How to assign work center to class

hi any one tell me how to assign w c to class

Mukesh,
In the Workcenter Create(CR01) or Change mode (CR02), in the basic data tab down you will find a function button "Classification" hit this button, system will prompt for Class assignment.
Class Type for work center is 019.
Regards,
Prasobh

Similar Messages

  • How to assign work centre in OM

    Hi,
    In organizational structure how to assign work centre.
    it is necessary to assign cost centre to org structure.how ?
    President has to be given personnel no.?
    if employee is reporting to two superiors of different depts or different regions ,how the employee should be placed i.e dual reporting?
    Urgently reply.
    Thks
    Archana

    Hi Archana,
    1. To assign Work Center the T-code is PO01.
    2. Yes. In SAP HR every employee has to be given Personnel Number irrespective of their designations.
    3. No its not possible according to me (Gurus Pls correct me too if I am wrong)
    Hope above answers are helpful to you.
    Regards
    Pavani
    Remainder: Points to be given on answered.

  • How to assign cost center to cost element.

    Hello,
    Can any one please guide how to assign cost center to cost element.
    Thanks in Advance..
    Have a nice day...

    Hi ,
    There are 3 ways :
    1. Default the cost center in cost element - Ka02 - account assingment tab enter cost center .
    2. Use OKB9 for diffrent combinations as per your requirement .
    3. Use GGB1 for substituting the cost center based on some conditions .
    Regards ,
    Dewang T.

  • How to construct Work center Hirerchy in Production Planning.

    Hi Experts,
    How to construct Work center Hirerchy in Production Planning.
    Thanks in advance.

    Amit,
    I guess you must have overlooked the rules of engagement for this forum. It is customary for questioners to first perform basic research before posting any questions.
    First, search in the forums (search box in the upper right of this page). FYI The question you raised has been covered dozens of times.
    Next, check online help. This help is generic, and not generally specific to a particular industry:
    http://help.sap.com
    Work Center Hierarchy:
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/b1/c037ae439a11d189410000e829fbbd/frameset.htm
    Next, look for generic solutions solutions in Best Practices. Basic index at
    http://help.sap.com/saap/sap_bp/BL_IN/html/Content_Library_BL_EN_IN.htm
    Next look for industry specific solutions in Best Practices:
    http://help.sap.com/content/bestpractices/industry/index.htm
    If you are experiencing a problem, or you believe that SAP is not working per the online help, you can then search OSS notes.
    http://service.sap.com/notes
    Next search in one of the standard online search engines (such as Google).
    Only after you have performed all of these tasks, and studied all of the online help that is supplied for free by SAP, should you then consider posting a question to these forums.
    If you are unwilling or unable to perform such research, then you should probably engage a consultant to assist you. All consultants use searches to assist them in designing and executing solutions. If you intend to one day become a consultant, you would be wise to cultivate this skill.
    Best Regards & Good luck,
    DB49

  • PM-HR assigning work center to employee changes position

    Dear all,
       I have an urgent issue, and I have absolutelly no idea how to resolve it, because it takes place in the module PM, and I dont know anything about it.
       The problem is that when users go to tcode IR02 and make an asignament of a employee to a work center the system also changes the position of the employee for the work center (I mean, SAP in the back ground goes to Infotype 0001 of the employee and changes the position of the employee).
       Is there a way of avoiding it? I think it is due to a bad customizing in the integration PM-HR, but Im not sure at all.
    PS: sorry if this is the wrong forum to post it, I didnt find a PM forum, If you know a forum that fixes better please let me know!!!
    Any advice will be GREATLY appreciated and rewarded
    Thanks a lot in advance

    Hello Wayne,
    I am not sure how you 'assign' an SFC to an operator (User). Anyway, you may use Certification functionality of ME to 'certify' some particular Users on Operations/Resources etc. KBA #1618564 may be helpful for you.
    Regards,
    Alex.

