How to avoid Cost error log  while confirming production order

Hi
I dont want to post actual activity cost via production order activity confirmation. But i want standard value keys for my production duration purpose. So,i defined activites(strd value key) in work center without assigning cost center to that work center. While i confirm system throws erro log as Actual cost calculation contain errors and allows me to confirm the activities. I am doing MB31 and all CO settlement activities also. But when i try to close the order it says error log exists,so closing of order is not possible. How to overcome this problem as i dont want to capture any cost of activites via production order,but i want confirmation only for production analysis.

Sudhar,
You can make the operation not relevant for Costing by using a Customized Control key which is not relevant for Costing or else in the operation details you need to leave the "Costing relevancy" field blank.
Regards,
Prasobh

Similar Messages

  • How to avoid actual cost error log while confirm production order activity

    Hi
    I dont want to post actual activity cost via production order activity confirmation. But i want standard value keys for my production duration purpose. So,i defined activites(strd value key) in work center without assigning cost center to that work center. While i confirm in CO11N, system throws erro log as Actual cost calculation contain errors and allows me to confirm the activities. I am doing MB31 and all CO settlement activities also. But when i try to close the order it says error log exists,so closing of order is not possible. How to overcome this problem as i dont want to capture any cost of activites via production order,but i want confirmation only for production analysis.

    Hi
    Issue is resolved thru PP forum. Thanks for ur reply.
    Solution lies in Control key of routing and BOM costing relevancy.

  • Error message while confirming production order.

    Hi Gurus,
    I would like to know if it is possible to get an error message when we try to confirm a production order if there is not a cost for each component.
    Please provide details if any.
    Thanks for your understanding.
    Naveen.A

    Hi,
    You can have setting for error message for incorrect costs in confirmation as below :
    Go to OPK4 ( Parameters for order confirmation) select plant & order type--> General individual entry ( tab)-> Error handling/logs
    Maintain tick in check box for Termination for Incorrect ActCosts.
    This will fulfill your requirement.
    Revert in case any doubt.
    Regards,
    Tejas
    Edited by: Tejas  Pujara on Apr 6, 2009 7:17 AM

  • Price error message while creating production order- Urgent

    In past i was getting warning message of 'No price could be determined for material/batch and Plant" message no CK 465 at the time of saving the production order after creation but now it has stopped even though there is no price in material amster.
    I changed the configuration to Error message (TC: OPR4_PPCO) and it works but why not for warning message?
    Thanks

    Please confirm where i should check for Activity price?
    But then why we are able to get error message.
    Reexplain:
    Creating a production order which do not have standard cost in material master.
    While saving, getting a error message'No price could be determined.......'
    Now changing the message to Warning through configuration using TC: OPR4_PPCO
    Now again creating the production order and saving
    Expectation to have same message as warning but not getting anything.
    Thanks
    Edited by: vineet garg on May 1, 2008 12:14 AM

  • Error message while creating production order with KMAT material strategy25

    Hi PP Gurus I am running variant configuration cycle...Strategy 25, Custermer Req KEK (KMAT Matrl)
    Sales order & MRP Picked the components correctly as per the dependencies
    written. So Planned order generated against sale order.
    When I tried to convert planned order to Production order...I am getting the
    below error message..
    Error Message:
    You cannot make an assignment to make-to-order stock Message no. CO684
    Diagnosis The component cannot be allocated to an individual stock because
    make-to-order production and engineer-to-order production cannot be executed
    with this order.
    A possible cause is that you are trying to create an order with reference to a
    sales-order/project, where an account assignment to a sales order/project is not
    allowed in the settlement profile that is assigned to the chosen order type.
    This is inconsistant.
    System response The following responses are possible:
    Order processing is cancelled.
    The system resets the special stock indicator back to the original value.
    Procedure Choose another order type.
    I used order type with SD1 as settelement profile.
    OVZG: default 046, settlement profile = SD1
    OPJH: Settlement profile = SD1
    Plz through some light on this if u have worked on Variant Configuration/MTO
    settlements.
    Question:
    1) Is creation of production order with KMAT material supported by SAP?
    2) If yes, why the above error occurs?
    Waiting for Ur reply
    With Best Regards

