMER in the parenth column. Even if you add it and use the mapping section for this purpose, then it will write CUSTOMER to parenth for all the members (even to CUSTOMER member). And this will be wrong. So, you will need to write it manually.
    Hope you got the idea.

  • How to assigne multiple value in key of read table

    Hi gurus,
    I want read table xxxx with key field1 = ' xxx' or field1 = 'yyy'.
    how to assign multiple value as key for the same field while reading internal table.
    Regards
    sagar

    Hi ,
    You can loop the internal table like
    loop at  <table xxxx> where field1 = ' xxx' or field1 = 'yyy'
    or you can write two read statements to read the internal table in wrk area.
    read table   <table xxxx> with key field1 = ' xxx'.
    if sy-subrc <>0
    read table   <table xxxx> with key field1 = 'yyy'.
    if sy-subrc = 0
    endif.
    else.
    do your data processing.
    endif.
    Thans.

  • How to assign a variable value to crystal report viewer formula with CR2008

    Hi ,
    I am using crystal reports 2008 and i am not able to find how to assign  variable value  to crystal report viewer formula.
    In CR 8.5 , i used to have crystalreport1.Formulas(0) = variable1
                                             crystalreport1.Formulas(1) = variable2
    but, i don't find similar kind  in crystal reports 2008.
    How can i achieve the same functionality using crystal reports 2008.
    Thanks in Advance
    Regards,
    Ramnath

    Hi,
    Can i anyone help me out with this.
    I am generating crystal reports in vb6 using CR 8.5 and vb6 and below is the code snippet for the same
    CrystalReport1.Formulas(0) = "PrintTitle= '" & strMyTitle & "'"
    CrystalReport1.Formulas(1) = "FromDate= '" & MskFromDate.Text & "'"
    CrystalReport1.Formulas(2) = "ToDate= '" & MskToDate.Text & "'"
    Please let me know how the same functionality can be achieved in VB.Net using Crsytal reports 2008
    Any code snippet would be of great Help.
    Thanks in Adnvance.
    Ramnath

Maybe you are looking for