  • How to assign profit center to automatically generated line items

    Hi, Experts,
                       My problem is that I want system automatically assign profit center to automatically generated line items.
                       Eg.
                             (Vat is @ 10%)
                                        Transaction                             Amount                            Profit Center                    
                              Purchase                   Dr                    Rs.1000/-                           XYZ
                              Vat                             Dr                    Rs.100/-
                              To Vendor                  Cr                                      Rs 1100/-
    Here I have to assign Profit Center in VAT G/L by double clicking on it, in reality, system should automatically assign profit center to VAT G/L same as to purchase, because this vat amount belongs to same purchase G/L.
    Kindly help me
    Thanks in advance

    Hi,
    1. In which SAP version you are working ? Are you using SAP 4.7 or ECC 6.0. ?
    2. If you are in ECC 6.0, have you activated New G/L ?
    3. Segment reporting is happening with Profit Center is one of the scenario ?
    Auto updation of Profit Center will depend upon these conditions. Accordingly one can provide you the solution.
    Regards,
    Shridhar

  • How to assign profit center to Inventory accounts

    Hi
    When ever delivery happens cogs will be debited and inventory will be credited,in that case where i need to assign profit center automatically flown to all inventory accounts,at this movement it is posting to dummy profit center,can any one tell me where to assign these profit centers,i checked OKB9 and inventory accounts also not cost elements,so is there any idea how to solve this problem.
    Thanks
    Lily

    Hi Lily,
    Referring to this old mail exchange, please let me know if you have got any solution.
    I need to split the accounting entry in MB1A (QA to Unrestricted movement). In the entry Invenroty Dr ,COGS Credit , we need to spit the credit into two GL a/cs.
    Please let me know.
    Thanks and Regards,
    Hemant

  • How to Assign Profit Center to a Sales district

    Hi,
    How to Assign a Profit Center to a Sales District thru standard configuration.

    Have you checked in IMG path and observed where we assign Profit Center?  Please do some analysis before posting here.
    G. Lakshmipathi

  • How to manage work center in Production order

    Hi,
    I am producing a material having one operation (suppose cutting), which I have mentioned in the routing. I have also mentioned the work center in routing on which cutting operation will be performed. When I make the Production order of 1000 pcs there comes only one work center. But practically, they are producing these 1000 pcs on two different work centers ( 500 on one and 500 on second). How to manage this in SAP.
    Kindly help me.
    Thanks and Regards,
    Yogesh Singla

    Dear ,
    What is the individual capacacity of the Work Centre -CR02-Header -No of Individual Capacity ?
    I think you must be using similar kind of work centre of 2 no 1000 pc .Now , when you are creating routing for this , you should hit Required Spilliting in Routing Operation -Select Operation line item  and then Double click -Select Spilitting and enter splitting No 2.
    At the same time in CR02-Work Center -Capacity Tab -Hit the Header -In the Bottom of the Detail Capacity Header -Avaialabile Capacity -Include 2 as Number of Inidvidaul Capacity  and SAVE.
    Now based on thr required spilittinga and invidual caapcity , it will consider the Work Centre Load .
    Other wise , you can enter one more operation line in routing with similar Labor hrs , work center and control key in routung for production of 1000 pc  .
    Hope it clarifies
    Regards
    JH

  • How to find work center in REM from the material Documnet number

    Hi ,
    We want to develop a Z report for the repetitive manufacturing cycle. Please let me know the logic how to get the work center from the material document that is posted after backflushing MFBF tranaction.
    I will elaborate it little further. From the material document number that is genearted out of confirmation from that document no how can I find the work center so that we can so show the throughput of each work center.
    Please avoid standard transaction of MCRP etc.
    Thanks & regards

    Dear Kumar,
    I'm not sure whether you can get the work center details,but you can get the production version number from you can get the
    rate routing details.
    Give a try by passing the document no to table BLPP and get the document log number and pass on the document log number to
    table BLPK,by which you can identify the production version.
    Also give a try using this FM,RM_DISPLAY_AFRU_REM,I guess you can get the exact work center details from here.
    check and revert back.
    Regards
    Mangalraj.S

  • How to get work center

    Hi All,
    I am creating r actual and planned renue report for service orders ( CS ) .
    Problem :
    I have a service order number , But i am  unable get the workcenter of the order.
    Please guide me how to get the workcenter based on service order.
    Thanks in advance
    Regards
    Sudhakar