    Dear R.Brahmankar,
    I have check on the note, but it is not relevant to ecc6. The current system default setting is :
    Standrad setting for reqt class 046
    Special Stock E
    Acct Assgt Cat. M
    Valuation M
    Settlmt Profile SD1
    However if I change the Acct Assgt Cat. from M to E. It resolve the problem. I would like to know is this the right solution?
    Config in Acct Assgt M
    Consumption Posting = E
    Config in Acct Assgt E
    Consumption Posting = '  '
    In F1 key of Consumption Posting field it shown following:
    To flag the sales order item as cost- and revenue-carrying, enter an "E" (settlement via sales order).
    If you do not wish to flag the sales order item as cost- and revenue-carrying, do not enter anything.
    Dependencies
    If you are working with nonvaluated sales order stock, always flag the sales order item as cost- and revenue-carrying.
    If you are working with valuated sales order stock:
      In the case of complex make-to-order production, flag the sales order item as cost- and revenue-carrying
      In the case of sales-order-related mass production, do not flag the sales order item as cost- and revenue-carrying
    Should we change to E?
    Regards,
    Ong

  • Split of activities and quantity while confirming production order

    hi gurus,
    Our scenario is that suppose if we have to confirm 10 nos of a finished product.
    and 10 operations are there.
    here we have to confirm each no. for each operation. and quality checks are there for these operations .
    now the quality people has to confirm the quantities and production people has to confirm the timings of activities(like set up , machine and labour ) .
    i will be thank ful to you if some one helps me regarding this
    thanks in advance
    Kalyan

    Hi Kalyan,
    Do as below:
    In OPK4, do the following for your order type--
    1) On the second tab page (general individual entry), select 'partial confirmation' as the confirmation type.
    2) On the third tab page (operation indiv.  entry), tick 'propose' quantity and 'propose' activity.
    Now, go to OPK0. Here, either change in the existing active profile or create another profile and tick it as active. Then, inside the profile, do the following:
    1) On the first tab page (are selection), for the detail area 'activities' select "Activities: activity 1 - actitivity 6 (table control)
    2) On the second tab page (default), select 'partial confirmation' as the confirmation type. Also select 'immediate proposal' for quantities and services
    I am assuming that the production would carry out confirmation in CO11N.
    After doing this, whenever QM would do the confirmation of activities, then proportionately the activities would be confirmed. This would be partial confirmation. After this, production people would access CO11N and do final confirmation. At this time, enter anmy changes in the activity values. You will be able to see a table giving actual and planned values for activities. If there are no changes, then just post the final confirmation.
    Make sure that when QM confirms, it is a partial confirmation.
    Carry out the process now and tell me in case of any issues.
    Regards,
    Shrenik

  • HOW CAN I AVOID THIS ERROR MESAGE WHILE TRYING TO EXPORT AN IPHOTO SLIDESHOW:  The operation couldn't be completed. (OSStatus error -61.)

    HOW CAN I AVOID THIS ERROR MESAGE WHILE TRYING TO EXPORT AN IPHOTO SLIDESHOW:  The operation couldn’t be completed. (OSStatus error -61.)

    Hello,
    I believe the issue was the external HD I purchased was not formatted for Mac . . . once I took care of that - all went well!  The slide show transferred and the surprise 70th birthday party was a huge sucess.  Thank you everyone!

  • Update termination error "Enter WBS element" while confirming Tranfer Order

    Hi Gurus,
    I am getting an update termination "Enter WBS element" while confirming Transfer Order. One thing that i noticed is that this issue is occuring with line items that are having special stock indicator "K".
    Please let me know as to what could be root cause and how could this be avoided.
    Do let me know for any clarification.
    Regards,
    Trishul

    Any suggestions?
    Regards,
    Tanuj Parikh

  • How to fix itunes error 1611 while restoring ios 4.3.2 , and when i restore to 4.2.1 the can be ok.plz help me

    how to fix itunes error 1611 while restoring ios 4.3.2 , and when i restore to 4.2.1 the can be ok.plz help me

    have a look at this support article.

  • Sales Order Costing Error Log Display

    When I look at Sales Order costing thru VA03 or when I run the Multi-level BOM costing for sales order CK87_99 I can not display the costing error log.  I can generate the log thru VA02, but we need to limit the Sales Order change transaction to the Order Management group and did not want to give change order access to the product cost group. 
    Any options to get the costing error log from VA03?
    Thanks

    I cheeked OKY9 and the Update tab had the "Save Error Log" checked, but on the Misc tab the "Log Messages but do not save" on the error message field was selected.  When I changed the selection to "Log and Save Message" this corrected my problem.
    Your suggestion guided me in the right direction. Thanks,

  • Help, How to view the error log of oracle Job

    Hi all,
    I created a job in my database, which clears the archivelog. After the job is executed, it occurs error.Such as :
    RMAN清理归档日志 1 问题 2010-3-19 下午03时11分00秒 GMT+08:00 PTDB 数据库实例 SYSTEM RMAN 脚本
    How to view the error log of oracle Job?
    Thank you.
    Eric Zhou

    Hello,
    Besides some views (with the scheduler) that you can get on the link below:
    http://download-west.oracle.com/docs/cd/B28359_01/server.111/b28310/scheduse002.htm#CHDGIDFD
    You may use the LOG parameter with RMAN so as to generate a logfile on the server.
    Also from EM DBConsole (starting with 10g) you may have the RMAN Backup Report.
    Hope this help.
    Best regards,
    Jean-Valentin

  • How/ where to  check output type while saving sales order for confirmation

    Hi All,
    Could you anyone pls let me know How/ where to  check output type while saving sales order for confirmation.
    Present scenario : when the Sales Order is created the Order confirmation is sent irrespective of credit block of the sales order.
    Requirement : Order confirmation “ZA00” sent to the partner only for those Sales orders which does not have credit block and ZCLE sent to the partner if the order has credit block.
    Now i want to know where exactly to check the output types "ZA00" and 'ZCLE' based on the credit block to send the confirmation to partener.
    Quick help highly appreciated......
    Preetham

    Hi Santosh,
    Thanks for the info. But here in this case I have to send the confiramation based on credit limit check. If credit limit check exceeds "ZCLE' should go as confirmation else 'ZA00' should go as confirmation.
    Where can we check the credit limit whether it exceeded or not. My doubt is whether it is config issue or do we need to write code user exit or routine to send the specific output type for confirmation.
    Thanks & Regards,
    Preetham

  • Error while creating Production order without BOM

    Hi Guys,
    While creating production order without a BOM i am getting the following error in the error log.
    Error: BOM for material xxxxxx does not contain any valid items
    Message no. CO636
    Kindly help.
    Regards,
    Sid

    Dear customer,
    could you check in the master data screen of the order if one BOM has been selected?
    please coudl you check your customizing the following transactions:
    OPJM
    OPJI
    what do you have in 'BOM slection field' MRP4 view of the header material?
    Please check if with this info you can find the missing data to explode the BOM
    regards
    Maria

  • Error while releasing Production order

    Dear experts
    I am getting error "JV Object Type Is Required by JV Parameters for Company '1000'", message =  Message no. GJ118 while releasing Production order. Plz help me on this issue.

    Hi Harish,
    Please refer the below link, hope should be helpful
    Creating a Cost Center

  • I am trying to order a book, I keep getting the same error message," A network error occurred while processing your order, please check your network connection and try again"

    I am trying to order a book with iphoto, I keep getting the same error message.
    " A network error occurred while processing your order, please check your network connection and try again"
    I get the billing part up, it has even uploaded my jpegs but at the final process, I get the same message.
    I have ordered two books a few months ago without any problems.
    Now I keep getting the same message either half way into
    the order or at the final hurdle after the images have been uploaded.
    Any ideas?
    My shared Network has been fine and that does'nt seem an issue.
    Help.

    Try again in a couple of hours - sometimes it is a temp condition