    Dear Sudhakar,
    Try using this FM: CR_WORKSTATION_READ
    Field: GEWRK (Object ID of the Work Center)
    View: VIAUFKST
    Regards
    s@k
    Edited by: siemens.a.k on Feb 11, 2010 10:18 AM

  • CNR2 HR Assignment - Work Center Description

    Hello,
    We use CNR2 to maintain work centers.  In the "Change Work Center: Basic Data" section I am able to change the description of the work center.  I then click the 'HR Assignment' button at the top of the screen and notice that the work center description located above where the 'persons' are assigned does not get updated.  Is there a separate location where the work center description must be maintained? 
    Thanks,
    Jordan

    I figured it out.  Transaction code PO01 can be used to update the work center description for the HR assignment.
    Thanks,
    Jordan

  • Assigning Work Center to Operatios?

    HI,
    I Create two operators, named op1 and op2,
    and they are in the same Workcenter.
    I assign a SFC named sfc001  to op1,  But if I login use op2 account, op2 can to start and complete with sfc001?
    is it normal condition? or someone have another solution to setting their's permission ?
    THANKS,
    WAYNE
    Edited by: Sergiy Katerinich on Dec 15, 2011 3:12 PM

    Hello Wayne,
    I am not sure how you 'assign' an SFC to an operator (User). Anyway, you may use Certification functionality of ME to 'certify' some particular Users on Operations/Resources etc. KBA #1618564 may be helpful for you.
    Regards,
    Alex.

  • How to retrieve work center from material document

    Hello,
    For a report I need to display all the backflushs for a work center. Therefore I read table MKPF and MSEG selection the correct mouvement code, and from here I need to find the production version in order to get the work center.
    However I can not find this information in MKPF or MSEG. Material document is associated to a CO Production order but field AFPO-VERID is empty.
    Can someone provide me the correct path to read table MKAL starting with MKPF/MSEG.
    SAP version is ECC6 and we run repetitive manufacturing.
    Thank you.

    Hi,
    The FM L_TO_CREATE_SINGLE or L_TO_CREATE_MULTIPLE could solve your problem.
    Hope it helps.
    Chang

  • Work center assignment HR - PS

    Hi everyone
    is there anything else to do to assign work center in HR except what I've already accomplished:
    1. work centers have been created in CR01and customized in OP42
    2. via T-Code PO01 I assigned a work center to a position (connection A!003).
    What else should be done? How can I see the work center in organizational plan (PPOSE) besides Detailed description of an object???
    Will PS team-members be able to observe my work center from HR in their T-Codes???
    Best regards,
    Eldar

    HI,
    you cannot see ur work center directly in the Org.Structure.Please use this report RHXSTR06 which will give the existing work centers that are assigned to ur Organization Unit.
    Thanks and Regards
    Swati

Maybe you are looking for

  • Creation of muliple schedule lines in CRM 5.0 Quotation

    Hello all, We are implementing CRM 5.0. In quotations, whenever I try to create more than one schedule line, I get an error saying that only one schedule line is allowed. However, I may have a scenario where customer says that out of total 100 tonnes

  • Forefront TMG disconnected a non-TCP connection

    Hi, I am getting the following error alerts in  TMG Forefront TMG disconnected a non-TCP connection from 192.168.0.1 because the connection limit for this IP address was exceeded. Larger custom connection limits should be configured for the IP addres

  • How to create groups.

    Hi I have an oracle apex workspace (htmldb.oracle.com) and when I click on admin Application Administration>Manage Application Express Users. I get all the options of creating devloper/group/end users. But if I do it on my local machine (Apex 2.2) I

  • Songs go missing and Error message when connecting?

    the songs on my nano go missing but the space is still used, and when i hook it up to my computer i get an error message saying that it cant read the ipod? what is this?

  • PVZ bis

    Hi, I apologize if the English isn't perfect. I've purchased the game "PLants vs. Zombies" last week. iTunes can't sync it to my iPhone (it's a no contract Canadian iPhone 4 with iOS 4.2). In Spanish: "La aplicación "PvZ" no se ha instalado en el iPh